Attachment D RFB 758 2100000401 - Bid Price Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Forklift Simulator
Solicitation number
RFB 758 2100000401 1
Issued by
Kentucky

About this file

This is a Bid Price Sheet (Attachment D) for RFB 758 2100000401, a state and local contract opportunity for forklift training simulator equipment. The solicitation requests bids for a Forklift Training Simulator, specifically the Really-Virtual RVC-RFREMIUM-001 model or an approved equal. Bidders are required to enter only the price and delivery time on this form, with no modifications permitted to the document. The delivery timeline should be specified in working days following receipt of order.

Bidders proposing alternate brands or specifications must submit descriptive literature with their bids to allow for equality verification; failure to provide sufficient documentation may result in a non-responsive bid determination. If no brand changes are proposed, the contract will be awarded based on the specifications stated in the solicitation, and the successful bidder must deliver the specified brand and model. Pricing should be entered in the designated bid price field, and delivery time should be indicated in the section marked "Delivery time in working days after receipt of order."

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Attachment D - Bid Price Sheet
RFB 758 2100000401
ENTER PRICE AND DELIVERY TIME ONLY!
ANY MODIFICATIONS TO THIS FORM MAY RESULT IN REJECTION OF BID OFFER.
DO NOT ATTACH A SEPARATE QUOTE.
CommodityBid Price
Forklift Training Simulator - Really-Virtual RVC-RFPREMIUM-001 or approved equal
BRAND - MODEL # BID ___________________________________________________________
Bidders who propose alternate brands/specifications should enclose descriptive literature with their bids so that the equality can be verified. Failure to enclose sufficient literature may result in a non-responsive bid. If the brands are not changed, the contract will be written accordingly and the successful bidder shall be required to deliver the brand/specification stated in the solicitation.

Delivery time in working days after receipt of order __________________________________ARO

&D &P

File details come from the government source that posted it. Updated .