This document is a set of 100% construction documents (mechanical design drawings) for a U.S. Department of Veterans Affairs project to improve Building 700 ductwork at VA Mather Medical Center in Mather, California. The project, identified as VA Project Number VA261-17-D-0109 and Apogee Project Number 18-270, involves the demolition of existing air handling unit 700-AHU-3 and associated ductwork, installation of new supply air ductwork connected to the existing 700-AHU-4 system, and ductwork modifications to serve the second floor. The primary mechanical system being modified is 700-AHU-4, which has a total capacity of 36,200 CFM with heating capacity of 1456.2 MBH and operates at 7.5" TSP with MERV 17 HEPA filtration and 6" MERV 11 pre-filters.
The construction scope includes demolition of vertical external ductwork on multiple floors, installation of new rectangular ductwork (ranging from 30" to 50" diameter) with aluminum cladding on roof-mounted sections, fire and smoke damper installation, roof curb removal and roof patching, and coordination of mechanical work with structural and architectural modifications. Work is to be performed on weekends from Friday 4:00 PM through Sunday 12:00 PM, with a minimum of five temporary 2-ton cooling units required during shutdown. The contractor must perform comprehensive testing and balancing activities before demolition and after completion, coordinate ductwork routing in the field, provide structural supports every four feet, and submit coordination drawings showing integration with all trades. All exposed ductwork on the roof must be provided with aluminum cladding, and the contractor must maintain existing roof warranties while coordinating with the roofing contractor for any patching or repair work required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment SOW_DRAFT_ 8-29-26.pdf | ||
| 36C26126Q1279.docx | DOCX document | |
| Attachment Specifications_DRAFT_ 8-31-26.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
BUILDING 700
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/2
/2
:1
:5
P
M
GI001
ENG. PROJECT COVER
1 1
JONATHAN BASSIGANI
AS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
VA MATHER - IMPROVE BLDG 700
DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
VA PROJECT #:
VA261-17-D-0109
APOGEE PROJECT #: 18-270
RK
DRAWING LIST
No. Description Dwg of Dwg
GI001 ENG. PROJECT COVER 1 1
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 5
M-101 SECOND FLOOR HVAC WORK PLANS 2 5
M-102 ROOF MECHANICAL WORK PLANS 3 5
M-301 MECHANICAL SECTIONS AND 3D VIEWS 4 5
M-501 MECHANICAL DETAILS 5 5
DocuSign Envelope ID: 78AB3765-7351-4781-99AC-DEE2B800FFB2
3/26/2020
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFICAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTERGRATED PART LOAD VALUE
IRH INTRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT
AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS
LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED
BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM
CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. OBTAIN AND PAY FOR PERMITS, FEES, AND INSPECTIONS REQUIRED FOR THIS WORK.
4. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
5. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE
REQUIRED.
6. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR.
7. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
8. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
9. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
10. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
11. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
12. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
13. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
14. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
15. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
16. NOTIFY COR REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND FLOOR AND ROOF STRUCTURE. PROVIDE OFFSETS, FITTINGS, AND DIMENSIONAL TRANSITIONS NOT SHOWN BUT REQUIRED TO MAINTAIN MINIMUM CLEAR SPACE TO BUILDING SURFACES AT NO ADDITIONAL COST.
18. PATCH, PAINT AND CLEAN SURFACES SUSTAINING DAMAGE ASSOCIATED WITH MECHANICAL WORK OF THIS CONTRACT, UNLESS NOTED OTHERWISE.
19. SUBMIT BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR EQUIPMENT AT COMPLETION OF PROJECT.
20. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
21. MAKE A COMPLETE REVIEW OF DRAWINGS, INCLUDING SCHEDULES AND DETAILS, PRIOR TO BEGINNING MECHANICAL SYSTEM INSTALLATION. RESOLVE CONFLICTS WITH
COR.
22. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PIPING SYSTEMS.
23. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS
ARE NOT ACCEPTABLE UNLESS SPECIFICALLY INDICATED OTHERWISE.
24. INSTALL PIPING FREE OF SAGS AND BENDS.
25. INSTALL PIPING TO ALLOW APPLICATION OF INSULATION.
26. PIPING SHALL NOT BE ROUTED OVER TELECOM OR ELECTRICAL CLOSETS/ROOMS.
27. PREPARE DRAWINGS SHOWING MECHANICAL SYSTEMS AND EQUIPMENT FOR COORDINATION WITH WORK OF OTHER DIVISIONS AND WORK BY THE GOVERNMENT.
A. INCLUDE PLAN VIEWS, SECTIONS, AND ELEVATIONS, AS REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS.
B. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN DIAMETER AND OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING CAVITY.
C. IF THERE ARE OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS
GIVEN.
D. DO NOT BEGIN FABRICATION OR PLACE EQUIPMENT ORDERS UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
28. INSTALLATION COMMENCED PRIOR TO COORDINATION DRAWING APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK. MODIFY, MOVE OR RECONFIGURE WORK LACKING
COORDINATION AT NO ADDITIONAL COST.
29. ALL EXISTING SAFETIES LIKE DUCT SMOKE DETECTOR, FIRE AND SMOKE DAMPER ETC.. SHALL BE RE-USED.
30. MECHANICAL CONTRACTOR SHALL INCLUDE, AS PART OF HIS TEAM, ELECTRICAL AND CONTROLS CONTRACTOR TO PERFORM MISCELLANEOUS WORK AS INDICATED ON THE
DRAWINGS.
