ATTACHMENT D - CSPP.pdf
PDF 3 MB Posted
- Solicitation number
- S-10900-00010963
- Issued by
- Lane County, Condon City, Oregon
About this file
This document is a Construction Safety and Phasing Plan (CSPP) for the Cottage Grove State Airport Apron Rehabilitation Project, which is being managed by the Oregon Department of Aviation. The project involves rehabilitating the airport apron, including regrading the main apron, reinstalling aircraft tie-down locations, installing new storm drainage, and removing and applying apron and taxilane pavement markings. The work will be performed in two phases over a 90 calendar day contract period, with Phase 1 taking 40 days and Phase 2 taking 50 days. The runway and Taxiway A will remain open during construction. The CSPP provides detailed guidance on coordination, phasing, areas and operations affected, NAVAID protection, contractor access, wildlife management, FOD management, hazardous materials management, notification procedures, inspection requirements, and protection of runway and taxiway safety areas.
The CSPP requires the contractor to prepare a Safety Plan Compliance Document (SPCD) that supplements the CSPP with the contractor's specific safety procedures and responsibilities. The SPCD must be reviewed and approved prior to the start of work. The CSPP and SPCD include requirements for barricades, marking and lighting, radio communications, and other safety measures to maintain airport operations during construction. Costs associated with violations of the safety plans will be the responsibility of the contractor, and contract time and liquidated damages will apply to any work stoppages related to safety plan violations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT B - TECHNICAL SPECIFICATIONS.pdf | ||
| 61S-ITB BID ADDENDUM 1-2024-08-02 (ag).pdf | ||
| Bid tab~62.xlsx | XLSX spreadsheet | |
| ATTACHMENT C - PROJECT PLANS.pdf | ||
| 61S_ITB Cottage Grove (0711).pdf | ||
| ATTACHMENT A - GENERAL PROVISIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
CONSTRUCTION SAFETY AND
PHASING PLAN
This Page Left Intentionally Blank
Oregon Department of Aviation Cottage Grove State Airport Apron Rehabilitation Project
Construction Safety and Phasing Plan AIP No. 3-41-0015-014-2023
May 2024
Prepared for:
Oregon Department of Aviation
3040 25th Street SE
Salem, OR 97302
Prepared by:
Century West Engineering
5500 Meadows Road, Suite 250
Lake Oswego, OR 97035
OREGON DEPARTMENT OF AVIATION
Apron Rehabilitation Project – CSPP
12600.005.01 | May 2024 Century West Engineering
Table of Contents
Construction Safety and Phasing Plan
I. PURPOSE AND OBJECTIVE
II. RESPONSIBILITIES OF THE CONSTRUCTION CONTRACTOR
Safety Plan Compliance Document (SPCD)
Document Availability
Safety Procedures
Contractor’s SPCD Representative
Inspections
Vehicle Movement
Air Operations Area Protection
Form 7460-1 Submittal
III. INTRODUCTION OF STAFF
IV. SCHEDULE AND SCOPE OF WORK
Schedule
Scope
V. SAFETY PLAN
Construction Safety and Phasing
12600.005.01 | May 2024 Century West Engineering
Appendices
Appendix A Construction Project Daily Safety Inspection Checklist
Appendix B Specification Sections 01160 and 01300
Appendix C Construction Safety and Phasing Plan
Appendix D Safety Plan Compliance Document
40097.122.01 | May 2024 | Page 1
Construction Safety and Phasing Plan
This Construction Safety and Phasing Plan (CSPP) has been prepared in general accordance with FAA Advisory Circulars (AC) 150/5300-13B, “Airport Design”; and 150/5370-2G, “Operational Safety on Airports during Construction” for the Apron Rehabilitation Project at the
Cottage Grove State Airport in Cottage Grove, Oregon.
I. PURPOSE AND OBJECTIVE
Aviation safety is the primary consideration at airports, especially during construction. The
Construction Safety and Phasing Plan (CSPP) is a tool used to ensure safety compliance when coordinating construction activities with airport operations. This document identifies aspects of the Brookings Airport Project that pose a potential safety hazard to airport operations and outlines mitigation procedures for each hazard.
The following objectives must be met by the “Team” comprised of the Airport Manager; Oregon
Department of Aviation; the Engineering Design Consultant; the Prime Contractor; and various subconsultants, subcontractors, airport users, and airport tenants in order to maximize safety and minimize time and economic loss. These objectives include:
• maintaining the safety and integrity of operations on the airport,
• keeping the airport operational for all users to the greatest extent practical,
• minimizing delays for aircraft and construction operations, and
• maximizing airport operation and construction activity opportunities.
The “Team” must keep these objectives in mind when formulating work schedules and work activities affecting operations on the airport.
II. RESPONSIBILITIES OF THE CONSTRUCTION CONTRACTOR
The Contractor is responsible for the following items.
SAFETY PLAN COMPLIANCE DOCUMENT (SPCD)
The Contractor is responsible for supplementing and following the CSPP by way of the Safety
Plan Compliance Document (SPCD). The SPCD should include a general statement by the construction contractor that they have read and will abide by the CSPP. In addition, the SPCD must include all supplemental information that could not be included in the CSPP prior to the contract award. The contractor statement should include the name of the Contractor, the title of the project CSPP, the approval date of the CSPP, and a reference to any supplemental information (that is, “I, Name of Contractor, have read the Cottage Grove State Airport Apron
Rehabilitation Project CSPP, approved on ___________, and will abide by it as written and with the following additions as noted:”). The supplemental information in the SPCD should be written to match the format of the CSPP indicating each subject by corresponding CSPP subject
40097.122.01 | May 2024 | Page 2 number and title. If no supplemental information is necessary for any specific subject, the statement, “No supplemental information,” should be written after the corresponding subject title. The SPCD should not duplicate information in the CSPP. Guidance for supplementing the
CSPP with the SPCD is provided below:
1. Coordination
Discuss details of proposed safety meetings with the airport operator and with contractor employees and subcontractors.
a. This includes attendance of key personnel and subcontractors at weekly coordination meetings with the Airport and Engineer.
b. This includes weekly scheduling of an Airport escort, if needed, to work areas as allowed by the Airport.
