Attachment E - BP#2 - Bid Schedule.pdf
PDF 232 KB Posted
- Solicitation number
- RFP DET 270000000026 1
- Issued by
- Wayne County, Michigan
About this file
Attachment E - BP#2 - Bid Schedule Summary
This is a Bid Schedule document for Pershing High School Bid Pack 2C in Michigan, detailing signage and final cleaning services. The bid schedule outlines line items for various signage and cleaning work required to complete the project. The document specifies quantities for each service category, establishing the scope of work that bidders must price and execute. The schedule serves as the pricing template through which qualified contractors will submit their cost proposals for labor, materials, and any associated expenses related to the signage installation and final cleaning requirements at the school facility.
The bid schedule functions as the primary pricing document for competitive bidding and establishes the structure by which all bids will be evaluated on a line-item basis. This format ensures consistency across all submitted bids and allows the awarding authority to compare proposals equitably. Bidders are required to complete the schedule with their proposed pricing for each specified line item, forming the basis for contract award and payment upon completion of the designated signage and cleaning work at Pershing High School.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Activity ID Activity Name Original Duration
Start Finish Subcontractor
Pershing High SchoolPershing High School 631 12-May-25 A 05-Nov-27
MilestonesMilestones 541 12-May-25 A 30-Jun-27
A2080 Construction Duration 539 12-May-25 A 30-Jun-27
A1940 Temporary Heat 0 16-Oct-26*
A1710 Permanent Power 0 29-Oct-26
A1740 Conditioned Air 0 29-Oct-26
A1670 Substantial Completion 0 30-Jun-27*
A1760 Owner Occupancy 0 30-Jun-27*
Design PhaseDesign Phase 0
Design DocumentsDesign Documents 0
Construction DocumentsConstruction Documents 0
Bid Package 1Bid Package 1 0
Bid Package 2Bid Package 2 0
PermittingPermitting 0
School BoardSchool Board 0
Bid Package 1Bid Package 1 0
Bid Package 2Bid Package 2 0
ProcurementProcurement 373 13-Jun-25 A 04-Dec-26
SubmittalsSubmittals 0
Structural SubmittalsStructural Submittals 0
Electrical SubmittalsElectrical Submittals 0
Mechanical SubmittalsMechanical Submittals 0
Exterior Facade SubmittalsExterior Facade Submittals 0
Long Lead ItemsLong Lead Items 373 13-Jun-25 A 04-Dec-26
A1830 Generator 300 13-Jun-25 A 14-Oct-26
A1780 Kitchen Equipment 120 15-Jun-26 A 04-Dec-26
MEP CoordinationMEP Coordination 0
Schedule ImpactsSchedule Impacts 0
ConstructionConstruction 359 16-Mar-26 A 12-Aug-27
Site WorkSite Work 0
Foundation WallsFoundation Walls 0
Underground UtilitiesUnderground Utilities 0
Underground PlumbingUnderground Plumbing 0
Underground ElectricalUnderground Electrical 0
StructureStructure 171 26-May-26 A 28-Jan-27
Structural SteelStructural Steel 0
Sequence 1Sequence 1 0
Sequence 2Sequence 2 0
Sequence 3Sequence 3 0
Sequence 4Sequence 4 0
RoofingRoofing 0
Sequence 1Sequence 1 0
Sequence 2Sequence 2 0
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
Construction Duration
Temporary Heat
Permanent Power
Conditioned Air
Substantial Completion
Owner Occupancy
Generator
Kitchen Equipment
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Milestone
Pershing High School
Start Finish Subcontractor
Sequence 3Sequence 3 0
Sequence 4Sequence 4 0
Exterior MasonryExterior Masonry 21 26-May-26 A 25-Sep-26
S4-B-1030 Brick - Seq. 4 21 26-May-26 A 25-Sep-26 J&J
Curtainwall and StorefrontCurtainwall and Storefront 53 24-Aug-26 A 15-Oct-26
S3-CW-1050 Storefront - Seq. 3 8 24-Aug-26 A 30-Sep-26 Environmental
S3-CW-1060 Curtainwall - Seq. 3 9 24-Aug-26 A 30-Sep-26 Environmental
S4-CW-1070 Storefront - Seq. 4 11 01-Oct-26 15-Oct-26 Enviornmental
S4-CW-1080 Curtainwall - Seq. 4 5 01-Oct-26 07-Oct-26 Environmental
Metal PanelsMetal Panels 84 28-Sep-26 28-Jan-27
S1-MP-1000 Metal Panels - Seq. 1 21 28-Sep-26* 26-Oct-26 Rieckhoff
S2-MP-1010 Metal Panels - Seq. 2 28 27-Oct-26 08-Dec-26 Rieckhoff
S3-MP-1020 Metal Panels - Seq. 3 18 09-Dec-26 05-Jan-27 Rieckhoff
S4-MP-1030 Metal Panels - Seq. 4 17 06-Jan-27 28-Jan-27 Rieckhoff
Slab On GradeSlab On Grade 0
Spray FireproofingSpray Fireproofing 12 17-Sep-26 A 02-Oct-26
S4-FP-1060 Spray Fireproofing - Seq. 3 (Area B) 5 17-Sep-26 A 25-Sep-26 Saylor
S4-FP-1070 Spray Fireproofing - Seq. 4 (Area A) 5 28-Sep-26 02-Oct-26 Saylor
Interior CMU WallsInterior CMU Walls 16 29-Jun-26 A 18-Sep-26
S1-CMU-1000 Non Load Bearing CMU - Seq. 1 16 29-Jun-26 A 18-Sep-26 J&J
S1-CMU-1010 In Wall CMU MEP Rough - Seq. 1 16 29-Jun-26 A 18-Sep-26 J&J
Interior Fit OutInterior Fit Out 236 28-Aug-26 A 12-Aug-27
Sequence 1 - Area GSequence 1 - Area G 236 28-Aug-26 A 12-Aug-27
Rough InRough In 54 28-Aug-26 A 23-Nov-26
S1-G-1000 Overhead Mechanical Rough 15 28-Aug-26 A 18-Sep-26 Quality
S1-G-1350 Overhead Ductwork 20 14-Sep-26 A 09-Oct-26 Quality
S1-G-1050 Overhead Mechanical Piping (Final Branch) 10 05-Oct-26 16-Oct-26 Quality
S1-G-1360 Overhead Plumbing 20 05-Oct-26 30-Oct-26 Danboise
S1-G-1010 Overhead Electrical Rough 20 26-Oct-26 23-Nov-26 DeCal
S1-G-1030 Overhead Fire Protection Rough 10 26-Oct-26 06-Nov-26 Elite
S1-G-1060 Insulate MEP's 10 02-Nov-26 16-Nov-26 Quality
S1-G-1380 Cable Tray 5 17-Nov-26 23-Nov-26 DeCal
FinishesFinishes 192 09-Nov-26 12-Aug-27
S1-G-1370 Tape and Finish Drywall 15 09-Nov-26 02-Dec-26 City
S1-G-1070 Paint - Prime and Final Coat 15 24-Nov-26 16-Dec-26 Classic
S1-G-1440 Pull low voltage wiring 40 24-Nov-26 22-Jan-27
S1-G-1090 Ceiling Grid 10 10-Dec-26 23-Dec-26 City
S1-G-1020 Install Kitchen Hoods 10 17-Dec-26 31-Dec-26 Great Lakes
S1-G-1100 Fire Protection Trim 16 24-Dec-26 18-Jan-27 Elite
S1-G-1120 Mechanical Controls Grid Trim 10 24-Dec-26 08-Jan-27 Quality
S1-G-1130 Epoxy Flooring - Kitchen Areas 10 24-Dec-26 08-Jan-27 Syncon
S1-G-1410 Install Light Fixtures 20 24-Dec-26 22-Jan-27 DeCal
S1-G-1040 Ansul (Chemical Fire Suppression System) 5 04-Jan-27 08-Jan-27 Great Lakes
S1-E-1030 Set Cooler / Freezer 10 04-Jan-27* 15-Jan-27 Great Lakes
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
Brick - Seq. 4
Storefront - Seq. 3
Curtainwall - Seq. 3
Storefront - Seq. 4
Curtainwall - Seq. 4
Metal Panels - Seq. 1
Metal Panels - Seq. 2
Metal Panels - Seq. 3
Metal Panels - Seq. 4
Spray Fireproofing - Seq. 3 (Area B)
Spray Fireproofing - Seq. 4 (Area A)
Non Load Bearing CMU - Seq. 1
In Wall CMU MEP Rough - Seq. 1
Overhead Mechanical Rough
Overhead Ductwork
Overhead Mechanical Piping (Final Branch)
Overhead Plumbing
Overhead Electrical Rough
Overhead Fire Protection Rough
Insulate MEP's
Cable Tray
Tape and Finish Drywall
Paint - Prime and Final Coat
Pull low voltage wiring
Ceiling Grid
Install Kitchen Hoods
Fire Protection Trim
Mechanical Controls Grid Trim
Epoxy Flooring - Kitchen Areas
Install Light Fixtures
Ansul (Chemical Fire Suppression System)
Set Cooler / Freezer