31. MECHANICAL CONTRACTOR SHALL INCLUDE ALL COSTS ASSOCIATED WITH DUCT SUPPORTS (SUPPLY AND INSTALLATION), COATING AND PATCHING OF WORK, AND PAINTING
OF STEEL WORK.
32. MECHANICAL CONTRACTOR SHALL COORDINATE WITH EXISTING ROOFING CONTRACTOR FOR PATCHING/REPAIR WORK AND MAINTAIN EXISTING ROOF WARRANTY.
33. CONTRACTOR TO SUBMIT SHOP DRAWINGS WITH CALCULATIONS FOR ARCHITECTURAL AND STRUCTURAL WORK .
34. ALL EXPOSED DUCTWORK ON ROOF ASSOCIATED WITH 700-AHU-4 (NEW + OLD) SHALL BE PROVIDED WITH ALUMINUM CLADDING.
35. ARCHITECTURAL DETAILS PROVIDED ARE FOR GUUIDANCE AND SUBJECT TO FINAL APPROVAL BY VA. CONTRACTOR TO SUBMIT DETAIL BASED ON ACTUAL SITE CONDITIONS
FOR FINAL APPROVAL.
MECHANICAL GENERAL NOTES
T
CO2 CARBON DIOXIDE
THERMOSTAT
SUPPLY DIFFUSER
RETURN DIFFUSER/GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
DIFFUSER TAG | DIFFUSER CFM
LINEAR SLOT DIFFUSER
BALANCING DAMPER
(RECTANGULAR)
BALANCING DAMPER
(ROUND)
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
SIDE MOUNTED GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
MECHANICAL LEGEND
HPS
LPS
LPR
CHS
CHR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OUTLET
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MOTORIZED CONTROL VALVE
STEAM TRAPCOND CONDENSATE DRAIN LINE
HPR HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMITS OF DEMOLITION
INLINE CENTRIFUGAL PUMP
TANGENTIAL AIR SEPARATOR
EXPANSION TANK
WALL-MOUNTED INDOOR
SPLIT-SYSTEM
SPLIT-SYSTEM CONDENSING UNIT
UTILITY SET EXHAUST FAN
STEAM PRESSURE
REDUCING STATION
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
TERMINAL UNIT
CHECK VALVE
S
D SMOKE DETECTOR
NOTES FOR TESTING AND BALANCING.
(BELOW ARE SUGGESTED MINIMUM TAB ACTIVITIES. CONTRACTOR TO PERFORM ADDITIONAL
ACTIVITIES IF REQUIRED TO VERIFY EXISTING SYSTEM AND ADJUST THE NEW SYSTEM. ALL
TEST SPECIFIED IN THE TAB SPECIFICATION SHALL BE PERFORMED).
1. PRIOR TO START OF ANY DEMOLITION WORK MECHANICAL CONTRACTOR SHALL HAVE
TAB CONTRACTOR PERFORM TESTING/MEASUREMENT OF EXISTING SYSTEM 700-
AHU-4. AS A MINIMUM FOLLOWING TESTING AND MEASUREMENT SHALL BE DONE.
a. MEASURE TOTAL SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR FOR 700-AHU-4.
b. MEASURE TOTAL EXHAUST FOR EACH FAN ASSOCIATED WITH EXISTING 700-
AHU-4.
c. MEASURE AIR FLOW FOR EACH BRANCH DUCTS CONNECTED TO AIR
DISTRIBUTION SYSTEM OF 700-AHU-4 ON SECOND FLOOR.
d. MEASURE PRESSURE DROP AT EACH FILTER BANK OF 700-AHU-4.
e. PERFORM AIR FILTRATION TEST FOR 700-AHU-4.
f. MEASURE HYDRONIC FLOWS (CHILLED AND HOT WATER) FOR 700-AHU-4.
g. MEASURE STEAM FLOW AND HUMIDIFIER OPERATION, INCLUDING MAKEUP
WATER DRAIN AND VENTS.
h. MEASURE SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR TEMPERATURE AND
HUMIDITY FOR EACH AHU-1 AND AHU-23.
i. MEASURE EFFECTIVENESS OF ENERGY RECOVERY HEAT EXCHANGER.
j. MEASURE ALL ELECTRICAL LOADS AND CURRENT DRAWN BY ALL MOTORS
ASSOCIATED WITH 700-AHU-4 AND ASSOCIATED EXHAUST FANS.
k. RECORD ALL MEASUREMENTS ON NEEB OR AABC APPROVED FORM.
l. VERIFY ALL ABOVE DATA ON EXISTING BMS SYSTEM AND RECORD ON NEEB OR
AABC APPROVED FORMS.
m. IDENTIFY DIFFERENCE IN TAB MEASURED VALUES AND BMS RECORDED
VALUES.
n. REVIEW TAB REPORTS WITH VA AND DETERMINE FINAL AIRFLOWS THAT NEED
TO BE BALANCED.
