Attachment C - Specifications - Pages 1-2.docx

DOCX document 25 KB Posted

Attached to
Asbestos Abatement - DMA Bid Cancelled: 02/13/2025 - Addendum No. 1 – CANCELLATION Date Issued: 02/13/25 Your reference is
Solicitation number
3000023629
Issued by
Iberia Parish, Baton Rouge City, Louisiana

About this file

This document is the Scope of Work for Attachment C of an RFx contract opportunity with the Louisiana Department of Military Affairs (DMA). The contractor shall provide all labor and materials to demo, remove, and dispose of all asbestos containing material in Building 16 located at 5445 Point Clair Road, Carville, LA 70721. This includes removing contents, demolishing and disposing of vinyl tile and asbestos-containing materials in Rooms 116, 216, and 224, comprising a total of 660 square feet. The contractor must follow all Louisiana Department of Environmental Quality (LADEQ) standards and practices during removal, and properly dispose of all waste. The work must be completed within 60 days of the notice to proceed. The contractor is responsible for field verification of all measurements, quantities, and materials.

The contractor shall maintain the jobsite in an orderly and clean condition, remove all debris daily, and warrant all materials and workmanship for a minimum of one year. Power is available on-site, and DMA will designate storage areas if needed. Interested contractors can schedule an onsite visit by contacting Richard Gibbens at 225-319-4715 or richard.t.gibbens2.nfg@army.mil.

View the file

Other files

File Type Posted
3000023629-1.pdf PDF
Attachment B - Job Site Verification Form - Page 1.docx DOCX document
Attachment A - Special Terms and Conditions Pages 1-13.docx DOCX document
Attachment D - Appendix A.pdf PDF
3000023629.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment C – Specifications RFx 3000023629

Scope of Work:

The Contractor shall provide all labor and materials in order to demo, remove, and dispose of all asbestos containing material in Building 16 for the Louisiana Department of Military Affairs (DMA).

Location:

5445 Point Clair Road B16 Carville, LA 70721

Specifications:

Building 16 Room 116 -The Contractor shall remove all remaining contents from the work area.

-The Contractor shall demo and dispose of all vinyl tile and all asbestos containing material (glue and anything the glue was used to adhere to) in the 220 SQFT room. The Contractor shall follow all Louisiana Department of Environmental Quality (LADEQ) standards and practices during removal.

Building 16 Room 216 -The Contractor shall remove all remaining contents from the work area.

-The Contractor shall demo and dispose of all vinyl tile and all asbestos containing material (glue and anything the glue was used to adhere to) in the 220 SQFT room. The Contractor shall follow all Louisiana Department of Environmental Quality (LADEQ) standards and practices during removal.

Building 16 Room 224 -The Contractor shall remove all remaining contents from the work area.

-The Contractor shall demo and dispose of all vinyl tile and all asbestos containing material (glue and anything the glue was used to adhere to) in the 220 SQFT room. The Contractor shall follow all Louisiana Department of Environmental Quality (LADEQ) standards and practices during removal.

-The Contractor shall properly dispose of all waste in an approved landfill along with a written report.

-The Contractor shall provide profiling, waste manifest preparation, transportation, and disposal of asbestos materials.

-The Contractor shall furnish all material and complete repairs to the following areas (see Attachment D – Appendix A).

-All work shall be completed within 60 days after the issuance of the notice to proceed.

-The Contractor shall be responsible for field verification of all measurements/quantities/materials. To schedule an onsite visit you can contact Richard Gibbens at 225-319-4715 or richard.t.gibbens2.nfg@army.mil.

Cleaning:

-The Contractor shall retain all stored items in an orderly arrangement allowing maximum access, not impeding drainage or traffic, and providing the required protection of materials.

-The Contractor shall not allow the accumulation of scrap, debris, waste material and other items not required for the project.

-The Contractor shall provide daily cleanup of areas adjacent to work area.

-At the end of each working day, the Contractor shall store tools, small equipment (able to be carried by two – persons), building materials, and debris.

-At the end of each working day, the Contractor shall remove from the site all scrap, debris, and waste material. The Contractor shall provide adequate storage for all items awaiting removal from the site, observing all requirements for fire protection and protection of the ecology.

-At the end of each working day, the Contractor shall sweep interior spaces clean. “Clean”, shall be interpreted as meaning (free from dust and other material capable of being removed by use of reasonable effort of a hand-held broom).

General Conditions:

-The Contractor shall maintain the jobsite and surrounding areas orderly and clean of debris. Thorough cleanup shall be performed daily by the Contractor.

-No hazardous conditions shall be left exposed overnight, or for extended periods of time. Materials can be safely stored on facility.

-Power is available for operation of power tools.

-The Contractor shall be responsible for removal of all debris.

-The Contractor shall remove all furniture, file cabinets, desks, computer workstations, bookshelves, and all items requiring movement to facilitate removal of asbestos containing material. DMA’s representative shall designate areas for items to be stored if needed.

-All materials and workmanship shall be warranted for a minimum period of one year.