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
S1-G-1150 Stainless Steel Sinks 10 11-Jan-27 22-Jan-27 Danboise
S1-E-1040 Rough In to Cooler / Freezer 10 11-Jan-27 22-Jan-27
S1-G-1160 Set Kitchen Equipment 20 11-Jan-27 05-Feb-27 Great Lakes
S1-G-1220 Flooring Cafeteria 10 11-Jan-27 22-Jan-27 Shock
S1-G-1390 Polished Concrete 5 11-Jan-27 15-Jan-27 Syncon
S1-G-1400 Sealed Concrete 5 18-Jan-27 22-Jan-27 Syncon
S3-BC-1370 Signage 5 18-Jan-27 22-Jan-27
S1-G-1170 Kitchen Equipment - Plumbing and Mechanical Connections 10 25-Jan-27 05-Feb-27 Danboise
S1-G-1180 Kitchen Equipment - Electrical Connections 10 25-Jan-27 05-Feb-27 DeCal
S1-G-1190 Final Above Ceiling Inspections 10 25-Jan-27 05-Feb-27
S1-G-1330 Millwork / Casework 20 01-Feb-27 26-Feb-27 Trend
S1-G-1200 Drop Ceiling Tile 10 08-Feb-27 19-Feb-27 City
S1-G-1210 Install Doors and Hardware 20 08-Feb-27 05-Mar-27 City
S1-G-1110 Electrical / LV / FA Grid Trim 10 22-Feb-27 05-Mar-27 DeCal
S1-G-1430 Install Roll up Doors 10 22-Feb-27 05-Mar-27 City
S1-G-1230 Install Final Accessories / Trim / Lockers 5 01-Mar-27 05-Mar-27 Brainard
S1-G-1420 Interior Glazing 1 01-Mar-27 01-Mar-27 Environmental
S1-G-1260 Construction Clean 5 08-Mar-27 12-Mar-27
S1-G-1270 Gilbane Punch 5 15-Mar-27 19-Mar-27
S1-G-1280 Architect / Owner Produce Punchlist 1 22-Mar-27 22-Mar-27
S1-G-1290 GRC Remedy Punchlist Items 20 23-Mar-27 19-Apr-27
S1-G-1300 Final Clean 5 13-Apr-27 19-Apr-27
S1-G-1310 Architect / Owner Sign-off Punch List 5 20-Apr-27 26-Apr-27
S1-G-1240 Relocate Kitchen Equipment 30 01-Jul-27 12-Aug-27
Sequence 1 - Area ESequence 1 - Area E 181 08-Sep-26 A 25-May-27
Rough InRough In 80 08-Sep-26 A 04-Jan-27
S1-E-1000 Interior Framing - E 15 08-Sep-26 A 28-Sep-26 City
S1-E-2050 Overhead Duct Rough 20 29-Sep-26 26-Oct-26 Quality
S1-E-2010 Overhead Mechanical Piping Rough 15 20-Oct-26 09-Nov-26 Quality
S1-E-1020 In Wall and Overhead Plumbing Rough 15 10-Nov-26 03-Dec-26 Danboise
S1-E-1010 In Wall and Overhead Electrical Rough (Electrical / LV / FA) 20 04-Dec-26 04-Jan-27 DeCal
S1-E-2030 Overhead Fire Protection Rough 5 04-Dec-26 10-Dec-26 Elite
S1-E-1240 Insulate MEP 10 04-Dec-26 17-Dec-26 Quality
S1-E-1050 In Wall Inspections 5 18-Dec-26 28-Dec-26
S1-E-1250 Install Cable Tray 5 28-Dec-26 04-Jan-27 DeCal
FinishesFinishes 106 28-Dec-26 25-May-27
S1-E-1060 Hang Drywall 10 28-Dec-26 11-Jan-27 City
S1-G-1450 Pull low voltage wiring 40 05-Jan-27 01-Mar-27
S1-E-1070 Tape and Finish Drywall 10 12-Jan-27 25-Jan-27 City
S1-E-1080 Prime and 1st Coat 10 26-Jan-27 08-Feb-27 Classic
S1-E-1260 Polished Concrete 1 26-Jan-27 26-Jan-27 Syncon
S1-E-1100 Ceiling Grid 10 09-Feb-27 22-Feb-27 City
S1-E-1140 Carpet Flooring 20 09-Feb-27 08-Mar-27 Shock
S3-BC-1380 Signage 5 09-Feb-27 15-Feb-27
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
Stainless Steel Sinks
Rough In to Cooler / Freezer
Set Kitchen Equipment
Flooring Cafeteria
Polished Concrete
Sealed Concrete
Signage
Kitchen Equipment - Plumbing and Mechanical Connections
Kitchen Equipment - Electrical Connections
Final Above Ceiling Inspections
Millwork / Casework
Drop Ceiling Tile
Install Doors and Hardware
Electrical / LV / FA Grid Trim
Install Roll up Doors
Install Final Accessories / Trim / Lockers
Interior Glazing
Construction Clean
Gilbane Punch
Architect / Owner Produce Punchlist
GRC Remedy Punchlist Items
Final Clean
Architect / Owner Sign-off Punch List
Relocate Kitchen Equipment
Interior Framing - E
Overhead Duct Rough
Overhead Mechanical Piping Rough