2. AFTER COMPLETION DEMOLITION AND NEW WORK AND PRIOR TO PUTTING THE
SYSTEM IN OPERATION, MECHANICAL CONTRACTOR SHALL HAVE TAB CONTRACTOR
PERFORM TESTING/BALANCING/MEASUREMENT OF 700-AHU-4 SYSTEM. AT A MINIMUM,
FOLLOWING TAB SHALL BE DONE.
a. MEASURE TOTAL SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR FOR 700-AHU-4.
b. MEASURE TOTAL EXHAUST FOR EACH FAN ASSOCIATED WITH EXISTING 700-
AHU-4.
c. MEASURE AIR FLOW FOR EACH BRANCH DUCTS CONNECTED TO AIR
DISTRIBUTION SYSTEM OF 700-AHU-4 ON SECOND FLOOR. BALANCE BRANCH
AIRFLOWS AS INDICATED ON DRAWINGS.
d. MEASURE PRESSURE DROP AT EACH FILTER BANK OF 700-AHU-4.
e. PERFORM AIR FILTRATION TEST FOR 700-AHU-4.
f. MEASURE HYDRONIC FLOWS (CHILLED AND HOT WATER) FOR 700-AHU-4.
g. MEASURE STEAM FLOW AND HUMIDIFIER OPERATION, INCLUDING MAKEUP
WATER DRAIN AND VENTS.
h. MEASURE TOTAL AND INDIVIDUAL EQUIPMENT STEAM FLOW, OPERATION OF
HUMIDIFIER.
i. MEASURE SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR TEMPERATURE AND
HUMIDITY FOR AHU-1.
j. MEASURE ALL ELECTRICAL LOADS AND CURRENT DRAWN BY ALL MOTORS
ASSOCIATED WITH 700-AHU-4 AND ASSOCIATED EXHAUST FANS.
k. RECORD ALL MEASUREMENTS ON NEEB OR AABC APPROVED FORM.
l. VERIFY NEW GRAPHICS ON THE EXISTING BMS SYSTEM AND VERIFY
OPERATION OF NEW AHU-1 ON THE BMS SYSTEM.
m. RECORD ALL DATA FROM THE BMS SYSTEM (PRESSURE, TEMPERATURE, FLOW, HUMIDITY ETC.) FOR BOTH AIR AND HYDRONIC SYSTEM.
n. MAKE ADJUSTMENTS AS REQUIRED TO HAVE TAB MEASURED VALUES AND BMS
RECORDED VALUES WITHIN ACCEPTABLE TOLERANCE.
PHASING NOTES.
(BELOW IS SUGGESTED PHASING OF WORK. CONTRACTOR SHALL PREPARE DETAILED
PHASING PLAN AND SUBMIT TO VA FOR APPROVAL PRIOR TO START ON ANY WORK AT THE
SITE).
1. PRIOR TO START OF ANY DEMOLITION WORK MECHANICAL CONTRACTOR SHALL HAVE
TAB CONTRACTOR PERFORM TESTING/MEASUREMENT OF EXISTING SYSTEM 700-AHU-4
AS LISTED IN THE TAB ACTIVITIES.
2. AFTER COMPLETION OF INITIAL TAB ACTIVITIES CONTRACTOR SHALL PERFORM
DEMOLITION OF 700-AHU-3.
a. DISCONNECT AND DEMOLISH ELECTRICAL POWER TO THE 700-AHU-3 AND
REMOVE ALL SWITCHGEAR/CONDUCTORS UPTO MAIN PANELS.
b. DISCONNECT AND DEMOLISH ALL CONTROLS DEVICES AND WIRING
ASSOCIATED WITH 700-AHU-3.
c. DEMOLISH SUPPLY, RETURN, EXHAUST AND OUTSIDE AIR DUCTWORK ON ROOF
ASSOCIATED WITH 700-AHU-3.
d. DEMOLISH ALL PIPING ASSOCIATED WITH 700-AHU-3 UPTO THE ROOF LEVEL.
CUT AND CAP AT ROOF LEVEL.
e. DEMOLISH 700-AHU-3.
f. DEMOLISH EXISTING ROOF CURB SERVING 700-AHU-3.
g. PATCH ROOF AS REQUIRED. PROVIDE INSULATION AND WATER PROOFING FOR
THE ROOF AREA AFFECTED.
h. VERIFY AND MAINTAIN ALL LIFE SAFETY DEVICES LIKE FIRE SMOKE DAMPER
ASSOCIATED WITH 700-AHU-3 ON THE SHAFT WALL.
i. DEMOLISH 700-AHU-3 SUPPLY AND RETURN DUCTWORK BELOW SECOND
FLOOR CEILING LEVEL WITHIN THE SHAFT. CUT AND CAP DUCTWORK AS
REQUIRED.
j. INSTALL FIRE SMOKE DAMPERS ON ROOF AS INDICATED ON DRAWINGS.
k. ARRANGE FOR CLEANING AND SANITIZING OF SUPPLY AND RETURN AIR
DUCTWORK FROM SECOND FLOOR UPTO ROOF LEVEL. SUBMIT REPORT TO VA.
3. INSTALL 700-AHU-4 NEW MAIN DUCTWORK AS SHOWN ON THE DRAWINGS. PROVIDE
ALL DUCT SUPPORTS AS REQUIRED.
4. THIS WORK SHALL BE DONE ON WEEKEND STARTING FROM FRIDAY 4:00 PM AND
COMPLETING ON SUNDAY AT 12:00 PM.
a. SHUT DOWN 700-AHU-4. PROVIDE TEMPORARY COOLING OR HEATING IN
ROOMS AS INDICATED BY VA. MINIMUM FIVE UNITS EACH 2 TON CAPACITY
SHALL BE PROVIDED.
b. DEMOLISH SUPPLY AIR DUCTWORK ASSOCIATED WITH 700-AHU-4. DEMOLISH
ALL SUPPORTS VERTICAL AND HORIZONTAL THAT ARE NOT REUSED.
c. INSTALL REMAINING SUPPLY AIR DUCTWORK AND CONNECT THE DUCTWORK
TO SHAFTS AND 700-AHU-4 AS INDICATED ON THE DRAWINGS.
d. PERFORM DUCT LEAKAGE TEST AND MAKE CORRECTIONS IF REQUIRED.
e. DO DUCT MODIFICATIONS ON THE SECOND FLOOR AS INDICATED ON THE
DRAWINGS.
f. PUT 700-AHU-4 IN OPERATION AND PRE-BALANCE AIRFLOWS IN THE BRANCHES
AT ROOF.
5. PERFORM FINAL TESTING AND BALANCING OF 700-AHU-4. ADJUST ALL AIR FLOW AND
HYDRONIC AND STEAM FLOWS AS PER THE AHU SUBMITTAL.
6. ARCHITECTURAL AND STRUCTURAL WORK LIKE PROVIDING ACCESS PANELS AND
SUPPORTS WHICH ARE INDEPENDENT ACTIVITIES TO BE DONE PRIOR TO DOING ANY
WORK ASSOCIATED WITH 700-AHU-3 AND 700-AHU-4. THIS WILL HELP IN DEMOLITION
AND INSTALLATION ACTIVITIES.
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:1
:5
P
M
M-001
MECHANICAL GENERAL INFORMATION
1 5
JONATHAN BASSIGANI
AKS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
RK
AIR HANDLING UNIT SCHEDULE (EXISTING)
MARK LOCATION SERVICE
TOTAL
CAPACITY
SUPPLY FAN
TSP
FILTER
EXHAUST
FAN
HEATING
COIL
COOLING COIL TOTAL
CAPACITY
OPERATING
WEIGHT
REMARKS
700-AHU-4 BUILDING 700 ROOF OR 36200 CFM 7.5"
12" MERV 17
HEPA W/6" MERV
11 PRE-FILTERS
NA NA 1456.2 MBH 28810.00 lb 1
1. INFORMATION FOR 700-AHU-4 TAKEN FROM RECORD SUBMITTAL.
(FOR FINAL VALUES REFER STRUCTURAL DRAWINGS)
SEISMIC IMPORTANCE FACTOR 1.5
SEISMIC DESIGN CATEGORY D
MAPPED 1-SECOND SPECTRAL RESPONSE (SD1) 0.327
MAPPED SHORT PERIOD SPECTRAL RESPONSE (SDS) 0.498
MAXIMUM 1-SECOND SPECTRAL RESPONSE (SM1) 0.490
MAXIMUM SHORT PERIOD SPECTRAL RESPONSE... 0.747
SITE COEFFICIENT (Fv) 1.878
SITE COEFFICIENT (Fa) 1.361
SITE CLASSIFICATION D
ASSUMED (needs to be confirmed by geotechnical engineer)
MAPPED 1-SECOND SPECTRAL RESPONSE (SI) 0.261
MAPPED SHORT PERIOD SPECTRAL RESPONSE (ss) 0.548
RISK CATEGORY IV
LOCATION MATHER, CA
SEISMIC DESIGN CRITERIA
UP
DN
UP
DN
UP
DN
UP
DN
T1
TB
TB.1
T1.5 T2 T2.2 T2.7 T2.9 T3 T4 T5
(E) 28ø SA
(E) 48 300
(E) 12ø SA
(E) 30x30 EA
(E x2
E A
(E) 24x14 EA
(E) 12x6 EA
(E) 14x12 SA
(E) 10ø SA
(E) 12x6 EA
(E) 14x6 EA
(E) 10ø SA
(E ø
S A
(E) 24x24 SA
(E) 30ø SA
(E) 48x30 EA UP
ELEVATOR LOBBY
C2-102L
ELEV
S2
ELEV
S1
ELEV
P1
ELEV
P2
STAIR
TELE/DATA CLOSET
2A112
CORRIDOR
C2-104
SOILED UTILITY
DECONTAMINATION
2A115
CONFERENCE
2A015
CORRIDOR
C2-104A
M/W RESTROOM
2A107
M/W RESTROOM
2A109
SIT-UP RECOVERY
2A114
STERILE SUPPLY
2A120
CORRIDOR
C2-106
AREA OF WORK
PROVIDE ICRA BARRIERS AS PER VA REQUIREMENTS.
AT A MINUMUM, PROVIDE THE FOLLOWING:
1. FULL HEIGHT ZIPPER BARRIERS.
2. STICKY MATS AT ENTRY AND EXIT POINTS.
3. NEGATIVE PRESSURE WITH HEPA FILTRATION.
SUGGESTED ICRA BARRIER
LOCATIONS. PROVIDE AT ADDITIONAL
LOCATIONS AS PER PROJECT AND VA
REQUIREMENTS.
SUGGESTED ICRA BARRIER
LOCATIONS. PROVIDE AT ADDITIONAL
LOCATIONS AS PER PROJECT AND VA
REQUIREMENTS.
