Attachment C - Image - Page 1.docx
DOCX document 192 KB Posted
- Attached to
- Vertical Turbine Pump Assembly for LDWF
- Solicitation number
- 3000026921
- Issued by
- East Baton Rouge Parish, Baton Rouge City, Louisiana
About this file
This is an attachment to a Request for Exchange (RFX) for a Vertical Turbine Pump Assembly for the Louisiana Department of Wildlife and Fisheries (LDWF), identified as RFX No. 3000026921. The document serves as a visual reference image to denote the existing pump configuration for sizing purposes, with detailed specifications referenced in Attachment B. The pump assembly will have a lead time of 22 weeks for physical delivery to the hatchery facility; however, this timeline represents only the delivery period and does not constitute the total project completion timeframe. Installation services are not included as part of the equipment procurement and will be executed separately.
No pricing terms, set-asides, incumbent information, funding sources, or other financial details are specified in this attachment. The document functions solely as a visual aid and sizing reference for the proposed vertical turbine pump, with all technical specifications and requirements documented elsewhere in the bid package.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment B -Specifications.docx | DOCX document | |
| 3000026921.pdf | ||
| Attachment A - Standard Terms and Conditions - Pages 1-9.docx | DOCX document | |
| Attachment D - Online Bidding Instructions - Pages 1-10.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C – Pump Image RFX No: 3000026921 Title: Vertical Turbine Pump Assembly for LDWF
*Current image is just to denote what exists for sizing purposes.
*All specs to be referenced can be found on Attachment B.
· The 22 weeks is just the lead time for when the physical pump will be delivered to the hatchery not the total time for project completion.
· Install is not required with the equipment and will be done separately.
image1.png
File details come from the government source that posted it. Updated .