This is a construction plan document from the Iowa Department of Natural Resources for parking lot pavement maintenance at Lake Wapello State Park in Davis County (Project #24-05-26-03). The project consists of resurfacing a boat ramp parking lot and includes 2" surface overlay on roads and parking lots, installation of curb and gutter, granular shoulders, earth shoulders, and pavement markings. Key quantities include 297 tons of HMA surface course, 137.2 SY of pavement scarification, 55 LF of curb and gutter, 42 tons of granular shoulder material, and 56 tons of granular road surface material. The work also involves removing and reinstalling concrete wheel stops and adding new pavement markings.

The plans detail specific technical requirements including milled header dimensions, resurfacing granular shoulder sections, and curb/gutter specifications. The project location is clearly identified with detailed site plans showing the boat ramp road, parking areas, rigging lane, and various shoulder improvements. Cross sections indicate standard details for pavement overlay transitions, shoulder construction, and curb installations. The document includes comprehensive quantity tables breaking down materials needed for each project component.

View the file

Other files

File Type Posted
Attachment B - Specifications, Project #24-05-06-03.pdf PDF
Contract, Project #24-05-06-03.pdf PDF
1284325-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

V E

R S

H E

E T

SHEET INDEX

PROJECT DESCRIPTION AUTHORIZATION TO BID

DATEENGINEERING BUREAU CHIEF

DATEAUTHORIZATION - PARKS | WILDLIFE | FISHERIES | LAW ENFORCEMENT | FORESTRY

DIRECTORY

COMPANY

ADDRESS

CITY,STATE,ZIP

TELEPHONE

FAX

EMAIL

CONTACT

COMPANY

ADDRESS

CITY,STATE,ZIP

TELEPHONE

FAX

EMAIL

CONTACT

PROJECT MANAGER CONSTRUCTION INSPECTOR

Mandi.Aldrich-Peters@dnr.iowa.gov

515-205-1698

MANDI L. ALDRICH PETERS

DES MOINES, IA, 50321

6200 PARK AVE

IOWA DEPARTMENT OF NATURAL RESOURCES

MANDI L.

PETERS

ALDRICH

14439

AWOI

G R

E E

NI

N

E

L O

ANISSEFOR

P

D E

S N

E

CI

L

UNDER THE LAWS OF THE STATE OF IOWA.

DECISIONS WITH REGARD TO THE DESIGN WERE MADE BY ME

PREPARED UNDER MY SUPERVISION AND THAT ENGINEERING

I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS

PAGES COVERED BY THIS SEAL:

MY LICENCE RENEWAL DATE IS DECEMBER 31, 20

PRINTED OR TYPED NAME

SIGNATURE DATE

MANDI L. ALDRICH PETERS

A.01

SITE PLAN

SITE PLAN

QUANTITIES AND GENERAL INFORMATION

TYPICAL CROSS SECTIONS AND DETAILS

LOCATION MAP

COVER SHEET

D.02

D.01

C.01

B.01

A.02

A.01

This project consists of resurfacing a boat ramp parking lot at Lake Wapello State Park in Davis County.

ALL

jason.kruse@dnr.iowa.gov

515-250-3707

JASON KRUSE

IOWA DEPARTMENT OF NATURAL RESOURCES

IOWA DEPARTMENT OF NATURAL RESOURCES

PARKING LOT PAVEMENT MAINTENANCE REBID

LAKE WAPELLO STATE PARK

FOR

CONSTRUCTION DOCUMENTS

DAVIS COUNTY, IOWA

PROJECT # 24-05-26-03

PROJECT NUMBER:

DATE:

NO.