2. Phasing
Discuss proposed construction schedule elements, including:
a. Duration of each phase.
b. Daily start and finish of construction, including weekend work and nighttime construction.
c. Duration of construction activities during:
i. Normal runway/taxiway operations.
ii. Closed runway/taxiway operations.
iii. Closed Airport operations.
iv. Modified runway “Aircraft Reference Code” usage.
3. Areas and operations affected by the construction activity
These areas and operations should be identified in the CSPP and should not require an entry in the SPCD.
4. Protection of NAVAIDs.
Navigational Aids (NAVAIDs) will need to be protected for the duration of the project.
40097.122.01 | May 2024 | Page 3
5. Contractor access.
Provide the following:
a. Details on how the contractor will maintain the integrity of the airport security fence (gate guards, daily log of construction personnel, and other).
b. Listing of individuals requiring driver training (for certificated airports and as requested).
c. Radio communications.
i. Types of radios and backup capabilities.
ii. Parties responsible for monitoring radios.
iii. Who to contact if the ATCT/Sponsor cannot reach the contractor’s designated person by radio.
d. Details on how the contractor will escort material delivery vehicles.
6. Wildlife management.
Discuss the following:
a. Methods and procedures to prevent wildlife attraction.
b. Wildlife reporting procedures.
7. Foreign Object Debris (FOD) management.
Discuss equipment and methods for control of FOD, including construction debris and dust.
8. Hazardous material (HAZMAT) management.
Discuss equipment and methods for responding to hazardous spills.
9. Notification of construction activit ies.
Provide the following:
a. Contractor points of contact.
b. Contractor 24-hour emergency contact.
c. Listing of tall or other requested equipment proposed for use on the airport and the timeframe for submitting 7460-1 forms not previously submitted by the airport operator.
40097.122.01 | May 2024 | Page 4
10. Inspection requirements.
Discuss daily (or more frequent) inspections and special inspection procedures.
11. Underground utilit ies.
Discuss proposed methods of identifying and protecting underground utilities.
12. Penalties.
Penalties should be identified in the CSPP and should not require an entry in the SPCD.
13. Special conditions.
Discuss proposed actions for each special condition identified in the CSPP.
14. Runway and taxiway visual aids. Including marking, lighting, signs, and visual
NAVAIDs.
a. Equipment and methods for temporary closure markings (paint, fabric, other).
b. Equipment and methods for covering signage and airfield lights
15. Marking and signs for access routes.
Discuss proposed methods of demarcating access routes for vehicle drivers.
16. Hazard marking and lighting.
Discuss proposed equipment and methods for identifying excavation areas.
17. Protection of runway and taxiway safety areas, including object free areas, obstacle free zones, and approach/departure surfaces.
Discuss proposed methods of identifying, demarcating, and protecting airport surfaces including:
a. Equipment and methods for maintaining Runway Safety Area standards.
b. Equipment and methods for maintaining Taxiway Safety Area standards.
c. Equipment and methods for separation of construction operations from aircraft operations, including details of orange mesh safety fence.
18. Other limitations on construction.
These should be identified in the CSPP and should not require an entry in the SPCD.
40097.122.01 | May 2024 | Page 5
DOCUMENT AVAILABILITY.
Have copies of the CSPP and SPCD available at all times for reference by the airport operator and its representatives, and by subcontractors and contractor employees.
SAFETY PROCEDURES.
Ensure that construction personnel are familiar with safety procedures and regulations on the
Airport. Provide a point of contact that will coordinate an immediate response to correct any construction-related activity that may adversely affect the operational safety of the Airport. The
Contractor shall anticipate 24-hour coverage.
CONTRACTOR’S SPCD REPRESENTATIVE.
Identify in the SPCD the contractor’s on-site employees responsible for monitoring compliance with the CSPP and SPCD during construction. At least one of these employees must be on-site whenever active construction is taking place.
INSPECTIONS.
Conduct inspections sufficiently frequently to ensure construction personnel comply with the
CSPP and SPCD and that there are no altered construction activities that could create potential safety hazards.
VEHICLE MOVEMENT.
Restrict movement of construction vehicles and personnel to permitted construction areas by flagging, barricading, erecting temporary fencing, or providing escorts, as appropriate and as specified in the CSPP and SPCD.
AIR OPERATIONS AREA PROTECTION.
Ensure that no contractor employees, employees of subcontractors or suppliers, or other persons enter any part of the air operations area (AOA) from the construction site unless authorized.
FORM 7460-1 SUBMITTAL.
Ensure prompt submittal through the airport operator of Form 7460-1 for the purpose of conducting an aeronautical study of contractor equipment such as tall equipment (cranes, concrete pumps, and other equipment), stockpiles, and haul routes when different from cases previously filed by the airport operator. The FAA encourages online submittal of forms for expediency.
40097.122.01 | May 2024 | Page 6
III. INTRODUCTION OF STAFF
Key staff associated with the safety and operational planning of the Project.
