Attachment C - Plans.pdf
PDF 3 MB Posted
- Attached to
- Battlement Mesa Boiler Upgrade
- Solicitation number
- IFB-GC-FM-05-25
- Issued by
- Garfield County, Aurora City, Colorado
About this file
The document is a mechanical construction bid package for the Garfield County Battlement Mesa Substation Boiler Upgrade project, dated August 1, 2025. The project involves replacing the existing 550 MBH Burnham atmospheric boiler with a new 500 MBH Lochinvar Knight XL high-efficiency, sealed combustion boiler at the Battlement Mesa Substation. Key scope of work includes replacing the air separator, expansion tank, and heating water pumps, modifying the existing boiler piping to a primary/secondary system, routing new combustion air intake and vent through the existing louver, and providing new Distech controls as an add alternate. The project is located at 1777 S Battlement Parkway in Battlement Mesa, Colorado.
The bid package includes detailed mechanical specifications, boiler and pump schedules, and comprehensive installation requirements. The project will follow the 2021 versions of IBC, IMC, IECC, IPC, IFGC, and the 2023 NEC. The building has "B" and "S" occupancy classifications totaling 5,580 square feet. The contractor will be responsible for waste disposal, verifying dimensions, and ensuring all work meets code requirements. The project includes specific technical requirements such as using 30% propylene glycol in the hydronic system, commissioning per IECC Section 408, and requiring a certified boiler manufacturer's representative to provide system startup and verification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
EC
H
AN
IC
AL
T
IT
LE
S
H
EE
T
DATE: ISSUED FOR:
SHEET NUMBER:
July 31, 2025 - 4:53:36pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
T1.1
BM
S
U
BS
TA
TI
O N
B O
IL
ER
U
PG
R
AD
E
S B
AT
TL
EM
EN
T
PA
R
KW
AY
MJH
MJH
08/01/2025
25-280
BA
TT
LE
M
EN
T
M
ES
A, C
O
LO
R
AD
O
08/01/2025 CONSTRUCTION DOCUMENTS
SHEET LEGEND
T1-1 TITLE SHEET
M0-1 MECHANICAL COVER SHEET
M1-1 MECHANICAL FLOOR PLAN
M3-1 MECHANICAL DETAILS & SCHEDULES
CODE NOTES:
1. APPLICABLE CODES INCLUDE THE 2021 VERSIONS OF THE IBC, IMC, IECC, IPC, IFGC AND THE 2023 VERSION OF THE NEC.
GENERAL CONSTRUCTION NOTES:
1. THE SCOPE OF WORK FOR THIS PROJECT WILL INVOLVE UPGRADE OF THE EXISTING BOILER PLANT.
2. DEMOLITION INCLUDES THE REMOVAL OF EQUIPMENT/PIPING AS NOTED ON THE PLANS AND PATCHING/REPAIRING WALLS WHERE PIPING IS
REMOVED.
3. COORDINATE STAGING AREA FOR CONSTRUCTION WITH THE OWNER.
4. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL WASTE DISPOSAL FOR THIS PROJECT. COORDINATE THE LOCATION OF WASTE DUMPSTERS
WITH THE OWNER.
5. THE CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND ACCESS REQUIREMENTS FOR ALL NEW EQUIPMENT PRIOR TO ORDERING MATERIAL.
6. ANY WORK THAT DISTURBS OR ALTERS THE ROOF AND ROOFING MATERIAL IS TO BE RETURNED TO PRE-CONSTRUCTION CONDITIONS AND THE
ROOF MADE WEATHERTIGHT.
SCOPE OF NEW WORK / PROJECT BIDDING:
THE PROJECT WILL BE BID PER THE FOLLOWING SCOPE OF WORK:
1. REPLACE THE EXISTING 550 MBH BURNHAM ATMOSPHERIC BOILER WITH A NEW 500 MBH LOCHINVAR KNIGHT XL (OR APPROVED EQUAL)
HIGH-EFFICIENCY, SEALED COMBUSTION UNIT.
2. REPLACE THE EXISTING AIR SEPARATOR, EXPANSION TANK, AND HEATING WATER PUMPS WITH NEW.
3. MODIFY THE EXISTING BOILER PIPING ARRANGEMENT TO BE A PRIMARY / SECONDARY SYSTEM.
4. THE EXISTING COMBUSTION AIR DUCT SHALL BE REMOVED AND THE NEW BOILER 4" INTAKE AND VENT SHALL BE ROUTED THROUGH THE EXISTING
LOUVER.
5. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR THE BOILER AND PUMPS BY MSI OUT OF ENGLEWOOD, CO AS AN ADD ALTERNATE.
6. VERIFY THE EXISTING HEATING WATER SYSTEM HAS 30% PROPYLENE GLYCOL. PROVIDE ADDITIONAL GLYCOL AS REQUIRED TO REACH 30%.
7. EQUIPMENT TO BE COMMISSIONED IN ACCORDANCE WITH THE IECC SECTION 408.
ADD ALTERNATE:
1. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR THE BOILER AND PUMPS BY MSI OUT OF ENGLEWOOD, CO
VICINITY MAP
OCCUPANCY CLASSIFICATIONS:
"B" OCCUPANCY - BUILDING AREA - 3,375 SQ. FT.
"S" OCCUPANY - BUILDING AREA - 2,205 SQ. FT.
Attachment B Garfield County Battlement Mesa Substation Boiler Upgrade
AutoCAD SHX Text
AUGUST 1, 2025
AutoCAD SHX Text
BID PACKAGE
AutoCAD SHX Text
GARFIELD COUNTY COURTHOUSE BOILER UPGRADE
Mark Stamp
M0-1
A. SUBSTITUTIONS: SUBSTITUTION OF SPECIFIED EQUIPMENT WILL BE ALLOWED
THROUGH A PRIOR APPROVAL PROCESS INITIATED BY THE CONTRACTOR.
CONTRACTOR SHALL SUBMIT INTENDED SUBSTITUTION AT LEAST FIVE DAYS
PRIOR TO BID FOR APPROVAL FROM ENGINEER. SUBMITTAL SHALL INCLUDE
CAPACITIES, DIMENSIONS AND OPERATING INSTRUCTIONS FOR EACH PIECE OF
EQUIPMENT. SUBSTITUTION SHALL OCCUR AT NO COST TO THE OWNER.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF APPROVED SUBSTITUTION
AND SHALL INCUR ALL COSTS ASSOCIATED WITH THE SUBSTITUTION INCLUDING
STRUCTURAL MODIFICATIONS, SPACE LAYOUT AND REDESIGN COSTS. SEE ALSO
DIVISION I GENERAL REQUIREMENTS.
EXAMINATION OF SITE, DRAWINGS, SPECIFICATIONS:
A. EXAMINE CAREFULLY THE SITE AND CONDITIONS OF THE SITE. PROVIDE ALL
NECESSARY EQUIPMENT AND LABOR TO INSTALL A COMPLETE WORKING SYSTEM
WITHIN THE SITE CONDITIONS.
B. EXAMINE THE DRAWINGS AND SPECIFICATIONS AND 5 DAYS PRIOR TO
BIDDING REPORT ANY ERRORS, OMISSIONS, INCONSISTENCIES, AND CONFLICTS
TO THE ENGINEER TO BE REMEDIED IN AN ADDENDUM TO THE PROJECT PRIOR TO
BID TIME.
C. DRAWINGS ARE DIAGRAMMATIC AND CATALOG NUMBERS GIVEN ARE FOR
REFERENCE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
THE CAPACITY OF THE EQUIPMENT MEETS THE DRAWING REQUIREMENTS AND
SHALL NOT DIMENSION FROM THE MECHANICAL, PLUMBING, OR PIPING
DRAWINGS.
D. THE LATEST ADOPTED VERSIONS OF THE INTERNATIONAL BUILDING CODES
SHALL BE USED AS REQUIRED. THIS WILL ALSO INCLUDE THE LATEST ADOPTED
VERSIONS OF THE MECHANICAL, PLUMBING, AND ENERGY CONSERVATION
CODES. ALL METHODS AND MATERIALS REQUIRED BY THESE CODES SHALL BE
REQUIRED BY THESE SPECIFICATIONS UNLESS INDICATED OTHERWISE. OTHER
APPLICABLE LOCAL CODES AND ORDINANCES SHALL BE AS REQUIRED AND IT
SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO BE KNOWLEDGEABLE OF
THESE REQUIREMENTS.
E. WHERE INSTALLATION PROCEDURES OR ANY PART THEREOF ARE REQUIRED
TO BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE MANUFACTURER
OF THE MATERIAL BEING INSTALLED, PRINTED COPIES OF THESE
RECOMMENDATIONS SHALL BE FURNISHED TO THE ENGINEER PRIOR TO
INSTALLATION. INSTALLATION OF THE ITEM WILL NOT BE ALLOWED TO PROCEED
UNTIL THE RECOMMENDATIONS ARE RECEIVED. FAILURE TO FURNISH THESE
RECOMMENDATIONS CAN BE CAUSE FOR REJECTION OF THE MATERIAL.
44” MOUNTING HEIGHT ABOVE
FINISHED FLOOR TO CENTER OF DEVICE
A AMPS
A.D. ACCESS DOOR
AAV AIR ADMITTANCE VALVE
ABV ABOVE
AC AIR CONDITIONING UNIT
AC ABOVE COUNTER
AD AREA DRAIN (SEE SYMBOLS)
A.F.C. ABOVE FINISHED CEILING
A.F.G. ABOVE FINISHED GRADE
AIC AMPERE INTERRUPTING
CAPACITY
AFCI ARC FAULT CIRCUIT
INTERRUPTERS
A.F.F. ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AP ACCESS PANEL OR DOOR
ATS AUTOMATIC TRANSFER SWITCH
AV AUDIO / VIDEO
AVG AVERAGE
AWG AMERICAN WIRE GAGE
BAS BUILDING AUTOMATION SYSTEM
BB BASEBOARD
BD BACK DRAFT DAMPER
BFP BACK FLOW PREVENTOR
BL BOILER
BLDG BUILDING
BLW BELOW
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOP BOTTOM OF PIPE
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
C CHILLER
CAFCI COMBINATION ARC FAULT
CIRCUIT INTERRUPTERS
CAP CAPACITY
CB CIRCUIT BREAKER
CBV CIRCUIT BALANCING VALVE
CCT CORRELATED COLOR
TEMPERATURE
CKT CIRCUIT
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CL CENTER LINE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CONTR CONTRACTOR
CRI COLOR RENDERING INDEX
CT COOLING TOWER
CT CURRENT TRANSFORMER
CU CONDENSING UNIT
CU COPPER
CUH CABINET UNIT HEATER
CVB CONSTANT VOLUME BOX
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
DB DRY BULB
DEPT DEPARTMENT
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGRAM
DIFF DIFFERENTIAL
DISCH DISCHARGE
DIV DIVISION
DN DOWN
DS DUCT SILENCER
DWG DRAWING
DX DIRECT EXPANSION
(E) EXISTING
EA EXHAUST AIR GRILLE/REGISTER
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
ECC ECCENTRIC
EF EXHAUST FAN
EFF EFFICIENCY
EL ELEVATION
ELEC ELECTRIC
ELEV ELEVATOR
EM EMERGENCY FUNCTION
ENT ENTERING
EMT ELECTRIC METALLIC TUBE
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER
TEMPERATURE
EX EXHAUST
EXPAN EXPANSION
EXT EXTERNAL
F DEGREES FAHRENHEIT
FA FREE AREA
FC FAN COIL UNIT
FC FOOTCANDLE
FCV FLOW CONTROL VALVE
FD FIRE DAMPER
FD FLOOR DRAIN
FIN FINISHED
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLR FLOOR
FOB FLAT ON BOTTOM
FOT FLAT ON TOP
FP FIRE PROTECTION
FP FIRE PUMP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FT FEET
FXC FLEXIBLE CONNECTION
GND GROUND
GA GAUGE
GAL GALLON
GALV GALVANIZED
GEC GROUND ELECTRODE
CONDUCTOR
GFCI / GFI GROUND FAULT CIRCUIT
INTERRUPTER
GC GENERAL CONTRACTOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRS/LB GRAINS PER POUND
H 2O WATER
HB HOSE BIBB
HD HEAD (SEE SCHEDULES)
HP HEAT PUMP
HP HORSEPOWER
HR HOUR
HT HEIGHT
HTR HEATER
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
ID INSIDE DIAMETER
IG ISOLATED GROUND
IN INCHES
INV INVERT
JBOX JUNCTION BOX
K KELVIN
KW KILOWATT
KVA KILO VOLT - AMPS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LV LAVATORY
LB POUND
LD LINEAR DIFFUSER
LF LINEAR FEET
LIN LINEAR
LIQ LIQUID
LM LUMEN
LRA LOCKED ROTOR AMPS
LV LOUVER
LVG LEAVING
LWT LEAVING WATER TEMPERATURE
MBH THOUSANDS OF BTU PER HOUR
MC MECHANICAL CONTRACTOR
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MD MOTORIZED DAMPER
MDP MAIN DISTRIBUTION PANEL
MED MEDIUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUG ONLY
MOCP MAXIMUM OVERCURRENT
PROTECTION
MTD MOUNTED
MUA MAKE-UP AIR UNIT
N NEUTRAL
NC NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NL NIGHT / SECURITY LIGHT - DO
NOT SWITCH
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OCC OCCUPIED
OCP OVER CURRENT PROTECTION
OD OUTSIDE DIAMETER
OL OVERLOAD
ORD OVERFLOW ROOF DRAIN
OZ OUNCE
PBD PARALLEL BLADE DAMPER
PD PRESSURE DROP
PH PHASE
POS POSITIVE PRESSURE
POS POINT OF SALES
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSI POUNDS PER SQUARE INCH
PT PRESSURE TRANSMITTER
PTAC PACKAGED TERMINAL AIR
CONDITIONER
PV PLUG VALVE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RA RETURN AIR GRILLE / REGISTER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REL RELIEF
REQD REQUIRED
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RLA RATED LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR GRILLE / REGISTER
SC SHORT CIRCUIT
SCA SHORT CIRCUIT AVAILABLE
SCCR SHORT CIRCUIT CURRENT
RATING
SCH SCHEDULE
SD SMOKE DAMPER
SEF SMOKE EXHAUST FAN
SF SUPPLY FAN
SH SENSIBLE HEAT
SH SHOWER
SP STATIC PRESSURE
SPD SURGE PROTECTION DEVICE
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SS SAFETY SHOWER
STD STANDARD
STL STEEL
SYS SYSTEM
TEMP TEMPERATURE
TR TRANSFER GRILLE / REGISTER
TR TAMPER RESISTANT
TT TEMPERATURE TRANSMITTER
TTB TELECOMMUNICATIONS
TERMINAL BACKBOARD
TYP TYPICAL
TX TRANSFORMER
UC UNDERCUT DOOR
UH UNIT HEATER
UNO UNLESS NOTED OTHERWISE
UNOCC UNOCCUPIED
UR URINAL
V VOLTS
VA VOLT AMPERE
VA VALVE
VAV VARIABLE AIR VOLUME UNIT
VFD VARIABLE FREQUENCY DRIVE
VRF VARIABLE REFRIGERANT FLOW
VOLT VOLTAGE
VTR VENT THROUGH ROOF
W WIDTH
W WATTS
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER COLUMN
WC WATER CLOSET
WG WATER GAUGE
WP WEATHERPROOF
WPIU WEATHERPROOF IN-USE
WSR WITHSTAND RATING
XFMR TRANSFORMER
SUBSTITUTIONS:RESPONSIBLE DIVISION:
UNLESS OTHERWISE INDICATED ALL HEATING, VENTILATING, AIR CONDITIONING, PLUMBING,
AND OTHER MECHANICAL EQUIPMENT, MOTORS, AND CONTROLS SHALL BE FURNISHED, SET
IN PLACE AND WIRED AS FOLLOWS:
ITEM FURNISHED SET POWER CONTROL
WIRED WIRED
EQUIPMENT 23 23 26 --
COMBINATION MAGNETIC
MOTOR STARTERS, MAGNETIC
MOTOR STARTERS, VFD'S AND
CONTACTORS 23(1) 26 26(2) 23
FUSED AND UNFUSED
DISCONNECT SWITCHES,
THERMAL OVERLOAD SWITCHES
AND HEATERS, MANUAL MOTOR
STARTERS 26 26 26 --
MANUAL-OPERATING AND
MULTI-SPEED SWITCHES 23 26 26 26
CONTROLS, RELAYS,
TRANSFORMERS 23 23 26 23
THERMOSTATS (LOW VOLTAGE)
AND TIME SWITCHES 23 23 26 23
THERMOSTATS (LINE VOLTAGE) 23 23 26 26
TEMPERATURE CONTROL PANELS 23 23 26 23
MOTOR AND SOLENOID VALVES,
DAMPER MOTORS, PE & EP
SWITCHES 23 23(2) -- 23(2)
PUSH-BUTTON STATIONS
AND PILOT LIGHTS 23 23(2) -- 23(2)
HEATING, COOLING,
VENTILATION AND AIR
CONDITIONING CONTROLS 23 23 26 23
EXHAUST FAN SWITCHES 23 26 26 23(2)
SUBSCRIPT FOOTNOTES:
1. MOTOR STARTER TO INCLUDE CONTROL TRANSFORMER, HOA SWITCH, (1) NO AND (1)NC
AUXILIARY CONTACT, AND “ON” AND “OFF” PILOT LIGHTS.
2. IF ITEM IS FOR LINE VOLTAGE, SET IN PLACE AND CONNECT UNDER DIVISION 26. WHERE
FACTORY MOUNTED ON EQUIPMENT OR ATTACHED TO PIPING OR DUCTS AND USING LINE
VOLTAGE FURNISH AND SET UNDER DIVISION 23, CONNECT UNDER DIVISION 26.
ABBREVIATIONS:
SECTION THROUGH RETURN DUCT
SECTION THROUGH SUPPLY OR OUTSIDE AIR DUCT
SUPPLY OR OUTSIDE AIR DUCT
ACCESS DOOR (BOTTOM OR SIDE)
ACOUSTICALLY LINED DUCT
FIRE DAMPER, SMOKE DAMPER, FIRE/SMOKE DAMPER
MANUAL VOLUME DAMPER
INCLINED DROP IN DIRECTION OF ARROW
INCLINED RISE IN DIRECTION OF ARROW
TRANSITION, RECTANGULAR TO ROUND
FLEXIBLE DUCT
IN-LINE FAN
TRANSITION, RECTANGULAR
SPIN-IN COLLAR INTO ADAPTER ON TOP OF DUCT
CEILING SUPPLY AIR REGISTER/GRILLE
SIDEWALL SUPPLY AIR REGISTER (SR)
ELBOW TURNED DOWN
ELBOW TURNED UP
ELBOW, RADIUS TYPE
ELBOW, SQUARE OR RECTANGULAR TYPE
WITH AIRFOIL TURNING VANES
CEILING RETURN AIR REGISTER (RR)
OPEN END DUCT
FLEXIBLE CONNECTION
SIDEWALL RETURN AIR REGISTER (RR)
VD
FXC
RR
DD
PIPE DROPPING DOWN
PIPE RISING UP
DIRECTION OF FLOW
RELIEF/SAFETY VALVE
FLOW METER-VENTURI
FLOW METER-ORIFICE
AUTOMATIC AIR VENT (EXTEND
AUTOMATIC FILL VALVE
DISCHARGE TO DRAIN)
MANUAL AIR VENT
CONCENTRIC REDUCER
ECCENTRIC REDUCER
STEAM LEAK DETECTOR
TPV
S
CBV
R D
STRAINER
MV
AV
GAS COCK
AQUASTAT
VB VACUUM BREAKER
EXPANSION LOOP
GAS PRESSURE
STEAM TRAP
ANCHOR
EJ
TT
FS
TH
PT/PS
G
PRESSURE SWITCH
& SYPHON (STEAM)
GAUGE COCK
TRANSMITTER OR
THERMOMETER
EXPANSION JOINT
TEMPERATURE
FLOW SWITCH
GUIDE
A
DIRECTION OF PITCH-RISE OR
DROP
STRAINER WITH BLOW
OFF VALVE
UNION - SCREWED OR FLANGED
FLOAT OPERATED
CO
CD
T
CARBON MONOXIDE
CARBON DIOXIDE
THERMOSTAT
CONTROL VALVE
REGULATOR
TRANSMITTER
PRESSURE
GAUGE WITH
FSD FIRE SMOKE DAMPER
RELIEF VALVE
SOLENOID VALVE
TEMPERATURE/PRESSURE
DIAPHRAGM VALVE
BALANCING VALVE
BALL VALVE
GLOBE VALVE, ANGLE
GATE VALVE, ANGLE
LIFT CHECK VALVE
SWING CHECK VALVE
GATE VALVE
BUTTERFLY VALVE
PLUG VALVE
GLOBE VALVE
CIRCUIT SETTING
BALANCING VALVE
THREE WAY CONTROL VALVE
TWO WAY CONTROL VALVE
PRESSURE REDUCING
VALVE (PRV)
EXISTING EQUIPMENT OR
PIPE TO BE REMOVED.
CS CONDENSER WATER SUPPLY
CR CONDENSER WATER RETURN
R REFRIGERANT LIQUID AND VAPOR LINE
RS REFRIGERANT SUCTION / VAPOR
HOT WATER SUPPLY (HWS)
HOT WATER RETURN (HWR)
HPS HEAT PUMP SUPPLY
HPR HEAT PUMP RETURN
VENT PIPING
D DRAIN
NATURAL GAS
SMS SNOWMELT SUPPLY
SMR SNOWMELT RETURN
CHWS CHILLED WATER SUPPLY
CHWR CHILLED WATER RETURN
LINE DESIGNATION SYMBOLS
MECHANICAL ELEMENTS / VALVING
SMOKE DAMPER
FIRE / SMOKE DAMPERFSD
SD
RH REFRIGERANT HIGH PRESSURE VAPOR
CA COMPRESSED AIR
FD - SD
- FSD
SECTION THROUGH EXHAUST AIR DUCT
HX
S
AIR VENT
HYDRAULIC SEPARATOR
AIR SEPARATOR
HEAT EXCHANGER
DIGITAL SENSOR
OR PUMP
HVAC & DUCTWORK SYMBOLS
POINT OF CONNECTION OF NEW TO EXISTING
G
M
EC
H
AN
IC
AL
C
O
VE
R S
H
EE
T
DATE: ISSUED FOR:
SHEET NUMBER:
July 31, 2025 - 4:53:36pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
BM
S
U
BS
TA
TI
O N
B O
IL
ER
U
PG
R
AD
E
S B
AT
TL
EM
EN
T
PA
R
KW
AY
MJH
MJH
08/01/2025
25-282
BA
TT
LE
M
EN
T
M
ES
A, C
O
LO
R
AD
O
08/01/2025 CONSTRUCTION DOCUMENTS
AutoCAD SHX Text
PRV
AutoCAD SHX Text
AutoCAD SHX Text
PSI
M1-1 MECHANICAL KEYNOTES:
EXISTING WATER HEATER TO REMAIN.
PROVIDE AND INSTALL NEW HIGH EFFICIENCY, GAS FIRED BOILER. REFER TO THE BOILER PIPING SCHEMATIC FOR ADDITIONAL INFORMATION, EQUIPMENT, COMPONENTS, CONTROLS, AND REQUIREMENTS. ROUTE 4" COMBUSTION AIR AND FLUE AS SHOWN PER MANUFACTURER'S RECOMMENDATIONS. CONNECT TO EXISTING ELECTRICAL CIRCUIT CURRENTLY SERVING THE EXISTING BOILER PER THE ADOPTED VERSION OF THE NEC. CONNECT TO EXISTING GAS LINE CURRENTLY SERVING THE EXISTING BOILER. INSTALL FACTORY PROVIDED CONDENSATE NEUTRALIZATION KIT, PIPE TO NEAREST EXISTING FLOOR DRAIN, AND TERMINATE WITH AIR GAP.
PROVIDE AND INSTALL SHEETMETAL PLENUM TO COVER THE EXISTING EXTERIOR LOUVER. ROUTE 4" FLUE AND 4" COMBUSTION AIR DUCT FROM THE CONNECTIONS AT THE NEW BOILER, TO THE EXTERIOR WALL, AND TERMINATE WITH FACTORY PROVIDED CONCENTRIC VENT PER MANUFACTURER'S RECOMMENDATIONS. MAINTAIN CLEARANCES TO ALL
BUILDING OPENINGS.
CONTRACTOR TO VERIFY THE EXISTING CIRCUIT(S) CURRENTLY SERVING THE EXISTING BUILDING HEATING WATER PUMPS ARE ADEQUATE FOR THE NEW HEATING WATER PUMPS. IF FOUND TO BE INADEQUATE, CONTRACTOR TO PROVIDE ALL REQUIRED BREAKERS, CONDUCTORS, AND ACCESSORIES REQUIRED TO ENERGIZE THE NEW PUMPS PER
THE ADOPTED VERSION OF THE NEC.
PROVIDE AND INSTALL NEW 115/1/60 RECEPTACLE IN THE BOILER ROOM TO POWER THE NEW GLYCOL FEEDER PER THE ADOPTED VERSION OF THE NEC. PROVIDE NEW RECEPTACLE, CONDUCTORS, AND 15-AMP BREAKER FED FROM THE
NEAREST EXISTING ELECTRICAL PANEL OF ADEQUATE CAPACITY.
PROVIDE AND INSTALL EMERGENCY POWER OFF (EPO) SWITCH IN ACCORDANCE WITH ASME CSD-1 CONTROLS.
ET
GF
HS
CP
CP
2 BL
EPO
BUILDING HEATING BOILER PIPING SCHEMATIC
SCALE: NTS NOTE: FINAL FILL OF SYSTEM SHALL BE WITH SOLUTION OF
30% PROPYLENE GLYCOL.
TO NETURALIZATION
CONDENSATE DRAIN
HWR
AIR VENT
3/4"
HWS
TO DRAIN
2-1/2"
CONNECT NEW TO EXIST1
CP
2-1/2"
2-1/2"
BOILER DRAIN
2-1/2"
BL
G
CIRCUIT SETTER
2-1/2"
G
CONNECT TO EXISTING
NATURAL GAS PIPE
BOILER PROVIDED WITH
CIRCULATION PUMP. TYP.
PIPE RELIEF DRAIN FULL
SIZE TO FLOOR DRAIN
HWS
HWR
PRESSURE
GAUGE
CP
2-1/2" TACO 59025A
HYDRAULIC SEPARATOR
TACO - 409
AUTOMATIC AIR
VENT
THERMOMETER
2-1/2"
AXIOM - SF100
GLYCOL FEEDER
TACO - CA215-125
EXPANSION TANK
ET-1
GF-1
G
HEATING WATER PIPING
1"
IN MECHANICAL ROOM
KIT. PIPE TO FLOOR
DRAIN WITH AIR GAP.
2"
DATE: ISSUED FOR:
SHEET NUMBER:
July 31, 2025 - 4:53:39pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M1-1
M
EC
H
AN
IC
AL
BO
IL
ER
R O
O M
P
LA
N
BM
S
U
BS
TA
TI
O N
B O
IL
ER
U
PG
R
AD
E
S B
AT
TL
EM
EN
T
PA
R
KW
AY
BA
TT
LE
M
EN
T M
ES
A, C O
LO
R
AD
O
MECHANICAL - BOILER ROOM PLAN
SCALE:
NORTH
SCALE: 1/4" = 1'-0"
08/01/2025
25-282
AS SHOWN
08/01/2025 CONSTRUCTION DOCUMENTS
EXISTING CONDITIONS PHOTOS
DEMOLITION NOTES:
· REPLACE THE EXISTING BOILER PLANT INCLUDING BOILER, HEATING WATER PUMPS, EXPANSION TANK, AND AIR
SEPARATOR.
· REMOVE THE EXISTING DOMESTIC WATER MAKEUP LINE INCLUDING THE REDUCED PRESSURE BACKFLOW
PREVENTER BACK TO ACTIVE COLD WATER LINE AND PROVIDE SHUT-OFF VALVE AND CAP.
· MAINTAIN THE EXISTING ELECTRICAL CIRCUITS CURRENTLY SERVING THE EXISTING BOILER AND HEATING WATER
PUMPS FOR REUSE TO SERVE THE NEW BOILER AND PUMPS.
· REMOVE THE EXISTING FLUE AND PATCH THE ROOF TO MATCH EXISTING.
· REMOVE THE EXISTING COMBUSTION AIR DUCT FROM THE EXTERIOR LOUVER.
DATE: ISSUED FOR:
SHEET NUMBER:
July 31, 2025 - 4:53:38pm
DO NOT REPRODUCE THESE DRAWINGS AND
SPECIFICATIONS WITHOUT THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER. THE DRAWINGS AND
SPECIFICATIONS ARE INSTRUMENTS OF THE SERVICE AND
SHALL REMAIN THE PROPERTY OF THE DESIGNER
WHETHER THE PROJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT. THESE DRAWINGS AND
SPECIFICATIONS SHALL NOT BE USED BY ANYONE ON
ANY OTHER PROJECTS FOR ADDITIONS TO THIS PROJECT
BY OTHERS EXCEPT BY THE EXPRESSED WRITTEN
PERMISSION OF THE DESIGNER.
Bi gh or n
C on su lti ng E ng in ee rs
, I nc
M ec ha ni ca l & E le ct ric al
E ng in ee rs
In di an
R oa d G ra nd
J un ct io n, C
O
Ph on e:
(9
) 2
-8
DATE:
CHECKED BY:
JOB NO:
DRAWN BY:
SCALE:
M3-1
M
EC
H
AN
IC
AL
D
ET
AI
LS
S C
H
ED
U
LE
S
BM
S
U
BS
TA
TI
O N
B O
IL
ER
U
PG
R
AD
E
S B
AT
TL
EM
EN
T
PA
R
KW
AY
08/01/2025
25-282
BA
TT
LE
M
EN
T
M
ES
A, C
O
LO
R
AD
O
08/01/2025 CONSTRUCTION DOCUMENTS
MECHANICAL PROVISIONS:
1. SCOPE OF WORK
A. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK, MATERIALS, AND LABOR TO
SATISFY A COMPLETE WORKING SYSTEM WHETHER SPECIFIED OR IMPLIED.
B. ALL WORK IS TO BE PERFORMED IN STRICT COMPLIANCE WITH ALL LOCAL CODES
AND ALL OTHER REGULATION GOVERNING WORK OF THIS NATURE.
C. THE CONTRACTOR SHALL, BEFORE SUBMITTING ANY PROPOSAL, EXAMINE THE
PROPOSED SITE AND SHALL DETERMINE FOR HIMSELF THE CONDITIONS THAT MAY
EFFECT THE WORK. NO ALLOWANCE SHALL BE MADE IF THE CONTRACTOR FAILS TO
MAKE SUCH EXAMINATIONS.
D. ALL EQUIPMENT AND MATERIALS SHALL BE AS SPECIFIED BY THE ENGINEER OR
ARCHITECT.
2. PERMITS
A. THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY ANY
AND ALL FEES.
3. SHOP DRAWINGS
A. SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT TO THE
ARCHITECT/ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL SUBMIT FIVE SETS
OF SHOP DRAWINGS AND THEY SHALL BE CLEARLY LABELED.
4. FLEXIBLE DUCT WORK
A. FLEXIBLE TYPE DUCT SHALL BE OF TWO ELEMENT SPIRAL CONSTRUCTION
COMPOSED OF A CORROSION RESISTANT METAL SUPPORTING SPIRAL AND COATED
FABRIC WITH A MINERAL BASE. FLEXIBLE DUCT CONNECTORS SHALL BE LISTED BY
U.L., CLASS 1 DUCTS, AND SHALL HAVE A FLAME SPREAD RATING NOT EXCEEDING 25
AND A SMOKE DEVELOPED RATING NOT EXCEEDING 50.
B. USE OF FLEXIBLE DUCTWORK SHALL BE LIMITED TO NO MORE THAN 6 LINEAR FEET
PER RUN.
C. CONTRACTOR SHALL BE CAREFUL SO AS NOT TO KINK OR COLLAPSE FLEXIBLE
DUCT.
5. REFRIGERANT
A. PIPING CONTRACTOR SHALL PROVIDE AND INSTALL REFRIGERANT PIPING IN
ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND IN SUCH A WAY AS
TO BE INCONSPICUOUS AND FREE FROM ANY POSSIBLE CONDENSATION.
B. INSULATE REFRIGERANT LINES WITH ARMOUR-FLEX TYPE INSULATION, SHALL BE TYPE
"K" COPPER TUBING, WITH WROUGHT COPPER SOLDER TYPE FITTINGS SUITABLE FOR
CONNECTION WITH SILVER SOLDER.
6. DUCTWORK
A. THE DUCTWORK SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE "SMACNA"
APPLICABLE MANUALS.
B. ALL DUCTWORK SHALL BE THE LOW VELOCITY TYPE, UNLESS SPECIFIED OTHERWISE.
C. CONTRACTOR SHALL PROVIDE AND INSTALL APPROVED FIRE DAMPERS AND ACCESS
PANELS IN ANY AND ALL DUCTWORK WHICH PENETRATES A HORIZONTAL OR
VERTICAL FIRE PARTITION, OR AS OTHERWISE SHOWN ON DRAWINGS.
D. ALL BRANCH DUCTS TO HAVE VOLUME DAMPERS, SMOOTH TURN RADIUS DUCTWORK
OR TURNING VANES SHALL BE USED THROUGHOUT WHERE FLOW EXCEEDS 150 CFM.
E. ALL DUCT JOINTS TO BE SEALED IN ACCORDANCE WITH "SMACNA"STANDARDS AND
ACCEPTED GOOD PRACTICE.
F. ALL DUCT DIMENSIONS SHOWN ARE NET INSIDE VALUES.DIMENSIONS MAY BE
CHANGED SO LONG AS THE NET FREE FACE AREA IS MAINTAINED.
G. ALL CONCEALED DUCTWORK SHALL BE INSULATED WITH 1-1/2" FIBERGLASS
INSULATING BLANKET WITH ALUMINUM FOIL FACING.
H. ALL SUPPLY AND RETURN DUCTWORK 15 FEET DOWNSTREAM OF THE HVAC UNIT
SHALL BE INTERNALLY LINED WITH A 1/2" ACOUSTICAL DUCT LINER UNLESS
OTHERWISE NOTED ON THE DRAWINGS.
7. DRAINAGE PIPING
A. (CONDENSATE) SHALL BE SCHEDULE 40 PVC PIPE WITH SOLVENT JOINTS, UNLESS
NOTED OTHERWISE ON FLOOR PLAN. MATERIALS USED IN RETURN AIR PLENUMS
MUST COMPLY WITH ASTM E84 FLAME/SMOKE 25/50 SPREAD INDEX REQUIREMENTS.
PITCH HORIZONTAL LINES 1" IN 10'-0". CONDENSATE DRAINS SHALL BE ROUTED TO
FLOOR DRAIN, ROOF DRAIN OR INDIRECT WASTE DRAIN.
8. HVAC CONTROLS
A. CONTRACTOR TO SUPPLY AND INSTALL ALL CONTROL WIRING AND THERMOSTATS
AS REQUIRED.
9. ELECTRICAL
A. CONTRACTOR TO COORDINATE WITH ELECTRICAL CONTRACTOR FOR LOCATION OF
WIRING FOR EACH HVAC UNIT.
10. PIPE SUPPORTS
A. ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING STRUCTURE IN A NEAT AND
WORKMANLIKE MANNER. THE USE OF WIRE OR METAL STRAP TOSUPPORT PIPES
WILL NOT BE PERMITTED. SPACING OF PIPE SUPPORTS SHALL NOT EXCEED 8 FEET
FOR ALL PIPING. PLASTIC PIPING TO BE SUPPORTED EVERY 4 FEET.
11. GAS PIPING
A. PIPING SHALL BE SCHEDULE 40 BLACK STEEL PIPE WITH MALLEABLE IRON FITTINGS.
WHERE GAS PIPE CONNECTS TO EQUIPMENT, IT SHALL BE PROVIDED WITH A DRIP
LEG THE FULL SIZE OF THE RUNOUT, A 100% SHUT-OFF VALVE AND A UNION. GAS
PIPING CONTAINING PRESSURE GREATER THAN 9" W.G. SHALL BE SCHEDULE 40
BLACK STEEL PIPE WITH WELDED JOINTS.
12. HYDRONIC HEATING WATER PIPING, ABOVE GRADE
A. STEEL PIPE: ASTM A53/A53M, SCHEDULE 40, BLACK, USING ONE OF THE FOLLOWING
JOINT TYPES:
- WELDED JOINTS: ASTM A234/A234M, WROUGHT STEEL WELDING TYPE FITTINGS;
AWS D10.12M/D10.12 WELDED.
- THREADED JOINTS: ASME B16.3, MALLEABLE IRON FITTINGS.
- GROOVED JOINTS: AWWA C606 GROOVED PIPE, FITTINGS OF SAME MATERIAL, AND
MECHANICAL COUPLINGS.
- MECHANICAL PRESS SEALED FITTINGS: ASTM F3226/F3226M, ICC (IMC), AND IAPMO
(UMC) APPROVED, WITH EPDM SEALS.
B. COPPER TUBE: ASTM B88 (ASTM B88M), TYPE L (B), DRAWN, USING ONE OF THE
FOLLOWING JOINT TYPES:
- SOLDER JOINTS: ASME B16.18 CAST BRASS/BRONZE OR ASME B16.22 SOLDER
WROUGHT COPPER FITTINGS.
- SOLDER: ASTM B32 LEAD-FREE SOLDER, HB ALLOY (95-5 TIN-ANTIMONY) OR TIN
AND SILVER.
- BRAZE: AWS A5.8M/A5.8 BCUP COPPER/SILVER ALLOY.
- GROOVED JOINTS: AWWA C606 GROOVED TUBE, FITTINGS OF SAME MATERIAL,
AND COPPER-TUBE-DIMENSION MECHANICAL COUPLINGS.
- TEE CONNECTIONS: MECHANICALLY EXTRACTED COLLARS WITH NOTCHED AND
DIMPLED BRANCH TUBE.
- MECHANICAL PRESS SEALED FITTINGS: DOUBLE PRESSED TYPE COMPLYING WITH
ASME B16.22, UTILIZING EPDM, NONTOXIC SYNTHETIC RUBBER SEALING
ELEMENTS.
C. ALL HOT WATER PIPES TO BE INSULATED IN ACCORDANCE WITH THE 2021 IECC
SECTION C403.12.3.
13. MISCELLANEOUS
A. ALL EXTERIOR OPENINGS TO BE PROPERLY CAULKED AND SEALED WITH A SEALANT
OF HIGH QUALITY AND LONG LIFE, TO PREVENT INFILTRATION OF OUTSIDE AIR INTO
CONDITIONED SPACE.COORDINATE INSTALLATION OF ALL ROOF FLASHING AT ROOF
PENETRATION.
B. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS.
C. VERIFY ALL FIGURES, CONDITIONS, AND DIMENSIONS AT THE JOB SITE.
D. THE MECHANICAL PLANS ARE INTENDED TO BE DIAGRAMMATIC AND ARE BASED ON
ONE MANUFACTURE'S EQUIPMENT. THEY ARE NOT INTENDED TO SHOW EVERY ITEM
IN ITS EXACT LOCATION, THE EXACT DIMENSIONS, OR ALL THE DETAILS OF THE
EQUIPMENT.
E. THE CONTRACTOR SHALL VERIFY THE ACTUAL DIMENSIONS OF THE EQUIPMENT
PROPOSED TO ENSURE THAT THE EQUIPMENT WILL FIT IN THE AVAILABLE SPACE.
F. PEX TUBING, IF PEX TUBING IS USED AS AN APPROVED ALTERNATE FOR
APPLICATIONS WHERE METALLIC PIPING IS THE BASIS OF DESIGN. THE PEX
MANUFACTURER SHALL SUBMIT SHOP DRAWINGS CLEARLY INDICATING THAT THE
DESIGN HAS BEEN ANALYZED AND MODIFIED, AS REQUIRED TO MAINTAIN
SCHEDULED HYDRONIC SYSTEM PARAMETERS. ANY DESIGN RESULTING IN
INCREASED SYSTEM PRESSURE DROP AS A RESULT OF IMPROPER PEX SIZING OR
DESIGN SHALL NOT BE PERMITTED.
14. TESTING AND BALANCING
A. THE HVAC SYSTEM SHALL BE TESTED AND AND BALANCED BY AN INDEPENDENT
AGENCY, UNDER THE SUPERVISION OF A LICENSED PROFESSIONAL ENGINEER. A
SEALED TYPE WRITTEN REPORT SHALL BE SUBMITTED TO THE
ARCHITECT/ENGINEER FOR REVIEW AND APPROVAL.
15. GUARANTEE
A. MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A PERIOD
OF ONE(1) YEAR FROM DATE OF ACCEPTANCE. DEFECTS WHICH APPEAR DURING
THAT PERIOD SHALL BE CORRECTED AT THIS CONTRACTOR'S EXPENSE.
B. FOR THE SAME PERIOD, THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY DAMAGE TO PREMISES CAUSED BY DEFECTS IN WORKMANSHIP OR IN THE
WORK OR EQUIPMENT FURNISHED AND/OR INSTALLED BY HIM.
PLUMBING SPECIFICATION:
1. SCOPE OF WORK
A. THE CONTRACTOR IS RESPONSIBLE FOR ALL WORK, MATERIALS, AND LABOR
TO SATISFY A COMPLETE WORKING SYSTEM WHETHER SPECIFIED OR
IMPLIED.
B. ALL WORK IS TO BE PREFORMED IN STRICT COMPLIANCE WITH THE
INTERNATIONAL PLUMBING CODE (LATEST EDITION), ALL LOCAL CODES AND
ALL OTHER REGULATION GOVERNING WORK OF THIS NATURE.
C. THE CONTRACTOR SHALL, BEFORE SUBMITTING ANY PROPOSAL, EXAMINE
THE PROPOSED SITE AND SHALL DETERMINE FOR HIMSELF THE CONDITIONS
THAT MAY AFFECT THE WORK. NO ALLOWANCE SHALL BE MADE IF THE
CONTRACTOR FAILS TO MAKE SUCH EXAMINATIONS.
D. ALL EQUIPMENT AND MATERIALS SHALL BE AS SPECIFIED OR "APPROVED AS
EQUAL" BY THE ENGINEER OR ARCHITECT.
2. PERMITS
A. THE CONTRACTOR SHALL SECURE ALL PERMITS OR APPLICATIONS AND PAY
ANY AND ALL FEES.
3. SHOP DRAWINGS
A. SUBMIT MATERIAL LIST AND SHOP DRAWINGS FOR MAJOR EQUIPMENT TO
THE ARCHITECT/ENGINEER FOR APPROVAL. THE CONTRACTOR SHALL
SUBMIT FIVE SETS OF SHOP DRAWINGS AND THEY SHALL BE CLEARLY
LABELED.
4. DOMESTIC WATER SUPPLY PIPING
A. UNDERGROUND: PROVIDE TYPE "K" SOFT DRAWN COPPER TUBING WITH
BRAZED CONNECTIONS.
B. ABOVE GROUND: PROVIDE TYPE "L" HARD DRAWN COPPER TUBING WITH 125
PSI SOLDER JOINTS, COPPER OR BRASS FITTINGS. ALL SOLDER TO BE "NO
LEAD" TYPE.
C. ALL HOT WATER PIPING TO BE INSULATED WITH 1" FIBERGLASS INSULATION.
D. ALL COLD WATER PIPING TO BE INSULATED WITH 1/2" FOAM INSULATION.
5. SANITARY/STORM DRAINAGE AND VENT PIPING
A. ABOVE GRADE:
-2" BELOW: SCHEDULE 40 GALV. STEEL PIPE WITH SCREWED ENDS
OR SOLID CORE SCHEDULE 40 PVC WITH SOLVENT JOINTS OR DWV COPPER
WITH SOLDER JOINTS. ALL SOLDER TO BE "NO LEAD" TYPE.
-3" AND ABOVE: SERVICE WT. CAST IRON WITH NO-HUB OR
BELL AND SPIGOT JOINTS; OR SOLID CORE SCHEDULE 40 PVC WITH
SOLVENT JOINTS.
B. BELOW GRADE: SERVICE WT. CAST IRON WITH NO-HUB OR BELL AND SPIGOT
JOINTS; OR SOLID CORE SCHEDULE 40 PVC WITH SOLVENT JOINTS.
C. PVC PIPING SHALL NOT BE USED IN AIR PLENUM CEILINGS AND SHALL NOT
CROSS FIRE RATED WALLS, CEILINGS, OR FLOORS.
D. DRAINAGE PIPING SHALL BE RUN AS STRAIGHT AS POSSIBLE AND SHALL
HAVE LONG TURN FITTINGS.
E. DRAINAGE PIPING 3" SIZE AND SMALLER SHALL RUN AT A UNIFORM GRADE
OF AT LEAST 1/4" PER FOOT. AND PIPING LARGER THAN 3" SHALL BE RUN AT
A GRADE OF NO LESS THAN 1/8" PER FOOT.
F. ALL VENT PIPING SHALL BE SLOPED TO DRAIN BACK TO FIXTURES.
G. CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER FLASHING OF THE
VENT PIPING RUN THROUGH THE ROOF.
H. PVC USED TO BE SOLID CORE TYPE SCHEDULE 40 PVC.
7. PIPE SUPPORTS
A. ABOVE GRADE: ALL PIPE SHALL BE SUPPORTED FROM THE BUILDING
STRUCTURE IN A NEAT AND WORKMANLIKE MANNER. THE USE OF WIRE AND
PERFORATED METAL TO SUPPORT PIPES WILL NOT BE PERMITTED. SPACING
OF PIPE SUPPORTS SHALL BE A S SPECIFIED IN INTERNATIONAL PLUMBING
CODE (LATEST EDITION).
B. BELOW GRADE: EARTH SHALL BE EXCAVATED TO A MINIMUM DEPTH WITH AN
EVEN SURFACE TO INSURE SOLID BEARING OF PIPE FOR ITS ENTIRE LENGTH.
-INTERIOR: THE PIPE SHALL BE INSTALLED (UNLESS OTHERWISE SPECIFIED)
A MINIMUM OF 4 INCHES BELOW THE BOTTOM OF THE SLAB AND SHALL NOT
BE IN ANY DIRECT CONTACT WITH THE CONCRETE AT ANY POINT.
-EXTERIOR: THE WATER PIPE SHALL HAVE A MINIMUM OF 60" OF COVER AND
THE SANITARY WASTE PIPE SHALL HAVE A MINIMUM OF 24" OF COVER.
8. MISCELLANEOUS
A. COORDINATE INSTALLATION OF ALL ROOFS FLASHING AT ROOF
PENETRATIONS.
B. DO NOT SCALE THIS DRAWING FOR EXACT DIMENSIONS. VERIFY ALL
FIGURES, CONDITIONS AND DIMENSIONS AT THE JOB SITE.
C. THE PLUMBING PLANS ARE INTENDED TO BE DIAGRAMMATIC AND ARE BASED
ON ONE MANUFACTURER'S EQUIPMENT. THEY ARE NOT INTENDED TO SHOW
EVERY ITEM IN ITS EXACT LOCATION. THE EXACT DIMENSIONS OR ALL THE
DETAILS OF THE EQUIPMENT. THE CONTRACTOR SHALL VERIFY THE ACTUAL
DIMENSIONS OF THE EQUIPMENT PROPOSED TO ENSURE THAT THE
EQUIPMENT WILL FIT THE AVAILABLE SPACE.
9. TESTING
A. PLUMBING SYSTEM SHALL BE FLOW AND PRESSURE TESTED IN
ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE (LATEST EDITION).
10 GUARANTEE
A. MATERIALS, EQUIPMENT AND INSTALLATION SHALL BE GUARANTEED FOR A
PERIOD OF ONE (1) YEAR FROM DATE OF ACCEPTANCE. DEFECTS WHICH
APPEAR DURING THAT PERIOD SHALL BE CORRECTED AT THIS
CONTRACTORS EXPENSE.
B. FOR THE SAME PERIOD THE PLUMBING CONTRACTOR SHALL BE
RESPONSIBLE FOR ANY DAMAGE TO PREMISES CAUSED BY DEFECTS IN
WORKMANSHIP OR IN THE WORK OR EQUIPMENT FURNISHED AND/OR
INSTALLED BY HIM.
MECHANICAL/HYDRONIC GENERAL NOTES:
1. DRAWING IS DIAGRAMMATIC IN NATURE. LOCATIONS AND SIZES MAY VARY DURING FIELD COORDINATION & INSTALLATION OF MECHANICAL, PLUMBING, & ELECTRICAL. DRAWINGS DO NOT NECESSARILY INDICATE EVERY REQUIRED OFFSET, FITTING, ETC. DRAWINGS ARE NOT TO BE SCALED FOR DIMENSIONS. TAKE ALL DIMENSIONS FROM ARCHITECTURAL DRAWINGS, CERTIFIED EQUIPMENT DRAWINGS AND FROM THE STRUCTURE ITSELF BEFORE FABRICATING ANY WORK, VERIFY ALL SPACE REQUIREMENTS COORDINATING WITH OTHER TRADES, AND INSTALL THE SYSTEMS IN THE SPACE PROVIDED WITHOUT EXTRA CHARGES TO THE OWNER.
2. COORDINATE FINAL LOCATION OF THERMOSTAT WITH OWNER PRIOR TO INSTALLATION. IF THERMOSTAT IS
LOCATED ON EXTERIOR WALL PROVIDE THERMOSTAT WITH INSULATED BACKING.
3. CONDENSING BOILER VENT MATERIAL SHALL COMPLY WITH MANUFACTURER'S LISTED AND APPROVED MATERIALS (AL29-4C POLYPRO). PVC SHALL NOT BE USED FOR FLUE/COMBUSTION AIR VENTING MATERIAL.
ENGINEERS PREFERRED MATERIAL IS PRESSURE RATED, DOUBLE WALL, GASKETED, STAINLESS STEEL CONDENSING FLUE VENTING MATERIAL. RECOMMENDED MANUFACTURER'S SELKIRK OR JEREMIAS.
4. ROUTE CONDENSATE FROM CONDENSING MECHANICAL EQUIPMENT TO CONDENSATE NEUTRALIZATION KITS.
CONDENSATE FROM NEUTRALIZATION KITS SHALL BE DISCHARGED INDIRECTLY THROUGH AIR GAP TO
NEAREST FLOOR DRAIN.
5. CONTRACTOR SHALL CLEAN AND SERVICE ALL EXISTING EQUIPMENT TO REMAIN. CONTRACTOR SHALL VERIFY ALL EQUIPMENT TO REMAIN IS PROPERLY FUNCTIONING PRIOR TO RE-USING EQUIPMENT. CONTRACTOR TO INSURE THAT FINAL MECHANICAL SYSTEM WILL OPERATE AS INTENDED ON PROVIDED DRAWINGS.
6. NEW BOILER TO BE FULLY INTEGRATED INTO EXISTING BUILDING AUTOMATION SYSTEM. PROVIDE WITH BACNET OR MODBUS COMMUNICATION. EXISTING ELECTRICAL CIRCUIT IN BUILDING TO POWER NEW BOILER.
7. THE HYDRONIC SYSTEM INSTALLING CONTRACTOR SHALL SAMPLE HYDRONIC SYSTEM FILL WATER PRIOR TO INITIAL FILLING OF HYDRONIC SYSTEM TO VERIFY THAT FILL WATER QUALITY TO BE USED MEETS BOILER MANUFACTURER RECOMMENDED WATER QUALITY CRITERIA. (I.E. TESTING OF TOTAL DISSOLVED SOLIDS, PH, IRON/METALS CONTENT (IRON OXIDES, COPPER, ETC.), DISSOLVED OXYGEN CONTENT, CHLORIDES, TOTAL HARDNESS, ETC.) IF THE TESTED FILL WATER DOES NOT MEET THE BOILER MANUFACTURER REQUIRED CRITERIA THE SYSTEM SHALL BE FILLED WITH DISTILLED WATER THAT MEETS THE BOILER MANUFACTURER'S REQUIRED WATER QUALITY CRITERIA. RECORDS OF THE SAMPLE SHALL BE PROVIDED TO ENGINEER AND OWNER SHOWING THAT THE WATER QUALITY MEETS THE BOILER MANUFACTURER QUALITY CRITERIA.
8. THE HYDRONIC SYSTEM INSTALLING CONTRACTOR SHALL PROVIDE QUARTERLY WATER SAMPLE TESTING DURING THE WARRANTY PERIOD (~90 DAYS). IF SAMPLES ARE OUT OF BOILER MANUFACTURER WATER QUALITY CRITERIA REQUIREMENTS THE OWNER SHALL BE NOTIFIED. WATER QUALITY SHALL BE ADDRESSED IMMEDIATELY AS TO PREVENT PREMATURE FAILURE OF BOILER HEAT EXCHANGERS AND HYDRONIC SYSTEM. IF NEEDED A WATER QUALITY ANALYST SHALL BE CONTACTED TO PROVIDE OPTIONS FOR WATER TREATMENT SOLUTIONS. IT IS SUGGESTED THAT AFTER THE WARRANTY PERIOD HAS EXPIRED THE OWNER CONTINUE TO SAMPLE AND VERIFY THE HYDRONIC SYSTEM WATER QUALITY IS WITHIN BOILER MANUFACTURER QUALITY
CRITERIA.
9. EXISTING HYDRONIC SYSTEMS BEING RETROFITTED WITH NEW BOILERS SHALL BE COMPLETELY DRAINED OF ALL SYSTEM HYDRONIC FLUID. EXISTING HYDRONIC FLUID SHALL NOT BE RE-USED. THE EXISTING HYDRONIC SYSTEM SHALL BE PROPERLY CLEANED SO THAT THE HYDRONIC SYSTEM IS WITHIN BOILER MANUFACTURER WATER QUALITY CRITERIA REQUIREMENTS. ONCE THE SYSTEM HAS BEEN VERIFIED IT IS WITHIN REQURIED
WATER QUALITY CRITERIA, NEW WORKING FLUID WATER/GLYCOL MIX SHALL BE PROVIDED.
10. CLEANING PRODUCTS USED TO FLUSH EXISTING BOILER SYSTEMS SHALL BE VERIFIED TO NOT DETERIORATE MATERIAL COMPONENTS WITHIN BOILER SYSTEM. (I.E. IF SYSTEM IS HAS COPPER, ALUMINUM, STAINLESS THE CLEANER SHALL BE APPROVED FOR USE FOR THE MATERIALS WITHIN SYSTEM.) THE INSTALLING CONTRACTOR SHALL FOLLOW THE MANUFACTURER'S RECOMMENDATIONS AND CLEANING PROCEDURES FOR ITERATIONS
UNTIL SATISFACTORY RESULTS ARE OBTAINED.
11. IF COUPON RACK IS NOT PROVIDED TO HYDRONIC SYSTEM, A SAMPLING HOSE BIB SHALL BE PROVIDED FOR SAMPLING OF HYDRONIC SYSTEM FLUIDS. THE HOSE BIB SHALL BE LOCATED AND ORIENTATED IN THE HYDRONIC SYSTEM SO THAT PARTICULATE SETTLING CANNOT OCCUR WITHIN THE HOSE BIB CAUSING LESS ACCURATE RESULTS. HOSE BIB TAP SHOULD BE LOCATED ON TOP OF SUPPLY/RETURN PIPING AND LABELED
APPROPRIATELY.
12. A CERTIFIED BOILER MANUFACTURER'S REPRESENTATIVE SHALL PROVIDE STARTUP OF THE BOILER SYSTEM AND VERIFICATION THAT BOILERS ARE INSTALLED CORRECTLY. (SUCH AS EXCESS OXYGEN IN FLUE GASES, GAS PRESSURE, ETC.)
13. BOILER EMERGENCY POWER OFF (E.P.O.) SWITCHES SHALL BE PROVIDED AT EXIT DOORS WITHIN BOILER
MECHANICAL ROOM. IN ACCORDANCE WITH ADOPTED CODE AND STANDARDS.
AS SHOWN
BOILER SCHEDULE
EQUIPMENT
NO. LOCATION
INPUT
CAPACITY
(MBH)
OUTPUT
CAPACITY
(MBH)
THERMAL
EFFICIENCY
FLUE/COMB.
AIR
SIZE (IN)
ELECTRICAL
MANUFACTURER & MODEL NOTES
FLA V./PH./HZ.
BL-1 BOILER ROOM 500 485 97.0% 4" / 4" 20 120/1/60 LOCHINVAR - KNIGHT XL KBX0500N NOTE - 1
NOTES:
1. NEW DISTECH CONTROLS SHALL BE PROVIDED FOR NEW BOILER BY MSI OUR OF ENGLEWOOD, CO AS AN ADD ALTERNATE. BOILER CONTROLS TO BE IN ACCORDANCE WITH CSD-1. PROVIDE WITH SEALED COMBUSTION, VARIABLE SPPED BOILER CIRCULATION PUMP, ASME RELIEF VALVE, LOW-WATER CUTOFF WITH MANUAL RESET & TEST, FLOW SWITCH, ADJUSTABLE HIGH LIMIIT WITH MANUAL RESET, MODULATING TEMPERATURE CONTROL, CONDENSATE NEUTRALIZING KIT, HIGH ALTITUDE KIT SIZED PER LOCATION ELEVATION, WIRELESS OUTDOOR TEMPERATURE SENSOR, BMS GATEWAY TO BACnet, CONCENTRIC VENT KIT, AND BLOWER MOTOR.
PIPE CLEANING SEQUENCE:
A. CONCENTRATION:
1. ONE POUND PER 100 GALLONS OF WATER FOR HOT SYSTEMS AND ONE POUND PER 50 GALLONS OF WATER FOR COLD SYSTEMS.
B. HOT WATER HEATING SYSTEMS:
1. APPLY HEAT WHILE CIRCULATING, SLOWLY RAISING TEMPERATURE TO 160 DEGREES F AND MAINTAIN FOR 12 HOURS MINIMUM.
2. REMOVE HEAT AND CIRCULATE TO 100 DEGREES F OR LESS; DRAIN SYSTEMS AS QUICKLY AS POSSIBLE AND REFILL WITH CLEAN WATER.
3. CIRCULATE FOR 6 HOURS AT DESIGN TEMPERATURES, THEN DRAIN.
4. REFILL WITH CLEAN WATER AND REPEAT UNTIL SYSTEM CLEANER IS REMOVED.
C. USE NEUTRALIZER AGENTS ON RECOMMENDATION OF SYSTEM CLEANER SUPPLIER AND APPROVAL OF ENGINEER.
D. FLUSH OPEN SYSTEMS AND GLYCOL FILLED CLOSED SYSTEMS WITH CLEAN WATER FOR ONE HOUR MINIMUM. DRAIN COMPLETELY AND REFILL.
E. REMOVE, CLEAN, AND REPLACE STRAINER SCREENS.
F. INSPECT, REMOVE SLUDGE, AND FLUSH LOW POINTS WITH CLEAN WATER AFTER CLEANING PROCESS IS COMPLETED. INCLUDE DISASSEMBLY OF COMPONENTS AS
REQUIRED.
PUMP SCHEDULE
EQUIPMENT NO. SERVICE LOCATION GPM HEAD (FT.)
MOTOR
MANUFACTURER & MODEL OPTIONS/ACCESSORIES
WATTS RPM V./PH./HZ. HP FLA
CP-1 BUILDING HEAT INLINE 50 55 1550 1750 208/1/60 2.1 8 TACO - VR SERIES VR25H-1 NOTE-1
CP-2 BUILDING HEAT INLINE 50 55 1550 1750 208/1/60 2.1 8 TACO - VR SERIES VR25H-1 NOTE-1
NOTES:
1. SELF-SENSING VARIABLE SPEED PUMP. PROVIDE WITH DISCONNECT.
| Sheets and Views |
| 25282 - BMS BOILER ROOM - MEP TITLE SHEET-T1.1 |
| Unsaved Drawing1-M0-1 |
| Unsaved Drawing1-M1-1 |
| Unsaved Drawing1-M3-1 |
File details come from the government source that posted it. Updated .