In Wall and Overhead Plumbing Rough
In Wall and Overhead Electrical Rough (Electrical / LV / FA)
Overhead Fire Protection Rough
Insulate MEP
In Wall Inspections
Install Cable Tray
Hang Drywall
Pull low voltage wiring
Tape and Finish Drywall
Prime and 1st Coat
Polished Concrete
Ceiling Grid
Carpet Flooring
Signage
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
S1-E-1230 Electrical / LV / FA Grid Trim 10 23-Feb-27 08-Mar-27 DeCal
S1-E-1270 Install Light Fixtures 20 23-Feb-27 22-Mar-27 DeCal
S1-E-1280 Install Wood Slat Ceiling 10 23-Feb-27 08-Mar-27 City
S1-E-1160 Final Paint 10 02-Mar-27 15-Mar-27 Classic
S1-E-1120 Final Above Ceiling Inspections 1 09-Mar-27 09-Mar-27
S1-E-1130 Install Doors and Hardware 20 16-Mar-27 12-Apr-27 City
S1-E-1110 Casework and MEP Trim 20 16-Mar-27 12-Apr-27 Trend
S1-E-1150 Drop Ceiling Tile 10 23-Mar-27 05-Apr-27 City
S1-E-1290 Interior Glazing 5 23-Mar-27 29-Mar-27 Environmental
S1-E-1170 Construction Clean 4 06-Apr-27 09-Apr-27
S1-E-1180 Gilbane Punch 5 13-Apr-27 19-Apr-27
S1-E-1190 Architect / Owner Produce Punchlist 1 20-Apr-27 20-Apr-27
S1-E-1200 GRC Remedy Punchlist Items 20 21-Apr-27 18-May-27
S1-E-1210 Final Clean 5 12-May-27 18-May-27
S1-E-1220 Architect / Owner Sign-off Punch List 5 19-May-27 25-May-27
Sequence 2 - Area H, Area F, and Area DSequence 2 - Area H, Area F, and Area D 206 08-Sep-26 A 30-Jun-27
Rough InRough In 110 08-Sep-26 A 15-Feb-27
S2-HFD-1280 In Wall MEP Rough In (Area H) 7 08-Sep-26 A 25-Sep-26 Quality
S2-HFD-1270 Hang, Tape, and Finish Drywall (Area H) 8 28-Sep-26 07-Oct-26 City
S2-HFD-1290 Overhead Duct Rough 20 27-Oct-26 24-Nov-26 Quality
S2-HFD-1000 Overhead Mechanical Piping Rough 15 18-Nov-26 10-Dec-26 Quality
S2-HFD-1310 Overhead Plumbing Rough 15 04-Dec-26 24-Dec-26 Danboise
S2-HFD-1020 Overhead Fire Protection Rough 10 18-Dec-26 04-Jan-27 Elite
S2-HFD-1030 Insulate MEP's 10 18-Dec-26 04-Jan-27 Quality
S2-HFD-1010 Overhead Electrical Rough 20 05-Jan-27 01-Feb-27 DeCal
S2-HFD-1320 Cable Tray 5 26-Jan-27 01-Feb-27 DeCal
S2-HFD-1100 Final Above Ceiling Inspections 10 02-Feb-27 15-Feb-27
S2-HFD-1300 Frame Ceilings and Soffits/ Drywall and Finish 10 02-Feb-27 15-Feb-27 City
FinishesFinishes 116 19-Jan-27 30-Jun-27
S1-G-1460 Pull low voltage wiring 40 19-Jan-27 15-Mar-27
S2-HFD-1140 Polished Concrete 10 09-Feb-27 22-Feb-27 Syncon
S2-HFD-1060 Ceiling Grid 20 16-Feb-27 15-Mar-27 City
S2-HFD-1330 Light Fixtures 20 09-Mar-27 05-Apr-27 DeCal
S2-HFD-1150 Install Lockers 15 16-Mar-27 05-Apr-27 Brainard
S2-HFD-1350 Flooring 35 16-Mar-27 03-May-27 Shock
S3-BC-1390 Signage 5 16-Mar-27 22-Mar-27
S2-HFD-1160 Drop Ceiling Tile 11 06-Apr-27 20-Apr-27 City
S2-HFD-1180 Final Paint 10 06-Apr-27 19-Apr-27 Classic
S2-HFD-1120 Install Lab Casework and MEP Trim 20 06-Apr-27 03-May-27 NEIS
S2-HFD-1340 Install Casework 20 06-Apr-27 03-May-27 Trend
S2-HFD-1110 Install Doors and Hardware 15 20-Apr-27 10-May-27 City
S2-HFD-1190 Construction Clean 4 11-May-27 14-May-27
S2-HFD-1200 Gilbane Punch List 10 17-May-27 28-May-27
S2-HFD-1210 Architect / Owner Produce Punchlist 7 01-Jun-27 09-Jun-27
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
Electrical / LV / FA Grid Trim
Install Light Fixtures
Install Wood Slat Ceiling
Final Paint
Final Above Ceiling Inspections
Install Doors and Hardware
Casework and MEP Trim
Drop Ceiling Tile
Interior Glazing
Construction Clean
Gilbane Punch
Architect / Owner Produce Punchlist
GRC Remedy Punchlist Items
Final Clean
Architect / Owner Sign-off Punch List