Jenna Pang Airport Engineer – FAA Seattle ADO (206-231-4147)
Anthony Beach Airport Manager – Oregon Department of Aviation (503-378-2523)
James Kirby, PE Senior Project Manager – Century West Engineering (971-317-0557)
Ryan Halvorson, PE Project Manager/EOR – Century West Engineering (971-384-7544)
IV. SCHEDULE AND SCOPE OF WORK
SCHEDULE.
Construction is anticipated to begin in the Summer of 2024 with an anticipated contract duration of 90 consecutive calendar days. The work will be performed through four phases as described in Section V of this document.
SCOPE.
The overall work includes the following:
1. Rehabilitation of Airport Apron;
2. Regrade main Apron;
3. Reinstall aircraft tie down locations;
4. Install new storm drainage and revisions to existing drainage system to maintain drainage within main Apron;
5. Remove and apply Apron and Taxilane pavement markings.
V. SAFETY PLAN
CONSTRUCTION SAFETY AND PHASING.
The items listed below follow the guidance of Chapter 2, Section 2, “Plan Requirements” and
Chapter 3, “Guidelines for Writing a CSPP” as provided in AC 150/5370-2G-Operational Safety on Airports during Construction.
1. Coordination.
The Cottage Grove State Airport Apron Rehabilitation Project’s predesign, prebid, and preconstruction conferences will be used as opportunities to introduce the subject of airport operational safety during construction and to describe the elements of this CSPP and resulting
SPCD.
a. Contractor Progress Meetings. Operational safety will be a standing agenda item for discussion during weekly progress meetings through duration of the project.
40097.122.01 | May 2024 | Page 7
b. Scope or Schedule Changes. Changes in the scope or duration of the project will be represented by revisions to the CSPP.
c. FAA-ATO Coordination. The contractor will work with the project representative during construction to assure that FAA Air Traffic Organization (ATO) will be coordinated with, and schedule, airway facility (including NAVAIDs) shutdowns and restarts. The FAA
ATO contact person will be the Western Service Center and can be reached at 1-206-
231-2420.
i. Partial closures of Taxilanes and apron are anticipated over the project.
2. Phasing.
The project Construction Safety and Phasing Plan provided in Appendix C details the scheduling of construction phases. The sequenced construction phases have been incorporated into the project design and are reflected in the contract drawings and specifications. It is anticipated that the project will be completed in one phase; refer to the Construction Safety and
Phasing Plan provided in Appendix C for additional information.
Phase 1 and 2 shall not be performed concurrently; the Phases shall be completed successively beginning with Phase 1. All Phases will not require a Runway or Taxiway A closure for work performed.
a. Phase 1-
a. Includes the following (see Drawing G-03 in Appendix C for diagram of Phase 1 area and details),
b. Phase extents include from fuel tank, vehicular parking lot, and south side of
Hangar taxilane OFA to the south to the northern extent of the asphalt paving to the north, and east of terminal building and southern hangars.
c. This work shall occur over 40 calendar days.
d. Runway 15-33 NAVAIDs and electrical equipment shall remain in operation during this Phase. No anticipated runway closure for this Phase.
b. Phase 2-
a. Includes the following (see Drawing G-04 in Appendix C for diagram of Phase 1 area and details),
40097.122.01 | May 2024 | Page 8
b. Phase extents include from south side of Hangar taxilane OFA to the north to southern taxilane connector to Taxiway A, and apron area east of fuel tank, terminal building, and southern hangars.
c. This work shall occur over 50 calendar days.
d. Runway 15-33 NAVAIDs and electrical equipment shall remain in operation during this Phase. No anticipated runway closure for this Phase.
c. Total contract time: 90 calendar days.
3. Areas and Operations Affected by Construction Activity.
The Construction Safety and Phasing Plan included in Appendix C for the project identifies areas and operations affected by the construction. Major impacts include:
a. Phase 1 will require partial closure (approximately half) of the main apron and taxilanes serving the main apron.
b. Phase 2 will require partial closure (approximately second half) of the main apron and taxilanes serving the main apron.
c. Phase 1 and Phase 2 will not require Taxiway A and Runway 15-33 to be closed.
Service to the Taxiway A and Runway 15-33 will remain open during construction.
4. Navigation Aid (NAVAID) Protection.
All NAVAIDs will remain operational while the Runway is open. Extreme caution shall be used when working near existing light fixtures, underground electrical ducts, underground electrical cable and any other existing airport fixtures. Should damage occur to any of these items, they will be replaced at the Contractor’s expense.
5. Contractor Access.
a. Location of Stockpiled Construction Materials. Stockpiled materials and equipment storage will be restricted to the areas marked as ‘Contractor Staging Area’ on the attached Construction Safety and Phasing Plans. Contractor stockpiled materials and equipment storage are not permitted within Runway Safety Areas (RSA), Obstacle Free
Zones (OFZ) or Object Free Areas (OFA) of operational runways. Stockpiled materials and equipment adjacent to these areas are to be prominently marked and lighted during hours of restricted visibility or darkness (see Section 16). Limit stockpiled materials to 12 feet in height and at least 125 feet from any runway centerline and 45 feet from any taxiway centerline. Stockpiled materials shall not penetrate part 77 surfaces shown on the Construction Safety and Phasing Plan in Appendix C. Materials are to be stabilized
40097.122.01 | May 2024 | Page 9 and stored at an approved location so as not to be a hazard to aircraft operations and to prevent attraction of wildlife and foreign object damage. Refer to Sections 6 and 7.
