This is a Government Cost Estimate Form for the National Park Service Samoa Wayside Exhibit Panels Fabrication project. The form serves as a template with all cost fields populated at $0.00, indicating it is a blank cost estimation worksheet rather than a completed budget document. The template is organized into six major project categories: Project Management, Samples/Mock-ups/Prototypes, Electrical/Electronic components, Graphics, Project Closeout, and Shipping.
The cost estimate structure captures labor hours and material costs across multiple functional areas. The Electrical/Electronic section includes detailed line items for audio-visual equipment such as Audio Description Beacons, headphones, iPhone XR devices, charging stations, and related accessories, along with labor categories for audio describers, AV producers, technicians, videographers, and electrical technicians. The Graphics section itemizes 15 wayside exhibit panels (WS01 through WS15) covering topics including Mt. Alava Trail, Vatia Trail, Parrotfish, Rainforest, flying fox, and invasive species, with associated labor for graphics shop supervisors and exhibit specialists. Each major section includes subsections for materials with markup calculations and labor rates, allowing contractors to provide detailed cost breakdowns for the National Park Service Samoa project fabrication work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Gov't Est
| NPSA Wayside Exhibit Panels - Fabrication | ||||
| Labor | Materials | Totals | ||
| PROJECT MANAGEMENT | $0.00 | $0.00 | ||
| SAMPLES | $0.00 | $0.00 | $0.00 | |
| ELECTRICAL/ ELECTRONIC | $0.00 | $0.00 | $0.00 | |
| GRAPHICS | $0.00 | $0.00 | $0.00 | |
| PROJECT CLOSEOUT | $0.00 | $0.00 | $0.00 | |
| SHIPPING | $0.00 | $0.00 | $0.00 |
Grand Total $0
| PROJECT MANAGEMENT (excluding travel) | |||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Samples/Mock-ups/Prototypes | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| graphic samples | job | $0.00 | |||
| graphic samples-color proofs | job | $0.00 | |||
| custom elements samples | job | $0.00 | |||
| prototypes | job | $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| exhibit spec-fabrication | hours @ | $0.00 | |||
| model maker | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Samples $0.00
| Electrical/Electronic | |||||
| MATERIALS - AV EQUIPMENT: | qty. | unit | unit cost | amount | |
| EP-00.00-000 Audio Description | |||||
| Beacons | each | $0.00 | |||
| Headphone cushion sanitary cover, black, 50 pair | each | $0.00 | |||
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | each | $0.00 | |||
| Headphones | each | $0.00 | |||
| Induction neckloop | each | $0.00 | |||
| iPhone XR, black, 128GB, unlocked sim-free | each | $0.00 | |||
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | each | $0.00 | |||
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | each | $0.00 | |||
| Refresh Kit, replacement cushion and bag | each | $0.00 | |||
| Ruggedized case for media player | each | $0.00 | |||
| Sreen Protector for media player | each | $0.00 | |||
| USB charging station, 6 ports, 6 Apple cables, white | each | $0.00 | |||
| SUBTOTAL, AV EQUIPMENT | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR (Production) | hours | x | rate | amount | |
| Audio Describer | Hours | $0.00 | |||
| AV Producder | Hours | $0.00 | |||
| AV Technician | Hours | $0.00 | |||
| Electrical Technician | Hours | $0.00 | |||
| Videographer | Hours | $0.00 |
TOTAL ALL LABOR (see AV Estimate for Detail) $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| 0 | WS01 _Mt. Alava Trail | Each | $0.00 | ||
| WS02_Vatia Trail | Each | $0.00 | |||
| 1 | WS03_Parrotfish | Each | $0.00 | ||
| WS04_Rainforest | Each | $0.00 | |||
| 2 | WS05_PPGH | Each | $0.00 | ||
| WS06_PolaIsland | Each | $0.00 | |||
| WS07_Island Formation | Each | $0.00 | |||
| 3 | WS08_Screwpine | Each | $0.00 | ||
| WS09_FlyingFox | Each | $0.00 | |||
| WS10_Saua | Each | $0.00 | |||
| WS11_NPSA | Each | $0.00 | |||
| WS12_Breadfruit | Each | $0.00 | |||
| WS13_Swiftlets | Each | $0.00 | |||
| WS14_Tropicbirds | Each | $0.00 | |||
| WS15_Invasives | Each | $0.00 | |||
| SUBTOTAL MATERIALS | $0.00 | ||||
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Graphics Shop Supervisor | hours @ | $0.00 | |||
| Exhibit Specialist (Graphics) | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| PROJECT CLOSEOUT | ||||
| MATERIALS: | qty. | unit | unit cost | amount |
| $0.00 |
| SUBTOTAL MATERIALS | $0.00 | |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | $0.00 | ||||
| LABOR | hours | x | rate | amount | |
| Project Manager | hours @ | $0.00 | |||
| TOTAL ALL LABOR | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | |||||
| MATERIALS: | qty. | unit | unit cost | amount | |
| Packing | job @ | $0.00 | |||
| Shipping | job @ | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | hours | x | rate | amount | |
| Exhibit Spec - Fabrication | hours @ | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00