PHASE ONE - RFIs Tracking Log 11.24.2021.pdf

PDF 70 KB Posted

Attached to
Y1DZ--FY22: Tier 1 (PROJ: 675-CSI-153) DB Viera MRI Replacement Site Prep
Solicitation number
36C24822R0041
Issued by

About this file

This document contains a request for information tracking log and related federal contract opportunity solicitation. The tracking log provides responses to questions from potential offerors regarding a design-build project for site preparation work associated with replacing a magnetic resonance imaging scanner at the Department of Veterans Affairs Viera Outpatient Clinic in Florida. The estimated value of the project is between $500,000 and $1,000,000. The solicitation seeks proposals for all design and construction services needed to complete the project within a 210-day period of performance. Offerors must be registered in the System for Award Management and certified as a Service-Disabled Veteran-Owned Small Business to be considered for the sole-source set-aside award. Environmental compliance and stewardship are also requirements. Proposals are due based on a two-phase design-build selection process outlined in the solicitation and Federal Acquisition Regulation.

View the file

Other files

File Type Posted
VIERA Asbestos Report 2016.pdf PDF
36C24822R0041 0001_1.docx DOCX document
ATTACHMENT C - Contract Progress Schedule.docx DOCX document
ATTACHMENT F - Past Performance Questionnaire.docx DOCX document
SOLICITATION 36C24822R0041.pdf PDF
ATTACHMENT D - EMR.pdf PDF
36C24822R0041_1.docx DOCX document
ATTACHMENT B - DBA WD FL20210001 10.29.2021.pdf PDF
ATTACHMENT E - Experience Information Sheet.pdf PDF
ATTACHMENT A - Viera MRI Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information (RFI) Tracking Log

Solicitation# 36C24822R0041 Project# 675-CSI-153

‘Design-Viera MRI Replacement Site Prep’ Phase One - Questions# 1-7

November 24, 2021

RFI Tracking Log – Amendment 0001

RFI

NBR. QUESTIONS & ANSWERS

SUBMITTED

BY

DATE

RECEIVE

D

1. It appears a new MRI will be replacing an existing one in an existing suite. Is the existing electrical and HVAC anticipated to be adequate for the new MRI (similar size) or is it anticipated that the new MRI will likely require more power and AC? This will be confirmed during design, but an estimated answer will help define MEP scope of work in the level of modification potentially required to the existing systems.

Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

It is anticipated the existing electrical and HVAC systems will require modifications and upgrades to meet manufacturer requirement.

2. Are A/E as-builts of this space available for review? Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

Yes, electrical, mechanical, fire protection and HVAC as-builts of MRI suite are available for review.

3. Is there any equipment (connection to ceiling above or weight based for existing floor confirmation) or associated work that would require a structural engineer?

Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

VA is not currently aware of facility loading changes associated with new MRI that would require the services of a structural engineer, however final determination is dependent upon approved designs.

4. Will a landscape architect be required based on landscape and fencing scope? Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

Offeror will be required to provide all professional A/E services as needed to support all aspects of work, including modification to signage, landscaping, irrigation, roadways, parking and fencing as determined by approved design.

Request for Information (RFI) Tracking Log

Solicitation# 36C24822R0041 Project# 675-CSI-153

‘Design-Viera MRI Replacement Site Prep’ Phase One - Questions# 1-7

November 24, 2021

RFI Tracking Log – Amendment 0001

5. Please provide the latest Asbestos survey for the area. Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

See attached Viera VA OPC Asbestos Survey Report 2016.

6. Please confirm if the superintendent can act as the SSHO or if a full time SSHO is necessary. Blue Cord Design & Construction, LLC

11/24/2021

VA

Response

Confirm.

7. Can the Superintendent, QC, and SSHO be covered by the same person? Contracting and Purchasing Solutions, Inc.

11/24/2021

VA

Response

Yes.

File details come from the government source that posted it. Updated .