Attachment C - Statement of Work.pdf
PDF 803 KB Posted
- Solicitation number
- 70Z03826RL0000005
About this file
Statement of Work: APS-143 Radar Components Repair
This is a Statement of Work (SOW) for the repair of APS-143C(V)3 radar components for HC-144 aircraft operated by the U.S. Coast Guard (USCG). The contractor must be FAA I45 Certified as an authorized repair center and must test, troubleshoot, clean, repair, and/or modify components to Ready for Issue (RFI) condition in compliance with Original Equipment Manufacturer (OEM) specifications, maintenance manuals, service bulletins, and USCG publications. All repairs must integrate seamlessly with HC-144 aircraft subsystems without requiring further on-aircraft adjustment or calibration.
The contractor must provide all necessary facilities, trained personnel, labor, tooling, calibrated test equipment, and OEM-approved parts. The Repair Turn Around Time (RTAT) consists of a 30-calendar-day evaluation phase and a 60-calendar-day repair phase, with delays from parts unavailability or extended lead times excluded from the schedule. The contractor shall perform incoming inspections, failure verification using approved Acceptance Test Procedures (ATP), final acceptance testing, and environmental cleaning per FAA Advisory Circular 43-205 to remove hazardous materials including hexavalent chromium, cadmium, and lead. All components must pass factory-approved ATP testing and include FAA Form 8130-3 certification. The contractor must maintain a Component Repair Record (CRR) for each unit, participate in weekly status meetings with USCG personnel covering repair progress and anticipated timelines, and maintain configuration control documentation. The contract has a performance period of one 12-month ordering period followed by four one-year renewal options for a maximum five-year duration. USCG correspondence shall be directed to the Aviation Logistics Center in Elizabeth City, North Carolina.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
g) If the USCG Contracting Officer concurs with the exclusion determination, a written modification shall be issued that authorizes the Contractor to proceed with the repair at the agreed upon cost and delivery schedule.
h) No authorization to proceed is valid until the USCG Contracting Officer issues a modification to the task order with instructions to the Contractor and additional funding provided. The government may provide the necessary missing part from USCG inventory via modification.
File details come from the government source that posted it. Updated .