b. Vehicle and Pedestrian Operations. Vehicle and pedestrian access routes for airport construction projects must be controlled to prevent inadvertent or unauthorized entry of persons, vehicles, or animals onto the AOA. Construction and related vehicles shall be restricted to areas clearly indicated on the attached Construction Safety and Phasing
Plan sheets and as directed by the Airport. The use of escort vehicles is addressed below.
i. Construction Site Parking. Vehicle parking areas for contractor employees will be restricted to ‘Contractor Staging Areas’ as depicted in the attached
Construction Safety and Phasing Plan.
ii. Construction Equipment Parking. Contractor employees must park and service all construction vehicles in ‘Contractor Staging Areas’. Inactive equipment must not be parked on a closed taxiway or runway. Employees shall park construction vehicles in the designated staging areas when not in use by construction personnel (for example, overnight, on weekends, or during other periods when construction is not active).
iii. Access and Haul Roads. Construction contractor’s access to the construction site and haul roads has been clearly marked on the Construction Safety and
Phasing Plan. The construction contractor is not permitted to use any access or haul roads other than those approved. Access routes used by contractor vehicles must be clearly marked by contractor to prevent inadvertent entry to areas open to airport operations.
iv. Marking and Lighting of Vehicles. Contractor vehicles/equipment shall be marked with company identification (on both sides of the vehicle/equipment) and a flashing yellow beacon or an Engineer approved orange and white checkered flag (must be visible from 300 feet) while operating within the airport boundary.
If working at night, all construction vehicles working on the airport (beyond the staging area) shall be equipped with amber strobe lights or amber rotating beacons. This is required in order to provide adequate visibility of construction equipment from the air and from aircraft taxiing on the ground. Lights shall conform to AC 150/5210-5D Painting, Marking and Lighting of Vehicles Used on an Airport, latest edition.
v. Vehicle Operations. Only vehicles used for construction purposes shall enter the air operations area. Contractor vehicle operations are allowed only in defined work areas, haul routes, and paved areas closed to aircraft traffic, unless
40097.122.01 | May 2024 | Page 10 otherwise approved by the Airport or Engineer in advance. The contractor is to familiarize all construction personnel with the safety provisions.
vi. Training Requirements for Vehicle Drivers. Contractors will attend an Airport
Safety training conducted by Century West Engineering. The training will introduce/refresh the Contractor on airport safety, operations, and communication. The Contractor will be required to pass a test at the end of the training.
vii. Escorting. The Contractor and employees are not required to be escorted while on site if they have been trained per vi above.
viii. Situational Awareness. Vehicle drivers must confirm by personal observation that no aircraft is approaching their position (either in the air or on the ground) when given clearance to cross a runway, taxiway, or any other area open to airport operations.
ix. Two-way Radio Communication Procedures.
The Contractor shall monitor Common Traffic Advisory Frequency (CTAF)
122.80 MHz for Cottage Grove State Airport air traffic.
x. Maintenance of the Secured Area of the Airport. Not applicable. There are no secured areas on the airport.
6. Wildlife Management.
Construction contractors must carefully control and continuously remove waste or loose materials that might attract wildlife. Contractor personnel must be aware of and avoid construction activities that can create wildlife hazards on airports, such as the following:
a. Trash. Food scraps must be collected from construction personnel activity.
b. Standing Water. Standing water is not permitted on Airport grounds.
c. Tall Grass and Seeds. Grass seed is attractive to birds. Lower quality seed mixtures can contain seeds of plants (such as clover) that attract larger wildlife.
d. Poorly Maintained Fencing and Gates. See Section 5 above.
e. Encounters with Wildlife. If the contractor encounters large to medium sized mammals (such as deer) within Airport property fencing they are to notify the project representative during construction.
40097.122.01 | May 2024 | Page 11
7. Foreign Object Debris (FOD) Management.
Waste and loose materials, commonly referred to as FOD, are capable of causing damage to aircraft landing gears, propellers, and jet engines. Construction contractors must not leave or place FOD on or near active aircraft movement areas. Materials capable of creating FOD must be continuously removed during the construction project. The Contractor shall take care to manage FOD so as not to disturb operation of FAA owned facilities (including NAVAIDS) at the airport. Additionally, prior to reopening the runway or taxiways following a closure, all FOD must be removed from airfield pavement.
8. Hazardous Materials (HAZMAT) Management.
Encountering hazardous material (HAZMAT) during construction should be considered an emergency. Emergency procedures shall be followed in this instance. Contractor shall take care to prevent and contain leaks of hazardous material (fuel, hydraulic fluids, etc.). Contractors operating construction vehicles and equipment on the airport must be prepared to expeditiously contain and clean-up spills resulting from fuel or hydraulic fluid leaks.
9. Notification of Construction Activit ies.
a. List of Responsible Representatives:
In Case of Emergency
Cottage Grove Police (General) .................................................... (541) 942-9145
South Lane County Fire & Rescue (Office) ................................... (541) 942-4493
Cottage Grove State Airport Manager (Anthony Beach) ................ (503) 378-2523
Century West Engineering ............................................................. (503) 419-2130
Poison Control Center ................................................................... (800) 222-1222
b. NOTAMs. Only the Airport Manager may initiate or cancel a Notice to Airmen (NOTAM) on airport conditions and is the only entity that can close or open a runway. The airport operator must coordinate the issuance, maintenance, and cancellation of NOTAMs about airport conditions resulting from construction activities with tenants and the local air traffic facility (control tower, approach control, or air traffic control center), and must provide information on closed or hazardous conditions on airport movement areas to the
FAA Flight Service Station (FSS) so it can issue a NOTAM.