M-501
T1
TA
TAA
TB
TB.1
T1.5 T2 T2.2 T2.7 T2.9 T3 T4 T5
M-301
_____ 1
M-301
(E) 28ø SA
(E) 12ø SA
(E x6
E A
(E) 20x14 EA (E) 20x16 EA
(E) 12x10 SA(E) 10x10 SA
(E x2
E A
(E) 8ø SA
(E) 10ø SA
(E) 14x6 EA
(E) 30x30 EA
(E x2
E A
(E) 24x14 EA
(E) 12x6 EA
(E x8
(E
(E
(E) 12x10 EA
(E) 10ø SA
(E) 12x6 EA
(E) 14x6 EA
(E) 10ø SA
(E ø
S A
(E) 24x24 SA
(E) 30ø SA UP
2 3 4
(E) 24x24 SA
(E x2
S A
(E) 48x24 SA UP
(E ø
S A
CLEAN HOLDING
2A006
SOILED HOLDING/RT
CLEANUP
2A008
ELEVATOR LOBBY
C2-102L
ELEV
S3
ELEV
S2
ELEV
S1
ELEV
P1
ELEV
P2
STAIR
1 TELE/DATA CLOSET
2A112
CORRIDOR
C2-104
SOILED UTILITY
DECONTAMINATION
2A115
CONFERENCE
2A015
CORRIDOR
C2-104A
M/W RESTROOM
2A107
M/W RESTROOM
2A109
SIT-UP RECOVERY
2A114
STERILE SUPPLY
2A120
OFFICE/STO
2A017
NURSE MGR. OFFICE
2A019 CHIEF SURGERY OFFICE
2A023
CORRIDOR
C2-106
SUGGESTED ICRA BARRIER
LOCATIONS. PROVIDE AT ADDITIONAL
LOCATIONS AS PER PROJECT AND VA
REQUIREMENTS.
SUGGESTED ICRA BARRIER
LOCATIONS. PROVIDE AT ADDITIONAL
LOCATIONS AS PER PROJECT AND VA
REQUIREMENTS.
AREA OF WORK
PROVIDE ICRA BARRIERS AS PER VA REQUIREMENTS.
AT A MINUMUM, PROVIDE THE FOLLOWING:
1. FULL HEIGHT ZIPPER BARRIERS.
2. STICKY MATS AT ENTRY AND EXIT POINTS.
3. NEGATIVE PRESSURE WITH HEPA FILTRATION.
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:1
:0
P
M
M-101
SECOND FLOOR HVAC WORK PLANS
2 5
JONATHAN BASSIGANI
AKS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
RK
0 2 4 8
NORTH
PLAN
1 PROVIDE 30" ELBOW TO EXISTING SUPPLY AIR
DUCTWORK FROM ABOVE AND EXTEND 30" BEYOND
SHAFT WALL INTO THE CORRIDOR.
2 PROVIDE FIRE SMOKE DAMPER AT THE SHAFT WALL.
3 CONNECT EXISTING 24"x24" DUCTWORK TO NEW 30"
MAINS.
4 PROVIDE 2 HR RATED HINGED ACCESS DOOR
MINIMUM 4' HIGH X 2' WIDE. INSTALL 6" ABOVE
FINISHED FLOOR.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 30" DIAMETER VERTICAL DUCT IN THIS LOCATION TO
SERVE AS NEW AIR SUPPLY TO THIS LEVEL.
DEMOLISH DUCT THAT GOES DOWN TO 1ST FLOOR.
2 DEMOLISH EXTERNAL DUCTING DOWN TO FIRST
FLOOR. PATCH HOLE IN BUILDING WHERE DUCT
ENTERS THE BUILDING. DEMOLISH ALL ASSOCIATED
SUPPORT STEEL STRUCTURE.
3 DEMOLISH EXTERNAL DUCTING BACK TO POINT OF
CONNECTION WITH DUCT AT THIS LEVEL. PATCH
HOLE IN BUILDING WHERE DUCT ENTERS THE
BUILDING. DEMOLISH ALL ASSOCIATED SUPPORT
STEEL STRUCTURE.
4 DEMOLISH EXTERNAL VERTICAL DUCTWORK AND
ASSOCIATED STEEL SUPPORTS.
5 CUT OPENING IN WALL AT SECOND FLOOR LEVEL
FOR DUCT DEMOLITION.
6 DEMOLISH DUCT SUPPLYING AIR TO VAV BOX IN THIS
LOCATION BACK TO MAIN.
A. MODIFICATION OF AIR DISTRIBUTION SYSTEM
ON SECOND FLOOR IS NOT PART OF THIS
PROJECT EXCEPT AS NOTED.
B. WORK ON SECOND FLOOR SHALL BE DONE
ON WEEKENDS STARTING FROM FRIDAY AT
4:00 PM AND COMPLETING BY 12:00 PM ON
THE FOLLOWING SUNDAY.
C. REFER TO WORK PHASING NOTS ON SHEET
M-001.
Scale: 1/4" = 1'-0"
SECOND FLOOR HVAC NEW WORK PLAN
Scale: 1/4" = 1'-0"
SECOND FLOOR HVAC DEMOLITION WORK PLAN
0 2 4 8
NORTH
PLAN
6A-005
6A-008
6A-007
6A-006
6A-008
S D
S D
6A-005
6A-008
6A-007
6A-006
6A-008
S D S
D
T1
TA
TAA
TB
TB.1
TB.2
TC
TD
T0.4 T1.5 T2 T2.2 T2.7 T2.9 T3 T4 T5 T6 T6.6 T6.9T7 T7.9 T8
PERFORM TAB ON
700-AHU-4 FOR ALL
SYSTEMS
EF TO BE
REBALANCED AFTER
DUCT MODIFICATION
M-301
M-301
_____ 1
M-301
36x30 SA
40x34 SA 50x40 SA
700-AHU-3
(E) 66x48 RA
(E x2
R A
(E x2
S A
(E) 82x52 SA
(E) 64x38 SA(E) 30x28 SA
(E x2
S A
(E) 30x28 RA
M-301
M-301
_____ 1
M-301
(E) 36x30 SA
(E) 40x34 SA
700-EF-2
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/2
/2
:1
:0
P
M
M-102
ROOF MECHANICAL WORK PLANS
3 5
JONATHAN BASSIGANI
AKS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
RK
Scale: 1/8" = 1'-0"
ROOF NEW WORK MECHANICAL PLAN 0 4 8 16
NORTH
PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLDG. 700 ROOF
1 INSTALL NEW SUPPLY AIR DUCTWORK AND CONNECT
TO 700-AHU-4 AS INDICATED.