In Wall MEP Rough In (Area H)
Hang, Tape, and Finish Drywall (Area H)
Overhead Duct Rough
Overhead Mechanical Piping Rough
Overhead Plumbing Rough
Overhead Fire Protection Rough
Insulate MEP's
Overhead Electrical Rough
Cable Tray
Final Above Ceiling Inspections
Frame Ceilings and Soffits/ Drywall and Finish
Pull low voltage wiring
Polished Concrete
Ceiling Grid
Light Fixtures
Install Lockers
Flooring
Signage
Drop Ceiling Tile
Final Paint
Install Lab Casework and MEP Trim
Install Casework
Install Doors and Hardware
Construction Clean
Gilbane Punch List
Architect / Owner Produce Punchlist
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
S2-HFD-1220 GRC Remedy Punchlist Items 10 10-Jun-27 23-Jun-27
S2-HFD-1230 Final Clean 5 17-Jun-27 23-Jun-27
S2-HFD-1240 Architect / Owner Sign-off Punch List 5 24-Jun-27 30-Jun-27
Sequence 3 - Area B / Area CSequence 3 - Area B / Area C 190 28-Sep-26 28-Jun-27
Rough InRough In 60 27-Oct-26 25-Jan-27
S3-BC-1290 Overhead Duct Rough 20 27-Oct-26 24-Nov-26 Quality
S3-BC-1000 Overhead Mechanical Piping 15 18-Nov-26 10-Dec-26 Quality
S3-BC-1300 Overhead Plumbing Rough 15 04-Dec-26 24-Dec-26 Danboise
S3-BC-1030 Insulate MEP's 10 11-Dec-26 24-Dec-26 Quality
S3-BC-1010 Overhead Electrical Rough 20 18-Dec-26 18-Jan-27 DeCal
S3-BC-1020 Overhead Fire Protection Rough 10 12-Jan-27 25-Jan-27 Elite
S3-BC-1050 Cable Tray 5 12-Jan-27 18-Jan-27 DeCal
FinishesFinishes 190 28-Sep-26 28-Jun-27
S3-BC-1040 Prime and 1st Coat 10 28-Sep-26 09-Oct-26 Classic
S3-BC-1310 Top of Wall Stud/Drywall/Finish 15 28-Dec-26 18-Jan-27 City
S3-BC-1140 Polished Concrete 10 19-Jan-27 01-Feb-27 Syncon
S3-BC-1330 Frame Ceilings and Soffits/ Drywall and Finish 10 26-Jan-27 08-Feb-27 City
S3-BC-1180 Install Lockers 10 02-Feb-27 15-Feb-27 Brainard
S3-BC-1060 Ceiling Grid 5 09-Feb-27 15-Feb-27 City
S3-BC-1320 Paint Ceiling 10 09-Feb-27 22-Feb-27 Classic
S3-BC-1070 Fire Protection Trim 18 16-Feb-27 11-Mar-27 Elite
S3-BC-1200 Install Final Accessories / Trim / Interior Glazing 5 16-Feb-27 22-Feb-27
S3-BC-1210 Final Paint 10 23-Feb-27 08-Mar-27 Classic
S3-BC-1090 Install Light Fixtures 20 23-Feb-27 22-Mar-27 DeCal
S3-BC-1340 Theater Lighting 10 23-Feb-27 08-Mar-27 Tobins
S3-BC-1130 Install Theater Flooring 35 09-Mar-27 26-Apr-27 Shock
S3-BC-1120 Casework and MEP Trim 20 09-Mar-27 05-Apr-27 Trend
S3-BC-1100 Final Above Ceiling Inspections 5 12-Mar-27 18-Mar-27
S3-BC-1190 Drop Ceiling Tile 2 23-Mar-27 24-Mar-27 City
S3-BC-1350 Concession Casework 10 23-Mar-27 05-Apr-27 Neis
S3-BC-1110 Install Doors and Hardware 15 25-Mar-27 14-Apr-27 City
S3-BC-1160 Theater Equipment 15 27-Apr-27 17-May-27 Tobins
S3-BC-1170 Flooring 10 27-Apr-27 10-May-27 Shock
S3-BC-1360 Signage 5 27-Apr-27 03-May-27
S3-BC-1220 Construction Clean 4 11-May-27 14-May-27
S3-BC-1230 Gilbane Punch 14 17-May-27 04-Jun-27
S3-BC-1240 Architect / Owner Produce Punchlist 1 07-Jun-27 07-Jun-27
S3-BC-1250 GRC Remedy Punchlist Items 10 08-Jun-27 21-Jun-27
S3-BC-1260 Final Clean 5 15-Jun-27 21-Jun-27
S3-BC-1270 Architect / Owner Sign-off Punch List 5 22-Jun-27 28-Jun-27
Sequence 4 - Area ASequence 4 - Area A 175 12-Oct-26 21-Jun-27
Rough In - GymRough In - Gym 17 18-Nov-26 14-Dec-26
S4-A-1000 Overhead Duct Rough 10 18-Nov-26 03-Dec-26 Quality
S4-A-1010 Overhead Electrical Rough 10 30-Nov-26 11-Dec-26 DeCal
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
GRC Remedy Punchlist Items
Final Clean
Architect / Owner Sign-off Punch List
Overhead Duct Rough