Construction activity shall not commence prior to issuance of a NOTAM. The Contractor shall advise the Engineer three (3) days in advance of the planned commencement of construction activity so a NOTAM can be issued and shall not commence such activity until advised by the Engineer. Upon completion of work to the satisfaction of the
Engineer, a NOTAM indicating completion will be issued. No further work in affected areas will be permitted.
40097.122.01 | May 2024 | Page 12
c. Emergency Notification Procedures. In the event of an emergency, Airport staff and the proper authorities will be notified immediately. In the event of an emergency, personnel and equipment shall move immediately to the staging area through appropriate routes.
Prior to start of construction, the Contractor shall provide a list of contact information for personnel available 24 hours a day to be contacted in case of an emergency. As applicable, the list shall include phone numbers of the Engineer, Inspector, Airport
Manager, and local FAA NAVAIDS facilities manager.
The Contractor shall designate a qualified safety officer for the project as well as appoint a point of contact for any required operational safety concerns.
d. Coordination with ARFF. Coordinate ARFF activities with the Airport Manager.
e. Notification to the FAA.
i. Part 77. Any proposed construction or alterations of objects that affect navigable airspace, as defined in Part 77, will be coordinated with FAA.
ii. NAVAIDS. For emergency (short-notice) notification about impacts to both airport owned and FAA owned NAVAIDs, contact: 866-432-2622. FAA
ATO/Technical Operations shall be provided a 45-day minimum notice for the scheduled interruption of NAVAIDS.
10. Inspection Requirements.
a. Daily Inspections. Inspections shall be conducted at least daily, but more frequently if necessary to ensure conformance with the CSPP. For the Contractors own use, a sample checklist has been attached to this safety plan as Appendix A. The project representative during construction, serving as the project inspector, is responsible for monitoring work progress and will respond to construction and safety issues. The inspector will have communication capability with Airport staff. The Contractor is required to immediately remedy any deficiencies, whether caused by negligence, oversight, or project scope.
The Engineer is responsible for the supervision and enforcement of Safety Plan requirements, as well as addressing airfield issues with construction personnel, as appropriate.
b. Inspections Prior to Reopening. As applicable, closed runway(s), taxiway(s), and tie-down apron(s) are subject to safety inspections prior to reopening the facilities for
40097.122.01 | May 2024 | Page 13 service. Requirements for reopening a runway/taxiway/apron at the end of each work shift include:
i. Runway Safety Area conditions
a. Open trenches or excavations are not permitted within the RSA while the runway is open. Backfill trenches before the runway is opened. If backfilling excavations before the runway must be opened is impracticable, cover the excavations appropriately. Covering for open trenches must be designed to allow the safe operation of the heaviest aircraft operating on the runway across the trench without damage to the aircraft.
b. RSA must have no potentially hazardous ruts, humps, depressions, or other surface variations, and must be capable, under dry conditions, of supporting the occasional passage of aircraft without causing structural damage to the aircraft.
ii. Pavement conditions
a. Pavement edges and ends shall not exceed 3 inches vertical.
b. Construction debris (gravel, sand, mud, paving materials) and trash shall be removed from pavement prior to reopening runway.
iii. Return all equipment to staging areas.
iv. Remove barricades and runway closure markers.
11. Underground Utilities.
The following individuals, firms or corporations have authority to excavate or otherwise disturb non-FAA owned utility services or facilities located within the limits of the work:
Utility or other Facility Contact Person Phone Number
1. Utility One-Call One-Call Dispatcher 1-800-332-2344 (or 811)
2. FAA ATO Western Service Center 1-206-231-2420
FAA-owned equipment and utilities area present at the Airport. The Contractor shall vacuum excavate and/or hand dig at crossings to locate and protect all utilities. If accidental damage occurs, the Contractor shall notify the Airport, the utility company, and the Engineer.
40097.122.01 | May 2024 | Page 14
12. Penalties.
Contractor will make construction personnel familiar with this safety plan. All contractor and subcontractor personnel are required to comply with this safety plan. The Contractor will be held responsible for any accident that occurs as a result of construction personnel not following the provisions of this safety plan.
Strict adherence to the provisions of this plan by all personnel assigned to or visiting the construction site is mandatory. In the event contractor activities are not in conformance with the provisions of this plan, the contractor shall immediately cease those operations involved in the violation of the provisions of this plan and conduct a safety meeting. The owner may direct the contractor, in writing, to immediately cease those operations involved in the violation of the provisions of this plan. The contractor shall not resume construction operations until an appropriate action is taken as determined by the Owner.
13. Special Conditions.
There are no special conditions that affect the operation of the airport or will require the activation of any special procedures.
14. Runway and Taxiway Visual Aids.
The airport will remain open for the duration of this project. The airport’s only runway will not be impacted by the project. Existing navaids including runway lights and PAPIs will not be impacted for the duration of the project.
15. Marking and Signs for Access Routes.
Pavement markings and signs for construction personnel will conform to AC 150/5340-1M and
150/5340-18G respectively, and, to the extent practicable, with the Federal Highway
Administration Manual on Uniform Traffic Control Devices (MUTCD) and/or State highway specifications. Signs adjacent to areas used by aircraft must comply with the frangibility requirements of AC 150/5220-23A, Frangible Connections.