2 INSTALL NEW DUCT AND CONNECT TO EXISTING
SMOKE DAMPER AS INDICATED.
3 INSTALL NEW DUCTWORK AND CONNECT TO EXISTING
SMOKE DAMPER AS INDICATED.
4 RETURN DUCT AVAILABLE FOR FUTURE USE.
MAINTAIN EXISTING SMOKE DAMPER AND CAP DUCT.
5 PROVIDE DUCT SUPPORTS EVERY FOUR FEET.
SUPPORTS SHALL BE FABRICATED FROM GALVANISED
STEEL.
6 ALL NEW DUCTWORK SHALL BE INSULATED AND
PROVIDED WITH ALUMINUM CLADDING. SLOPE TOP OF
CLADDING.
7 HORIZONTAL 36X30 SA DUCT HERE TO BE INSTALLED
SUCH THAT ACCESS TO OTHER ROOF AREAS IS NOT
CUT OFF. SEE M-301 FOR DETAILS.
Scale: 1/8" = 1'-0"
ROOF MECHANICAL DEMOLITION PLAN 0 4 8 16
NORTH
PLAN
1 DEMOLISH SUPPLY AIR DUCT WORK AS INDICATED,
INCLUDING SUPPLY AIR PLENUM. DEMOLISH
ASSOCIATED DUCT SUPPORTS.
2 DEMOLISH RECTANGULAR SUPPLY AIR DUCTWORK
UP TO EXISTING SMOKE DAMPER. DEMOLISH
ASSOCIATED DUCT SUPPORTS.
3 DEMOLISH SUPPLY AIR DUCTWORK FROM MAINS ON
ROOF DOWN TO ENTRY ON SECOND FLOOR.
DEMOLISH ALL ASSOCIATED SUPPORT STEEL.
4 DEMOLISH SUPPLY AIR AND RETURN AIR
DUCTWORK FROM MAINS ON ROOF DOWN TO FIRST
FLOOR. DEMOLISH ASSOCIATED SUPPORT STEEL.
5 DEMOLISH SUPPLY AIR DUCTWORK FROM MAINS ON
ROOF DOWN TO SECOND FLOOR. DEMOLISH
ASSOCIATED STEEL SUPPORT.
6 DEMOLISH RETURN AIR DUCTWORK ASSOCIATED
WITH 700-AHU-3 AS INDICATED. DEMOLISH
ASSOCIATED STEEL SUPPORTS.
7 DEMOLISH SUPPLY AIR DUCTWORK ASSOCIATED
WITH 700-AHU-3. DEMOLISH ASSOCIATED STEEL
SUPPORTS.
8 DEMOLISH ROOF CURB. REINSULATE PORTION OF
ROOF AFFECTED BY ROOF CURB DEMOLITION.
FINISH ROOF WITH ROOFING MEMBRANE TO MATCH
EXISTING.
A. EXISTING CONDITION DUCT SIZES LISTED ARE
APPROXIMATED. CONTRACTOR TO FIELD VERIFY
DUCT SIZE, AS REQUIRED.
B. SHADED AREAS DENOTE EXISTING EQUIPMENT
AND DUCTWORK NOT IN THE SCOPE OF THIS
PROJECT.
C. REFER TO WORK PHASING NOTES ON M-001.
D. WORK SHALL BE DONE ON WEEKENDS AS
REQUIRED.
E. FIRE AND SMOKE DETECTION/PREVENTION
SYSTEMS ASSOCIATED WITH AHU-4 SHALL BE
MAINTAINED.
F. THIS PLAN DOES NOT REPRESENT A COMPLETE
VIEW OF ALL OF THE EQUIPMENT ON THE ROOF.
DocuSign Envelope ID: 78AB3765-7351-4781-99AC-DEE2B800FFB2
3/26/2020
VHAMACWeeP Rectangle
VHAMACWeeP Typewritten Text Remove the existing plastic ductwork and install new sheet metal ductwork for improved durability and performance.
Insulate ductwork with aluminum metal jacket.
S S S S
S S S S
S S S S
S S S S
AMBULANCE
Medical Center
FIRST FLOOR
0' - 0"
T1
SECOND FLOOR
17' - 0"
THIRD FLOOR
34' - 0"
ROOF LEVEL
82' - 0"
FOURTH FLOOR
50' - 0"
FIFTH FLOOR
66' - 0"
T1.5T2T2.2T2.7T2.9T3T4T5T6T6.6T6.9T7T7.9T8
T.O. SCREEN
101' - 6"
(E x2
S A
(E x2
S A
(E x2
S A
(E x2
R A
700-AHU-4
(E) 30x28 RA
(E) 30x28 SA
(E) 30x24 SA
(E) 30x24 SA
STRUCTURAL DUCT SUPPORTS
FOR DUCT TO BE DEMOLISHED.