DATE

BY

REVISION

DRAWN BY:

CHK'D BY:

SHEET No:

N A

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

F

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

PROJECT NUMBER:

DATE:

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

AIRPORT

MUNICIPAL

BLOOMFIELD

245TH ST

E B

O N

Y A

V E

265TH ST

E L

K A

V E

275TH ST

192ND ST

BU

N C

H R

D

A L P

IN

E A

V E

LIM

E TR

H

IL

L B

L V

D

H U S K

Y

TR 161ST ST

BISO

N

TR

125TH ST

159TH TR

152ND ST

268TH ST

K

IT

E A

V E

255TH ST

252ND ST

260TH ST

FE

RN

B

LV

D

258TH ST

D

IL

L A

V E

M A

P L

E S

T

IR

IS

B

L V

D

K

IW

I A

V E

198TH ST

JAGUAR TR

212TH ST212TH ST

232ND TR

175TH ST

D O

E A

V E

208TH ST

B E E C

H W

O O

D A

V E

205TH ST

215TH ST

A P

P L

E A

V E

225TH ST

E C

H O A

V E

N

IC

K E L A

V E

G A

R L

IC

A

V E

L

IL

Y A

V E

IM

P A

LA

TR

130TH ST

L

IL

Y A

V E

155TH ST

F A

L C

O N B

L V

D

165TH ST

E B

O N

Y A

V E

E C

H O A

V E

120TH ST

FLA

X

BLV

D

144TH TR

BUTTERCUP TR

B E E C

H W

O O

D A

V E

230TH ST

J A

D E A

V E

240TH ST

L

IL

A C

A V

E

H A

R V

E S T A

V E

250TH ST

L

IL

A C

A V

E

JA

D

E A

V E

C E

D A

R A

V

E 250TH ST

250TH ST

262ND ST

276TH ST

C L A

Y A

V E

195TH ST

L

IL

A C

A V

E

195TH ST

IC

E A

V E

L

IL

A C A

V E

BUNCH RD

D R

IF

T W

O O

D B

L V

D

202ND ST

F L

O R

A A

V E

F L O

R A A

V E

160TH ST

HI

LL

B

LV

D

JEW

EL A

V E

125TH ST

LIME TR

J E

W E L A

V E

IC

E

A V

E

F

IR

A

V E

DAVIS WAPELLO ST

BISO

N

TR

F A

LC

O

N B

LV

D

C L

A Y

A V

E

F A

L C

O N B

L V

D

150TH ST

159TH TR

TH

T

R

M A

H O

G A

N Y A

V E

M A

L L A

R D A

V E

N E C

T A

R

IN

E A

V E

M A

H O

G A

N Y A

V E

M A

L L A

R D A

V E

240TH ST

IC

E A

V E

255TH ST

258TH ST

IR

O

N A

V E

G A

R N

E T A

V E

265TH ST

270TH ST

JA

S

P E

R A

V E

IC

E

A V

E

230TH ST

A C

O R

N A

V E

F A

W N

A V

E

F

IR

A V

E

A P P L E A

V E

262ND ST

F E R

N B

L V

D

274TH ST

B A

L S A A

V E

170TH ST

K E

L P

A V

E

JA

D

E A

V E

170TH ST

K

IW

I A

V E

190TH ST

200TH ST

J A

D E A

V E

H A

R V

E S

T A

V E

210TH ST

220TH ST

JA

D

E A

V E

JE

W

E L

A V

E

A R B O

R B

LV

D

F A

W N

A V

E

E B

O N

Y A

V E

195TH ST

C L A

Y A

V E

200TH ST E

C

H O

A V

E

210TH ST

220TH ST

220TH ST

M O

NARCH

TR

M

IN

K B

L V

D

LU

PI

N E

TR

K R

E S

S A

V E

K R E S S A

V E

IV

Y B

L V

D

H

IC

K O

R Y B

LV

D

MULBE

RRY T

R

K R

E S S A

V E

118TH ST

C L

A Y

A V

E

TH

S

T

F A

W N A

V E

D A

IS

Y B

L V

D

130TH ST

BISO

N TR

BISON TR

