About this file

This is a Site Photographs attachment document prepared by the Oregon Military Department for the Camp Rilea Building 7029 Structural Foundation Stabilization project located at Camp Rilea Armed Forces Training Center in Warrenton, Oregon. The attachment provides six representative photographs documenting existing site conditions to assist contractors in understanding project scope and constraints. The photographs depict the equipment access route from the parking area to the hilltop building, the hilltop staging area adjacent to Building 7029, underside access beneath the structure showing the existing pier-and-post foundation and crawlspace clearance, the building elevation and surrounding terrain with slope conditions, existing foundation conditions showing settlement and displacement concerns, and the existing deck with grade differential transitions. The document emphasizes that these photographs are provided for informational purposes only and do not replace, supplement, or modify contract requirements, and that contractors are responsible for verifying all site conditions through their own investigation and evaluation.

The attachment establishes that the State does not represent or warrant that the site photographs depict all existing conditions and that contractors must rely on independent assessment of site conditions. The photographs specifically highlight working conditions for foundation stabilization activities, including equipment access constraints, available staging space on the paved surface, and the challenging terrain created by the slope conditions. The documentation indicates that post-foundation stabilization work will require construction of stairs, landings, or transitions to address the grade differential between the deck elevation and surrounding ground.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C – SITE PHOTOGRAPHS

Camp Rilea Building 7029 – Structural Foundation Stabilization | Project No. 230018C001

Attachment C – Site Photographs Page 1 of 7

Contract Attachment

Project:

Camp Rilea Building 7029 – Structural Foundation Stabilization

Location:

Camp Rilea Armed Forces Training Center 33168 Patriot Way Warrenton, Oregon

This Attachment provides representative site photographs to assist Contractors in understanding existing conditions.

These Site Photographs are incorporated into the Contract Documents for informational purposes to assist in understanding general site conditions.

The Site Photographs do not replace, supplement, or modify the requirements of the Contract Documents. The Contractor is responsible for verifying all site conditions that may affect the Work.

The State does not represent or warrant that the Site Photographs depict all existing conditions. The Contractor shall rely on its own investigation and evaluation of site conditions in performing the Work.

The Site Photographs are provided for convenience only and shall not be relied upon as a complete representation of site conditions.

Attachment C – Site Photographs Page 2 of 7

Photo 1 – Equipment Access Route to Building 7029

Description:

View of paved access route and approach from parking area to the hilltop building, showing slope conditions and available equipment access.

Attachment C – Site Photographs Page 3 of 7

Photo 2 – Hilltop Staging Area and Access at Building

View of the hilltop area adjacent to Building 7029 showing available staging space, paved surface conditions, and proximity to the structure for equipment setup and foundation installation activities.

Attachment C – Site Photographs Page 4 of 7

Photo 3 – Underside Access Beneath Structure

View of the existing pier-and-post foundation beneath Building 7029 showing crawlspace clearance and working conditions for foundation stabilization activities.

Attachment C – Site Photographs Page 5 of 7

Photo 4 – Building Elevation and Terrain

View of Building 7029 and surrounding hillside terrain illustrating the slope conditions, elevation change, and relationship between the structure and adjacent site features.

Attachment C – Site Photographs Page 6 of 7

Photo 5 – Existing Foundation Conditions / Concerns

View of existing foundation pier conditions beneath the structure illustrating settlement, displacement, and non-uniform support conditions of the existing foundation system.

Attachment C – Site Photographs Page 7 of 7

Photo 6 – Existing Deck and Access Transition Area

View of existing deck and adjacent paved access area. The structure is situated at the top of a slope with a grade differential between the deck elevation and surrounding ground. The Contractor shall construct stairs, landings, or transitions as required following foundation stabilization.