16. Hazard Marking, Lighting and Signing.
a. Hazard marking and lighting prevents pilots from entering areas closed to aircraft, and prevents construction personnel from entering areas open to aircraft. Hazard marking and lighting must also be specified to identify open manholes, small areas under repair, stockpiled material, waste areas, and areas subject to jet blast.
b. Hazard marking equipment:
40097.122.01 | May 2024 | Page 15
i. Barricades. Will be used to identify and define the limits of construction and hazardous areas on airports. Barricade type and placement can be found in the project Specifications (Section 01300) and Construction Safety and Phasing
Plan, included in Appendix B and Appendix C, respectively. The spacing of the barricades is such that a breach is physically prevented barring a deliberate act.
ii. Lights. Must be red and must meet the luminance requirements of the State
Highway Department. Lights must be mounted on barricades and spaced at no more than 10 ft. Lights must be operated between sunset and sunrise and during periods of low visibility whenever the airport is open for operations. Mounted barricade lights may be operated by photocell or battery power, but the contractor must maintain the aforementioned luminance requirements while the airport is open for operations.
iii. No supplement barricades with signs are needed for the proposed project.
iv. Air Operations Area – General. Barricades are not permitted in any active safety area or on the runway side of a runway hold line.
v. Air Operations Area – Runway/Taxiway Intersections. Use highly reflective barricades with lights to close taxiways leading to closed runways. Evaluate all operating factors when determining how to mark temporary closures that can last from 10 to 15 minutes to a much longer period of time. Even for closures of relatively short duration, close all taxiway/runway intersections with barricades.
vi. Air Operations Area – Other. Not applicable to this project.
vii. Maintenance. In accordance with specification Section 01300, the contractor is required to have a person on call 24 hours a day for emergency maintenance of airport hazard lighting and barricades. The contractor must file the contact person’s information with the airport operator.
40097.122.01 | May 2024 | Page 16
17. Protection of Runway and Taxiway Safety Areas.
a. Runway Safety Area (RSA). A runway safety area is the defined surface surrounding the runway prepared or suitable for reducing the risk of damage to airplanes in the event of an undershoot, overshoot, or excursion from the runway (see AC 150/5300-13B, latest addition and changes).
The Cottage Grove State Airport RSA has the following dimensions:
Runway 15-33: 120’ in width and 3,860’ in length
Construction activities within the existing RSA are subject to the following conditions:
i. No activity (including construction) may occur within the RSA while the runway is open for aircraft operations.
ii. The RSA width will not be adjusted for the proposed project.
iii. Stockpiles are not permitted within the RSA while the runway is open.
iv. Excavations
a. Open trenches or excavations are not permitted within the RSA while the runway is open. Excavations are to be backfilled before the runway is reopened.
b. If required by Airport Operations, construction contractors must prominently mark open trenches and excavations at the construction site with red or orange flags, as approved by the airport operator, and light them with red lights during hours of restricted visibility or darkness.
v. Soil erosion must be controlled to maintain RSA standards, that is, the RSA must be cleared and graded and have no potentially hazardous ruts, humps, depressions, or other surface variations, and capable, under dry conditions, of supporting snow removal equipment, aircraft rescue and firefighting equipment, and the occasional passage of aircraft without causing structural damage to the aircraft.
b. Runway Object Free Area (ROFA). Construction, including excavations, may be permitted in the ROFA. However, equipment must be removed from the ROFA when not in use. The proposed project does not allow stockpiling within the ROFA.
The Cottage Grove State Airport ROFA has the following dimensions:
Runway 15-33: 250’ in width and 3,680’ in length
40097.122.01 | May 2024 | Page 17
c. Taxiway Safety Area (TSA). A taxiway safety area is a defined surface alongside the taxiway prepared or suitable for reducing the risk of damage to an airplane unintentionally departing the taxiway.
The Cottage Grove State Airport TSA has a width of 49.
Construction activities within the TSA are subject to the following conditions:
i. No activity (including construction) may occur within the TSA while the taxiway is open for aircraft operations.
ii. The TSA width will not be adjusted for the proposed project.
iii. Excavations
a. Open trenches or excavations are not permitted within the TSA while the taxiway is open. Excavations are to be backfilled before the taxiway is reopened.
b. If required by Airport Operations, construction contractors must prominently mark open trenches and excavations at the construction site with red or orange flags, as approved by the airport operator, and light them with red lights during hours of restricted visibility or darkness.
iv. Soil erosion must be controlled to maintain TSA standards, that is, the TSA must be cleared and graded and have no potentially hazardous ruts, humps, depressions, or other surface variations, and capable, under dry conditions, of supporting snow removal equipment, aircraft rescue and firefighting equipment, and the occasionally passage of aircraft without causing structural damage to the aircraft.
d. Taxiway Object Free Area (TOFA). Unlike the Runway Object Free Area, aircraft wings regularly penetrate the taxiway object free area during normal operations. Thus, the restrictions are more stringent. No construction may occur within the taxiway object free area while the taxiway is open for aircraft operations.
The Cottage Grove State Airport TOFA has a width of 89’.
e. Obstacle Free Zone (OFZ). Personnel, material, and/or equipment may not penetrate the OFZ while the runway is open for aircraft operations.
The Cottage Grove State Airport OFZ has the following dimensions:
Runway 15-33: 250’ in width and 3,680’ in length
40097.122.01 | May 2024 | Page 18
f. Runway Approach/Departure Areas and Clearways. All personnel, materials, and/or equipment must remain clear of the applicable threshold siting surfaces, as defined in
Appendix 2, “Threshold Siting Requirements,” of AC 150/5300-13B, latest addition and changes.
18. Other Limitations on Construction
a. Prohibitions
i. No use of tall equipment (cranes, concrete pumps, etc.) unless a 7460-1 determination letter is issued for such equipment.
ii. No use of open flame, welding, or torches unless fire safety precautions are provided and the airport operator has approved their use.
iii. No use of electrical blasting caps on or within 1,000 ft. (300 m) of the airport property.
iv. No use of flare pots within the AOA.
b. Restrictions. The Notes and Details shown on the attached Site Work Area and Safety
Plan offer additional details on restrictions on which areas cannot be worked in simultaneously, day/night work restrictions and other limitations.