Overhead Mechanical Piping
Overhead Plumbing Rough
Insulate MEP's
Overhead Electrical Rough
Overhead Fire Protection Rough
Cable Tray
Prime and 1st Coat
Top of Wall Stud/Drywall/Finish
Polished Concrete
Frame Ceilings and Soffits/ Drywall and Finish
Install Lockers
Ceiling Grid
Paint Ceiling
Fire Protection Trim
Install Final Accessories / Trim / Interior Glazing
Final Paint
Install Light Fixtures
Theater Lighting
Install Theater Flooring
Casework and MEP Trim
Final Above Ceiling Inspections
Drop Ceiling Tile
Concession Casework
Install Doors and Hardware
Theater Equipment
Flooring
Signage
Construction Clean
Gilbane Punch
Architect / Owner Produce Punchlist
GRC Remedy Punchlist Items
Final Clean
Architect / Owner Sign-off Punch List
Overhead Duct Rough
Overhead Electrical Rough
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
S4-A-1020 Overhead Fire Protection Rough 10 30-Nov-26 11-Dec-26 Elite
S4-A-1310 Overhead Mechanical Rough 5 04-Dec-26 10-Dec-26 Quality
S4-A-1040 Cable Tray 5 07-Dec-26 11-Dec-26
S4-A-1320 Overhead Plumbing Rough 1 11-Dec-26 11-Dec-26 Danboise
S4-A-1290 Insulate MEP's 1 14-Dec-26 14-Dec-26 Quality
Rough In - Locker RoomRough In - Locker Room 35 04-Dec-26 25-Jan-27
S4-A-1390 Overhead Duct Rough 10 04-Dec-26 17-Dec-26 Quality
S4-A-1400 Overhead Mechanical Rough 10 11-Dec-26 24-Dec-26 Quality
S4-A-1410 Overhead Plumbing Rough 15 28-Dec-26 18-Jan-27 Danboise
S4-A-1420 Overhead Electrical Rough 10 05-Jan-27 18-Jan-27 DeCal
S4-A-1430 Overhead Fire Protection Rough 5 05-Jan-27 11-Jan-27 Elite
S4-A-1440 Insulate MEP's 5 19-Jan-27 25-Jan-27 Quality
Finishes - GymFinishes - Gym 175 12-Oct-26 21-Jun-27
S4-A-1070 Prime and 1st coat 10 12-Oct-26 23-Oct-26 Classic
S1-G-1470 Pull low voltage wiring 20 14-Dec-26 12-Jan-27
S4-A-1140 Final Above Ceiling Inspections 5 13-Jan-27 19-Jan-27
S4-A-1060 Paint Gym Ceiling 10 20-Jan-27 02-Feb-27 Classic
S4-A-1090 Install Gym Overhead Equipment (Hoops/Track) 10 03-Feb-27 16-Feb-27 C&M
S4-A-1350 Final Paint - Gym 5 03-Feb-27 09-Feb-27 Classic
S4-A-1370 Light Fixtures - Gym 10 17-Feb-27 02-Mar-27 DeCal
S4-A-1180 Gym Flooring 30 03-Mar-27 13-Apr-27 Kuhn
S4-A-1200 Install Bleachers and Remaining Gym Equipment 15 14-Apr-27 04-May-27 Interkal
S4-A-1330 Signage 5 14-Apr-27 20-Apr-27
S4-A-1230 Construction Clean 4 05-May-27 10-May-27
S4-A-1240 Gilbane Punch 5 11-May-27 17-May-27
S4-A-1250 Architect / Owner Produce Punchlist 7 18-May-27 26-May-27
S4-A-1260 GRC Remedy Punchlist Items 10 27-May-27 10-Jun-27
S4-A-1270 Final Clean 9 28-May-27 10-Jun-27
S4-A-1280 Architect / Owner Sign-off Punch List 7 11-Jun-27 21-Jun-27
Finishes - Locker RoomFinishes - Locker Room 95 14-Dec-26 27-Apr-27
S1-G-1480 Pull low voltage wiring 40 14-Dec-26 09-Feb-27
S4-A-1470 Final Above Ceiling Inspections 5 26-Jan-27 01-Feb-27
S4-A-1460 Top of Wall Stud/Drywall/Finish 15 02-Feb-27 22-Feb-27 City
S4-A-1500 Frame/Drywall/Finish Hard Ceilings 15 10-Feb-27 02-Mar-27 City
S4-A-1450 Prime and 1st coat 10 03-Mar-27 16-Mar-27 Classic
S4-A-1530 Final Paint - Locker Rooms 10 03-Mar-27 16-Mar-27 Classic
S4-A-1550 Fire Protection Trim 5 17-Mar-27 23-Mar-27 Elite
S4-A-1480 Sealed Concrete 5 17-Mar-27 23-Mar-27 Syncon
S4-A-1560 Epoxy Flooring - Locker Room 10 17-Mar-27 30-Mar-27 Syncon
S4-A-1570 Light Fixtures - Locker Room 10 17-Mar-27 30-Mar-27 DeCal
S4-A-1590 Lockers 15 31-Mar-27 20-Apr-27 Brainard
S4-A-1610 Signage 5 31-Mar-27 06-Apr-27
S4-A-1600 Install Doors and Hardware 5 21-Apr-27 27-Apr-27 City
