Attachment C – Lot 1 Bid Schedule Ground Level Parking Lots.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- ITB 2526H281 ANC Parking Lots Winter Maintenance - AMENDED
- Issued by
- Anchorage Municipality, Alaska
About this file
This is a Bid Schedule attachment for ITB 2526H281, a snow plowing, sanding, and hauling services contract issued by the Alaska Department of Transportation & Public Facilities Division of Program Management and Administration for the Anchorage International Airport (ANC) parking lots and garage. The solicitation encompasses three service categories: Lot 1A (Full Response Snow Plowing per event), Lot 1B (Constant Presence staffing and equipment on a monthly basis), and Lot 1C (Overage Equipment Rates). Lot 1A includes five snowfall categories ranging from 0"-2" to 8.1"+ accumulation, each with estimated quantities. Lot 1B requires 24/7 staffing and equipment for five months with specified monthly equipment allowances including Wheel Loaders (120 operating hours), Compact Wheel Loaders (100 operating hours), and Pickup/Plow vehicles (unlimited hours). A site inspection is scheduled for June 11, 2026 at 10:00 AM Alaska Time at 5740 DeHavilland Ave., Anchorage. The amended bidding deadline is June 23, 2026 at 2:00 PM Alaska Time.
All unit prices in the bid schedule are currently listed as $0.00, indicating this is a blank form for bidder completion. Unit prices for Full Response Call Out events include all labor, supervision, equipment, fuel, mobilization, and overhead, with no equipment hours or overage rates applying. The Constant Presence monthly rate includes labor, supervision, equipment staging, fuel, mobilization, and overhead duties as specified. Overage Equipment Rates in Lot 1C apply when Constant Presence hours exceed monthly allowances or for additional authorized services and require pre-approval from the ANC Project Manager. No minimum or maximum quantities are guaranteed for any lot. Bidders must register with Procurement Officer Joel Balzer (907-269-0867 or joel.balzer@alaska.gov) to receive subsequent amendments, and the contract is subject to nondiscrimination requirements under Title VI of the Civil Rights Act and Americans with Disabilities Act compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| LOT 1 BID SCHEDULE - GROUND LEVEL PARKING LOTS | |||||
| LOT 1A - Full Response Snow Plowing (Per Event) | |||||
| Item | Description | Unit | Est. Qty | Unit Price | Total |
| 1 | 0”–2” | Each | 5 | $0.00 | |
| 2 | 2.1”–4” | Each | 12 | $0.00 | |
| 3 | 4.1”–6” | Each | 5 | $0.00 | |
| 4 | 6.1”–8” | Each | 5 | $0.00 | |
| 5 | 8.1”+ | Each | 3 | $0.00 | |
| Subtotal Lot 1A (Items 1-5) | $0.00 | ||||
| Unit price per event includes all labor, supervision, equipment (See Table E1 for specs.), fuel, mobilization, and overhead. Equpment hours/equipment rates/Overage Rates DO NOT APPLY for Full Response Call Out events. No minimum or maximum quantity guaranteed. | |||||
| LOT 1B - Constant Presence (Monthly) | |||||
| Item | Description | Unit | Qty | Unit Price | Total |
| 6 | *24/7 CP Staffing & Equipment | Month | 5 | $0.00 | |
| Subtotal Lot 1B | $0.00 |
| *Includes all labor, supervision, equipment staging, fuel, mobilization, overhead, and duties per Table 1.6. | |||||
| Equipment must meet specs. per table E1. Unit price includes monthly equipment allowance as follows: | |||||
| Wheel Loader w/ Operator (see table E1, Item 1): up to 120 operating hrs/month | |||||
| Compact Wheel Loader w/Operator (see table E1, Item 2): up to operating 100 hrs/month | |||||
| Pickup/Plow w/Operator (see table E1, Item 3): unlimited hrs/month | |||||
| LOT 1C - Overage Equipment Rates | |||||
| Item | Description | Unit | Est. Qty | Unit Price | Total |
| 7 | Wheel Loader w/Operator | Hour | 100 | $0.00 | |
| 8 | Compact Wheel Loader w/Operator | Hour | 100 | $0.00 | |
| Subtotal Lot 1C (Items 7, 8) | $0.00 | ||||
| Applies when CP hours exceed monthly allowance or for additional authorized services. Equipment must meet specs. per Table E1. All overage equipment use/charges must be pre-approved by ANC Project Manager. No quantities guaranteed. | |||||
| LOT 1 GRAND TOTAL (1A+1B+1C) | $0.00 |
File details come from the government source that posted it. Updated .