140TH ST

F A

L C

O N B

L V

D

ARBOR B

LV

D

E G

R E T A

V E

125TH ST

130THST

ALF

ALF

A

A V

E

184TH

ST

225TH

S T

4T

H

BL

VD

B A

Y L

E A

F

A V

E

250TH

ST

K E

Y B

L V

D

K

IW

I A

V E

H A

R V

E S

T

A V

E

185TH

ST

3R

D

ST

128TH

ST

180TH ST

180TH ST180TH ST

180TH ST

E A

G

LE

B

LV

D

D R

IF

T W

O O

D

B

L V

D

D E

W B E R

R Y A

V E

M A

LLA

RD

A

V E

IC

E A

V E

D R

IF

T

W O

D

B

L V

D

WAPELLO ST

DAVIS

ST

152ND

ST

150TH

HW

Y 2O

LD

A V

E

B A

L S A

ST

228TH

A V

E

L

IL

A C

ST

170TH

ST

265TH

A V

E

D E

W B E R

R Y

123RD ST

H A

L

IT

E B

L V

D

175TH ST

C E

D A

R A

V E

A V

E

A P

P A

N O

O S

E

D A

V

IS

A V

E G

IN

G E R

111TH ST

B O

U L D

E R B

L V

D

A S

T E

R

IA

B L

V D

134TH BLVD

G R

A P

E

A V

E

132ND

ST

138TH

ST

A P

P A

N O

O S

E A

V E

D A

V

IS

ST

190TH

A V E

LIN

SEED

A P P

A N

O O

S E

C

WAPELLO CO.

BLOOMFIELD

DRAKESVILLE

Soap Cr ee k

Fo x

Ri ve r

LAKE

W

A P

EL

LO

Fox River

T

N T

N

R-15W R-14W

T

N

BELKNAP

PARIS

CARBON

GROVE

WEST

GROVE

ASH

FOREST

STATE

STEPHENS

M A R I O N

S O A P

C R E E K

P E R R Y

F O X

R I V E R

W E S T

G R O V E

D R A K E S V IL L E

C LE V E L A N D

123456

8 9 10

1415161718

2627282930

31 32

35 36

7 8 9 10 11

131415161718

19 20 21 22 23

27282930

31 32 33 34

7 8 9 10 11 12

19 20 21

23 24

252627

32 33 34

7 8 9 10 11 12

13141516

19 20 21 22

31 32 33

123456

11 12

131415 161718

21 22 23 24

26272930

123456

7 8 9 10 11 12

19 20 21 22

252627

STATE PARK

WAPELLO

LAKE

T7J

J19

T7J

J19

V17

T7J

V17

J51 J51

J3T

J3T

J37

V20

J40

POP.

POP.

CO.

MONROE

A.02

P R

O

JE

C T

L O

C A

T

IO

N M

A P

PROJECT LOCATION

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

B.01

T Y

PI

C

A L

C R

O

SS

S E

C T

IO

N

S A

N D

D E

T A

IL

S

RESURFACING GRANULAR SHOULDER SECTION

Top of Existing Snhoulder

4'

4.0% 2" Surface Course

MILLED HEADER DIMENSIONS AND DETAILS

Transistion Slope = 1 Inch : 10 Feet Existing Pavement

25 FEET

2"

Milled Transistion Area

Existing pavement

3" Granular Shoulder2" Overlay

2'

FORM

GRADE

ELEV.

per plans Slope as

Pavement

Existing

2 3

CURB AND GUTTER UNIT

Existing

Existing

Existing

Existing

Pavement is HMA.

Pavement is PCC. 'B' joint if

'BT' , 'KT', or 'L' joint if

Pavement is PCC.

elevation difference if

Pavement is HMA. No inch if 8

6 inch Standard Curb1

Curb Any

No Cur b

5'-0" T ransit ion

FOR ALL CURBS

CURB RUNOUT

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

Q U

A N

T

IT

IE

S

A N

D G

E N

E R

A L

I N

FO

R

M A

T

IO

N

ITEM

NO.

