This is a Fee Proposal Form for a Construction Manager at Risk (CMAR) engagement with Spalding County, Georgia, for the 117 E Solomon Street Reconstruction project. The project involves the construction of a new two-story structure approximately 34,000 square feet in area to serve as an extension of the existing Spalding County Courthouse Annex. The CMAR will provide preconstruction services during the Schematic Development phase, including cost estimates at design milestones, value engineering analysis, and constructability reviews. The CMAR will assume responsibility for the guaranteed maximum price (GMP) and develop a final project schedule, both of which become contractual obligations. The scope includes demolition of the existing slab and construction of the new building, with the CMAR responsible for methods of construction, safety, and coordination of all construction contracts. The Design Team will deliver completed Schematic Development plans to the selected CMAR.

The fee proposal structure includes separate line items for preconstruction phase costs, construction fees expressed as a percentage of costs, and construction phase general conditions labor and costs. The form requires bidders to submit itemized labor costs by job title with hourly rates, estimated project percentage allocation, monthly rates, and duration in months. General conditions costs are itemized across 32 line items covering field office expenses, equipment, insurance, bonds, vehicles, travel, technology, and site management. The maximum stated cost limitation is $12,000,000 for the total of preconstruction fees, construction fees, and general conditions. Detailed breakdowns must be submitted with the proposal fee schedule in a separate sealed envelope.

View the file

Other files

File Type Posted
Attachment_Programming Plan.pdf PDF
117 E Solomon_CMAR RFQ.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fee Proposal

EXHIBIT A

CM/GC's GENERAL CONDITIONS & FEE PROPOSAL

Kennesaw Public Safety Facility (Submit Proposal Fee Schedule in Separate Sealed Envelope)

CM/GC'S PRE‐CONSTRUCTION PHASE COSTS $

CM/GC'S CONSTRUCTION FEE

FEE AS PERCENTAGE %

FEE AMOUNT $

CM/GC'S CONSTRUCTION PHASE GENERAL CONDITIONS

LABOR $

GENERAL CONDITIONS $

CONSTRUCTION PHASE TOTAL $

The CMAR’s Overhead Costs. The maximum amount for the CMAR’s overhead cost is inclusive of all direct and incidental expenses including but not limited to travel, sustenance, reproduction, salaries, wages, design and field office expenses, and those costs listed in the General Requirements. If authorized by the Owner to proceed with

Construction Phase Services, the CMAR will execute the work and be reimbursed for the actual costs as defined in the Contract Documents.

TOTALS

STATED COST LIMITATION

TOTAL ‐ PRE‐CONSTRUCTION FEE, CONSTRUCTION FEE AND GC'S $

PERCENTAGE OF PROJECT %

$ 12,000,000

117 E SOLOMON STREET RECONSTRUCTION

Fee Proposal

EXHIBIT A

GENERAL CONDITIONS BREAKDOWN

Depot Park - Phase 8

(Submit with Proposal Fee Schedule in Separate Sealed Envelope)

CONSTRUCTION PHASE LABOR COSTS

Job Title Hourly Rate**

Est. % on Project

Monthly Rate**

Duration (Months)

Total Notes

** Construction Manager shall attach a detailed itemization of the components of the labor burden.

CONSTRUCTION PHASE GENERAL CONDITION COSTS

Description Number of

Units

Unit (Lump

Sum, Day, Month, etc.)

Cost per Unit

Total Notes

1 Field Office Trailer

2 Field Office Set‐Up

3 Temp Toilet

4 Temp Power for Trailer

5 Temp Power Installation for Trailer

6 Telephone/Internet for Trailer 7 Telephone/Internet Installation for Trailer 8 Cleaning for Trailer 9 Furniture for Trailer

10 Machines & Equipment for Trailer 11 Supplies for Trailer 12 Water for Consumption for Trailer 13 Postage & Shipping 14 Reproduction of Plans and Specs 15 Project Website 16 Site Security (Incl. Fencing) 17 Owner Project Identification Signs 18 Mobile Phones 19 Project Vehicles 20 Fuel for Project Vehicles 21 Travel

22 Computers 23 Payment & Performance Bond 24 Builder's Risk Insurance 25 Liability Insurance 26 Safety & First Aid Supplies

117 E SOLOMON STREET RECONSTRUCITON