Attachment_ CRCBF-06 HV Disconnect Switch SECTION 1100 Drawings.pdf
PDF 2 MB Posted
- Attached to
- CRCBF-06 HV Disconnect Switch
- Solicitation number
- 69CRC-S1964
- Issued by
- Clark County, Nevada
About this file
This document contains drawings and material lists related to the CRCBF-06 HV Disconnect Switch contract opportunity issued by the Colorado River Commission of Nevada (CRCNV). The contract requests bids to supply materials for the Boulder Flats 230kV Switchyard project, including steel structures, bus work, grounding, equipment, communications, and other miscellaneous materials. The drawings and lists are marked as "Preliminary - Not for Construction" and "Issued for Bid", indicating this is part of the bidding process for the project. No specific bid due date, award date, or contract term is provided in the document.
The pricing terms, set-asides, incumbent contractors, funding sources, and other commercial details are not included in this document. This appears to be a technical specification and material list for the construction of the Boulder Flats 230kV Switchyard, which is the subject of the CRCBF-06 HV Disconnect Switch contract opportunity issued by the CRCNV.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\P&C\CADD\ES-4104.dwg 12/9/2021 11:27 AM TABRADBURY2
PRELIMINARY - NOT
FOR CONSTRUCTION
COLORADO RIVER COMMISSION
ISSUED FOR BID
BOULDER FLATS 230KV SWITCHYARD
ES-4104 B
ES-4151 A
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\P&C\CADD\ES-4151.dwg 12/9/2021 10:30 AM DGTAYLOR
A
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
PRELIMINARY - NOT
FOR CONSTRUCTION
COLORADO RIVER COMMISSION
ISSUED FOR BID
ES-4152 A
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\P&C\CADD\ES-4152.dwg 12/9/2021 10:38 AM DGTAYLOR
A
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
PRELIMINARY - NOT
FOR CONSTRUCTION
ES-4153 A
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\P&C\CADD\ES-4153.dwg 12/9/2021 10:39 AM DGTAYLOR
A
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
PRELIMINARY - NOT
FOR CONSTRUCTION
STEEL STRUCTURE MATERIAL LIST BUS WORK AND CONNECTIONS
MATERIAL LIST GROUNDING CONDUCTOR AND CONNECTIONS MATERIAL LIST
MISCELLANEOUS MATERIAL LIST
MAJOR EQUIPMENT MATERIAL LIST
COMMUNICATIONS MATERIAL LIST
ENCLOSURES/SAFETY SWITCH
MATERIAL LIST
TRENCH
MATERIAL LIST
BOULDER FLATS 230KV SWITCHYARD
ES-4201 B
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\Physical\ES-4201.dwg12/9/2021 9:20 AM JZJONES
A
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
PRELIMINARY - NOT
FOR CONSTRUCTION
AB
C
D
E
F ɸC ɸA ɸB ɸB ɸA ɸC ɸB ɸA ɸC
EAST-WEST
BASELINE
N O
R
TH
-S O
U
TH
BA
SE
LI
N
E
BOULDER FLATS 230KV SWITCHYARD
ES-4204 B
Z:\Clients\TND\CRCofNV\134241_BoulderFlats\Design\Substation\CADD\Boulder Flats Switchyard\Working\Physical\ES-4204.dwg 12/8/2021 JZJONES
A
B
C
D
E
F
G
H
I
J
2 3 4 5 6 7 8 9 10 11 12 13 14 15 161
COLORADO RIVER COMMISSION
PRELIMINARY - NOT
FOR CONSTRUCTION
File details come from the government source that posted it. Updated .