ESTIMATE REFERENCE INFORMATION

DESCRIPTION

ESTIMATED PROJECT QUANTITIES

ITEM NO. ITEM UNIT TOTAL

GENERAL NOTES

features on the project. This may involve seeding, silt fence, rock ditch checks, silt basins or silt dikes.

The contractor is expected to have materials, equipment, and labor available on a daily basis to install and maintain erosion control

The contractor shall shape graded area to maintain surface drainage. All elevations are to finish grade.

caused by such work.

and to avoid damage thereto. No claims for additional compensation will be allowed to the contractor for any interference or delay existence of which is presently not known or shown. It is the contractor’s responsibility to determine their existence and exact location available surveys and records and therefore their locations must be considered approximate only. It is possible there may be others, the access to these facilities for necessary modification of services. Underground facilities, structures and utilities have been plotted from the contractor to notify the DNR Engineer of those utilities prior to the beginning of any construction. The contractor shall be afforded Where utilities and fixtures are shown as Existing on the plans or encountered within the construction area, it shall be the responsibility of note.

when measured at breast height, shall be felled between October 1st and March 31st. Brush and debris removal is not restricted by this Unless otherwise directed by the Plans, Specifications, or the DNR Engineer, all trees with a trunk diameter of three inches or greater be subject to the approval of the DNR Engineer.

permitted to park or service vehicles and equipment or use these areas for storage of materials. Storage, parking and service areas will The contractor shall not disturb desirable grass areas and desirable trees outside the construction limits. The contractor will not be the DNR Engineer.

material hauled to these sites. No material shall be placed within the right-of-way, unless specifically stated in the plans or approved by concrete) which is not desirable to be incorporated into the work involved on this project. No payment for overhaul will be allowed for It shall be the contractor’s responsibility to provide waste areas or disposal sites for excess material (excavated material or broken discrepancies, omissions, and/or conflicts prior to proceeding with the work.

The contractor shall verify, at the site, all dimensions and conditions shown on the plans and shall notify the DNR Engineer of any plans, specification, special provisions and contract.

bidding and the start of work. Failure to visit the project site shall not relieve the contractor from performing the work in accordance to the The contractor shall visit the site and inspect the project area and thoroughly familiarize themselves with the actual job conditions prior to

All work shall conform to and be performed in accordance with all applicable codes and ordinances.

Verify actual locations and elevations with DNR Engineer.

C.01

C B. Seeding shall be incidental.

A. No payment for overhaul will be allowed for earth shoulder material.

D. No payment for overhaul will be allowed.

C. Off site disposal is the responsibility of the contractor.

B. All saw cuts shall be incidental.

A. The contractor shall remove the existing pavement and base as indicated in the plan sheets.

control details.

A. A. Includes all barricades, signs, pilot cars, and/or flaggers needed to complete the work under traffic per Iowa DOT standard traffic Traffic Control12 markings.

A. See DOT Specification Table 2527.03-1 for the minimum atmospheric and surface temperatures for application of pavement Painted Pavement Marking, High-Build Waterborne11

A. Wheel stops shall be tied to the paved surface via metal pins.

Remove and Reinstall Concrete Wheel Stops0

. Urban seeding shall be Type 1 (Permanent Lawn Mixture) and placed in mowed areas.

Shoulder Construction, Earth9

A. 6" of modified subbase has be placed under and extending 2' beyond the curb and gutter.

Modified Subbase6

A. Road surface temperature shall be at or above those listed for the applicable course and thickness in DOT Specification 2303.

