Attachment C_Pricing Template-HFP-2025-128492.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Central Laboratory Vacuum System Replacement
Solicitation number
HFP-2025-128492
Issued by

About this file

The file is a Pricing Template for a Request for Quotation (RFQ) HFP-2025-128492 issued by the Food and Drug Administration (FDA) for a Central Laboratory Vacuum System Replacement at the Harvey W. Wiley Federal Building in College Park, MD. The pricing template outlines five Contract Line Item Numbers (CLINs) for the project: demolition and removal of existing system, triplex central vacuum system with dual controller, delivery and installation, warranty and preventative maintenance, and other direct costs.

The project requires a contractor to provide a new skid-mounted, tri-plex, dry (oil-less) vacuum system with a manually switchable redundant control system, compatible with existing infrastructure. The performance period is from September 29, 2025, to September 28, 2026. The solicitation is for commercial products and services, with a quote validity period of 90 calendar days. The total project will involve site survey, submittals, delivery, installation, utility connections, testing, commissioning, and warranty service at the FDA's College Park facility.

View the file

Other files

File Type Posted
Attachment D Responses to Questions.xlsx XLSX spreadsheet
Attachment B_Statement_of_Work .pdf PDF
Attachment A- Combined_Synopsis_Solicitation_HFP-2025-8492.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary & CLINs

Vendor Name:UEI/DUNS:RFQ No.:
Point of Contact:Email:Phone:
Central Laboratory Vacuum System Replacement — PRICING WORKSHEET
All price must be firm fixed price
CLINDescriptionQtyUnitUnit Price ($)Extended ($)Notes
1DEMOLITION AND REMOVAL OF EXISTING SYSTEM$0.00
2TRIPLEX CENTRAL VACUUM SYSTEM WITH DUAL CONTROLLER (Equipment)$0.00
3DELIVERY AND INSTALLATION$0.00
4WARRANTY AND PREVENTATIVE MAINTENANCE (Include in the overall cost)$0.00$0.00
5OTHER DIRECT COSTS$0.00
TOTAL$0.00

File details come from the government source that posted it. Updated .