Attachment C Figures for HAHD Drain Maintenance.pdf
PDF 872 KB Posted
- Solicitation number
- W912DW24Q0028
About this file
This document consists of attachments related to a federal contract opportunity issued by the U.S. Army Corps of Engineers, Seattle District for the Howard A. Hanson Dam (HAHD) Relief Tunnel Drain Cleaning.
The key details are:
- The contract requires the contractor to provide all supervision, labor, equipment, and materials to perform drainage tunnel drain camera inspections, cleaning, decommissioning, and repairs at the HAHD site.
- The attachments include figures showing the existing drainage tunnel system, a geologic profile, and a site map.
- A site visit is scheduled for September 10, 2024 at 9:00 AM Pacific Time for vendors to inspect the site.
- Additional attachments provide more details on decontamination, drain cleaning logs, drain as-builts, and other relevant information.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment C:
Figures for
HAHD Drain
Maintenance
TRANSITION FROM GRAVEL TO AC
" C
U L
V E
R T
Spur
D2
6’-7’H CHAINLINK W/
BARBED WIRE TOP
BLDG.
EAVES
WIER B3
EXISTIN
G
A D
M
IN
ISTR
A
TIO
N
B U
ILD
IN
G
B L D
G
BUI
LDI
NG
BUILDING
TUNNEL WIER
133 123
102A
41A
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
T H
D
SHAFT
VENTILATION
SHAFT
VENTILATION
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
T W
26138
THD1
THD2
THD3
T H
D
T H
D
T H
D
T H
D 7T
H D
T H
D
T H
D
THD11
T H
D
T H
D
T H
D
T H
D
THD1
THD18
T H
D
U .S .A
R M
Y
E N
G
IN
E
R
D
IS
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T
O e s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b o l
F il v
Seattle District
US Army Corps of Engineers
Sheet of e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R P
S
F
G
IN
E E
1 2 3 4 5
A
T
A
I
L
O T
T E
D
D E
S I
G
L E
L
C A
D
S h e e t s
H H
C
I m a g e d u r i n g c o n s t r u c t i o n
D G
N
H H
T R
B
L O
C
A B
D G
N number:
Plate
A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.
IF SHEET MEASURES LESS THAN 22" X 34" IT IS
G R
E
IV
W
S H
IN
G T
O N
E
H O
W A
H A
N S
M
P
D R
A
IN
A
N N
E L
IM
P R
O V
E M
E N
T S
E
E
E
N 103400
N 103200
B-101
EXISTING HORIZONTAL DRAIN, TYP
N 103600
T U
N N
IN
A N
E X
IS
T
A
IN
A G
E
E B
N E
T
S W
A N
S O
N
D A
N
IE
L S
O N
DRAINAGE TUNNEL
EXISTING
1" = 30’ 030’ 15’ 30’ 60’
LEGEND
THD5
EXISTING PIEZOMETER
EXISTING TUNNEL VENTILATION SHAFT
EXISTING TUNNEL HORIZONTAL DRAIN
NEW DRAINAGE WELL
NEW HORIZONTAL DRAINTHD25
STA 16+48
END OF TUNNEL
ACCESS ROAD "A"
STA 10+08
PORTAL
B-201
A
WELL (TO BE LINED)
EXISTING TUNNEL DRAINAGE
B
A E
C H
A N
T E
R0004
COPY OF
TW275
T W
R E
V
IS
B U
IL
T
AS-BUILT
A S
B U
IL
T
8. THD 2,8,9,13,14 ABANDONED IN PLACE
PER RFI 0006
7. PIEZOMETER 15, 128, AND 130 ARE FLUSH MOUNT
AFTER THEY ARE COMPLETED.
SURFACE SHALL BE REPAIRED OVER TW267 AND TW268
FLUSH MOUNT TRAFFIC BOXES. THE ASPHALT ROAD
6. TW267, TW268 AND TW269 SHALL BE COMPLETED WITH
REPAIRED AFTER COMPLETION OF LINER INSTALLATION.
WELL 26 IS BELOW ASPHALT. ASPHALT SHALL BE
5. THE SURFACE MONUMENT FOR EXISTING TUNNEL
THE WATER TABLE ABOVE THE INVERT OF THE TUNNEL.
POOL STORAGE OR RAIN EVENTS THAT MAY RAISE
MAY BE USED FOR DEWATERING DURING CONSERVATION
4. NEW VERTICAL DRAINS IN THE DRAINAGE TUNNEL
STATE PLANE COORDINATE SYSTEM, NAD27, NORTH ZONE.
3. HORIZONTAL CONTROL BASED ON THE WASHINGTON
SA., 47.
2. VERTICAL CONTROL BASED ON N.G.V.D., 1929 GA.,
DRAIN SCHEDULES.
1. SEE PLATE B-601 FOR VERTICAL & HORIZONTAL
NOTES:
FROM TW (TYPICAL)
@ 10’ OFFSET
SAMPLING HOLES
GEOTECHNICAL
R E
V
IS
B U
IL
T
FIGURE 1
BEDROCK
AQUITARD
LOWER AQUIFER
A P
P R
O X
IM
A T
E E
L E
V A
T
IO
N I
N F
E E
T
A P
P R
O X
IM
A T
E E
L E
V A
T
IO
N I
N F
E E
T
14001400
NE
11+0012+0013+0014+0015+0016+00 10+00
B E
N D I
N T
U N
N E
L
N
W
N
W ) 3
N
W
N
W
N
W
N
W
N
W
N
W
N
W
N
W
N
W
EL. 1095.08
S T
A
P
O R
T A
L
E N
D O
F T
U N
N E
L
B E
N D I
N T
U N
N E
L
STATIONING ALONG TUNNEL CENTERLINE
LANDSLIDE
FLUVIAL
SILT
UPPER AQUIFER
VENTILATION
HOLE
36 AND 140
SW
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
T W -2
.S .A
R
Y
G
IN
E
IS
T R
IC
T ,S
E A
T T
L E
P r e p a r e d b y
D r a w n b y
S E
A T
T L
E
W A
S H
IN
G T s ig n e d b y
C h e c k e d b y
D a t e
S y m b o l
S y m b o l
F il v
Seattle District
US Army Corps of Engineers
Sheet of e s c r ip t io n D a t e
D e s c r ip t io n A p p r
A
B
C
D
C O
R
G
IN
E E
1 2 3 4 5
A
O T
T E
D
D E
S I
L E
L
C A
D
S h e e t s
H H
I m a g e d u r i n g c o n s t r u c t i o n
D G
N
H H
T R
B
P R
O
A B
D G
N number:
Plate
A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.
IF SHEET MEASURES LESS THAN 22" X 34" IT IS
G R
E
IV
W
S H
IN
G T
O N
E
H O
W A
H A
N S
M
P
D R
A
IN
A
N N
E L
IM
P R
O V
E M
E N
T S
B-201
E B
N E
T
S W
A N
S O
N
A B-101
1" = 30’
030’ 15’ 30’ 60’
E B
N E
T
D A
N
IE
L S
O
X
IS
T
N N
E L
G E
O L
O
IC
O F
IL
E
SURFACE
EXISTING GROUND
BULKHEAD SLOT
ROCK PORTAL
(TYP)
EXISTING WELL
(TYP)
PROPOSED WELL
WITH PIEZOMETER IN PLACE
WELL 25 PREVIOUSLY GROUTED
SEE NOTE 5
8" PIPE RISER @ 15’ O.C.,
8" PERFORATED PIPE AND
EXISTING
SEE NOTE 5
8" DRAIN PIPE,
A
A
R E
V
IS
L L
O U
T S
A E
5. 8" FLOOR DRAIN TO BE DECOMMISSIONED IN ACCORDANCE WITH THE SPECIFICATIONS.
PROPERTIES OF SUBSURFACE MATERIALS.
4. SEE GEOTECHNICAL BASELINE REPORT (GBR) FOR DESCRIPTIONS AND ENGINEERING
3. DEPTHS OF EXISTING DRAINS CONSIDERED APPROXIMATE AND ARE TO BE FIELD VERIFIED.
2. PRESENCE OF SILT AQUITARD MAY NOT BE CONTINUOUS ALONG TUNNEL ALIGNMENT.
1. GEOLOGIC CONTACTS ARE APPROXIMATE.
NOTES:
A E
R E
V
IS
T E
S
R0003
COPY OF
R E
V
IS
B U
IL
T
AS-BUILT
A S
B U I L
T
R E
V
IS
B U
IL
T
GEOLOGIC PROFILE
EXISTING TUNNEL
FIGURE 2
DRAINAGE TUNNEL LAYDOWN AREA AND SETTLING PONDS
HOWARD A. HANSON DAM
RAVENSDALE, WASHINGTON
PA-2A
Street Parking
LAYDOWN AREA
DRAINAGE TUNNEL
PORTAL
SETTLING PONDS
ACCESS ROAD
ACCESS ROAD
HOWARD A. HANSON
DAM
ADMINISTRATION
BUILDING
Figure 3
NORTH
| Attachment C Figures for HAHD Drain Maintenance |
| HAHD Drainage Tunnel Well Maintenance PWS Figure 1 |
| HAHD Drainage Tunnel Well Maintenance PWS Figure 2 |
| HAHD SIte Map Figure 3 |
| Slide Number 1 |
File details come from the government source that posted it. Updated .