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
Overhead Fire Protection Rough
Overhead Mechanical Rough
Cable Tray
Overhead Plumbing Rough
Insulate MEP's
Overhead Duct Rough
Overhead Mechanical Rough
Overhead Plumbing Rough
Overhead Electrical Rough
Overhead Fire Protection Rough
Insulate MEP's
Prime and 1st coat
Pull low voltage wiring
Final Above Ceiling Inspections
Paint Gym Ceiling
Install Gym Overhead Equipment (Hoops/Track)
Final Paint - Gym
Light Fixtures - Gym
Gym Flooring
Install Bleachers and Remaining Gym Equipment
Signage
Construction Clean
Gilbane Punch
Architect / Owner Produce Punchlist
GRC Remedy Punchlist Items
Final Clean
Architect / Owner Sign-off Punch List
Pull low voltage wiring
Final Above Ceiling Inspections
Top of Wall Stud/Drywall/Finish
Frame/Drywall/Finish Hard Ceilings
Prime and 1st coat
Final Paint - Locker Rooms
Fire Protection Trim
Sealed Concrete
Epoxy Flooring - Locker Room
Light Fixtures - Locker Room
Lockers
Signage
Install Doors and Hardware
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
Mechanical EquipmentMechanical Equipment 107 29-Jun-26 A 01-Dec-26
RTURTU 30 29-Jun-26 A 30-Sep-26
A2250 RTU - MEP Connections 30 29-Jun-26 A 30-Sep-26
A2320 ERU - MEP Connections 30 29-Jun-26 A 30-Sep-26
BoilerBoiler 30 31-Aug-26 A 12-Oct-26
A2270 Boiler - MEP Connections 30 31-Aug-26 A 12-Oct-26
A2260 Set Boiler 0 23-Sep-26*
Exhaust FansExhaust Fans 30 31-Aug-26 A 12-Oct-26
A2290 Exhaust Fans - MEP Connections 30 31-Aug-26 A 12-Oct-26
A2370 Set Exhaust Fans 0 23-Sep-26
Electrical EquipmentElectrical Equipment 53 15-Sep-26 A 01-Dec-26
A2710 Equipment Pads 1 15-Sep-26 A 18-Sep-26
A2480 Set Electrical Equipment 10 21-Sep-26 02-Oct-26 DeCal
A2610 Pull Cable - Primary to medium volt transformet 2 05-Oct-26 06-Oct-26 DeCal
A2620 Pull Cable - Medium Volt to Main Switch Panel 3 07-Oct-26 09-Oct-26 DeCal
A2630 Start Up and Test Equipment 2 12-Oct-26 13-Oct-26 DeCal
A2360 Set Generator 0 15-Oct-26 DeCal
A2280 Generator - MEP Connections 30 16-Oct-26 01-Dec-26 DeCal
A2640 Set Power Pole - DTE 1 26-Oct-26* 26-Oct-26 DeCal
A2650 Pull Cable - Power Pole to Primary switch 2 27-Oct-26 28-Oct-26 DeCal
Hardscape and LandscapesHardscape and Landscapes 311 16-Mar-26 A 04-Jun-27
A1900 Stone and Compact 5 16-Mar-26 A 25-Sep-26 Eastedge
A1980 Base Course 5 05-Oct-26 09-Oct-26 Nagle
A1950 Asphalt Paving - Wearing Course 5 07-May-27 13-May-27 Nagle
A1960 Striping 2 14-May-27 17-May-27 Nagle
A1970 Install Accessories (Light Poles, Bike Racks, Benches, Flag Poles) 7 18-May-27 26-May-27 DeCal
SouthSouth 168 28-Aug-26 A 28-Apr-27
A2540 South - Grading Parking Lot 10 28-Aug-26 A 18-Sep-26 Eastedge
A1920 Curbs and Gutters (Teachers Lot) 5 21-Sep-26 25-Sep-26 DSP
A2000 South - Site Grading 10 28-Sep-26 09-Oct-26 Eastedge
A2660 South - Site Concrete 10 12-Oct-26 23-Oct-26 DSP
A2570 South - Top Soil 5 26-Oct-26 30-Oct-26 PGA
A2580 South - Trees 15 02-Nov-26 23-Nov-26 PGA
A2550 South - Site Screening / Fencing 7 15-Apr-27 23-Apr-27 Industrial Fence
A2590 South - Plantings / Mulch 5 15-Apr-27* 21-Apr-27 PGA
A2560 South - Site Furnishings 5 22-Apr-27 28-Apr-27 PGA
A2600 South - Seeding 3 22-Apr-27 26-Apr-27 PGA
NorthNorth 178 21-Sep-26 03-Jun-27
A2460 North - Grading Parking Lot 5 21-Sep-26 25-Sep-26 Eastedge
A1990 Curbs and Gutters (Main Lot) 5 28-Sep-26 02-Oct-26 DSP
A2300 North - Site Grading 10 05-Oct-26 16-Oct-26 Eastedge
A2500 North - Top Soil 5 19-Oct-26 23-Oct-26 PGA
A2860 North - Site Concrete 10 26-Oct-26 06-Nov-26 DSP
