Attachment C Plans and Drawings to Basewide PAVEMENT REPAIR 8-1-23.pdf
PDF 665 KB Posted
- Attached to
- PANG Basewide Pavement Repair
- Solicitation number
- S-24800-00007949
- Issued by
- Multnomah County, Oregon
About this file
The provided document is the "Attachment C Plans and Drawings to Basewide PAVEMENT REPAIR 8-1-23.pdf" for the PANG Basewide Pavement Repair contract opportunity located in Multnomah County and the City of Portland, Oregon. The project involves fog sealing 5,000 square feet, pavement patching and repair of 5,000 square feet, and crack sealing of 10,000 linear feet of pavement at the Portland Air National Guard Base. The contractor will be required to thoroughly clean the cracks and any areas to be patched or repaired using compressed air, dispose of all debris off-base, and install sealants conforming to ASTM D6690 standards. The contractor must also provide a test section, coordinate with the government for access and escort, and complete the work within the approved project schedule.
The document provides details on the sealant material requirements, crack preparation and sealing procedures, and general project notes. It does not contain information on pricing, set-asides, incumbents, funding sources, or contract term and renewal options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASEWIDE PAVEMENT REPAIR
Date: AUGUST 2023 SHEET:
DRAWING:
BASEWIDE PAVEMENT REPAIR
Portland Air National Guard Base, Oregon
G-100
Sheet Index
G-001 COVER SHEET
G-002 DETAILS
D-101 SITE PLAN
D-102 LEVEL OF IMPORTANCE
1 of 3COVER SHEET https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=2ahUKEwjVhK2qie7fAhUP3Z8KHSeACb8QjRx6BAgBEAU&url=https://twitter.com/142ndfw&psig=AOvVaw32y30V2CqXruITh-xp-403&ust=1547582792340035
DRAWING:
G-101
GENERAL SITE NOTES:
1. CONTRACTOR TO THROUGHLY DRY AND CLEAN THE CRACKS
AND ANY AREA TO BE PATCHED OR REPAIR, WITH
COMPRESSED AIR (100CFM OR GREATER) TO REMOVE
OXIDEZED PAVEMENT, LOOSE AGGREGATE AND FOREIGN
DEBRIS.
2. ALL DEBRIS TO BE DISPOSED OFF BASE. WASTE TICKETS TO
BE SUBMITTED TO PANG ENVIRONMENTAL DEPARTMENT.
3. SEALANTS TO CONFORM WITH ASTMD6690, TYPE II OR ASTM
D6690, TYPE I. PREFERRED BRAND: COLJOINT 6690 TYPE I
AND II OR APPROVED EQUAL.
4. BACKER ROD MATERIAL- WHEN REQUIRED, USE BACKER ROD
MATERIAL IN ALL CRACKS THAT OTHERWISE WOULD
REQUIRE EXCESSIVE SEALANT. PLACE THE BACKER ROD SO
THAT THE TOP OF THE BACKER ROD IS AT LEAST 3/4 INCH
BELOW THE TOP OF THE PAVEMENT. ENSURE THAT THE
BACKER ROD MATERIAL IS PLACED AT THE SPECIFIED DEPTH
AND IS NOT STRETCHED OR TWISTED DURING INSTALLATION.
5. RATE OF PROGRESS OF CRACK PREPARATION - LIMIT THE
STAGES OF CRACK PREPARATION, WHICH INCLUDE AIR
PRESSURE CLEANING AND PLACING OF THE BACKER ROD
MATERIAL, TO ONLY THAT LINEAR FOOTAGE THAT CAN BE
SEALED DURING THE SAME DAY.
6. PREPARATION OF SEALANT- DO NOT HEAT HOT-POURED
SEALANTS IN EXCESS OF THE SAFE HEATING TEMPERATURE
RECOMMENDED BY THE MANUFACTURER, AS SHOWN ON THE
SEALANT CONTAINERS. WITHDRAW AND WASTE SEALANT
THAT HAS BEEN OVERHEATED OR SUBJECTED TO
APPLICATION TEMPERATURES FOR OVER 4 HOURS OR THAT
HAS REMAINED IN THE APPLICATOR AT THE END OF THE
DAY'S OPERATION.
7. SUBMIT MANUFACTURER'S INSTRUCTIONS 3 DAYS PRIOR TO
THE USE OF THE MATERIAL ON THE PROJECT. INSTALLATION
OF THE MATERIAL WILL NOT BE ALLOWED UNTIL THE
INSTRUCTIONS ARE RECEIVED.
8. TIME OF APPLICATION - SEAL CRACKS IMMEDIATELY
FOLLOWING FINAL CLEANING AND DRYING OF THE CRACK
WALLS AND FOLLOWING THE PLACEMENT OF THE BACKER
ROD MATERIAL (WHEN REQUIRED). PLACE SEALANT ONLY
WHEN CRACKS ARE DRY. RECLEAN CRACKS THAT CANNOT BE
SEALED UNDER THE CONDITIONS SPECIFIED, OR WHEN RAIN
INTERRUPTS SEALING OPERATIONS, AND ALLOW TO DRY OR
DRY BY MECHANICAL MEANS PRIOR TO INSTALLING THE
SEALANT
9. SEALING THE CRACK - IMMEDIATELY PRECEDING, BUT NOT
MORE THAN 50 FEET AHEAD OF THE CRACK SEALING
OPERATIONS, PERFORM A FINAL CLEANING AND DRYING WITH
COMPRESSED AIR. CRACKS SHOULD BE FILLED NO HIGHER
THAN 1/8 INCH ABOVE THE PAVEMENT. REMOVE EXCESS OR
SPILLED SEALANT FROM THE PAVEMENT BY APPROVED
METHODS AND DISCARD IT. INSTALL THE SEALANT IN A
MANNER WHICH PREVENTS THE FORMATION OF VOIDS AND
ENTRAPPED AIR. SEVERAL PASSES WITH THE APPLICATOR
WAND MAY BE NECESSARY TO OBTAIN THE SPECIFIED
SEALANT DEPTH FROM THE PAVEMENT SURFACE. DO NOT
USE GRAVITY METHODS OR POURING POTS TO INSTALL THE
SEALANT MATERIAL. DO NOT PERMIT TRAFFIC OVER NEWLY
SEALED PAVEMENT UNTIL THE SEALANT HAS CURED. CHECK
CRACKS FREQUENTLY TO ENSURE THAT THE NEWLY
INSTALLED SEALANT IS CURED TO A TACK-FREE CONDITION
WITHIN 3 HOURS.
10. CRACK SEALANT INSTALLATION - TEST SECTION PRIOR TO THE
CLEANING AND SEALING OF THE CRACKS FOR THE ENTIRE
PROJECT, CONSTRUCT A TEST SECTION AT LEAST 200 FEET
LONG USING THE SPECIFIED MATERIALS AND APPROVED
EQUIPMENT TO DEMONSTRATE THE PROPOSED SEALING OF
ALL CRACKS OF THE PROJECT. FOLLOWING THE COMPLETION
OF THE TEST SECTION AND BEFORE ANY OTHER CRACK IS
SEALED, INSPECT THE TEST SECTION TO DETERMINE THAT
THE MATERIALS AND INSTALLATION MEET THE
REQUIREMENTS SPECIFIED. IF MATERIALS OR INSTALLATION
DO NOT MEET REQUIREMENTS, REMOVE THE MATERIALS AND
RE-CLEAN AND RESEAL THE CRACKS AT NO COST TO THE
GOVERNMENT.
11. CLEANUP - DAILY, REMOVE UNUSED MATERIALS FROM THE
SITE AND LEAVE THE PAVEMENT IN A CLEAN CONDITION.
GENERAL SITE NOTES
GENERAL PROJECT NOTES:
1. CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND
ADJUST WORK PLAN ACCORDINGLY, PRIOR TO
BEGINNING CONSTRUCTION.
2. WORK TO BE COMPLETED IN RESTRICTED AREA.
GOVERNEMTN ESCORT REQUIRED FOR THE DURATION
OF THE PROJECT.
3. PROJECT SCHEDULE (DAYS AND TIMES) MUST BE
APPROVED 72 HOURS PRIOR TO START OF WORK, TO
SCHEDULE GOVERNMENT ESCORT.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING WITH 142 SFS/RESOURCE PROTECTION
OFFICE FOR ACCESS TO PANG BASE (SEE ITB/CONTRACT
FOR DETAILS).
5. FOD TRAINING IS REQUIRED FOR ALL CONTRACTORS
WORKING PAST THE FLIGHTLINE. PANG WILL PROVIDE
FOD TRAINING.
6. CONTRACTOR TO PROVIDE SANITARY STATION.
7. CONTRACTOR TO PROVIDE WATER FOR PROJECT. NO
TRUCK OR EQUIPMENT WASHING IS APPROVED ON
BASE.
REFERENCES:
1. Provide sealants conforming to ASTM D6690, Type II or ASTM D6690, Type I. Preferred Brand: ColJoint 6690 Type I and II or approved equal.
https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=2ahUKEwjVhK2qie7fAhUP3Z8KHSeACb8QjRx6BAgBEAU&url=https://twitter.com/142ndfw&psig=AOvVaw32y30V2CqXruITh-xp-403&ust=1547582792340035
DRAWING:
D-100
SITE PLAN
LEGEND
FOG SEAL (5,000 SQFT)
PATCH/REPAIR (5,000 SQFT)
CRACK SEAL (10,000 LNFT)
N
NOT TO SCALE
https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=images&cd=&cad=rja&uact=8&ved=2ahUKEwjVhK2qie7fAhUP3Z8KHSeACb8QjRx6BAgBEAU&url=https://twitter.com/142ndfw&psig=AOvVaw32y30V2CqXruITh-xp-403&ust=1547582792340035
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
File details come from the government source that posted it. Updated .