This document is a Code Analysis Plan for the Evans Police Department Renovation project located at 1100 37th St, Evans, Colorado, prepared by D2C Architects. The plan details fire protection and building code requirements for the first floor renovation, with a total business area of 6,918 square feet. The document includes comprehensive fire protection notes specifying fireproofing requirements for various structural components, such as sprayed fire protection for structural members, fireproofing of concealed structure and roof deck, and requirements for fire separation assemblies.

The code analysis plan outlines specific fire protection strategies, including that all fire protection of structural members will be done with sprayed materials, exposed structure above 20 feet will not be fireproofed, and floor decks will remain unfireproofed. The specifications mandate that the fireproofing subcontractor submit a detailed schedule listing all components to be fireproofed, along with the appropriate UL test or recognized testing method to achieve the required fire protection rating. The document is marked as a schematic design and is not intended for construction, serving as a planning and compliance document for the Evans Police Department renovation project.

View the file

Other files

File Type Posted
Exhibit A - Evans PD Schedule.pdf PDF
20250424 City of Evans PD Facility_FF_E RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OCCUPANCY LOAD

EGRESS LOAD

EGRESS PATH

1 HR FIRE RATED PARTITION

SMOKE RESISTIVE PARTITION

PER INCIDENTAL USE REQ.

2 HR FIRE RATED PARTITION

CODE ANALYSIS LEGEND

FIRE PROTECTION RATING REQUIREMENTS SHOWN ON BUILDING CODE

DATA CHART AND BUILDING CODE PLANS ON CODE SHEETS. THERE IS A

SCHEDULE OF WHAT COMPONENTS ARE FIREPROOFED AND WHAT UL

TEST MUST BE USED FOR EACH COMPONENT IN THE PROJECT MANUAL

FIREROOFING SECTION 07250 ALL DETAILING ON THE DRAWINGS IS

INTENDED TO COMFORM TO THE REQUIREMENTS OF THE TEST CITED

AND THE BUILDING CODE.

FIRE PROTECTION RATING REQUIREMENTS FOR BUILDING AND

STRUCTURAL COMPONENTS ARE REFEREED TO IN THE CODE DATA

CHART ON THE CODE DRAWING SHEET. THIS CHART IS TAKEN FROM

CODE TABLE 602 OF THE MAIN CODE, AND LIST THE APPLICABLE

PRIMARY ASPECTS OF THE BUILDING. THIS CHART IS REPEATED IN THE

SPECIFICATION SECTION 07811 "SPRAYED FIRE RESTRICTIVE

MATERIALS", TO REQUIRE THIS LEVEL OF FIRE PROTECTION FOR THE

BUILDING.

TYPICALLY:

a. ALL FIRE PROTECTION OF STRUCTURAL MEMBERS IS DONE WITH

SPRAYED MATERIALS.

b. ALL EXPOSED STRUCTURE AND DECK MORE THAN 20 FEET ABOVE

THE FLOOR IS NOT FIREPROOFED.

c. ALL CONCEALED STRUCTURE AND ROOF DECK IS FIREPROOFED.

d. ALL FLOOR DECK (WHETHER CONCEALED OR NOT) IS NOT

FIREPROOFED.

e. ALL "FIRE SEPARATION ASSEMBLIES" ARE TO BE CONSTRUCTED

WITH SHEATHING TO OBTAIN APPROPRIATE RATING.

THE SPECIFICATIONS REQUIRE THE FIREPROOFING SUBCONTRACTOR

TO SUBMIT A SCHEDULE LISTING ALL COMPONENTS TO BE

FIREPROOFED, AND THE U.L. TEST (OR OTHER RECOGNIZED TEST) THAT

DESCRIBES THE FIREPROOFING TO ACHIEVE THE RATING.

FIRE PROTECTION NOTES

6918 SF

BUSINESS

AREA NOT IN SCOPE

1 2 3 4 5

D

C

B

A

SHEET

IDENTIFICATION

D R

A W

N B

Y

D E

S

IG

N B

Y

S B

M T

B Y

S

IZ

E

F

IL

E N

A M

E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

C K

D B

Y x

F

IL

E N

U M

B E

R

P L

O T

S C

A L E

P L

O T

D A

T E

D2C ARCHITECTS, INC.

DENVER, COLORADO

COPYRIGHT © 2025

THESE DRAWINGS AND PLANS ARE

COPYRIGHTED AND ARE NOT TO BE USED

OR REPRODUCED WHOLLY OR IN PART

WITHOUT THE WRITTEN PERMISSION OF

D2C ARCHITECTS, INC.

NOT FOR

CONSTRUCTION

D

C P

R O

J E

C T

N U

M B

E R

C O

N S

U L

T A

N T

S P

R O

J E

C T

A s i n d ic a te d

/1

/2

:5

:4 P

M

G I1

A P

R

IL

7, D e s ig n e r

A u th o r

A p p ro v e r

GI101

C h e c k e r

C O

D E

A N

A L Y

S

IS

P L A

N

C

IT

Y O

F E

V A

N S

E V

A N

S P

D R

E N

O V

A T

IO

N

7T

H S

T, E

V A

N S

, C O

LO

R

A D

O

SCHEMATIC

DESIGN

GI101 1/8" = 1'-0"

1 FIRST FLOOR - CODE ANALYSIS PLAN

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

N

TRUE

NORTH

0' 4' 8' 16'

NOT IN SCOPE

KEY PLAN

NOT TO SCALE

N

File details come from the government source that posted it. Updated .