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
RTU - MEP Connections
ERU - MEP Connections
Boiler - MEP Connections
Set Boiler
Exhaust Fans - MEP Connections
Set Exhaust Fans
Equipment Pads
Set Electrical Equipment
Pull Cable - Primary to medium volt transformet
Pull Cable - Medium Volt to Main Switch Panel
Start Up and Test Equipment
Set Generator
Generator - MEP Connections
Set Power Pole - DTE
Pull Cable - Power Pole to Primary switch
Stone and Compact
Base Course
Asphalt Paving - Wearing Course
Striping
Install Accessories (Light Poles, Bike Racks, Benches, Flag Poles)
South - Grading Parking Lot
Curbs and Gutters (Teachers Lot)
South - Site Grading
South - Site Concrete
South - Top Soil
South - Trees
South - Site Screening / Fencing
South - Plantings / Mulch
South - Site Furnishings
South - Seeding
North - Grading Parking Lot
Curbs and Gutters (Main Lot)
North - Site Grading
North - Top Soil
North - Site Concrete
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
Start Finish Subcontractor
A2510 North - Trees 15 09-Nov-26 02-Dec-26 PGA
A2520 North - Plantings / Mulch 5 22-Apr-27 28-Apr-27 PGA
A2470 North - Site Screening / Fencing 3 26-Apr-27 28-Apr-27 Industrial Fence
A2490 North - Site Furnishings 5 29-Apr-27 05-May-27 PGA
A2530 North - Seeding 3 29-Apr-27 03-May-27 PGA
A2690 North - Brick Unit Paving 10 20-May-27 03-Jun-27 PGA
CourtyardCourtyard 159 19-Oct-26 04-Jun-27
A2410 Courtyard - Grading 5 19-Oct-26 23-Oct-26 Eastedge
A2680 Courtyard - Site Concrete 15 26-Oct-26 16-Nov-26 DSP
A2700 Courtyard - Trees 10 26-Oct-26 06-Nov-26 PGA
A2440 Courtyard - Plantings / Mulch 5 29-Apr-27 05-May-27 PGA
A2420 Courtyard - Brick Unit Paving 10 06-May-27 19-May-27 PGA
A2450 Courtyard - Seeding 1 06-May-27 06-May-27 PGA
A2010 Exterior Punchlist and Corrections 6 27-May-27 04-Jun-27
Close OutClose Out 212 11-Jan-27 05-Nov-27
A1860 Commissioning 40 11-Jan-27 05-Mar-27
A2140 Health Department Inspection 5 08-Feb-27 12-Feb-27
A2020 Test and Balance 10 11-May-27 24-May-27
A1680 Final Inspections 10 25-May-27 08-Jun-27
A2090 Final Plumbing Inspection 5 25-May-27 01-Jun-27
A2100 Final Electrical Inspection 5 25-May-27 01-Jun-27
A2110 Final Mechanical Inspection 5 25-May-27 01-Jun-27
A2130 Final Low Voltage Inspection (By Owner) 5 25-May-27 01-Jun-27
A2120 Life Safety Inspection 5 04-Jun-27 10-Jun-27
A2230 Owner Training 20 09-Jun-27 07-Jul-27
A1690 Project Close out 60 13-Aug-27 05-Nov-27
Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecJan Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1
2027 2028
North - Trees
North - Plantings / Mulch
North - Site Screening / Fencing
North - Site Furnishings
North - Seeding
North - Brick Unit Paving
Courtyard - Grading
Courtyard - Site Concrete
Courtyard - Trees
Courtyard - Plantings / Mulch
Courtyard - Brick Unit Paving
Courtyard - Seeding
Exterior Punchlist and Corrections
Commissioning
Health Department Inspection
Test and Balance
Final Inspections
Final Plumbing Inspection
Final Electrical Inspection
Final Mechanical Inspection
Final Low Voltage Inspection (By Owner)
Life Safety Inspection
Owner Training
Project Close out
Finish Date: 05-Nov-27
Data Date: 16-Sep-26
Run Date: 22-Sep-26 15:05
Pershing-1
Remaining Level of Effort
Actual Level of Effort
Project Baseline Bar
Actual Work
Remaining Work
Critical Remaining Work
Summary Milestones
Critical Milestones
Baseline Milestone
File details come from the government source that posted it. Updated .