Attachment C - Specifications - Page 1.docx
DOCX document 21 KB Posted
- Solicitation number
- 3000024003
- Issued by
- West Feliciana Parish, Louisiana
About this file
This is a specifications document from the Department of Public Safety (DPS) detailing requirements for installing a 1000-gallon above-ground propane tank at the FETA Pine Country facility in Minden, Louisiana. The contractor must provide labor and materials to install the tank on an existing 20' x 40' x 4" concrete pad, with cradles approximately 3 feet at base and 2 feet high. The installation requires connecting to the current system above ground with no digging or trenching. Required components include two leg stands made from 6-inch channel iron, 100ft air hose, internal valve, Jomar ball valve, PVC pipes, rotary actuator, pressure regulator, rubber hoses, and various valves and couplings.
Work must be performed Monday through Friday between 8 a.m. and 4 p.m., with the contractor responsible for site cleanup. The contractor must conduct pressure testing for leaks after installation. The document does not specify pricing terms, set-asides, funding sources, or contract duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3000024003-1.pdf | ||
| Attachment A - Special Terms and Conditions Pages 1-13.docx | DOCX document | |
| 3000024003.pdf | ||
| Attachment B - Job Site Verification Form - Page 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Specifications RFx 3000024003
Scope of Work:
The Contractor shall provide all labor and materials in order to install a 1000 gallon above ground propane tank for the Department of Public Safety (DPS).
Location:
FETA Pine Country 214 Dutch Harbor Road Minden, La 71055
Specifications:
This new tank shall be tied into DPS’s current system above ground by the Contractor with no digging or trenching required. The new tank shall be placed on a pre-existing concrete pad by the Contractor that is 20 feet wide x 40 feet long x 4 inches high. The cradles shall be approximately 3 feet at the base and approximately 2 feet high. All work shall be pressure tested for leaks by the Contractor.
1000 gallon Propane Tank shall have the following components:
Two Leg Stands made from 6 inch channel iron 100ft 1/8 inch Air Hose 1 ¼ inch Internal Valve with flat handle Jomar Ball Valve 1 ¼ inch (R250 1 ¼ inch) or equal Two 2”x20’ Schedule 40 DWV PE PVC PIPE Rotary Actuator A3213RA or equal Adjustable 3-35 PSI High Pressure bottle Regulator Rubber Hose 15’ ¼ 3/8 Female Flared Ends Pigtail Rubber POL x ¼ IF x 48” QCC Quick Fill Coupling x ¼ MPT Hydrostatic Relief Valve ME449H or equal Liquid transfer valve ¾ x ¾ with MEH225 or equal
General Terms and Conditions:
All work shall be performed between the hours of 8 a.m. to 4 p.m. Monday- Friday.
The Contractor shall clean up all trash and supplies used around the site.