Hot Mix Asphalt High Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement3

C. No payment for overhaul will be allowed.

B. Off site disposal of removed material is the responsibility of the contractor.

A. Quantity includes milled headers.

Pavement Scarification2

Removal of Pavement

Mobilization Traffic Control Painted Pavement Marking, High-Build Waterborne Remove and Reinstall Concrete Wheel Stops Shoulder Construction, Earth Granular Shoulder, Type B Granular Surface On Road, Class A Crushed Stone Modified Subbase Curb and Gutter, HMA, 2.0' Asphalt Binder, PG 58-28H, High Traffic Hot Mix Asphalt High Traffic, Surface Course, 1/2 In. Mix, No Special Friction Requirement Pavement Scarification Removal of Pavement

9.9

2.87 4.4

55.0

137.2 17.2

LS

LS

STA

LS

STA

TON

TON

CY

LF

TON

TON

SY

SY

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

Q U

A N

T

IT

IE

S

A N

D G

E N

E R

A L

I N

FO

R

M A

T

IO

N

C.02

(FT)

LENGTH

(FT)

WIDTH

LOCATION

Rigging Lane

Pull Off Lane

100.0

73.0

56.0

34.8

19.2

ROCK ROAD

(TON)

ROADSTONE

1 1/4"

45.00

28.00

196.00

70.00

114.00

(FT)

LENGTH

(FT)

WIDTH

LOCATION

Boat Ramp Road and Lot

42.0

3.2

2.0

13.8

4.9

8.0

SHOULDER ROCK

(TON)

CLASS A

LENGTH (FT) WIDTH (FT) AREA (SY) MILES 1" INTERLAYER (TON) 1.5" INTERMEDIATE (TON) 2" SURFACE (TON)

2689.7

2689.7

RESURFACING

SCARIFICATION (SY)

MILLED HEADER

LOCATION

137.2

137.2Boat Ramp Road and Lot

(IN)

THICKNESS

@ 1.00

Line (White)

SLW4: Solid

PAVEMENT MARKINGS

STATION

9.94

9.94

9.94

Factored Length

Unfactored Length

STATION

2.87

1.27

0.50

1.10

(STA)

LENGTH

(FT)

WIDTH

LOCATION

Car Parking

Curb and Gutter

Island

EARTH SHOULDER

(IN)

THICKNESS

55.0

55.0

(FT)

LENGTH

(FT)

WIDTH

LOCATION

CURB AND GUTTER

(IN)

THICKNESS

Parking Lots

(CY)

SUBBASE

4.4

4.4

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

Existing Vault

Existing Parking Lot

3" of Class A in 100x16 Rigging Lane

110x4 Earth Shoulder

114x4 of 3" Class A Granular Shoulder 45x4 of 3" Class A Granular Shoulder

70x4 of 3" Class A Granular Shoulder

28x4 of 3" Class A Granular Shoulder

55' of 2' Curb and Gutter

196x4 of 3" Class A Granular Shoulder

73x15 of 3" Class A Granular Road Rock

2" Overlay On Road and Parking Lots

Overlay Taper

127x4 Earth Shoulder

Remove Existing Pavement

50x4 Earth Shoulder

D.01

S

IT

E P

L A

N

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

FEET

OO 50

NO.

DATE

BY

REVISION

DRAWN BY:

T U

R A

L R

E S

O U

R C

E S

IO

W

A D

E P

A R

T M

E N

T

P A

R K

A V

E

D E

S M

O

IN

E S

IA

E N

G

IN

E E

R

IN

G S

E R

V

IC

E S

C

E N

T R

A L

O F

F

IC

E

24-05-26-03

C O

N S

U L

T A

N T

D A

V

IS

C O

U N

T Y

P A

R K

IN

G

L O

T P

A V

E M

E N

T M

A

IN

T E

N A

N C

E F

O R

L A

K E

W A

P E

L L

O S

T A

T E

P A

R K

Reinstall and Pin 9 Concrete Wheel Stops Remove 10 Concrete Wheel StopsRemove, Reinstall and Pin 5 Concrete Wheel Stops

P.01

S

IT

E P

L A

N

© 2024 Microsoft Corporation © 2024 Maxar ©CNES (2024) Distribution Airbus DS

FEET

OO 50

24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset
24-05-26-03 Lake Wapello, Boat Ramp Parking Pvmt Maint_Planset

File details come from the government source that posted it. Updated .