Attachment D-Cost Proposal AMC Snow Removal.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Anschutz Medical Campus Snow Removal
- Solicitation number
- RFP_F-0000000058
- Issued by
- Arapahoe County, Aurora City, Colorado
About this file
Attachment D-Cost Proposal AMC Snow Removal.xlsx is a detailed pricing document for the University of Colorado Anschutz Medical Campus snow removal contract located in Colorado. The document outlines comprehensive pricing for snow removal services across the campus, covering a five-year contract period with hourly rates for various equipment and labor categories. Equipment options include road graders, front-end loaders, heavy-duty pickups with snowplow blades, Bobcat skid loaders, dump trucks, and specialized vehicles for snow removal, along with provisions for hand shovelers and ice management.
The cost proposal provides a structured pricing matrix with zero-dollar placeholder rates across equipment usage and labor categories for Years 1-5, suggesting that actual pricing will be completed separately or in another document. The pricing structure accommodates different snow removal scenarios, including emergency calls, on-call employees, supervisory oversight, and specialized surface protection techniques. The contract appears designed to ensure comprehensive winter maintenance for the medical campus, covering vehicular roadways, pedestrian sidewalks, parking lots, emergency access routes, and critical facility entrances while maintaining flexibility for various winter maintenance requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Proposal
SNOW REMOVAL SERVICES COST PROPOSAL
| Equipment Usage-Per hour | Year 1 Hourly Rate | Year 2 Hourly Rate | Year 3 Hourly Rate | Year 4 Hourly Rate | Year 5 Hourly Rate | |
| 1 | Road Grader (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Front end loader (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Front end loader and Snow Pusher (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Heavy duty pick up with 7” min. snowplow blade (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Heavy duty pick up with 7” min. snowplow blade with “feet” to protect gravel surface (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | Bobcat Style Skid Loader and Snow Pusher (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | Inspector/Supervisor to review Assigned roads and parking lots | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 6 Cubic Yard Dump Truck (with operator) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | Hand Shovelers | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | Ice Slicer (Fee - per hourly labor plus material) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Labor Rate-Per Hour | Year 1 Hourly Rate | Year 2 Hourly Rate | Year 3 Hourly Rate | Year 4 Hourly Rate | Year 5 Hourly Rate | |
| 1 | Supervisor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Laborer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Emergency Calls/Services | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Call in/On Call Employee (if needed) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .