Attachment C - Plans.pdf

PDF 3 MB Posted

Attached to
Battlement Mesa Boiler Upgrade
Solicitation number
IFB-GC-FM-05-25
Issued by
Garfield County, Aurora City, Colorado

About this file

The document is a mechanical construction bid package for the Garfield County Battlement Mesa Substation Boiler Upgrade project, dated August 1, 2025. The project involves replacing the existing 550 MBH Burnham atmospheric boiler with a new 500 MBH Lochinvar Knight XL high-efficiency, sealed combustion boiler at the Battlement Mesa Substation. Key scope of work includes replacing the air separator, expansion tank, and heating water pumps, modifying the existing boiler piping to a primary/secondary system, routing new combustion air intake and vent through the existing louver, and providing new Distech controls as an add alternate. The project is located at 1777 S Battlement Parkway in Battlement Mesa, Colorado.

The bid package includes detailed mechanical specifications, boiler and pump schedules, and comprehensive installation requirements. The project will follow the 2021 versions of IBC, IMC, IECC, IPC, IFGC, and the 2023 NEC. The building has "B" and "S" occupancy classifications totaling 5,580 square feet. The contractor will be responsible for waste disposal, verifying dimensions, and ensuring all work meets code requirements. The project includes specific technical requirements such as using 30% propylene glycol in the hydronic system, commissioning per IECC Section 408, and requiring a certified boiler manufacturer's representative to provide system startup and verification.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

EC

H

AN

IC

AL

T

IT

LE

S

H

EE

T

DATE: ISSUED FOR:

SHEET NUMBER:

July 31, 2025 - 4:53:36pm

DO NOT REPRODUCE THESE DRAWINGS AND

SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER. THE DRAWINGS AND

SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND

SHALL REMAIN THE PROPERTY OF THE DESIGNER

WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS

EXECUTED OR NOT. THESE DRAWINGS AND

SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON

ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT

BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER.

Bi gh or n

C on su lti ng E ng in ee rs

, I nc

M ec ha ni ca l & E le ct ric al

E ng in ee rs

In di an

R oa d G ra nd

J un ct io n, C

O

Ph on e:

(9

) 2

-8

DATE:

CHECKED BY:

JOB NO:

DRAWN BY:

SCALE:

T1.1

BM

S

U

BS

TA

TI

O N

B O

IL

ER

U

PG

R

AD

E

S B

AT

TL

EM

EN

T

PA

R

KW

AY

MJH

MJH

08/01/2025

25-280

BA

TT

LE

M

EN

T

M

ES

A, C

O

LO

R

AD

O

08/01/2025 CONSTRUCTION DOCUMENTS

SHEET LEGEND

T1-1 TITLE SHEET

M0-1 MECHANICAL COVER SHEET

M1-1 MECHANICAL FLOOR PLAN

M3-1 MECHANICAL DETAILS & SCHEDULES

CODE NOTES:

1. APPLICABLE CODES INCLUDE THE 2021 VERSIONS OF THE IBC, IMC, IECC, IPC, IFGC AND THE 2023 VERSION OF THE NEC.

GENERAL CONSTRUCTION NOTES:

1. THE SCOPE OF WORK FOR THIS PROJECT WILL INVOLVE UPGRADE OF THE EXISTING BOILER PLANT.

2. DEMOLITION INCLUDES THE REMOVAL OF EQUIPMENT/PIPING AS NOTED ON THE PLANS AND PATCHING/REPAIRING WALLS WHERE PIPING IS

REMOVED.

3. COORDINATE STAGING AREA FOR CONSTRUCTION WITH THE OWNER.

4. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL WASTE DISPOSAL FOR THIS PROJECT. COORDINATE THE LOCATION OF WASTE DUMPSTERS

WITH THE OWNER.

5. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND ACCESS REQUIREMENTS FOR ALL NEW EQUIPMENT PRIOR TO ORDERING MATERIAL.

6. ANY WORK THAT DISTURBS OR ALTERS THE ROOF AND ROOFING MATERIAL IS TO BE RETURNED TO PRE-CONSTRUCTION CONDITIONS AND THE

ROOF MADE WEATHERTIGHT.

SCOPE OF NEW WORK / PROJECT BIDDING:

THE PROJECT WILL BE BID PER THE FOLLOWING SCOPE OF WORK:

1. REPLACE THE EXISTING 550 MBH BURNHAM ATMOSPHERIC BOILER WITH A NEW 500 MBH LOCHINVAR KNIGHT XL (OR APPROVED EQUAL)

HIGH-EFFICIENCY, SEALED COMBUSTION UNIT.

2. REPLACE THE EXISTING AIR SEPARATOR, EXPANSION TANK, AND HEATING WATER PUMPS WITH NEW.

3. MODIFY THE EXISTING BOILER PIPING ARRANGEMENT TO BE A PRIMARY / SECONDARY SYSTEM.

4. THE EXISTING COMBUSTION AIR DUCT SHALL BE REMOVED AND THE NEW BOILER 4" INTAKE AND VENT SHALL BE ROUTED THROUGH THE EXISTING

LOUVER.

5. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR THE BOILER AND PUMPS BY MSI OUT OF ENGLEWOOD, CO AS AN ADD ALTERNATE.

6. VERIFY THE EXISTING HEATING WATER SYSTEM HAS 30% PROPYLENE GLYCOL. PROVIDE ADDITIONAL GLYCOL AS REQUIRED TO REACH 30%.

7. EQUIPMENT TO BE COMMISSIONED IN ACCORDANCE WITH THE IECC SECTION 408.

ADD ALTERNATE:

1. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR THE BOILER AND PUMPS BY MSI OUT OF ENGLEWOOD, CO

VICINITY MAP

OCCUPANCY CLASSIFICATIONS:

"B" OCCUPANCY - BUILDING AREA - 3,375 SQ. FT.

"S" OCCUPANY - BUILDING AREA - 2,205 SQ. FT.

Attachment B Garfield County Battlement Mesa Substation Boiler Upgrade

AutoCAD SHX Text

AUGUST 1, 2025

AutoCAD SHX Text

BID PACKAGE

AutoCAD SHX Text

GARFIELD COUNTY COURTHOUSE BOILER UPGRADE

Mark Stamp

M0-1

A. SUBSTITUTIONS: SUBSTITUTION OF SPECIFIED EQUIPMENT WILL BE ALLOWED

THROUGH A PRIOR APPROVAL PROCESS INITIATED BY THE CONTRACTOR.

CONTRACTOR SHALL SUBMIT INTENDED SUBSTITUTION AT LEAST FIVE DAYS

PRIOR TO BID FOR APPROVAL FROM ENGINEER. SUBMITTAL SHALL INCLUDE

CAPACITIES, DIMENSIONS AND OPERATING INSTRUCTIONS FOR EACH PIECE OF

EQUIPMENT. SUBSTITUTION SHALL OCCUR AT NO COST TO THE OWNER.

CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF APPROVED SUBSTITUTION

AND SHALL INCUR ALL COSTS ASSOCIATED WITH THE SUBSTITUTION INCLUDING

STRUCTURAL MODIFICATIONS, SPACE LAYOUT AND REDESIGN COSTS. SEE ALSO

DIVISION I GENERAL REQUIREMENTS.

EXAMINATION OF SITE, DRAWINGS, SPECIFICATIONS:

A. EXAMINE CAREFULLY THE SITE AND CONDITIONS OF THE SITE. PROVIDE ALL

NECESSARY EQUIPMENT AND LABOR TO INSTALL A COMPLETE WORKING SYSTEM

WITHIN THE SITE CONDITIONS.

B. EXAMINE THE DRAWINGS AND SPECIFICATIONS AND 5 DAYS PRIOR TO

BIDDING REPORT ANY ERRORS, OMISSIONS, INCONSISTENCIES, AND CONFLICTS

TO THE ENGINEER TO BE REMEDIED IN AN ADDENDUM TO THE PROJECT PRIOR TO

BID TIME.

C. DRAWINGS ARE DIAGRAMMATIC AND CATALOG NUMBERS GIVEN ARE FOR

REFERENCE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING

THE CAPACITY OF THE EQUIPMENT MEETS THE DRAWING REQUIREMENTS AND

SHALL NOT DIMENSION FROM THE MECHANICAL, PLUMBING, OR PIPING

DRAWINGS.

D. THE LATEST ADOPTED VERSIONS OF THE INTERNATIONAL BUILDING CODES

SHALL BE USED AS REQUIRED. THIS WILL ALSO INCLUDE THE LATEST ADOPTED

VERSIONS OF THE MECHANICAL, PLUMBING, AND ENERGY CONSERVATION

CODES. ALL METHODS AND MATERIALS REQUIRED BY THESE CODES SHALL BE

REQUIRED BY THESE SPECIFICATIONS UNLESS INDICATED OTHERWISE. OTHER

APPLICABLE LOCAL CODES AND ORDINANCES SHALL BE AS REQUIRED AND IT

SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO BE KNOWLEDGEABLE OF

THESE REQUIREMENTS.

E. WHERE INSTALLATION PROCEDURES OR ANY PART THEREOF ARE REQUIRED

TO BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER

OF THE MATERIAL BEING INSTALLED, PRINTED COPIES OF THESE

RECOMMENDATIONS SHALL BE FURNISHED TO THE ENGINEER PRIOR TO

INSTALLATION. INSTALLATION OF THE ITEM WILL NOT BE ALLOWED TO PROCEED

UNTIL THE RECOMMENDATIONS ARE RECEIVED. FAILURE TO FURNISH THESE

RECOMMENDATIONS CAN BE CAUSE FOR REJECTION OF THE MATERIAL.

44” MOUNTING HEIGHT ABOVE

FINISHED FLOOR TO CENTER OF DEVICE

A AMPS

A.D. ACCESS DOOR

AAV AIR ADMITTANCE VALVE

ABV ABOVE

AC AIR CONDITIONING UNIT

AC ABOVE COUNTER

AD AREA DRAIN (SEE SYMBOLS)

A.F.C. ABOVE FINISHED CEILING

A.F.G. ABOVE FINISHED GRADE

AIC AMPERE INTERRUPTING

CAPACITY

AFCI ARC FAULT CIRCUIT

INTERRUPTERS

A.F.F. ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALUM ALUMINUM

AP ACCESS PANEL OR DOOR

ATS AUTOMATIC TRANSFER SWITCH

AV AUDIO / VIDEO

AVG AVERAGE

AWG AMERICAN WIRE GAGE

BAS BUILDING AUTOMATION SYSTEM

BB BASEBOARD

BD BACK DRAFT DAMPER

BFP BACK FLOW PREVENTOR

BL BOILER

BLDG BUILDING

BLW BELOW

BOB BOTTOM OF BEAM

BOD BOTTOM OF DUCT

BOP BOTTOM OF PIPE

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

C CHILLER

CAFCI COMBINATION ARC FAULT

CIRCUIT INTERRUPTERS

CAP CAPACITY

CB CIRCUIT BREAKER

CBV CIRCUIT BALANCING VALVE

CCT CORRELATED COLOR

TEMPERATURE

CKT CIRCUIT

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CI CAST IRON

CL CENTER LINE

CLG CEILING

CMU CONCRETE MASONRY UNIT

CO CLEAN OUT

COL COLUMN

COMP COMPRESSOR

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CONT CONTINUATION

CONTR CONTRACTOR

CRI COLOR RENDERING INDEX

CT COOLING TOWER

CT CURRENT TRANSFORMER

CU CONDENSING UNIT

CU COPPER

CUH CABINET UNIT HEATER

CVB CONSTANT VOLUME BOX

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

DB DRY BULB

DEPT DEPARTMENT

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGRAM

DIFF DIFFERENTIAL

DISCH DISCHARGE

DIV DIVISION

DN DOWN

DS DUCT SILENCER

DWG DRAWING

DX DIRECT EXPANSION

(E) EXISTING

EA EXHAUST AIR GRILLE/REGISTER

EAT ENTERING AIR TEMPERATURE

EC ELECTRICAL CONTRACTOR

ECC ECCENTRIC

EF EXHAUST FAN

EFF EFFICIENCY

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATOR

EM EMERGENCY FUNCTION

ENT ENTERING

EMT ELECTRIC METALLIC TUBE

EQ EQUAL

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ES END SWITCH

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER

TEMPERATURE

EX EXHAUST

EXPAN EXPANSION

EXT EXTERNAL

F DEGREES FAHRENHEIT

FA FREE AREA

FC FAN COIL UNIT

FC FOOTCANDLE

FCV FLOW CONTROL VALVE

FD FIRE DAMPER

FD FLOOR DRAIN

FIN FINISHED

FLA FULL LOAD AMPS

FLEX FLEXIBLE

FLR FLOOR

FOB FLAT ON BOTTOM

FOT FLAT ON TOP

FP FIRE PROTECTION

FP FIRE PUMP

FPM FEET PER MINUTE

FPS FEET PER SECOND

FS FLOW SWITCH

FSD FIRE/SMOKE DAMPER

FT FEET

FXC FLEXIBLE CONNECTION

GND GROUND

GA GAUGE

GAL GALLON

GALV GALVANIZED

GEC GROUND ELECTRODE

CONDUCTOR

GFCI / GFI GROUND FAULT CIRCUIT

INTERRUPTER

GC GENERAL CONTRACTOR

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRS/LB GRAINS PER POUND

H 2O WATER

HB HOSE BIBB

HD HEAD (SEE SCHEDULES)

HP HEAT PUMP

HP HORSEPOWER

HR HOUR

HT HEIGHT

HTR HEATER

HWR HEATING WATER RETURN

HWS HEATING WATER SUPPLY

HX HEAT EXCHANGER

HZ HERTZ

ID INSIDE DIAMETER

IG ISOLATED GROUND

IN INCHES

INV INVERT

JBOX JUNCTION BOX

K KELVIN

KW KILOWATT

KVA KILO VOLT - AMPS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LV LAVATORY

LB POUND

LD LINEAR DIFFUSER

LF LINEAR FEET

LIN LINEAR

LIQ LIQUID

LM LUMEN

LRA LOCKED ROTOR AMPS

LV LOUVER

LVG LEAVING

LWT LEAVING WATER TEMPERATURE

MBH THOUSANDS OF BTU PER HOUR

MC MECHANICAL CONTRACTOR

MCA MINIMUM CIRCUIT AMPACITY

MCB MAIN CIRCUIT BREAKER

MD MOTORIZED DAMPER

MDP MAIN DISTRIBUTION PANEL

MED MEDIUM

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUG ONLY

MOCP MAXIMUM OVERCURRENT

PROTECTION

MTD MOUNTED

MUA MAKE-UP AIR UNIT

N NEUTRAL

NC NORMALLY CLOSED

NEG NEGATIVE

NIC NOT IN CONTRACT

NL NIGHT / SECURITY LIGHT - DO

NOT SWITCH

NO NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OCC OCCUPIED

OCP OVER CURRENT PROTECTION

OD OUTSIDE DIAMETER

OL OVERLOAD

ORD OVERFLOW ROOF DRAIN

OZ OUNCE

PBD PARALLEL BLADE DAMPER

PD PRESSURE DROP

PH PHASE

POS POSITIVE PRESSURE

POS POINT OF SALES

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

PSI POUNDS PER SQUARE INCH

PT PRESSURE TRANSMITTER

PTAC PACKAGED TERMINAL AIR

CONDITIONER

PV PLUG VALVE

PVC POLYVINYL CHLORIDE

QTY QUANTITY

RA RETURN AIR GRILLE / REGISTER

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REL RELIEF

REQD REQUIRED

RF RETURN FAN

RH RELATIVE HUMIDITY

RHC REHEAT COIL

RLA RATED LOAD AMPS

RM ROOM

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR GRILLE / REGISTER

SC SHORT CIRCUIT

SCA SHORT CIRCUIT AVAILABLE

SCCR SHORT CIRCUIT CURRENT

RATING

SCH SCHEDULE

SD SMOKE DAMPER

SEF SMOKE EXHAUST FAN

SF SUPPLY FAN

SH SENSIBLE HEAT

SH SHOWER

SP STATIC PRESSURE

SPD SURGE PROTECTION DEVICE

SPEC SPECIFICATION

SQ SQUARE

SS STAINLESS STEEL

SS SAFETY SHOWER

STD STANDARD

STL STEEL

SYS SYSTEM

TEMP TEMPERATURE

TR TRANSFER GRILLE / REGISTER

TR TAMPER RESISTANT

TT TEMPERATURE TRANSMITTER

TTB TELECOMMUNICATIONS

TERMINAL BACKBOARD

TYP TYPICAL

TX TRANSFORMER

UC UNDERCUT DOOR

UH UNIT HEATER

UNO UNLESS NOTED OTHERWISE

UNOCC UNOCCUPIED

UR URINAL

V VOLTS

VA VOLT AMPERE

VA VALVE

VAV VARIABLE AIR VOLUME UNIT

VFD VARIABLE FREQUENCY DRIVE

VRF VARIABLE REFRIGERANT FLOW

VOLT VOLTAGE

VTR VENT THROUGH ROOF

W WIDTH

W WATTS

W/ WITH

W/O WITHOUT

WB WET BULB

WC WATER COLUMN

WC WATER CLOSET

WG WATER GAUGE

WP WEATHERPROOF

WPIU WEATHERPROOF IN-USE

WSR WITHSTAND RATING

XFMR TRANSFORMER

SUBSTITUTIONS:RESPONSIBLE DIVISION:

UNLESS OTHERWISE INDICATED ALL HEATING, VENTILATING, AIR CONDITIONING, PLUMBING,

AND OTHER MECHANICAL EQUIPMENT, MOTORS, AND CONTROLS SHALL BE FURNISHED, SET

IN PLACE AND WIRED AS FOLLOWS:

ITEM FURNISHED SET POWER CONTROL

WIRED WIRED

EQUIPMENT 23 23 26 --

COMBINATION MAGNETIC

MOTOR STARTERS, MAGNETIC

MOTOR STARTERS, VFD'S AND

CONTACTORS 23(1) 26 26(2) 23

FUSED AND UNFUSED

DISCONNECT SWITCHES,

THERMAL OVERLOAD SWITCHES

AND HEATERS, MANUAL MOTOR

STARTERS 26 26 26 --

MANUAL-OPERATING AND

MULTI-SPEED SWITCHES 23 26 26 26

CONTROLS, RELAYS,

TRANSFORMERS 23 23 26 23

THERMOSTATS (LOW VOLTAGE)

AND TIME SWITCHES 23 23 26 23

THERMOSTATS (LINE VOLTAGE) 23 23 26 26

TEMPERATURE CONTROL PANELS 23 23 26 23

MOTOR AND SOLENOID VALVES,

DAMPER MOTORS, PE & EP

SWITCHES 23 23(2) -- 23(2)

PUSH-BUTTON STATIONS

AND PILOT LIGHTS 23 23(2) -- 23(2)

HEATING, COOLING,

VENTILATION AND AIR

CONDITIONING CONTROLS 23 23 26 23

EXHAUST FAN SWITCHES 23 26 26 23(2)

SUBSCRIPT FOOTNOTES:

1. MOTOR STARTER TO INCLUDE CONTROL TRANSFORMER, HOA SWITCH, (1) NO AND (1)NC

AUXILIARY CONTACT, AND “ON” AND “OFF” PILOT LIGHTS.

2. IF ITEM IS FOR LINE VOLTAGE, SET IN PLACE AND CONNECT UNDER DIVISION 26. WHERE

FACTORY MOUNTED ON EQUIPMENT OR ATTACHED TO PIPING OR DUCTS AND USING LINE

VOLTAGE FURNISH AND SET UNDER DIVISION 23, CONNECT UNDER DIVISION 26.

ABBREVIATIONS:

SECTION THROUGH RETURN DUCT

SECTION THROUGH SUPPLY OR OUTSIDE AIR DUCT

SUPPLY OR OUTSIDE AIR DUCT

ACCESS DOOR (BOTTOM OR SIDE)

ACOUSTICALLY LINED DUCT

FIRE DAMPER, SMOKE DAMPER, FIRE/SMOKE DAMPER

MANUAL VOLUME DAMPER

INCLINED DROP IN DIRECTION OF ARROW

INCLINED RISE IN DIRECTION OF ARROW

TRANSITION, RECTANGULAR TO ROUND

FLEXIBLE DUCT

IN-LINE FAN

TRANSITION, RECTANGULAR

SPIN-IN COLLAR INTO ADAPTER ON TOP OF DUCT

CEILING SUPPLY AIR REGISTER/GRILLE

SIDEWALL SUPPLY AIR REGISTER (SR)

ELBOW TURNED DOWN

ELBOW TURNED UP

ELBOW, RADIUS TYPE

ELBOW, SQUARE OR RECTANGULAR TYPE

WITH AIRFOIL TURNING VANES

CEILING RETURN AIR REGISTER (RR)

OPEN END DUCT

FLEXIBLE CONNECTION

SIDEWALL RETURN AIR REGISTER (RR)

VD

FXC

RR

DD

PIPE DROPPING DOWN

PIPE RISING UP

DIRECTION OF FLOW

RELIEF/SAFETY VALVE

FLOW METER-VENTURI

FLOW METER-ORIFICE

AUTOMATIC AIR VENT (EXTEND

AUTOMATIC FILL VALVE

DISCHARGE TO DRAIN)

MANUAL AIR VENT

CONCENTRIC REDUCER

ECCENTRIC REDUCER

STEAM LEAK DETECTOR

TPV

S

CBV

R D

STRAINER

MV

AV

GAS COCK

AQUASTAT

VB VACUUM BREAKER

EXPANSION LOOP

GAS PRESSURE

STEAM TRAP

ANCHOR

EJ

TT

FS

TH

PT/PS

G

PRESSURE SWITCH

& SYPHON (STEAM)

GAUGE COCK

TRANSMITTER OR

THERMOMETER

EXPANSION JOINT

TEMPERATURE

FLOW SWITCH

GUIDE

A

DIRECTION OF PITCH-RISE OR

DROP

STRAINER WITH BLOW

OFF VALVE

UNION - SCREWED OR FLANGED

FLOAT OPERATED

CO

CD

T

CARBON MONOXIDE

CARBON DIOXIDE

THERMOSTAT

CONTROL VALVE

REGULATOR

TRANSMITTER

PRESSURE

GAUGE WITH

FSD FIRE SMOKE DAMPER

RELIEF VALVE

SOLENOID VALVE

TEMPERATURE/PRESSURE

DIAPHRAGM VALVE

BALANCING VALVE

BALL VALVE

GLOBE VALVE, ANGLE

GATE VALVE, ANGLE

LIFT CHECK VALVE

SWING CHECK VALVE

GATE VALVE

BUTTERFLY VALVE

PLUG VALVE

GLOBE VALVE

CIRCUIT SETTING

BALANCING VALVE

THREE WAY CONTROL VALVE

TWO WAY CONTROL VALVE

PRESSURE REDUCING

VALVE (PRV)

EXISTING EQUIPMENT OR

PIPE TO BE REMOVED.

CS CONDENSER WATER SUPPLY

CR CONDENSER WATER RETURN

R REFRIGERANT LIQUID AND VAPOR LINE

RS REFRIGERANT SUCTION / VAPOR

HOT WATER SUPPLY (HWS)

HOT WATER RETURN (HWR)

HPS HEAT PUMP SUPPLY

HPR HEAT PUMP RETURN

VENT PIPING

D DRAIN

NATURAL GAS

SMS SNOWMELT SUPPLY

SMR SNOWMELT RETURN

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

LINE DESIGNATION SYMBOLS

MECHANICAL ELEMENTS / VALVING

SMOKE DAMPER

FIRE / SMOKE DAMPERFSD

SD

RH REFRIGERANT HIGH PRESSURE VAPOR

CA COMPRESSED AIR

FD - SD

- FSD

SECTION THROUGH EXHAUST AIR DUCT

HX

S

AIR VENT

HYDRAULIC SEPARATOR

AIR SEPARATOR

HEAT EXCHANGER

DIGITAL SENSOR

OR PUMP

HVAC & DUCTWORK SYMBOLS

POINT OF CONNECTION OF NEW TO EXISTING

G

M

EC

H

AN

IC

AL

C

O

VE

R S

H

EE

T

DATE: ISSUED FOR:

SHEET NUMBER:

July 31, 2025 - 4:53:36pm

DO NOT REPRODUCE THESE DRAWINGS AND

SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER. THE DRAWINGS AND

SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND

SHALL REMAIN THE PROPERTY OF THE DESIGNER

WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS

EXECUTED OR NOT. THESE DRAWINGS AND

SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON

ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT

BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER.

Bi gh or n

C on su lti ng E ng in ee rs

, I nc

M ec ha ni ca l & E le ct ric al

E ng in ee rs

In di an

R oa d G ra nd

J un ct io n, C

O

Ph on e:

(9

) 2

-8

DATE:

CHECKED BY:

JOB NO:

DRAWN BY:

SCALE:

BM

S

U

BS

TA

TI

O N

B O

IL

ER

U

PG

R

AD

E

S B

AT

TL

EM

EN

T

PA

R

KW

AY

MJH

MJH

08/01/2025

25-282

BA

TT

LE

M

EN

T

M

ES

A, C

O

LO

R

AD

O

08/01/2025 CONSTRUCTION DOCUMENTS

AutoCAD SHX Text

PRV

AutoCAD SHX Text

AutoCAD SHX Text

PSI

M1-1 MECHANICAL KEYNOTES:

EXISTING WATER HEATER TO REMAIN.

PROVIDE AND INSTALL NEW HIGH EFFICIENCY, GAS FIRED BOILER. REFER TO THE BOILER PIPING SCHEMATIC FOR ADDITIONAL INFORMATION, EQUIPMENT, COMPONENTS, CONTROLS, AND REQUIREMENTS. ROUTE 4" COMBUSTION AIR AND FLUE AS SHOWN PER MANUFACTURER'S RECOMMENDATIONS. CONNECT TO EXISTING ELECTRICAL CIRCUIT CURRENTLY SERVING THE EXISTING BOILER PER THE ADOPTED VERSION OF THE NEC. CONNECT TO EXISTING GAS LINE CURRENTLY SERVING THE EXISTING BOILER. INSTALL FACTORY PROVIDED CONDENSATE NEUTRALIZATION KIT, PIPE TO NEAREST EXISTING FLOOR DRAIN, AND TERMINATE WITH AIR GAP.

PROVIDE AND INSTALL SHEETMETAL PLENUM TO COVER THE EXISTING EXTERIOR LOUVER. ROUTE 4" FLUE AND 4" COMBUSTION AIR DUCT FROM THE CONNECTIONS AT THE NEW BOILER, TO THE EXTERIOR WALL, AND TERMINATE WITH FACTORY PROVIDED CONCENTRIC VENT PER MANUFACTURER'S RECOMMENDATIONS. MAINTAIN CLEARANCES TO ALL

BUILDING OPENINGS.

CONTRACTOR TO VERIFY THE EXISTING CIRCUIT(S) CURRENTLY SERVING THE EXISTING BUILDING HEATING WATER PUMPS ARE ADEQUATE FOR THE NEW HEATING WATER PUMPS. IF FOUND TO BE INADEQUATE, CONTRACTOR TO PROVIDE ALL REQUIRED BREAKERS, CONDUCTORS, AND ACCESSORIES REQUIRED TO ENERGIZE THE NEW PUMPS PER

THE ADOPTED VERSION OF THE NEC.

PROVIDE AND INSTALL NEW 115/1/60 RECEPTACLE IN THE BOILER ROOM TO POWER THE NEW GLYCOL FEEDER PER THE ADOPTED VERSION OF THE NEC. PROVIDE NEW RECEPTACLE, CONDUCTORS, AND 15-AMP BREAKER FED FROM THE

NEAREST EXISTING ELECTRICAL PANEL OF ADEQUATE CAPACITY.

PROVIDE AND INSTALL EMERGENCY POWER OFF (EPO) SWITCH IN ACCORDANCE WITH ASME CSD-1 CONTROLS.

ET

GF

HS

CP

CP

2 BL

EPO

BUILDING HEATING BOILER PIPING SCHEMATIC

SCALE: NTS NOTE: FINAL FILL OF SYSTEM SHALL BE WITH SOLUTION OF

30% PROPYLENE GLYCOL.

TO NETURALIZATION

CONDENSATE DRAIN

HWR

AIR VENT

3/4"

HWS

TO DRAIN

2-1/2"

CONNECT NEW TO EXIST1

CP

2-1/2"

2-1/2"

BOILER DRAIN

2-1/2"

BL

G

CIRCUIT SETTER

2-1/2"

G

CONNECT TO EXISTING

NATURAL GAS PIPE

BOILER PROVIDED WITH

CIRCULATION PUMP. TYP.

PIPE RELIEF DRAIN FULL

SIZE TO FLOOR DRAIN

HWS

HWR

PRESSURE

GAUGE

CP

2-1/2" TACO 59025A

HYDRAULIC SEPARATOR

TACO - 409

AUTOMATIC AIR

VENT

THERMOMETER

2-1/2"

AXIOM - SF100

GLYCOL FEEDER

TACO - CA215-125

EXPANSION TANK

ET-1

GF-1

G

HEATING WATER PIPING

1"

IN MECHANICAL ROOM

KIT. PIPE TO FLOOR

DRAIN WITH AIR GAP.

2"

DATE: ISSUED FOR:

SHEET NUMBER:

July 31, 2025 - 4:53:39pm

DO NOT REPRODUCE THESE DRAWINGS AND

SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER. THE DRAWINGS AND

SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND

SHALL REMAIN THE PROPERTY OF THE DESIGNER

WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS

EXECUTED OR NOT. THESE DRAWINGS AND

SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON

ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT

BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER.

Bi gh or n

C on su lti ng E ng in ee rs

, I nc

M ec ha ni ca l & E le ct ric al

E ng in ee rs

In di an

R oa d G ra nd

J un ct io n, C

O

Ph on e:

(9

) 2

-8

DATE:

CHECKED BY:

JOB NO:

DRAWN BY:

SCALE:

M1-1

M

EC

H

AN

IC

AL

BO

IL

ER

R O

O M

P

LA

N

BM

S

U

BS

TA

TI

O N

B O

IL

ER

U

PG

R

AD

E

S B

AT

TL

EM

EN

T

PA

R

KW

AY

BA

TT

LE

M

EN

T M

ES

A, C O

LO

R

AD

O

MECHANICAL - BOILER ROOM PLAN

SCALE:

NORTH

SCALE: 1/4" = 1'-0"

08/01/2025

25-282

AS SHOWN

08/01/2025 CONSTRUCTION DOCUMENTS

EXISTING CONDITIONS PHOTOS

DEMOLITION NOTES:

· REPLACE THE EXISTING BOILER PLANT INCLUDING BOILER, HEATING WATER PUMPS, EXPANSION TANK, AND AIR

SEPARATOR.

· REMOVE THE EXISTING DOMESTIC WATER MAKEUP LINE INCLUDING THE REDUCED PRESSURE BACKFLOW

PREVENTER BACK TO ACTIVE COLD WATER LINE AND PROVIDE SHUT-OFF VALVE AND CAP.

· MAINTAIN THE EXISTING ELECTRICAL CIRCUITS CURRENTLY SERVING THE EXISTING BOILER AND HEATING WATER

PUMPS FOR REUSE TO SERVE THE NEW BOILER AND PUMPS.

· REMOVE THE EXISTING FLUE AND PATCH THE ROOF TO MATCH EXISTING.

· REMOVE THE EXISTING COMBUSTION AIR DUCT FROM THE EXTERIOR LOUVER.

DATE: ISSUED FOR:

SHEET NUMBER:

July 31, 2025 - 4:53:38pm

DO NOT REPRODUCE THESE DRAWINGS AND

SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER. THE DRAWINGS AND

SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND

SHALL REMAIN THE PROPERTY OF THE DESIGNER

WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS

EXECUTED OR NOT. THESE DRAWINGS AND

SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON

ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT

BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN

PERMISSION OF THE DESIGNER.

Bi gh or n

C on su lti ng E ng in ee rs

, I nc

M ec ha ni ca l & E le ct ric al

E ng in ee rs

In di an

R oa d G ra nd

J un ct io n, C

O

Ph on e:

(9

) 2

-8

DATE:

CHECKED BY:

JOB NO:

DRAWN BY:

SCALE:

M3-1

M

EC

H

AN

IC

AL

D

ET

AI

LS

S C

H

ED

U

LE

S

BM

S

U

BS

TA

TI

O N

B O

IL

ER

U

PG

R

AD

E

S B

AT

TL

EM

EN

T

PA

R

KW

AY

08/01/2025

25-282

BA

TT

LE

M

EN

T

M

ES

A, C

O

LO

R

AD

O

08/01/2025 CONSTRUCTION DOCUMENTS

MECHANICAL PROVISIONS:

1. SCOPE OF WORK

A. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK, MATERIALS, AND LABOR TO

SATISFY A COMPLETE WORKING SYSTEM WHETHER SPECIFIED OR IMPLIED.

B. ALL WORK IS TO BE PERFORMED IN STRICT COMPLIANCE WITH ALL LOCAL CODES

AND ALL OTHER REGULATION GOVERNING WORK OF THIS NATURE.

C. THE CONTRACTOR SHALL, BEFORE SUBMITTING ANY PROPOSAL, EXAMINE THE

PROPOSED SITE AND SHALL DETERMINE FOR HIMSELF THE CONDITIONS THAT MAY

EFFECT THE WORK. NO ALLOWANCE SHALL BE MADE IF THE CONTRACTOR FAILS TO

MAKE SUCH EXAMINATIONS.

D. ALL EQUIPMENT AND MATERIALS SHALL BE AS SPECIFIED BY THE ENGINEER OR

ARCHITECT.

2. PERMITS

A. THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY ANY

AND ALL FEES.

3. SHOP DRAWINGS

A. SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT TO THE

ARCHITECT/ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL SUBMIT FIVE SETS

OF SHOP DRAWINGS AND THEY SHALL BE CLEARLY LABELED.

4. FLEXIBLE DUCT WORK

A. FLEXIBLE TYPE DUCT SHALL BE OF TWO ELEMENT SPIRAL CONSTRUCTION

COMPOSED OF A CORROSION RESISTANT METAL SUPPORTING SPIRAL AND COATED

FABRIC WITH A MINERAL BASE. FLEXIBLE DUCT CONNECTORS SHALL BE LISTED BY

U.L., CLASS 1 DUCTS, AND SHALL HAVE A FLAME SPREAD RATING NOT EXCEEDING 25

AND A SMOKE DEVELOPED RATING NOT EXCEEDING 50.

B. USE OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO NO MORE THAN 6 LINEAR FEET

PER RUN.

C. CONTRACTOR SHALL BE CAREFUL SO AS NOT TO KINK OR COLLAPSE FLEXIBLE

DUCT.

5. REFRIGERANT

A. PIPING CONTRACTOR SHALL PROVIDE AND INSTALL REFRIGERANT PIPING IN

ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND IN SUCH A WAY AS

TO BE INCONSPICUOUS AND FREE FROM ANY POSSIBLE CONDENSATION.

B. INSULATE REFRIGERANT LINES WITH ARMOUR-FLEX TYPE INSULATION, SHALL BE TYPE

"K" COPPER TUBING, WITH WROUGHT COPPER SOLDER TYPE FITTINGS SUITABLE FOR

CONNECTION WITH SILVER SOLDER.

6. DUCTWORK

A. THE DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "SMACNA"

APPLICABLE MANUALS.

B. ALL DUCTWORK SHALL BE THE LOW VELOCITY TYPE, UNLESS SPECIFIED OTHERWISE.

C. CONTRACTOR SHALL PROVIDE AND INSTALL APPROVED FIRE DAMPERS AND ACCESS

PANELS IN ANY AND ALL DUCTWORK WHICH PENETRATES A HORIZONTAL OR

VERTICAL FIRE PARTITION, OR AS OTHERWISE SHOWN ON DRAWINGS.

D. ALL BRANCH DUCTS TO HAVE VOLUME DAMPERS, SMOOTH TURN RADIUS DUCTWORK

OR TURNING VANES SHALL BE USED THROUGHOUT WHERE FLOW EXCEEDS 150 CFM.

E. ALL DUCT JOINTS TO BE SEALED IN ACCORDANCE WITH "SMACNA"STANDARDS AND

ACCEPTED GOOD PRACTICE.

F. ALL DUCT DIMENSIONS SHOWN ARE NET INSIDE VALUES.DIMENSIONS MAY BE

CHANGED SO LONG AS THE NET FREE FACE AREA IS MAINTAINED.

G. ALL CONCEALED DUCTWORK SHALL BE INSULATED WITH 1-1/2" FIBERGLASS

INSULATING BLANKET WITH ALUMINUM FOIL FACING.

H. ALL SUPPLY AND RETURN DUCTWORK 15 FEET DOWNSTREAM OF THE HVAC UNIT

SHALL BE INTERNALLY LINED WITH A 1/2" ACOUSTICAL DUCT LINER UNLESS

OTHERWISE NOTED ON THE DRAWINGS.

7. DRAINAGE PIPING

A. (CONDENSATE) SHALL BE SCHEDULE 40 PVC PIPE WITH SOLVENT JOINTS, UNLESS

NOTED OTHERWISE ON FLOOR PLAN. MATERIALS USED IN RETURN AIR PLENUMS

MUST COMPLY WITH ASTM E84 FLAME/SMOKE 25/50 SPREAD INDEX REQUIREMENTS.

PITCH HORIZONTAL LINES 1" IN 10'-0". CONDENSATE DRAINS SHALL BE ROUTED TO

FLOOR DRAIN, ROOF DRAIN OR INDIRECT WASTE DRAIN.

8. HVAC CONTROLS

A. CONTRACTOR TO SUPPLY AND INSTALL ALL CONTROL WIRING AND THERMOSTATS

AS REQUIRED.

9. ELECTRICAL

A. CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR FOR LOCATION OF

WIRING FOR EACH HVAC UNIT.

10. PIPE SUPPORTS

A. ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE IN A NEAT AND

WORKMANLIKE MANNER. THE USE OF WIRE OR METAL STRAP TOSUPPORT PIPES

WILL NOT BE PERMITTED. SPACING OF PIPE SUPPORTS SHALL NOT EXCEED 8 FEET

FOR ALL PIPING. PLASTIC PIPING TO BE SUPPORTED EVERY 4 FEET.

11. GAS PIPING

A. PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH MALLEABLE IRON FITTINGS.

WHERE GAS PIPE CONNECTS TO EQUIPMENT, IT SHALL BE PROVIDED WITH A DRIP

LEG THE FULL SIZE OF THE RUNOUT, A 100% SHUT-OFF VALVE AND A UNION. GAS

PIPING CONTAINING PRESSURE GREATER THAN 9" W.G. SHALL BE SCHEDULE 40

BLACK STEEL PIPE WITH WELDED JOINTS.

12. HYDRONIC HEATING WATER PIPING, ABOVE GRADE

A. STEEL PIPE: ASTM A53/A53M, SCHEDULE 40, BLACK, USING ONE OF THE FOLLOWING

JOINT TYPES:

- WELDED JOINTS: ASTM A234/A234M, WROUGHT STEEL WELDING TYPE FITTINGS;

AWS D10.12M/D10.12 WELDED.

- THREADED JOINTS: ASME B16.3, MALLEABLE IRON FITTINGS.

- GROOVED JOINTS: AWWA C606 GROOVED PIPE, FITTINGS OF SAME MATERIAL, AND

MECHANICAL COUPLINGS.

- MECHANICAL PRESS SEALED FITTINGS: ASTM F3226/F3226M, ICC (IMC), AND IAPMO

(UMC) APPROVED, WITH EPDM SEALS.

B. COPPER TUBE: ASTM B88 (ASTM B88M), TYPE L (B), DRAWN, USING ONE OF THE

FOLLOWING JOINT TYPES:

- SOLDER JOINTS: ASME B16.18 CAST BRASS/BRONZE OR ASME B16.22 SOLDER

WROUGHT COPPER FITTINGS.

- SOLDER: ASTM B32 LEAD-FREE SOLDER, HB ALLOY (95-5 TIN-ANTIMONY) OR TIN

AND SILVER.

- BRAZE: AWS A5.8M/A5.8 BCUP COPPER/SILVER ALLOY.

- GROOVED JOINTS: AWWA C606 GROOVED TUBE, FITTINGS OF SAME MATERIAL,

AND COPPER-TUBE-DIMENSION MECHANICAL COUPLINGS.

- TEE CONNECTIONS: MECHANICALLY EXTRACTED COLLARS WITH NOTCHED AND

DIMPLED BRANCH TUBE.

- MECHANICAL PRESS SEALED FITTINGS: DOUBLE PRESSED TYPE COMPLYING WITH

ASME B16.22, UTILIZING EPDM, NONTOXIC SYNTHETIC RUBBER SEALING

ELEMENTS.

C. ALL HOT WATER PIPES TO BE INSULATED IN ACCORDANCE WITH THE 2021 IECC

SECTION C403.12.3.

13. MISCELLANEOUS

A. ALL EXTERIOR OPENINGS TO BE PROPERLY CAULKED AND SEALED WITH A SEALANT

OF HIGH QUALITY AND LONG LIFE, TO PREVENT INFILTRATION OF OUTSIDE AIR INTO

CONDITIONED SPACE.COORDINATE INSTALLATION OF ALL ROOF FLASHING AT ROOF

PENETRATION.

B. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS.

C. VERIFY ALL FIGURES, CONDITIONS, AND DIMENSIONS AT THE JOB SITE.

D. THE MECHANICAL PLANS ARE INTENDED TO BE DIAGRAMMATIC AND ARE BASED ON

ONE MANUFACTURE'S EQUIPMENT. THEY ARE NOT INTENDED TO SHOW EVERY ITEM

IN ITS EXACT LOCATION, THE EXACT DIMENSIONS, OR ALL THE DETAILS OF THE

EQUIPMENT.

E. THE CONTRACTOR SHALL VERIFY THE ACTUAL DIMENSIONS OF THE EQUIPMENT

PROPOSED TO ENSURE THAT THE EQUIPMENT WILL FIT IN THE AVAILABLE SPACE.

F. PEX TUBING, IF PEX TUBING IS USED AS AN APPROVED ALTERNATE FOR

APPLICATIONS WHERE METALLIC PIPING IS THE BASIS OF DESIGN. THE PEX

MANUFACTURER SHALL SUBMIT SHOP DRAWINGS CLEARLY INDICATING THAT THE

DESIGN HAS BEEN ANALYZED AND MODIFIED, AS REQUIRED TO MAINTAIN

SCHEDULED HYDRONIC SYSTEM PARAMETERS. ANY DESIGN RESULTING IN

INCREASED SYSTEM PRESSURE DROP AS A RESULT OF IMPROPER PEX SIZING OR

DESIGN SHALL NOT BE PERMITTED.

14. TESTING AND BALANCING

A. THE HVAC SYSTEM SHALL BE TESTED AND AND BALANCED BY AN INDEPENDENT

AGENCY, UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER. A

SEALED TYPE WRITTEN REPORT SHALL BE SUBMITTED TO THE

ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL.

15. GUARANTEE

A. MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A PERIOD

OF ONE(1) YEAR FROM DATE OF ACCEPTANCE. DEFECTS WHICH APPEAR DURING

THAT PERIOD SHALL BE CORRECTED AT THIS CONTRACTOR'S EXPENSE.

B. FOR THE SAME PERIOD, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE

FOR ANY DAMAGE TO PREMISES CAUSED BY DEFECTS IN WORKMANSHIP OR IN THE

WORK OR EQUIPMENT FURNISHED AND/OR INSTALLED BY HIM.

PLUMBING SPECIFICATION:

1. SCOPE OF WORK

A. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK, MATERIALS, AND LABOR

TO SATISFY A COMPLETE WORKING SYSTEM WHETHER SPECIFIED OR

IMPLIED.

B. ALL WORK IS TO BE PREFORMED IN STRICT COMPLIANCE WITH THE

INTERNATIONAL PLUMBING CODE (LATEST EDITION), ALL LOCAL CODES AND

ALL OTHER REGULATION GOVERNING WORK OF THIS NATURE.

C. THE CONTRACTOR SHALL, BEFORE SUBMITTING ANY PROPOSAL, EXAMINE

THE PROPOSED SITE AND SHALL DETERMINE FOR HIMSELF THE CONDITIONS

THAT MAY AFFECT THE WORK. NO ALLOWANCE SHALL BE MADE IF THE

CONTRACTOR FAILS TO MAKE SUCH EXAMINATIONS.

D. ALL EQUIPMENT AND MATERIALS SHALL BE AS SPECIFIED OR "APPROVED AS

EQUAL" BY THE ENGINEER OR ARCHITECT.

2. PERMITS

A. THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY

ANY AND ALL FEES.

3. SHOP DRAWINGS

A. SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT TO

THE ARCHITECT/ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL

SUBMIT FIVE SETS OF SHOP DRAWINGS AND THEY SHALL BE CLEARLY

LABELED.

4. DOMESTIC WATER SUPPLY PIPING

A. UNDERGROUND: PROVIDE TYPE "K" SOFT DRAWN COPPER TUBING WITH

BRAZED CONNECTIONS.

B. ABOVE GROUND: PROVIDE TYPE "L" HARD DRAWN COPPER TUBING WITH 125

PSI SOLDER JOINTS, COPPER OR BRASS FITTINGS. ALL SOLDER TO BE "NO

LEAD" TYPE.

C. ALL HOT WATER PIPING TO BE INSULATED WITH 1" FIBERGLASS INSULATION.

D. ALL COLD WATER PIPING TO BE INSULATED WITH 1/2" FOAM INSULATION.

5. SANITARY/STORM DRAINAGE AND VENT PIPING

A. ABOVE GRADE:

-2" BELOW: SCHEDULE 40 GALV. STEEL PIPE WITH SCREWED ENDS

OR SOLID CORE SCHEDULE 40 PVC WITH SOLVENT JOINTS OR DWV COPPER

WITH SOLDER JOINTS. ALL SOLDER TO BE "NO LEAD" TYPE.

-3" AND ABOVE: SERVICE WT. CAST IRON WITH NO-HUB OR

BELL AND SPIGOT JOINTS; OR SOLID CORE SCHEDULE 40 PVC WITH

SOLVENT JOINTS.

B. BELOW GRADE: SERVICE WT. CAST IRON WITH NO-HUB OR BELL AND SPIGOT

JOINTS; OR SOLID CORE SCHEDULE 40 PVC WITH SOLVENT JOINTS.

C. PVC PIPING SHALL NOT BE USED IN AIR PLENUM CEILINGS AND SHALL NOT

CROSS FIRE RATED WALLS, CEILINGS, OR FLOORS.

D. DRAINAGE PIPING SHALL BE RUN AS STRAIGHT AS POSSIBLE AND SHALL

HAVE LONG TURN FITTINGS.

E. DRAINAGE PIPING 3" SIZE AND SMALLER SHALL RUN AT A UNIFORM GRADE

OF AT LEAST 1/4" PER FOOT. AND PIPING LARGER THAN 3" SHALL BE RUN AT

A GRADE OF NO LESS THAN 1/8" PER FOOT.

F. ALL VENT PIPING SHALL BE SLOPED TO DRAIN BACK TO FIXTURES.

G. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FLASHING OF THE

VENT PIPING RUN THROUGH THE ROOF.

H. PVC USED TO BE SOLID CORE TYPE SCHEDULE 40 PVC.

7. PIPE SUPPORTS

A. ABOVE GRADE: ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING

STRUCTURE IN A NEAT AND WORKMANLIKE MANNER. THE USE OF WIRE AND

PERFORATED METAL TO SUPPORT PIPES WILL NOT BE PERMITTED. SPACING

OF PIPE SUPPORTS SHALL BE A S SPECIFIED IN INTERNATIONAL PLUMBING

CODE (LATEST EDITION).

B. BELOW GRADE: EARTH SHALL BE EXCAVATED TO A MINIMUM DEPTH WITH AN

EVEN SURFACE TO INSURE SOLID BEARING OF PIPE FOR ITS ENTIRE LENGTH.

-INTERIOR: THE PIPE SHALL BE INSTALLED (UNLESS OTHERWISE SPECIFIED)

A MINIMUM OF 4 INCHES BELOW THE BOTTOM OF THE SLAB AND SHALL NOT

BE IN ANY DIRECT CONTACT WITH THE CONCRETE AT ANY POINT.

-EXTERIOR: THE WATER PIPE SHALL HAVE A MINIMUM OF 60" OF COVER AND

THE SANITARY WASTE PIPE SHALL HAVE A MINIMUM OF 24" OF COVER.

8. MISCELLANEOUS

A. COORDINATE INSTALLATION OF ALL ROOFS FLASHING AT ROOF

PENETRATIONS.

B. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL

FIGURES, CONDITIONS AND DIMENSIONS AT THE JOB SITE.

C. THE PLUMBING PLANS ARE INTENDED TO BE DIAGRAMMATIC AND ARE BASED

ON ONE MANUFACTURER'S EQUIPMENT. THEY ARE NOT INTENDED TO SHOW

EVERY ITEM IN ITS EXACT LOCATION. THE EXACT DIMENSIONS OR ALL THE

DETAILS OF THE EQUIPMENT. THE CONTRACTOR SHALL VERIFY THE ACTUAL

DIMENSIONS OF THE EQUIPMENT PROPOSED TO ENSURE THAT THE

EQUIPMENT WILL FIT THE AVAILABLE SPACE.

9. TESTING

A. PLUMBING SYSTEM SHALL BE FLOW AND PRESSURE TESTED IN

ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE (LATEST EDITION).

10 GUARANTEE

A. MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A

PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. DEFECTS WHICH

APPEAR DURING THAT PERIOD SHALL BE CORRECTED AT THIS

CONTRACTORS EXPENSE.

B. FOR THE SAME PERIOD THE PLUMBING CONTRACTOR SHALL BE

RESPONSIBLE FOR ANY DAMAGE TO PREMISES CAUSED BY DEFECTS IN

WORKMANSHIP OR IN THE WORK OR EQUIPMENT FURNISHED AND/OR

INSTALLED BY HIM.

MECHANICAL/HYDRONIC GENERAL NOTES:

1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.

2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS

LOCATED ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.

3. CONDENSING BOILER VENT MATERIAL SHALL COMPLY WITH MANUFACTURER'S LISTED AND APPROVED MATERIALS (AL29-4C POLYPRO). PVC SHALL NOT BE USED FOR FLUE/COMBUSTION AIR VENTING MATERIAL.

ENGINEERS PREFERRED MATERIAL IS PRESSURE RATED, DOUBLE WALL, GASKETED, STAINLESS STEEL CONDENSING FLUE VENTING MATERIAL. RECOMMENDED MANUFACTURER'S SELKIRK OR JEREMIAS.

4. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.

CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO

NEAREST FLOOR DRAIN.

5. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO INSURE THAT FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.

6. NEW BOILER TO BE FULLY INTEGRATED INTO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE WITH BACNET OR MODBUS COMMUNICATION. EXISTING ELECTRICAL CIRCUIT IN BUILDING TO POWER NEW BOILER.

7. THE HYDRONIC SYSTEM INSTALLING CONTRACTOR SHALL SAMPLE HYDRONIC SYSTEM FILL WATER PRIOR TO INITIAL FILLING OF HYDRONIC SYSTEM TO VERIFY THAT FILL WATER QUALITY TO BE USED MEETS BOILER MANUFACTURER RECOMMENDED WATER QUALITY CRITERIA. (I.E. TESTING OF TOTAL DISSOLVED SOLIDS, PH, IRON/METALS CONTENT (IRON OXIDES, COPPER, ETC.), DISSOLVED OXYGEN CONTENT, CHLORIDES, TOTAL HARDNESS, ETC.) IF THE TESTED FILL WATER DOES NOT MEET THE BOILER MANUFACTURER REQUIRED CRITERIA THE SYSTEM SHALL BE FILLED WITH DISTILLED WATER THAT MEETS THE BOILER MANUFACTURER'S REQUIRED WATER QUALITY CRITERIA. RECORDS OF THE SAMPLE SHALL BE PROVIDED TO ENGINEER AND OWNER SHOWING THAT THE WATER QUALITY MEETS THE BOILER MANUFACTURER QUALITY CRITERIA.

8. THE HYDRONIC SYSTEM INSTALLING CONTRACTOR SHALL PROVIDE QUARTERLY WATER SAMPLE TESTING DURING THE WARRANTY PERIOD (~90 DAYS). IF SAMPLES ARE OUT OF BOILER MANUFACTURER WATER QUALITY CRITERIA REQUIREMENTS THE OWNER SHALL BE NOTIFIED. WATER QUALITY SHALL BE ADDRESSED IMMEDIATELY AS TO PREVENT PREMATURE FAILURE OF BOILER HEAT EXCHANGERS AND HYDRONIC SYSTEM. IF NEEDED A WATER QUALITY ANALYST SHALL BE CONTACTED TO PROVIDE OPTIONS FOR WATER TREATMENT SOLUTIONS. IT IS SUGGESTED THAT AFTER THE WARRANTY PERIOD HAS EXPIRED THE OWNER CONTINUE TO SAMPLE AND VERIFY THE HYDRONIC SYSTEM WATER QUALITY IS WITHIN BOILER MANUFACTURER QUALITY

CRITERIA.

9. EXISTING HYDRONIC SYSTEMS BEING RETROFITTED WITH NEW BOILERS SHALL BE COMPLETELY DRAINED OF ALL SYSTEM HYDRONIC FLUID. EXISTING HYDRONIC FLUID SHALL NOT BE RE-USED. THE EXISTING HYDRONIC SYSTEM SHALL BE PROPERLY CLEANED SO THAT THE HYDRONIC SYSTEM IS WITHIN BOILER MANUFACTURER WATER QUALITY CRITERIA REQUIREMENTS. ONCE THE SYSTEM HAS BEEN VERIFIED IT IS WITHIN REQURIED

WATER QUALITY CRITERIA, NEW WORKING FLUID WATER/GLYCOL MIX SHALL BE PROVIDED.

10. CLEANING PRODUCTS USED TO FLUSH EXISTING BOILER SYSTEMS SHALL BE VERIFIED TO NOT DETERIORATE MATERIAL COMPONENTS WITHIN BOILER SYSTEM. (I.E. IF SYSTEM IS HAS COPPER, ALUMINUM, STAINLESS THE CLEANER SHALL BE APPROVED FOR USE FOR THE MATERIALS WITHIN SYSTEM.) THE INSTALLING CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S RECOMMENDATIONS AND CLEANING PROCEDURES FOR ITERATIONS

UNTIL SATISFACTORY RESULTS ARE OBTAINED.

11. IF COUPON RACK IS NOT PROVIDED TO HYDRONIC SYSTEM, A SAMPLING HOSE BIB SHALL BE PROVIDED FOR SAMPLING OF HYDRONIC SYSTEM FLUIDS. THE HOSE BIB SHALL BE LOCATED AND ORIENTATED IN THE HYDRONIC SYSTEM SO THAT PARTICULATE SETTLING CANNOT OCCUR WITHIN THE HOSE BIB CAUSING LESS ACCURATE RESULTS. HOSE BIB TAP SHOULD BE LOCATED ON TOP OF SUPPLY/RETURN PIPING AND LABELED

APPROPRIATELY.

12. A CERTIFIED BOILER MANUFACTURER'S REPRESENTATIVE SHALL PROVIDE STARTUP OF THE BOILER SYSTEM AND VERIFICATION THAT BOILERS ARE INSTALLED CORRECTLY. (SUCH AS EXCESS OXYGEN IN FLUE GASES, GAS PRESSURE, ETC.)

13. BOILER EMERGENCY POWER OFF (E.P.O.) SWITCHES SHALL BE PROVIDED AT EXIT DOORS WITHIN BOILER

MECHANICAL ROOM. IN ACCORDANCE WITH ADOPTED CODE AND STANDARDS.

AS SHOWN

BOILER SCHEDULE

EQUIPMENT

NO. LOCATION

INPUT

CAPACITY

(MBH)

OUTPUT

CAPACITY

(MBH)

THERMAL

EFFICIENCY

FLUE/COMB.

AIR

SIZE (IN)

ELECTRICAL

MANUFACTURER & MODEL NOTES

FLA V./PH./HZ.

BL-1 BOILER ROOM 500 485 97.0% 4" / 4" 20 120/1/60 LOCHINVAR - KNIGHT XL KBX0500N NOTE - 1

NOTES:

1. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR NEW BOILER BY MSI OUR OF ENGLEWOOD, CO AS AN ADD ALTERNATE. BOILER CONTROLS TO BE IN ACCORDANCE WITH CSD-1. PROVIDE WITH SEALED COMBUSTION, VARIABLE SPPED BOILER CIRCULATION PUMP, ASME RELIEF VALVE, LOW-WATER CUTOFF WITH MANUAL RESET & TEST, FLOW SWITCH, ADJUSTABLE HIGH LIMIIT WITH MANUAL RESET, MODULATING TEMPERATURE CONTROL, CONDENSATE NEUTRALIZING KIT, HIGH ALTITUDE KIT SIZED PER LOCATION ELEVATION, WIRELESS OUTDOOR TEMPERATURE SENSOR, BMS GATEWAY TO BACnet, CONCENTRIC VENT KIT, AND BLOWER MOTOR.

PIPE CLEANING SEQUENCE:

A. CONCENTRATION:

1. ONE POUND PER 100 GALLONS OF WATER FOR HOT SYSTEMS AND ONE POUND PER 50 GALLONS OF WATER FOR COLD SYSTEMS.

B. HOT WATER HEATING SYSTEMS:

1. APPLY HEAT WHILE CIRCULATING, SLOWLY RAISING TEMPERATURE TO 160 DEGREES F AND MAINTAIN FOR 12 HOURS MINIMUM.

2. REMOVE HEAT AND CIRCULATE TO 100 DEGREES F OR LESS; DRAIN SYSTEMS AS QUICKLY AS POSSIBLE AND REFILL WITH CLEAN WATER.

3. CIRCULATE FOR 6 HOURS AT DESIGN TEMPERATURES, THEN DRAIN.

4. REFILL WITH CLEAN WATER AND REPEAT UNTIL SYSTEM CLEANER IS REMOVED.

C. USE NEUTRALIZER AGENTS ON RECOMMENDATION OF SYSTEM CLEANER SUPPLIER AND APPROVAL OF ENGINEER.

D. FLUSH OPEN SYSTEMS AND GLYCOL FILLED CLOSED SYSTEMS WITH CLEAN WATER FOR ONE HOUR MINIMUM. DRAIN COMPLETELY AND REFILL.

E. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS.

F. INSPECT, REMOVE SLUDGE, AND FLUSH LOW POINTS WITH CLEAN WATER AFTER CLEANING PROCESS IS COMPLETED. INCLUDE DISASSEMBLY OF COMPONENTS AS

REQUIRED.

PUMP SCHEDULE

EQUIPMENT NO. SERVICE LOCATION GPM HEAD (FT.)

MOTOR

MANUFACTURER & MODEL OPTIONS/ACCESSORIES

WATTS RPM V./PH./HZ. HP FLA

CP-1 BUILDING HEAT INLINE 50 55 1550 1750 208/1/60 2.1 8 TACO - VR SERIES VR25H-1 NOTE-1

CP-2 BUILDING HEAT INLINE 50 55 1550 1750 208/1/60 2.1 8 TACO - VR SERIES VR25H-1 NOTE-1

NOTES:

1. SELF-SENSING VARIABLE SPEED PUMP. PROVIDE WITH DISCONNECT.

Sheets and Views
25282 - BMS BOILER ROOM - MEP TITLE SHEET-T1.1
Unsaved Drawing1-M0-1
Unsaved Drawing1-M1-1
Unsaved Drawing1-M3-1

File details come from the government source that posted it. Updated .