(TYP)
700-AHU-4
RA DUCT
CAPPED FOR
FUTURE USE
NEW DUCT
SUPPORTSEXISTING DUCT
SUPPORTS TO REMAIN
50x40 SA
36x30 SA
40x34 SA
ROOF LEVEL
82' - 0"
T2.7T2.9T3T4T5
(E) 48x64 EA(E) 48x66 RA
30x36 SA34x40 SA
700-AHU-4 MECHANICAL SHAFTS
700-EF-2
PIPING AND NON-RELATED DUCTWORK
AND EQUIPMENT HIDDEN FOR CLARITY
CAPPED RA
FROM BELOW
Engineers Architects
## KEY NOTES:
# KEY NOTES:
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:1
:3
P
M
M-301
MECHANICAL SECTIONS AND 3D VIEWS
4 5
JONATHAN BASSIGANI
AKS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
RK
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
BLDG. 700 ROOF
Scale: 1/8" = 1'-0"
OVERALL NORTH ELEVATION (FOR REFERENCE)
Scale:
3D EXISTING DUCTWORK DEMOLITION
Scale:
3D NEW WORK (FOR REFERENCE)
1 MAINTAIN ACCESS BENEATH 30X36 SA DUCT IN
THIS LOCATION TO OTHER ROOF AREAS.
1 DEMOLISH VERTICAL DUCTWORK AND
ASSOCIATED STEEL SUPPORTS.
2 IN OPENING WHERE THE DUCT THROUGH THE
WALL WAS REMOVED, INSTALL STORM-PROOF
LOUVER TO MATCH EXISTING LOUVERS, SEE
SPECIFICATION SECTION 089000 LOUVERS.
3 PATCH HOLES IN PRE CAST PANEL WHERE
SUPPORT ANCHOR WERE REMOVED WITH
CONCRETE PATCH MATERIAL CONSISTENT WITH
PRE CAST FINISH, MATCH EXISTING COLOR.
A. FOR WORK PHASING, SEE NOTES ON M-001.
B. DUCTS SHALL BE DISCONNECTED ON FIRST FLOOR
BY VA/OTHERS. OPENING ON EXTERIOR WALL
SHALL BE SEALED BY VA/OTHERS.
1 33
1 3 1 3
Scale: 1/8" = 1'-0"
Section 8
NOTES:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE
REGARDLESS OF W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" RADIUS, 1-1/2" MAXIMUM SPACE
BETWEEN
VANES AND A 3/4" TRAILING EDGE.
4. WHEN W EQUAL W2 AND W1 IS GREATER THAN 20" VANES SHALL BE DOUBLE VANE
TYPE.
W1
W
MAIN SUPPLY
DUCT
PROVIDE VOLUME
DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR
4" MIN.
SUPPLY REGISTER OR
BRANCH DUCT
MAIN
SUPPLY
DUCT
SEE FLOOR PLAN
FOR SPLIT
DIMENSION
TURNING VANES
AIR FLOW
AIR FLOW
A
IR
F L O
W
AIR SPLIT DUCT TAKE-
OFF PLAN VIEW
BRANCH DUCT TAKE-OFF
PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
MAIN SUPPLY
DUCT
CONICAL TAP
TERMINAL UNIT DUCT TAKE-
OFF PLAN VIEW
AIR FLOW
A
IR
F
LO
W
W
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHT.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-16
INSULATION
DUCT
GASKET
INSULATION
SECTION "A-A"
ACCESS PANEL
CASING
GASKET HANDLE INSIDE
FLEXIBLE WASHER
FACTORY
FABRICATED LATCH
SECTION "B-B"
ACCESS DOOR
INSULATION
"B" "B"
"A"
"A"
NOTES:
1. THE INTERIOR SURFACE OF ALL RADIUS ELBOWS SHALL BE MADE ROUND.
2. ALL STANDARD ELBOWS CAN BE SUBSTITUTED WITH SHORT RADIUS
ELBOWS. ALL SHORT RADIUS ELBOWS SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED , SUPPORTED AND FASTENED AS RECOMMENDED BY
SMACNA.
STANDARD RADIUS OR
LONG RADIUS ELBOW
SHORT RADIUS ELBOW
WITH ONE VANE
SHORT RADIUS ELBOW
WITH TWO VANES
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/6 W
R
SHALL
EQUAL OR
BE
GREATER
THAN 1/3 W
R
SHALL
EQUAL OR
BE
GREATER
THAN W
R
W
W
2/3W
R
/3
W
/3
W
1/2W
VAN
E
VAN
E R
W
1/6W
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
1-1/2" POCKET SLIP
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
1" FLANGE & HEM
BOLT ON 4" CENTERALTERNATE
POSITION OF
BOLT 1" x 1/8" BAND IRON
WASHER
FLANGED
CONNECTION ON FAN
SIDE
FLEXIBLE MATERIAL
AS SPECIFIED
5/16" FLANGE
BOLT ON 4" CENTERS
1" x 1/8" BAND IRON
WASHER
FLANGED CONNECTION
ON FAN SIDE
1" x 1/8" DRAW BAND
FLEXIBLE
MATERIAL AS
SPECIFIED
SHEET
METAL
SCREWS ON
12" CENTERS
RIVET ON 4" CENTERS
DUCT
1-1/2" MIN. TO 3" MAX.
INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
RECTANGULAR FLEXIBLE CONNECTION
ROUND FLEXIBLE CONNECTION
1-1/2"1/2" 1/2"
SHEET METAL AS
SPECIFIED FOR
DUCTWORK
NOTES:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR
INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE
SIMILAR FOR MULTI-BLADE DAMPERS & ROUND DAMPERS.
SECTIONSIDE ELEVATION
1/2" ROUND ROD PIN
1/8" CLEARANCE
ALL AROUND
INSIDE END
BEARING
INSULATION
STAND-OFF
DAMPER BLADE
HANDLE WITH
LOCKING
QUADRANT
STIFFEN BLADE
AS REQUIRED
INSULATION SEE
SPECIFICATION
DUCT
OUTSIDE END BEARING
REFER TO THE DRAWINGS FOR
DUCT SIZE
ROOF STRUCTURE. REFER TO
STRUCTURAL DRAWINGS FOR
TYPE
ROOF CONSTRUCTION. CONTRACTOR
TO SURVEY ROOF TO DETERMINE
TYPE.
CANT STRIP
FLASHING BY GENERAL CONTRACTOR,
COUNTERFLASHING BY MECHANICAL
CONTRACTOR
TREATED 2 X 4 SHIMMING
TO LEVEL TOP OF CURB
12" HIGH PRE-MANUFACTURED ROOF CURB
SECURE FLASHING TO DUCTWORK WITH
STAINLESS STEEL SHEET METAL SCREWS.
WRAP DUCTWORK WITH STAILNESS
STEEL BANDING TO DRAW FLASHING
TIGHT TO DUCTWORK AND SEAL
WEATHERTIGHT
EXISTING CONCRETE
STRUCTURE
2 HOUR RATED
SEALANT
CEILING
SYSTEM
(2) LAYERS OF 5/8"
TYPE 'X' GYP BD,
TAPED AND FINISHED
BOTH SIDES
(1) LAYER OF 1"
GYPSUM LINER PANEL
(UL TYPE SCV)
20 GAUGE 2-1/2"
METAL FRAME @ 24"
O.C.
2 HOUR RATED
SEALANT BOTH
SIDES, TYP.
BASE
NOTES:
1. FINISH TO MATCH EXISTING.
2. 2 HOUR RATED NO INSULATION
3. UL DESIGN NO. U415.
SECTION VIEW
3 3/4"
2 1/2"
(2) LAYERS TYPE 'X' 5/8"
GYPSUM BOARD. BOTH
SHEETS TAPED AND FINISHED,
JOINTS STAGGERED.
2 1/2" HC
METAL STUD
@ 16" O.C.
1" GYPSUM
LINER PANEL
PLAN VIEW
EXISTING PRECAST PANEL
SEALANT ON ALL
EDGES.
STORM PROOF LOUVER WITH
INSULATED BLANK OFF PANEL
OPENING WHERE DUCT
WAS REMOVED
EXISTING ALUMINUM WINDOW ABOVE
CONCRETE SLAB OVER METAL DECK
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2
/2
:1
:3
P
M
M-501
MECHANICAL DETAILS
5 5
JONATHAN BASSIGANI
AKS
VA MATHER - IMPROVE
BLDG 700 DUCTWORK
10535 HOSPITAL WAY
MATHER, CA 95655
03/26/2020
100% CONSTRUCTION DOCUMENTS
VA261-17-D-010918-270
RK
Scale: N.T.S.
DUCTWORK SQUARE VANE ELBOWS
Scale: N.T.S.
SUPPLY DUCT TAKE-OFFS
Scale: N.T.S.
ACCESS PANEL AND DOOR DETAIL
Scale: N.T.S.
DUCTWORK RADIUS ELBOW
Scale: N.T.S.
FLEXIBLE DUCT CONNECTIONS
Scale: N.T.S.
VOLUME DAMPER DETAIL
Scale: N.T.S.
DUCTWORK ROOF PENETRATION DETAIL
CONTRACTOR TO DO TESTING AND
MEASUREMENT OF AIRFLOW AND
HYDRONIC/STEAM FLOW FOR AHU-4 AT
THE ROOF LEVEL AND SECOND FLOOR
FOR EACH MAIN DUCTS AND TOTAL FOR...
NOTE:
BALANCE 700-AHU-4 FANS TO 28,000 CFM
SPARE AIRFLOWS AVAILABLE 9,350
TOTAL AIR FLOW REQUIRED ON SECOND
FLOOR
26,850
APPROXIMATE ADDITIONAL AIRFLOW
REQUIRED ON SECOND FLOOR FOR
HYBRID OR'S ON EAST SIDE
5,000
AIRFLOWS SERVING SECOND FLOOR
SOUTH
7,250
AIRFLOWS SERVING SECOND FLOOR EAST 14,600
TOTAL AIR FLOW 36,200
CFM
700-AHU-4 FINAL AIRFLOWS
Scale: N.T.S.
SHAFT WALL DETAIL - 2 HR FIRE RATED
Scale: N.T.S.
LOUVER DETAIL
| Sheets |
| GI001 - ENG. PROJECT COVER |
| M-001 - MECHANICAL GENERAL INFORMATION |
| M-101 - SECOND FLOOR HVAC WORK PLANS |
| M-102 - ROOF MECHANICAL WORK PLANS |
| M-301 - MECHANICAL SECTIONS AND 3D VIEWS |
| M-501 - MECHANICAL DETAILS |
| 2020-03-26T16:17:29-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .