Attachment A - Scope of Work.pdf
PDF 182 KB Posted
- Attached to
- Battlement Mesa Boiler Upgrade
- Solicitation number
- IFB-GC-FM-05-25
- Issued by
- Garfield County, Aurora City, Colorado
About this file
This document is a Scope of Work (IFB-GC-FM-05-25) issued by Garfield County for a Battlement Mesa Boiler Upgrade project located at 1777 S Battlement Pkwy, Battlement Mesa, CO 81635, which is a former fire station now operated by the county. The project involves replacing an existing 550 mbh Burnham atmospheric boiler with a new 500 mbh Lochinvar Knight XL high-efficiency, sealed combustion unit, along with associated upgrades including replacing the air separator, expansion tank, heating water pumps, modifying boiler piping to a primary/secondary system, and routing new boiler intake and vent through an existing louver.
The project includes an add alternate for new Distech controls to be provided by MSI from Englewood, CO, which will ensure seamless integration with the current HVAC control system. The contractor will be responsible for all aspects of the project, including obtaining necessary permits, maintaining a safe working environment, managing daily cleanup and waste disposal, and ensuring compliance with applicable 2021 and 2023 building, mechanical, electrical, and construction codes. The scope requires verifying existing conditions, maintaining facility access, and commissioning equipment in accordance with IECC section 408, with special attention to maintaining the existing heating water system's 30% propylene glycol concentration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A
IFB-GC-FM-05-25
Scope of Work
Battlement Mesa Boiler Upgrade
In accordance with Article 5.2 of the Garfield County Procurement Code (“GCPC”), Garfield County is soliciting competitive sealed bids from qualified Contractors to perform the removal and replacement of an existing boiler for the Garfield County Facilities Department. This project is located at 1777 S Battlement Pkwy, Battlement Mesa, CO 81635. The facility is a former fire station now operated by the county.
The qualified Contractor shall provide all labor, materials, tools, equipment, and accessories required to complete this project. The qualified Contractor shall, without additional expense to the County, be responsible for obtaining any necessary licenses and permits, and for complying with any federal, state, count, and municipal laws, codes, and regulations applicable to the design and performance of the work.
The Contractor is responsible to verify all existing conditions, product compatibility, and measurements associated with this project. Failure to do so will not relieve them their obligation to furnish all material and labor necessary to carry out the provisions of the contract.
The Contractor shall plan on taking the necessary measures to maintain access to the facility.
The Contractor will be responsible for maintaining a safe working environment, traffic control, if necessary, daily removal and disposal of demolished materials from the job site, and daily project clean up.
The project will be bid per the following scope of work:
1. Replace the existing 550 mbh burnham atmospheric boiler with a new 500 mbh Lochinvar Knight XL (or approved equal) high-efficiency, sealed combustion unit.
2. Replace the existing air separator, expansion tank, and heating water pumps with new.
3. Modify the existing boiler piping arrangement to be a primary / secondary system.
4. The existing combustion air duct shall be removed and the new boiler 4" intake and vent shall be routed through the existing louver.
5. New Distech controls shall be provided for the boiler and pumps by MSI out of Englewood, Co as an add alternate.
6. Verify the existing heating water system has 30% propylene glycol. Provide additional glycol as required to reach 30%.
7. Equipment to be commissioned in accordance with the IECC section 408.
8. Refer to plumbing and electrical general construction notes and scope on drawing sheet m1-1, m3-1.
ADD ALTERNATE:
1. New Distech New Distech Controls shall be provided for the boiler and pumps by MSI out of Englewood, Co. This is our current vendor that provides maintenance and monitoring of the current HVAC control system. This will ensure seamless integration.
CODE NOTES:
1. Applicable codes include the 2021 versions of the IBC, IMC, IECC, IPC, IFGC and the 2023 version of the NEC.
GENERAL CONSTRUCTION NOTES:
1. The scope of work for this project will involve modifying the existing boiler plant.
2. Demolition includes the removal of equipment/piping as noted on the plans and patching/repairing walls where piping is removed.
3. Coordinate staging area for construction with the owner.
4. The contractor will be responsible for all waste disposal for this project. Coordinate the location of waste dumpsters with the owner.
5. The contractor is to verify all dimensions and access requirements for all new equipment prior to ordering material.
6. Any work that disturbs or alters the roof and roofing material is to be returned to pre-construction conditions and the roof made weathertight.
File details come from the government source that posted it. Updated .