ATTACHMENT C QASP Cable TV.docx

DOCX document 32 KB Posted

Attached to
S119--Cable TV services Federal contract opportunity
Solicitation number
36C25623Q0152
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16

About this file

This Quality Assurance Surveillance Plan outlines performance monitoring for an engineering services contract to provide cable television services. The contractor will be responsible for 330 cable drops, local channel lineups, and uninterrupted cable services. Performance will be evaluated on response times for outages, equipment troubleshooting and repairs, and maintenance of cable infrastructure. Monitoring methods include inspections, performance reports, customer feedback, and annual performance reviews. The contractor's performance will be rated as excellent, satisfactory, or unsatisfactory depending on whether standards are exceeded, met, or failed. The contract valued at Solicitation Number 36C25623Q0152 was awarded by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 to provide these cable television services from January 1, 2023 through December 31, 2027.

View the file

Other files for this federal contract opportunity

Other files attached to S119--Cable TV services, newest first.
File Type Posted
Biloxi VA Site Map.pdf PDF
Sparklight Cable Layout.pdf PDF
36C25623Q0152 0002.docx DOCX document
36C25623Q0152 0001.docx DOCX document
ATTACHMENT E Site Map.pdf PDF
ATTACHMENT A LIST OF PAST PERF REF.docx DOCX document
ATTACHMENT D Site Plan-Biloxi.pdf PDF
ATTACHMENT B PAST PERFORMANCE QUESTIONNAIRE.doc DOC document
36C25623Q0152.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C – QUALITY ASSURANCE SURVEILLANCE PLAN

36C25623Q0152

QUALITY ASSURANCE SURVEILLANCE PLAN

For: Engineering Service

Contract Number: (The Government will enter contract number upon award.)

Contract Description: Cable TV Services

Contractor’s name: (hereafter referred to as the Contractor)

Period of Performance: January 1, 2023 through December 31, 2027 (base plus four option periods)

1. PURPOSE

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

· What will be monitored.

· How monitoring will take place.

· Who will conduct the monitoring.

· How monitoring efforts and results will be documented.

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

2. GOVERNMENT ROLES AND RESPONSIBILITIES

The following personnel shall oversee and coordinate surveillance activities.

a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned CO: Danette Rene’ Impey Organization or Agency: Department of Veterans Affairs, Network Contracting Office (NCO) 16 Gulf Coast Veterans Health Care System, Biloxi, MS 39531

b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.

Assigned COR: Brandon O’Neal

c. Other Key Government Personnel: N/A

3. CONTRACTOR REPRESENTATIVES

The following employees of the contractor serve as the contractor’s program manager for this contract.

a. Program Manager: (Contractor please provide name here)

b. Other Contractor Personnel: (Contractor please enter name(s) or delete these lines if not applicable.)

Title: (Contractor please enter title(s) or delete these lines if not applicable.)

4. PERFORMANCE STANDARDS

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

Performance Requirements Summary Matrix:

The Government will use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality Level (AQL).

Task
ID
Indicator
Standard
Acceptable Quality Level
Method of Surveillance
Incentive
General
1
Contractor equipment (SOW Para. 1)
Contractor shall provide all required equipment.
100%
100% Inspection
Exercise of Option Period and Past Performance
2
Contractor basic cable TV drops TV service (SOW Para. 1.a.)
Contractor shall provide all 330 TV drops for cable TV service.
100%
100% Inspection
Exercise of Option Period and Past Performance
3
Contractor channel lineup (SOW Para. 1.b.)
Contractor shall provide all Channel line-ups including local channels.
100%
100% Inspection
Exercise of Option Period and Past Performance
4
Contractor TV services (SOW Para. 1.c.)
Contractor shall provide cable TV services.
100%
100% Inspection
Exercise of Option Period and Past Performance

General

5
Service Outage Response time (SOW Para. 2)
Contractor shall provide required response time.
98%
98% Inspection
Exercise of Option Period and Past Performance
6
Troubleshooting all Equipment failures (SOW Para. 4)
Contractor shall provide required performance and response time.
98%
98% Periodic Inspection
Exercise of Option Period and Past Performance
7
Defective cables outside/ inside buildings (SOW Para. 5 & 6)
Contractor shall replace defective cabling outside / inside buildings.
98%
98% Periodic Inspection
Exercise of Option Period and Past Performance
8
Repair faulty Equipment (SOW Para. 7)
Contractor shall provide required performance and response time.
98%
98% Inspection
Exercise of Option Period and Past Performance
9
Main cable pedestal trunk lines (SOW Para. 8)
Contractor shall secure with their locks.
98%
98% Inspection
Exercise of Option Period and Past Performance

5. INCENTIVES

The Government shall use Exercise of Option Period and Past Performance as incentives. Incentives shall be based on exceeding, meeting, or not meeting performance standards.

6. METHODS OF QA SURVEILLANCE

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

a. PERFORMANCE MANAGEMENT APPROACH. (The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives.)

b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)

c. CUSTOMER FEEDBACK. (Elements of validated user complaints. Complaints are then investigated and validated.)

e. 100% INSPECTION. (Evaluates all outcomes.)

f. REPORTING. (Demonstrates whether the contractor meets the stated objectives and/or performance standards.)

g. REVIEWS AND RESOLUTIONS. Meeting with contractor and COR and/or CO to discuss performance evaluation, such as cost, schedules, etc.)

7. RATINGS

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome. The following ratings shall be used:

Excellent (“E”) = Exceeds Standards Satisfactory (“S”) = Meets Standards Unsatisfactory (“U”) = Fails To Meet Standards

8. DOCUMENTING PERFORMANCE

a. ACCEPTABLE PERFORMANCE

The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.

b. UNACCEPTABLE PERFORMANCE

When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor's program manager.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the COR. The Government shall review the contractor's corrective action plan to determine acceptability.

Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.

9. FREQUENCY OF MEASUREMENT

a. Frequency of Measurement.

During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

The COR shall meet with the contractor annually to assess performance and shall provide a written assessment.

(After award, both the contractor’s Program Manager and the COR shall sign this document.)

Signature – Contractor Program Manager

Signature – Contracting Officer’s Representative

Contract Discrepancy Report

Contract No.
Report No. for this Discrepancy:

Contractor/Manager’s Name:

From: (Name of Project Officer)

Dates

Prepared:

Returned by Contractor:

Action Complete:

Discrepancy or Problem:

Signature of Contracting Officer:

To: (Contracting Officer)

From: (Contractor)

Contractor Response as to Cause, Corrective Action and Actions to Prevent Recurrence (Attach Continuation Sheet if Necessary)

Signature of Contractor Representative:

Date:

Government Evaluation:

Government Actions:

Close Out

Name
Title
Signature
Date

Contractor Notified

Project Officer

Contracting Officer

File details come from the government source that posted it. Updated .