Appendix A Construction Project Daily Safety Inspection Checklist
12/13/2017 AC 150/5370-2G
Appendix D
D-1
APPENDIX D. CONSTRUCTION PROJECT DAILY SAFETY INSPECTION CHECKLIST
The situations identified below are potentially hazardous conditions that may occur during airport construction projects. Safety area encroachments, unauthorized and improper ground vehicle operations, and unmarked or uncovered holes and trenches near aircraft operating surfaces pose the most prevalent threats to airport operational safety during airport construction projects. The list below is one tool that the airport operator or contractor may use to aid in identifying and correcting potentially hazardous conditions. It should be customized as appropriate for each project including information such as the date, time and name of the person conducting the inspection.
Table D-1. Potentially Hazardous Conditions
Item Action Required (Describe)
No Action
Required
(Check)
Excavation adjacent to runways, taxiways, and aprons improperly backfilled.
Mounds of earth, construction materials, temporary structures, and other obstacles near any open runway, taxiway, or taxi lane; in the related Object Free area and aircraft approach or departure areas/zones;
or obstructing any sign or marking.
Runway resurfacing projects resulting in lips exceeding 3 inch (7.6 cm) from pavement edges and ends.
Heavy equipment (stationary or mobile) operating or idle near AOA, in runway approaches and departures areas, or in
OFZ.
Equipment or material near NAVAIDs that may degrade or impair radiated signals and/or the monitoring of navigation and visual aids. Unauthorized or improper vehicle operations in localizer or glide slope critical areas, resulting in electronic interference and/or facility shutdown.
Tall and especially relatively low visibility units (that is, equipment with slim profiles)
— cranes, drills, and similar objects — located in critical areas, such as OFZ and
D-2
Item Action Required (Describe)
No Action
Required
(Check) approach zones.
Improperly positioned or malfunctioning lights or unlighted airport hazards, such as holes or excavations, on any apron, open taxiway, or open taxi lane or in a related safety, approach, or departure area.
Obstacles, loose pavement, trash, and other debris on or near AOA. Construction debris
(gravel, sand, mud, paving materials) on airport pavements may result in aircraft propeller, turbine engine, or tire damage.
Also, loose materials may blow about, potentially causing personal injury or equipment damage.
Inappropriate or poorly maintained fencing during construction intended to deter human and animal intrusions into the AOA.
Fencing and other markings that are inadequate to separate construction areas from open AOA create aviation hazards.
Improper or inadequate marking or lighting of runways (especially thresholds that have been displaced or runways that have been closed) and taxiways that could cause pilot confusion and provide a potential for a runway incursion. Inadequate or improper methods of marking, barricading, and lighting of temporarily closed portions of
AOA create aviation hazards.
Wildlife attractants — such as trash (food scraps not collected from construction personnel activity), grass seeds, tall grass, or standing water — on or near airports.
Obliterated or faded temporary markings on active operational areas.
Misleading or malfunctioning obstruction lights. Unlighted or unmarked obstructions in the approach to any open runway pose aviation hazards.
D-3
Item Action Required (Describe)
No Action
Required
(Check)
Failure to issue, update, or cancel
NOTAMs about airport or runway closures or other construction related airport conditions.
Failure to mark and identify utilities or power cables. Damage to utilities and power cables during construction activity can result in the loss of runway / taxiway lighting; loss of navigation, visual, or approach aids; disruption of weather reporting services; and/or loss of communications.
Restrictions on ARFF access from fire stations to the runway / taxiway system or airport buildings.
Lack of radio communications with construction vehicles in airport movement areas.
Objects, regardless of whether they are marked or flagged, or activities anywhere on or near an airport that could be distracting, confusing, or alarming to pilots during aircraft operations.
Water, snow, dirt, debris, or other contaminants that temporarily obscure or derogate the visibility of runway/taxiway marking, lighting, and pavement edges.
Any condition or factor that obscures or diminishes the visibility of areas under construction.
Spillage from vehicles (gasoline, diesel fuel, oil) on active pavement areas, such as runways, taxiways, aprons, and airport roadways.
Failure to maintain drainage system integrity during construction (for example, no temporary drainage provided when working on a drainage system).
D-4
Item Action Required (Describe)
No Action
Required
(Check)
Failure to provide for proper electrical lockout and tagging procedures. At larger airports with multiple maintenance shifts/workers, construction contractors should make provisions for coordinating work on circuits.
Failure to control dust. Consider limiting the amount of area from which the contractor is allowed to strip turf.
Exposed wiring that creates an electrocution or fire ignition hazard.
Identify and secure wiring, and place it in conduit or bury it.
Site burning, which can cause possible obscuration.
Construction work taking place outside of designated work areas and out of phase.
Appendix B Specification Sections 01160 and 01300
Century West Engineering Corporation Section 01160 - 1 of 6 May 2024 | #40097.122.01
01160 GENERAL REQUIREMENTS
DESCRIPTION
Location and Plans. The Cottage Grove State Airport (61S) is owned by the Oregon Department of Aviation (ODAV) and is located in Cottage Grove, Oregon approximately 1.5 miles northeast of downtown Cottage Grove, Oregon. For the purpose of this contract, the terms Airport and Owner are considered the same.
The contract plans for this project contain 20 sheets titled “Cottage Grove State Airport Apron Rehabilitation Project”.
