ATTACHMENT D QUALITY ASSURANCE SURVEILLANCE PLAN.docx

DOCX document 30 KB Posted

Attached to
Sun Nuclear Equipment services
Solicitation number
36C25622Q0995
Issued by

About this file

This Quality Assurance Surveillance Plan outlines performance monitoring for an engineering services contract to provide equipment and software maintenance support. The contractor will fully service Sun Nuclear equipment and provide inventory and service reports to the Contracting Officer's Representative within required timeframes. Performance will be assessed on a periodic basis through inspections, customer feedback, and reporting to determine if standards for timely and complete servicing and reporting are met. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 will oversee the contract and use incentives like exercise of option periods based on whether performance exceeds, meets, or fails to meet standards.

View the file

Other files

File Type Posted
J and A SunNuclearFY23 Redacted.pdf PDF
ATTACHMENT B PAST PERFORMANCE QUESTIONNAIRE.doc DOC document
ATTACHMENT A LIST OF PAST PERF REF.docx DOCX document
ATTACHMENT C CONTRACTOR CERTIFICATION.docx DOCX document
36C25622Q0995.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT G – QUALITY ASSURANCE SURVEILLANCE PLAN

36C25622Q0995

QUALITY ASSURANCE SURVEILLANCE PLAN

For: Engineering Service

Contract Number: (The Government will enter contract number upon award.)

Contract Description: Sun Nuclear Equipment/Software and Maintenance Services

Contractor’s name: (hereafter referred to as the Contractor)

Period of Performance: October 1, 2022 through September 30, 2027 (base plus four option periods)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Danette Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Jackson Holland

c. Other Key Government Personnel: None

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager: (Contractor please provide name here)

b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)

Title: (Contractor please enter title(s) or delete these lines if not applicable.)

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Performance Requirements Summary Matrix:

The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

Task
Standard
Acceptable Quality Level
Method of Surveillance
Incentive
Reporting
Fully completed Service Reports for all incoming serviced equipment with an inventory of all equipment completely serviced and delivered by the contractor and with the Service Report provided to the COR at the time of delivery of serviced equipment.
100%
No more than one (1) service report per month may be submitted to COR later than specified time.

Positive Past Performance & Exercise of Option Period.

Receipt and review of Service Reports by COR within the required timeframe.

5. INCENTIVES

The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. CUSTOMER FEEDBACK. (Elements of validated user complaints. Complaints are then investigated and validated.)

d. 100% INSPECTION. (Evaluates all outcomes.)

e. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)

f. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor quarterly to assess performance and shall provide a written assessment.

(After award, both the contractor’s Program Manager and the COR shall sign this document.)

Signature – Contractor Program Manager

Signature – Contracting Officer’s Representative

Contract Discrepancy Report

Contract No.
Report No. for this Discrepancy:

Contractor/Manager’s Name:

From: (Name of Project Officer)

Dates

Prepared:

Returned by Contractor:

Action Complete:

Discrepancy or Problem:

Signature of Contracting Officer:

To: (Contracting Officer)

From: (Contractor)

Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)

Signature of Contractor Representative:

Date:

Government Evaluation:

Government Actions:

Close Out

Name
Title
Signature
Date

Contractor Notified

Project Officer

Contracting Officer

File details come from the government source that posted it. Updated .