Airport Security. During the course of the contract, the Contractor shall be responsible for maintaining security against unauthorized access to the Airport. The Contractor will be held responsible for any fines, damages, or civil penalties filed against the Oregon Department of Aviation (ODAV) and the Cottage Grove State Airport (61S) for the Contractor's failure to maintain the regulations set forth herein.
The Contractor shall be fully responsible for compliance of all employees with the Airport security program and following regulations and orders of the Airport management. These regulations may affect identification requirements of employees and subcontractors, movement around the Airport, parking, entry, and other circumstances affecting the safety or protection of persons or property.
The security requirements are subject to change at any time during the project without prior notice.
For the intent and purpose of these regulations, Air Operations Area (AOA) is construed to mean any area used or intended to be used for takeoff, landing, or surface maneuvering of aircraft, and all other areas restricted to public access on the field. Work boundaries within the Air Operations Area shall be established as shown on the drawings. Only Contractor's employees are permitted in the work sites.
Deliveries to work sites will be controlled by the Contractor. The Contractor shall account for Airport-issued keys in a manner approved by the Airport.
Within the Air Operations Area, all equipment, vehicle, and personnel travel shall be restricted to designated work sites.
Only vehicles used for construction purposes shall enter the Air Operations Area. Contractor personnel shall park their personal vehicles within a designated staging area.
Contractor vehicles/equipment shall be marked with company identification (on both sides of the vehicle/equipment) and a flashing yellow beacon or an Engineer-approved orange and white checkered flag (must be visible from 300 feet) while operating within the airport boundary.
During night operations, each vehicle entering the Air Operations Area shall be equipped with a yellow flashing light mounted on the roof of the cab. Headlights, taillights, and flashers shall be used for all activities during these hours.
In the event of an emergency, personnel and equipment shall move immediately to the staging area.
Century West Engineering Corporation Section 01160 - 2 of 6 May 2024 | #40097.122.01
Layout of the Work. The Contractor will do all the construction surveying on the project. The Engineer will provide vertical and horizontal reference control points in the proximity of the work.
The Contractor should refer to Section 01406, “Construction Staking”, for specific requirements.
Completion Time. All items of contract work shall be substantially complete within the time period specified in the “ITB”.
Environmental Codes and Regulations. The Contractor shall comply with provisions of Federal, State and local statutes, ordinances and regulations dealing with the prevention of environmental pollution and the preservation of natural resources that affect the project.
If the Contractor must undertake additional work due to the enactment of new or the amendment of existing statutes, ordinances and regulations dealing with the prevention of the successful bid, the Airport will issue a supplemental agreement setting forth the additional work that must be undertaken. The supplemental agreement shall not invalidate the contract and there shall be, in addition to a reasonable extension of contract time, if necessary, a reasonable adjustment in the contract price to compensate the successful bidder for all costs and expenses incurred, including overhead and profits, as a result of the additional work.
Special Permits. The Contractor shall pay for, and obtain, any and all permits required for construction of the work.
Inspection and Testing. All tests called for in the specifications or deemed necessary by the Engineer will be performed by the Engineer, except when indicated otherwise in the specifications. The Engineer will perform quality assurance testing when, in the opinion of the Contractor, the work area to be tested is prepared and will meet the required specifications.
Contractor shall schedule testing at least 48 hours in advance of when he is ready for the test.
Bituminous surface course testing shall be scheduled a minimum of 14 days in advance of beginning paving. In the event test results do not meet the specifications, any cost for re-testing as may be required by the Engineer shall be at the Contractor's expense, charged at the rate established in the Engineer's standard fee schedule.
Contractor's Staging Area. An area (or areas) will be set aside on the Airport property for the Contractor's use as a staging area for personnel, equipment, and materials. The Contractor shall obtain all necessary building permits and operating licenses from local governmental agencies.
The Engineer will define the actual location in the field. The Contractor may install a security fence. The staging area shall be restored to its original condition at the conclusion of the work.
Disposal of Waste Material. Earthen material, rock, and other material that is acceptable for construction of embankments/fills for the project, and approved by the Engineer, shall be placed in locations as designated by the Engineer or as shown on the plans.
Excess waste earthen material, asphaltic pavement, unsuitable material, strippings, and vegetation/organic material from clearing and grubbing shall be disposed of off-site at the Contractor's expense.
Concrete and other debris shall be disposed of offsite.
Disposal of waste materials shall be in accordance with governing agency safety, health, and other requirements.
Century West Engineering Corporation Section 01160 - 3 of 6 May 2024 | #40097.122.01
Site Investigation and Representation. The Contractor acknowledges familiarity as to the nature and location of the work, the general and local conditions, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, roads, and uncertainties of weather, or similar physical conditions at the site, the conformation and conditions of the ground, the character of equipment and facilities needed preliminary to and during the prosecution of the work and all other matters which can in any way affect the work or the cost thereof under this contract.
The Contractor further acknowledges understanding of the character, quality, and quantity of surface and subsurface materials to be encountered from inspecting the site.
The Contractor warrants that as a result of the examination and investigation of all the aforesaid data that he can perform the work in a good and workmanlike manner and to the satisfaction of the Airport. The Airport assumes no responsibility for any representations made by any of its officers or agents during or prior to the execution of this contract, unless (1) such representations are expressly stated in the contract, and (2) the contract expressly provides that the responsibility therefore is assumed by the Airport. Representations for which liability is not expressly assumed by the Airport in the contract shall be deemed only for the information of the Contractor.
Information on Site Conditions. All information obtained by the Airport regarding site…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .