Attachment C - Equipment Data Sheet.pdf

PDF 9 MB Posted

Attached to
C1DA--A/E Install SPS Equip | Request for SF330s | 558-23-300 Federal contract opportunity
Solicitation number
36C24624R0047
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

This notice requests Standard Form 330 submissions from architect-engineering firms for design services. Required services include developing construction documents and specifications to modify space for new sterile processing equipment at the Durham VA Medical Center in North Carolina. Submissions are due February 28, 2024. The project value is estimated between $500,000 to $1 million. Design completion is due 190 days after notice to proceed, with construction period services through 365 days after construction award. Evaluation criteria prioritize relevant hospital project experience within the last five years, technical competence, past performance, and location. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to C1DA--A/E Install SPS Equip | Request for SF330s | 558-23-300, newest first.
File Type Posted
Attachment A - Floor Plan.pdf PDF
36C24624R0047.docx DOCX document
Attachment B - Department Survey.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHADURCazalL Text Box

ATTACHMENT C

VHADURCazalL Text Box Equipment Data Sheets > Triton 36 - Getinge Sonic Cleaner > 2460U - Getinge Sonic Cleaner > 9128E - Getinge Cart Washer > 733HC-E - Getinge Steam Sterilizer > GSS67N13 - Getinge Steam Sterilizer > 8668 - Getinge Instrument Washer Disinfector > 9668 - Getinge Return Conveyor > Loader & Unloader fro Washer Disinfector

VHADURCazalL Stamp

GETINGE Model Triton 36 Ultrasonic Cleaner

Construction Rough-In Drawings

*Photo may not represent actual model

Getinge Group 1 Geoffrey Way

Wayne, NJ 07470 United States

Dwg. 9756-005, Rev E

JULY-21

Getinge Surgical Workplaces

Disinfection and Sterilization Products

Project Responsibilities

Component Designed by/Materials Provided By

Performed By Timing/Project Phase

Getinge

Product specifications, Construction Rough In drawings

GETINGE GETINGE

At time of purchase order or customer signed GETINGE

Drawing Package

General Contractor

Design, Fabrication of space for egress, wall opening, foot print and utility rough-in for each piece of equipment

Customer or General contractor per GETINGE

Construction Rough In drawing

Customer’s Engineer of Record/Architect and General Contractor.

Based upon overall construction schedule

In Wall Chair Carriers GETINGE Customer’s specified General contractor

Based upon overall construction schedule

Plumbing Contractor

Cold Water, Hot Water, RO Water, Steam, Condensate and Air supply lines to within 5 running feet of equipment’s connection point. Drain

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Floor Sinks and/or Drains

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

Based upon overall construction schedule

Ball and Gate Valves for all supply lines with threads for easier connections

Customer or Plumbing contractor using Industry approved valves and materials

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Water, Steam, condensate and Air connections between equipment and facility supply lines

GETINGE using GETINGE Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor During Equipment Installation

Electrical Contractor

Duplex, “J” box and Fused Electrical Disconnect

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch circuit wiring and conduit (primary and secondary) external to GETINGE supplied equipment

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Electrical final terminations between Utilization

Equipment Outlet boxes and facility power

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical

After equipment installation

Mechanical Contractor

Exhaust Ducts and gravity line vents

Customer or Mechanical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch duct and gravity line vents

Customer or Mechanical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Installation Contractor (Non-Union)

Uncrating of equipment N/A GETINGE if installation purchased per sales agreement

Based upon overall construction schedule

Equipment Installation N/A GETINGE if installation purchased per sales agreement

During equipment installation phase based on project schedule

Disposal of shipping containers and packing debris to an on installation site customer provided receptacle

N/A

GETINGE if installation purchased per sales agreement

As required during equipment installation phase based on project schedule

Final Installation Checkout N/A GETINGE if installation purchased per sales agreement

After Equipment Installation

In-service

Training of Equipment Operation: cycle selection, start, stop, abort, reset, loading, unloading

GETINGE

Following Equipment Installation

Customer

Receive, off load and storage of equipment in secured protected area N/A

Customer or customer designated shipping contractor

Based upon overall construction schedule

Disposal of any existing equipment

N/A Customer After removal from existing location

Notes

1. Minimum of thirty (30) working days notification will be required for scheduling installation. Additional costs may be billed if less than 30 days’ notice is given.

2. Installation is performed during the hours of 8 a.m. to 5 p.m. excluding weekends and holidays. Overtime charges will apply after 5:00 p.m. and during weekends/holidays.

3. Removal of asbestos or equipment subject to disposal regulations of federal, state or local governments is not included. Pricing must be obtained through local hazardous waste contractors.

4. Pricing does not provide for union labor.

5. Scope of installation work is based upon timely and uninterrupted access, site conditions and utility availability.

Additional visits due to work stoppage beyond the control of Getinge will be billed directly to the buyer at prevailing rates.

6. Purchaser shall provide a site that is compatible to accept the egress of equipment into building, foot print, wall openings, utility supply lines, immediate access valves and which complies with any applicable requirements of any governmental authority.

7. The equipment ordered will be shipped in large crates and ingress into building requires specific height and width.

This includes the path to the final installation location. Dimensions will be provided upon request.

8. If equipment is stored off site, it is the customer’s responsibility to transport equipment to the installation site.

9. Getinge provides layout drawings based on information and/or facility drawings provided. Getinge provides these drawings for reference only to the contractor and architect. It will be the responsibility of the contractor to verify the dimensions for placement within the building based on the required dimensions provided by Getinge.

10. Wall thickness is indicated on the installation/arrangement drawings. For recessed equipment between one or two walls, please pay close attention to the wall thickness indicated to prevent interference with the equipment installation and operation. Wall thickness for the Getinge equipment is vitally important for proper installation, location, fit and function within the facility.

11. Floor protection to protect facility floors during installation is not provided by Getinge.

12. For the purpose of service, Getinge requires adequate permanent lighting in the enclosed service areas of the sterilizer and washer.

13. 120V duplex electrical receptacle recommended in the service area.

9887-001 Rev E, May 31, 2021

AutoCAD SHX Text

FRONT ELEVATION LOAD END

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

SIDE ELEVATION

AutoCAD SHX Text

FACILITY WALL

AutoCAD SHX Text

FACILITY FLOOR

AutoCAD SHX Text

NET WEIGHT

AutoCAD SHX Text

AutoCAD SHX Text 606 [274.9]

AutoCAD SHX Text

SHIPPING WEIGHT

AutoCAD SHX Text 940 [426.4]

AutoCAD SHX Text D

AutoCAD SHX Text L

AutoCAD SHX Text 49 " 1116" [1262]

AutoCAD SHX Text 24" [610]

AutoCAD SHX Text H

AutoCAD SHX Text 61 " 78" [1572]

AutoCAD SHX Text WEIGHTS Lb [kg]

AutoCAD SHX Text NOTES: 1) ALL DIMENSIONS GIVEN ARE FROM FINISHED SURFACES. 2) ALL DIMENSIONS ARE FEET/INCHES [MILLIMETERS]. 3) DRAWING NOT TO SCALE.

AutoCAD SHX Text

OPERATIONAL WEIGHT

AutoCAD SHX Text 896 [406.4]

AutoCAD SHX Text 5'-5 "34"

AutoCAD SHX Text [1670]

AutoCAD SHX Text 2'-5 "316"

AutoCAD SHX Text [741]

AutoCAD SHX Text 4'-1 "1116"

AutoCAD SHX Text [1262]

AutoCAD SHX Text 5'-1 "78"

AutoCAD SHX Text [1572]

AutoCAD SHX Text 1'-5 "1316"

AutoCAD SHX Text [452]

AutoCAD SHX Text 2'

AutoCAD SHX Text [610]

AutoCAD SHX Text 4'-1 "1116"

AutoCAD SHX Text [1262]

AutoCAD SHX Text 2'

AutoCAD SHX Text [610]

AutoCAD SHX Text

MAXIMUM LOAD

AutoCAD SHX Text 40 lbs (18.1 kg)

AutoCAD SHX Text

LIQUID VOLUME

AutoCAD SHX Text

OVERALL SIZE

AutoCAD SHX Text

ULTRASONIC CHAMBER SPEC

AutoCAD SHX Text

30 GALLONS (113.6L)

AutoCAD SHX Text 11.5"W x 37"D x 19.37"H

AutoCAD SHX Text (294 x 940 x 492)

AutoCAD SHX Text

(PER BASIN)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AN

AutoCAD SHX Text 1/20/20

AutoCAD SHX Text N/A

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text 9756-005 S1

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

(STRUCTURAL)

AutoCAD SHX Text

MODEL TRITON 36 ULTRASONIC CLEANER

AutoCAD SHX Text A

AutoCAD SHX Text

AN

AutoCAD SHX Text 10/27/20

AutoCAD SHX Text

ADD FULL LOAD AMPS.

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

GD

AutoCAD SHX Text 07/28/21

2021 UPDATES

Plumbing Notes: P1.) IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO INSURE BY USE OF PRESSURE IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO INSURE BY USE OF PRESSURE REGULATORS OR OTHER MEANS THAT MAXIMUM SPECIFIED PRESSURES ARE NOT EXCEEDED. DYNAMIC PRESSURE IS MEASURED DURING FLOW CONDITIONS. STATIC PRESSURE SHALL NOT EXCEED SPECIFIED VALUES FOR ANY SERVICE CONDITION. PRESSURE TO BE MEASURED AT POINT OF CONNECTION TO THE ULTRASONIC CLEANER. P2.) IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO ELIMINATE WATER HAMMER IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO ELIMINATE WATER HAMMER CONDITIONS SHOULD THEY OCCUR IN THE SERVICE PIPING. IF REQUIRED, SHOCK ARRESTORS OR PRESSURE REGULATORS WOULD BE PROVIDED AND INSTALLED BY THE CUSTOMER. P3) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO PROVIDE SHUTOFF VALVES FOR IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO PROVIDE SHUTOFF VALVES FOR WATER LINES AND A PROPERLY SIZED AND TRAPPED DRAINAGE SYSTEM IN ACCORDANCE WITH THE NATIONAL PLUMBING CODE. CONSIDERATION SHOULD BE IN ACCORDANCE WITH THE NATIONAL PLUMBING CODE. CONSIDERATION SHOULD BE CONSIDERATION SHOULD BE GIVEN TO OTHER EQUIPMENT DUMPING INTO DRAIN LINE TO PREVENT SLOW DRAINAGE, BACK-UP, OR OVERFLOW. P4) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO ENSURE THAT WATER SUPPLIES IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO ENSURE THAT WATER SUPPLIES ARE PROPERLY PROTECTED FOR INTERNAL CROSS CONNECTION CONTROL IN ACCORDANCE WITH LOCAL BUILDING AND PLUMBING REQUIREMENTS. P4.) INCOMING WATER TEMPERATURES FOR BOTH COLD WATER AND HOT WATER NEED INCOMING WATER TEMPERATURES FOR BOTH COLD WATER AND HOT WATER NEED TO BE IN AN ACCEPTABLE RANGE TO ALLOW THE FACTORY-SUPPLIED MIXING VALVE TO OUTPUT WATER TO THE SONIC IN THE RANGE OF 85'F TO 95'F (29.4'C TO 35'C). P5.) AIR SUPPLY MUST BE DRY, OIL FREE, AND FILTERED. AIR SUPPLY MUST BE DRY, OIL FREE, AND FILTERED. NOTICE: SAFE AND EFFICIENT OPERATION OF THIS PRODUCT IS DEPENDENT UPON THE OWNER/USER PROVIDING THE SERVICES SPECIFIED HEREIN AS WELL AS ANY OTHER NORMALLY ACCEPTED ELECTRICAL, MECHANICAL OR PLUMBING INTERFACE BETWEEN USER'S SUPPLY AND THIS PRODUCT. GETINGE USA WILL NOT ASSUME RESPONSIBILITY FOR PROBLEMS THAT RESULT FROM NON-COMPLIANCE WITH THE ABOVE CONDITIONS. THE FOLLOWING CONDITIONS AND SERVICES ARE REQUIRED FOR GETINGE USA EQUIPMENT AND ARE TO BE PROVIDED BY OTHERS.

AutoCAD SHX Text =COLD WATER 15-60 PSi 1 GPM (3.758L) 30 GAL/PHASE 15-60 PSi 1 GPM (3.758L) 30 GAL/PHASE 1 GPM (3.758L) 30 GAL/PHASE 30 GAL/PHASE 3/4" GARDEN HOSE (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) =HOT WATER 15-60 PSi 1 GPM (3.758L) 30 GAL/PHASE 15-60 PSi 1 GPM (3.758L) 30 GAL/PHASE 1 GPM (3.758L) 30 GAL/PHASE 30 GAL/PHASE 3/4" GARDEN HOSE (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) =PURIFIED WATER 15-60 PSi N/A 30 GAL/PHASE 15-60 PSi N/A 30 GAL/PHASE N/A 30 GAL/PHASE 30 GAL/PHASE 1/4"(6.35mm) NPT FEMALE (113.6 LITERS) (113.6 LITERS) (113.6 LITERS) =DRAIN 10 GPM WASTE LINE N/A N/A 10 GPM WASTE LINE N/A N/A 10 GPM WASTE LINE N/A N/A N/A 5/8" ID (15.875mm) =AIR SUPPLY 60-90 PSi 1 CFM N/A 60-90 PSi 1 CFM N/A 1 CFM N/A N/A N/A 1/4"(6.35mm) NPT FEMALE =DETERGENT N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A

AutoCAD SHX Text

ON UNIT CONNECTION

AutoCAD SHX Text

PRESSURE RANGE

AutoCAD SHX Text

DEMAND

AutoCAD SHX Text

CONSUMPTION

AutoCAD SHX Text

REQUIRED FOR

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

CW

AutoCAD SHX Text

HW

AutoCAD SHX Text

PW

AutoCAD SHX Text A

AutoCAD SHX Text

DT

AutoCAD SHX Text D

AutoCAD SHX Text D

AutoCAD SHX Text

REAR ELEVATION

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

PW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text A

AutoCAD SHX Text

DT

AutoCAD SHX Text D

AutoCAD SHX Text

PW

AutoCAD SHX Text

HW

AutoCAD SHX Text

CW

AutoCAD SHX Text A

AutoCAD SHX Text

DT

AutoCAD SHX Text

RELATIVE HUMIDITY

AutoCAD SHX Text

0 TO 75%%%

AutoCAD SHX Text

PRESSURE

AutoCAD SHX Text

TEMPERATURE

AutoCAD SHX Text

OPERATING ENVIRONMENTAL CONDITIONS

AutoCAD SHX Text 0-6500' (0-1981M)

AutoCAD SHX Text

SEA LEVEL FROM

AutoCAD SHX Text

5%%DC (41%%DF) TO 40%%DC (104%%DF)

AutoCAD SHX Text 7 "34"

AutoCAD SHX Text [197]

AutoCAD SHX Text 10"

AutoCAD SHX Text [254]

AutoCAD SHX Text 11"

AutoCAD SHX Text [279]

AutoCAD SHX Text 1 "34"

AutoCAD SHX Text [44]

AutoCAD SHX Text 3 "38"

AutoCAD SHX Text [86]

AutoCAD SHX Text 8 "34"

AutoCAD SHX Text [222]

AutoCAD SHX Text 9 "34"

AutoCAD SHX Text [248]

AutoCAD SHX Text 11 "34"

AutoCAD SHX Text [299]

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AN

AutoCAD SHX Text 1/20/20

AutoCAD SHX Text N/A

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text 9756-005 P1

AutoCAD SHX Text

(PLUMBING)

AutoCAD SHX Text

MODEL TRITON 36 ULTRASONIC CLEANER

AutoCAD SHX Text A

AutoCAD SHX Text

AN

AutoCAD SHX Text 10/27/20

AutoCAD SHX Text

ADD FULL LOAD AMPS.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SEE SHEET 1

NOTES: E1.) IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO COMPLETE ALL ELECTRICAL CONNECTIONS USING PROPERLY SIZED WIRING IN IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO COMPLETE ALL ELECTRICAL CONNECTIONS USING PROPERLY SIZED WIRING IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE.

AutoCAD SHX Text E1

AutoCAD SHX Text

REAR ELEVATION

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text E1

AutoCAD SHX Text 8"

AutoCAD SHX Text [203]

AutoCAD SHX Text

FREQUENCY

AutoCAD SHX Text 40 kHz

AutoCAD SHX Text

GENERATOR

AutoCAD SHX Text

TRANSDUCER TYPE

AutoCAD SHX Text

ULTRASONIC TRANSDUCER'S

AutoCAD SHX Text

2400 WATTS (1200 EACH)

AutoCAD SHX Text

TITANIUM ROD (QTY. 2)

AutoCAD SHX Text

OUTPUT

AutoCAD SHX Text

STRAIGHT BLADE (NEMA 6-20R)

AutoCAD SHX Text 1 "38"

AutoCAD SHX Text [35]

AutoCAD SHX Text =ELECTRICAL CIRCUIT RATING FULL LOAD AMPS CIRCUIT RATING FULL LOAD AMPS FULL LOAD AMPS 208V 60 Hz 20A 9.6A 20A 9.6A 9.6A

AutoCAD SHX Text

ALL UNITS

AutoCAD SHX Text E1

AutoCAD SHX Text

REQUIRED FOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

AN

AutoCAD SHX Text 1/20/20

AutoCAD SHX Text N/A

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text 9756-005 E1

AutoCAD SHX Text

(ELECTRICAL)

AutoCAD SHX Text

MODEL TRITON 36 ULTRASONIC CLEANER

AutoCAD SHX Text A

AutoCAD SHX Text

AN

AutoCAD SHX Text 10/27/20

AutoCAD SHX Text

ADD FULL LOAD AMPS.

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SEE SHEET 1

Equipment Data Sheet 9128E - Getinge Cart Washer

GETINGE Cart Washer Model 9128E – Floor Mounted –

Steam Heated Construction Rough-In Drawings

*Photo may not represent actual model

Getinge Group 1 Geoffrey Way

Wayne, NJ 07470 United States

Dwg. 9428-023 FM, Rev E 10-15-21

Construction Rough In drawings

GETINGE GETINGE

At time of purchase order or for egress, wall opening, foot print and utility rough-in for each piece of equipment

Customer or General contractor per GETINGE

Construction Rough In drawing

Customer’s Engineer of Record/Architect and General Contractor.

Based upon overall construction schedule

In Wall Chair Carriers GETINGE Customer’s specified General contractor

Water, Steam, Condensate and Air supply lines to within 5 running feet of equipment’s connection point. Drain

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Floor Sinks and/or Drains

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

Based upon overall construction schedule

Ball and Gate Valves for all supply lines with threads for easier connections

Customer or Plumbing contractor using Industry approved valves and materials

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Water, Steam, condensate and Air connections between equipment and facility supply lines

GETINGE using GETINGE Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing

Electrical Disconnect

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch circuit wiring and conduit (primary and secondary) external to GETINGE supplied equipment

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Electrical final terminations between Utilization

Equipment Outlet boxes and facility power

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical line vents Customer or Mechanical contractor using GETINGE Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch duct and gravity line vents

Customer or Mechanical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during

GETINGE if installation purchased per sales agreement

Based upon overall construction schedule

Equipment Installation N/A GETINGE if installation purchased per sales agreement

During equipment installation phase based on project schedule Disposal of shipping containers and packing debris to an on installation site customer provided receptacle

N/A

GETINGE if installation purchased per sales agreement

As required during equipment installation phase based on project schedule

Final Installation Checkout N/A GETINGE if installation purchased

Operation: cycle selection, GETINGE GETINGE Following Equipment of equipment in secured protected area N/A

Customer or customer designated shipping contractor

Based upon overall construction schedule

Disposal of any existing equipment N/A Customer After removal from existing

1. Minimum of thirty (30) working days notification will be required for scheduling installation. Additional costs may be billed if less than 30 days’ notice is given.

2. Installation is performed during the hours of 8 a.m. to 5 p.m. excluding weekends and holidays. Overtime charges will apply after 5:00 p.m. and during weekends/holidays.

3. Removal of asbestos or equipment subject to disposal regulations of federal, state or local governments is not included. Pricing must be obtained through local hazardous waste contractors.

4. Pricing does not provide for union labor.

5. Scope of installation work is based upon timely and uninterrupted access, site conditions and utility availability.

Additional visits due to work stoppage beyond the control of Getinge will be billed directly to the buyer at prevailing rates.

6. Purchaser shall provide a site that is compatible to accept the egress of equipment into building, foot print, wall openings, utility supply lines, immediate access valves and which complies with any applicable requirements of any governmental authority.

7. The equipment ordered will be shipped in large crates and ingress into building requires specific height and width.

This includes the path to the final installation location. Dimensions will be provided upon request.

8. If equipment is stored off site, it is the customer’s responsibility to transport equipment to the installation site.

9. Getinge provides layout drawings based on information and/or facility drawings provided. Getinge provides these drawings for reference only to the contractor and architect. It will be the responsibility of the contractor to verify the dimensions for placement within the building based on the required dimensions provided by Getinge.

10. Wall thickness is indicated on the installation/arrangement drawings. For recessed equipment between one or two walls, please pay close attention to the wall thickness indicated to prevent interference with the equipment installation and operation. Wall thickness for the Getinge equipment is vitally important for proper installation, location, fit and function within the facility.

11. Floor protection to protect facility floors during installation is not provided by Getinge.

12. For the purpose of service, Getinge requires adequate permanent lighting in the enclosed service areas of the

Service Door

LOAD END

(RH)

LOAD END

(LH)

5'-13 4 Center of Mass

[1569 MM]

11' Unit Length

[3353.8 MM]

20'-8" Tot. Length Unit With Ramps

[6299.2 MM]

4'-101 8" Ramp Length

[1476 MM]

8' -1

01 2" M in . H ei gh t I nn er R oo f

[2

M

M

9'-9" Tot. Width Trim Panel

[2972 MM]

4' -9

D is pl ay [1

7.

8M M

3' -6

[1

M M

11' Finish Face to Finish Face

[2501.9MM]

4.75"

[120.65MM]

10'" WALL OPENING

[3048 MM]

9' -5

" W

AL

L O

PE

N

IN

G

[2

M

M

9' -4

1 8" U ni t H ei gh t [2

M M

' W

AL

L

O

PE

N

IN

G [3

M M

Cover Strips built by others!

1"

[24.5MM]

Note!

it is preferable to place service door on soiled side but can also mount on clean side if required.

Service door clearance shall not be less than

19.75 inch.

NOTES:

1) ALL DIMENSIONS GIVEN ARE FROM FINISHED SURFACES.

2) ALL DIMENSIONS ARE IMPERIAL AND [METRIC].

3) DRAWING NOT TO SCALE.

5) SOUND LEVEL VALUE IS VALID WHEN WASHER AND SERVICE

AREA ARE BUILT IN. MEASURED 1 METER IN FRONT OF THE

WASHER AND 1.5 METER ABOVE FLOOR LEVEL.

6) "LH" REFERS TO LEFT HAND CONTROLS ON THE LOAD END,

"RH" REFERS TO RIGHT HAND CONTROLS ON THE LOAD END.

7) FOR AIR-BARRIER OPTION SEE DRAWING 9428-025

'-5

" A

FF

[3

9.

8M

M

9' -5

3 4" A

FF

[2

8.

M

M

CW

HW

PW S CW HW PW SEX EX

6'-31 2"

[1917.7MM]

6'-7"

[2006.6MM]

7'-65

8"

[2301.8MM]

E

9'-0"

[2743.2MM]

*SITE UTILITY DROP RECOMMENDATION*

N N

EFINISHED

CEILING

CW = COLD WATER

CA = COMPRESSED AIR

PW = PURIFIED WATER

HW = HOT WATER

S = STEAM

C = CONDENSATE

D = PROCESS DRAIN

E = ELECTRICAL

N = NETWORK

UTILITY SIZE TO UNIT

1-1/4" 1-1/4" 1-1/4"

1-1/4"

1/2"

FLOOR SINK W/ 3" DRAIN

NA

RJ45

#2-0/6

REQUIRED SUPPLY

30-60 psi (2-4 BAR)

5 psi (0.3 BAR)

SHEET REFERENCE

PAGE 5 (E1)

PAGE 4 (P1)

PAGE 5 (E1)

PAGE 2 (M1)EX = EXHAUST

30-60 psi (2-4 BAR) 30-60 psi (2-4 BAR)

8" DIA. DUCT 600CFM

100 MBIT/S

80-100 psi (5.5-7 BAR)

45-60 psi (3-4 BAR)

NA

C

E1 E1

E1 = ELECTRICAL PAGE 5 (E1)12 GA 120V

2'-6 58"

[762MM]

2'-10 18"

[866.8MM]

3'-1 58"

[955.7MM]

5'-71 8"

7'-3 78"

[1978MM]

6'-3 58"

[1920.9MM]

[1705MM]

AutoCAD SHX Text

SERVICE SIDE ELEVATION

AutoCAD SHX Text

FRONT ELEVATION LOAD END(LH)/UNLOAD(RH) - W/ TRIM KIT

AutoCAD SHX Text

FRONT ELEVATION LOAD END(LH)/UNLOAD END(RH)

AutoCAD SHX Text

PLAN VIEW

AutoCAD SHX Text

SERVICE SIDE ELEVATION

AutoCAD SHX Text

FRONT ELEVATION LOAD END(LH)/UNLOAD(RH) - W/ TRIM KIT

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text A

AutoCAD SHX Text

ADJUST WALL OPENING DIM/CHANGE TRANSFORMER WIRE GA.

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

REVISION LEVEL:

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

ANTONIO N.

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text A

AutoCAD SHX Text

SIZE

AutoCAD SHX Text S1

AutoCAD SHX Text

AN

AutoCAD SHX Text 7/27/18

AutoCAD SHX Text

9428-023 FM

AutoCAD SHX Text CART WASHER, MODEL 9128E STEAM HEATED, FLOOR MOUNTED. (STRUCTURAL) ROUGH-IN DRAWING

AutoCAD SHX Text B

AutoCAD SHX Text

UPDATE EXHAUST DESIGN.

AutoCAD SHX Text

AN

AutoCAD SHX Text 4/30/20

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

2021 UPDATES

AutoCAD SHX Text

TDL

10/15/21

LOAD END

(RH)

LOAD END

(LH)

Openable Service Hatches

7' -2

1 2" [2

M M

] F lo or to s er vi ce

H at ch

'-5

1 2" F re e

Sp ac e Ab ov e

[3

7.

M M

3'-13 4" Door Opening

[959 MM]

6' -6

3 4" D oo r O pe ni ng [2

M M

4" (EX)

[99 MM]

NOTES:

THE ROOM IN WHICH THE VENTILATION IS INSTALLED MUST HAVE A NON

RECIRCULATION VENTILATION SYSTEM.THE EXHAUST CONNECTION TO THE

MACHINE SHALL HAVE AN AIR GAP THAT PREVENTS DRAINING OF ENERGY

FROM THE CHAMBER. AN APPROPRIATE AIR GAP IS 2" SPHERICAL AROUND

THE EXHAUST POINT OF THE CONDENSATE COLLECTOR. THE CONDENSATE

COLLECTOR CAN WHEN NEEDED BE MOVED TO ANOTHER APPROPRIATE

POSITION. ONE EXAMPLE IS WHEN THE ROOF HEIGHT IS TO LOW OR FOR

OTHER PHYSICAL OBSTACLES THAT CAUSE LIMITATIONS. VERY IMPORTANT IS

THAT THE EXTENDED PIPING HAS A SLOPE AGAINST THE REPOSITIONED

CONDENSATE COLLECTOR. THE VENT SHOULD BE DEDICATED, CORROSION

PROOF AND WATER TIGHT. STAINLESS STEEL IS RECOMMENDED.

BASE VENTILATION

ENERGY LOSS DURING NORMAL OPERATION SEE INSTALLATION

MANUAL SECTION 4.3.2 ENERGY EMISSION.

ADDITIONAL VENTILATION DURING DRYING

1. STANDARD PERFORMANCE DRYER: 247.20ft /min (420m³/h) EXHAUST AIR.

2. HIGH PERFORMANCE DRYER: 341.38ft /min (580M³/h) EXHAUST AIR.

FOR MORE DETAILS, SEE INSTALLATION MANUAL SECTION 4.3.3

THE ENERGY OF THE EMITTED AIR DURING PHASE.

SIGNAL AVAILABLE IF CUSTOMER NEED TO CONTROL THE VENTILATION

FROM THE WASHER, SEE INSTALLATION MANUAL SECTION 9.1 (PARAMETER

33 DRYER DELAY ) AND CIRCUIT DIAGRAMS SHEET 48 (PROCESS RUNNING).

EX=Air Exhaust (1019 m ³/h ) 50-100% Air Humidity Pos./ Description Connections Flow Comments

600 cfm

³ ³

5'-71 2" Cover Plate

[1714.5 MM]

CL

Openable service hatch

Openable service hatch

1'-10"

[558MM]

12"

[305MM]

Openable service hatch

5' -2

EX

[1

M M

5' -7

3 4" D

O O

R P

U

LL

EY

E

N D

[1

0.

8M

M

8' -5

" D oo r R ai lin g

H ei gh t

[2

5.

4M

M

EX.

Note!

Facility exhaust duct size to be 12" maximum.

must be less than exhaust condensate catch pan diameter.

2' -4

3 4" [7

M

M

2" (50MM) MINIMUM AIR GAP

TO EXTERNAL VENTILATION

Ø8" MAX(Ø203MM)

9' -3

3 4" A ir Ex ha us t [3

M M

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

REVISION LEVEL:

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

ANTONIO N.

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text A

AutoCAD SHX Text

SIZE

AutoCAD SHX Text M1

AutoCAD SHX Text A

AutoCAD SHX Text

ADJUST WALL OPENING DIM/CHANGE TRANSFORMER WIRE GA.

AutoCAD SHX Text

AN

AutoCAD SHX Text 7/27/18

AutoCAD SHX Text

9428-023 FM

AutoCAD SHX Text CART WASHER, MODEL 9128E STEAM HEATED, FLOOR MOUNTED. (MECHANICAL) ROUGH-IN DRAWING

AutoCAD SHX Text B

AutoCAD SHX Text

UPDATE EXHAUST DESIGN.

AutoCAD SHX Text

AN

AutoCAD SHX Text 4/30/20

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

2021 UPDATES

AutoCAD SHX Text

TDL

MAX OUTSIDE SURFACE

TEMPERATURE 122°F (50°C)

HUMIDITY HUMIDITY DROPPING TO LESS THAN 40% AFTER

APPROX. 5 MIN OPERATION

SOUND LEVEL. APPROX 65 dB (A)

RADIANT HEAT LOSS CLEAN SIDE 2,25 KW/HR (7700 BTU /HR)

SOILED SIDE 0,90 KW/HR (3100 BTU/HR)

SERVICE AREA 1,35 KW/HR (4600 BTU/HR)

POWER CONSUMPTION STEAM HEATED MAX 6 KW

TEMPERATURE 5°C (41°F) TO 40°C (104°F)

RELATIVE HUMIDITY MAX 80% AT ≤31°C THEN DECREASING LINEARLY TO

50% WHEN TEMPERATURE IS INCREASING TO 40°C

VOLTAGE FLUCTUATIONS

(MAIN SUPPLY) NOT TO EXCEED ±10% OF THE NOMINAL VOLTAGE

INPUT CONDITIONS

OPERATING ENVIROMENTAL CONDITIONS

DIMENSION

(INCH)

WEIGHT

(LB)

DIMENSION

(INCH)

WEIGHT

(LB)

DIMENSION

(INCH)

WEIGHT

(LB)

WEIGHT

(LB)

CORE MODULE

CHAMBER

EXTENSION

MODULE (2x)

GLASS DOOR (2x)

TOTAL WEIGHT

DIMENSION AND WEIGHT (EXCL. PACKAGING)

9128E 53x96x47

52x96x33

43x83x1,5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

REVISION LEVEL:

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

ANTONIO N.

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text A

AutoCAD SHX Text

SIZE

AutoCAD SHX Text M2

AutoCAD SHX Text A

AutoCAD SHX Text

ADJUST WALL OPENING DIM/CHANGE TRANSFORMER WIRE GA.

AutoCAD SHX Text

AN

AutoCAD SHX Text 7/27/18

AutoCAD SHX Text

9428-023 FM

AutoCAD SHX Text

CART WASHER, MODEL 9128E STEAM HEATED, FLOOR MOUNTED. (NOTES) ROUGH-IN DRAWING

AutoCAD SHX Text B

AutoCAD SHX Text

UPDATE EXHAUST DESIGN.

AutoCAD SHX Text

AN

AutoCAD SHX Text 4/30/20

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

2021 UPDATES

AutoCAD SHX Text

TDL

C

S

LOAD END

(RH)

LOAD END

(LH)

CA

9' -1

01 4" S te am

[3

3.

M M

2'-11" CA

[887 MM]

D2'-91

2" (HW, CW, DW)

[851 MM]

CW

HW

DW

8' -2

H

W , C

W , D

W

[2

3.

M M

2' - 01 2" C

[622MM]

CW

HW

DW

3'-8" Center of Mass

[1117.6 MM]

2'-6" Steam

[762MM]

CL

CL

2'-13

4" DW

[654MM]

2'-51

4" HW

[743MM]

2'-9" CW

[838MM]

CW

D

C

S

CA

PW

HW

1-1/4"

1-1/4"

1-1/4"

1/2"

FLOOR SINK WITH

MINIMUM Ø3" DRAIN LINE

1-1/4"

PIPE SIZE TO UNITON UNIT CONNECTION

UNIT SUPPLIED WITH 3/4" NPT CONNECTION PKG

DRAIN COOLING

UNIT SUPPLIED WITH 3/4" NPT CONNECTION PKG

IF THIS OPTION IS SELECTED, UNIT SUPPLIED WITH

3/4" NPT CONNECTION PKG32 gallons (120 L)

DYNAMIC STEAM PRESSURE. DEPENDANT ON WASHER

3/4" TRI-CLAMP

3/4" TRI-CLAMP

3/4" TRI-CLAMP

MIN. 26 GPM

(100 L/MIN)

MIN. 26 GPM

(100 L/MIN)

MIN. 26 GPM

(100 L/MIN)

30-60 psi

(2-4 BAR)

30-60 psi

(2-4 BAR)

NA

80 gallons (303 L)

NA

Ø3" [Ø80] FLOOR DRAIN

TEMP MAX. 140°F [60 °C] WITH DRAIN COOLING

AIR FREE FROM OIL AND WATER

CONNECTION POINT AT FLOOR LEVEL

COMMENTS

95 lb (42 kg)

MINIMUM

= COMPRESSED AIR

= PURIFIED WATER

(OPTION)

= HOT WATER

113-140°F [45-60°C]

= STEAM 800 lb/h (363 kg/hr)

= CONDENSATE NA

MIN. 50 GPM(200 L/MIN)= PROCESS DRAIN NA

NOT TO EXCEED

5 psi (0.3 BAR)

1/4" NPT

Ø2" [Ø50]

1" NPT

3/4" FPT

0.9 SCFM (25L/min)

= COLD WATER

NOT TO EXCEED

70°F [21°C]"

30-60 psi

(2-4 BAR)

UTILITY

PRESSURE REC.

SUPPLY 9100 DEMAND

9100E CONSUMPTION

PER CYCLE

16 gallons (60 L)

64 gallons (240 L)

80-100 psi

(5.5-7 BAR)

45-60 psi

(3-4 BAR)

*RECOMMENDED*

CONFIGURATION AND WASH CYCLES.

3/4"

(DYNAMIC)

STATIC

NOTES:

1) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO ENSURE BY USE OF PRESSURE

REGULATORS OR OTHER MEANS THAT MAXIMUM SPECIFIED PRESSURES ARE NOT

EXCEEDED.

2) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO ELIMINATE WATER OR STEAM

HAMMER CONDITIONS SHOULD THEY OCCUR IN THE SERVICE PIPING.

3) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO PROVIDE A PROPERLY SIZED

AND LOCATED DRAINAGE SYSTEM IN ACCORDANCE WITH THE NATIONAL PLUMBING

CODE. CONSIDER WHAT OTHER EQUIPMENT IS TIED TO DRAIN TO ELIMINATE SLOW

DRAINAGE OR BACKUP. IF SITE CONDITIONS DICTATE THAT THE WASHER WILL

DUMP WATER DIRECTLY TO PIT, THE PIT SHOULD BE WATER-PROOFED.

4) DYNAMIC STEAM PRESSURE. STEAM DEMAND IS DEPENDING ON WASHER CONFIGURATION

AND WASH CYCLES.

5) IN ACCORDANCE WITH ISO15883-1, GETINGE RECOMMENDS THE USE OF TREATED

WATER WITH THE FOLLOWING LIMIT VALUES:

(UNLESS CONDENSATE

COOLING KIT IS USED)

POTABLEUNIT OFPARAMETER SOFTENED DI/ROMEASURE

PH-VALUE

HARDNESS

CONDUCTIVITY (@25°C)

CHLORINE (CL)

IRON

COPPER

SILICA (SiO )

FREE CHLORINE

PHOSPHATE (P O )

mg/L μS/cm mg/L mg/L mg/L mg/L mg/L mg/L

<100

<200

<60

<0.1

<0.1

≤2

<0.5

<10

7-8.5

<10

<700

<60

<0.1

<0.1

≤2

<0.5

<10

7-8.5

≤0.02 mmol/L

≤15

≤0.2

≤0.1

≤0.1

≤1

≤0.5

≤0.5

5-7.5

2 5

AutoCAD SHX Text

PLUMBING CONNECTIONS & UTILITIES

AutoCAD SHX Text

WATER QUALITY

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

REVISION LEVEL:

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

ANTONIO N.

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text A

AutoCAD SHX Text

SIZE

AutoCAD SHX Text P1

AutoCAD SHX Text A

AutoCAD SHX Text

ADJUST WALL OPENING DIM/CHANGE TRANSFORMER WIRE GA.

AutoCAD SHX Text

AN

AutoCAD SHX Text 7/27/18

AutoCAD SHX Text

9428-023 FM

AutoCAD SHX Text CART WASHER, MODEL 9128E STEAM HEATED, FLOOR MOUNTED. (PLUMBING) ROUGH-IN DRAWING

AutoCAD SHX Text B

AutoCAD SHX Text

UPDATE EXHAUST DESIGN.

AutoCAD SHX Text

AN

AutoCAD SHX Text 4/30/20

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

2021 UPDATES

AutoCAD SHX Text

TDL

LOAD END

(RH)

LOAD END

(LH)

E

6"

M in

. S er vi ce

F al lb ac k [9

.4

M M

STANDARD ELECTRICAL TRANSFORMER

FOR STEAM HEATED UNIT. LOCATED

INSIDE OR OUTSIDE OF SERVICE AREA.

Mass: 198.5 lbs

NOTES:

1) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO COMPLETE ALL ELECTRICAL

CONNECTIONS USING PROPERLY SIZED WIRING IN ACCORDANCE WITH THE NATIONAL

ELECTRICAL CODE.

2) IT SHALL BE THE CUSTOMERS RESPONSIBILITY TO PROVIDE A FUSED DISCONNECT

SWITCH IN ALL ELECTRICAL SUPPLY LINES AT THE WASHER LOCATION.

3) THE IT-NETWORK SHALL SUPPORT ETHERNET COMMUNICATIONS ON A CONNECTION

AT 100 MBIT/S, HALF-DUPLEX. IT SHALL SUPPORT STANDARD DHCP AND IP ADDRESSING

TECHNOLOGIES. THE NETWORK SHALL SUPPORT ROUTING AND

FIREWALLING: BLOCKING OF SPECIFIC PORTS AND TRAFFIC.

4) IT SHALL BE THE CUSTOMER'S RESPONSIBILITY TO PROVIDE CONNECTION POINTS AND WIRING

BETWEEN THE TRANSFORMER AND WASHER, IF THE PROVIDED CABLE IS NOT ADEQUATE.

5) PER UTILITY DROP (PAGE S1), INSTALL E1 120V GFCI DUPLEX.

1'-33 4"

[400MM]

4' -5

[1

2M

M

1'-2"

[355MM]

1'

[305MM]

SUPPLY

INPUT E

OUTPUT = ELECTRICAL

= ELECTRICAL E1

E

STEAM HEATED

RECOMMENDED

SERVICE

DISCONNECT SEE

NOTE 2

PRIMARY

TRANSFORMER

FULL LOAD AMPS

SECONDARY

TRANSFORMER

FULL LOAD AMPS

(MACHINE)

120 V 60 Hz 20A N/A N/A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

OF

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

REVISION LEVEL:

AutoCAD SHX Text

DRAWING NUMBER:

AutoCAD SHX Text

ANTONIO N.

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text N/A

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text A

AutoCAD SHX Text

SIZE

AutoCAD SHX Text E1

AutoCAD SHX Text A

AutoCAD SHX Text

ADJUST WALL OPENING DIM/CHANGE TRANSFORMER WIRE GA.

AutoCAD SHX Text

AN

AutoCAD SHX Text 7/27/18

AutoCAD SHX Text

9428-023 FM

AutoCAD SHX Text CART WASHER, MODEL 9128E STEAM HEATED, FLOOR MOUNTED. (ELECTRIC) ROUGH-IN DRAWING

AutoCAD SHX Text B

AutoCAD SHX Text

UPDATE EXHAUST DESIGN.

AutoCAD SHX Text

AN

AutoCAD SHX Text 4/30/20

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

2021 UPDATES

AutoCAD SHX Text

TDL

GSS67N13 - Getinge Steam Sterilizer

GETINGE Steam Sterilizer Model 67N13, 51", SD-LH, Recessed, Display Above

Construction Rough-In Drawings

Getinge 1777 E Henrietta Rd

Rochester, NY 14623 Dwg. 9615-002, Rev. A

9-1-2020

Image may not represent actual model

Construction Rough In drawings

GETINGE GETINGE

At time of purchase order or for egress, wall opening, foot print and utility rough-in for each piece of equipment

Customer or General contractor per GETINGE

Construction Rough In drawing

Customer’s Engineer of Record/Architect and General Contractor.

Based upon overall construction schedule

In Wall Chair Carriers GETINGE Customer’s specified General contractor

Water, Steam, Condensate and Air supply lines to within 5 running feet of equipment’s connection point. Drain

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Floor Sinks and/or Drains

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Plumbing contractor

Based upon overall construction schedule

Ball and Gate Valves for all supply lines with threads for easier connections

Customer or Plumbing contractor using Industry approved valves and materials

Customer’s/GC specified Plumbing contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Water, Steam, condensate and Air connections between equipment and facility supply lines

GETINGE using GETINGE Construction Rough In drawing or customer signed GETINGE

Drawing Package

GETINGE

Except where local code require a state licensed plumber or

Union Area

Electrical Disconnect

Customer or Plumbing contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch circuit wiring and conduit (primary and secondary) external to GETINGE supplied equipment

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

Electrical final terminations between Utilization

Equipment Outlet boxes and facility power

Customer or electrical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Electrical line vents Customer or Mechanical contractor using GETINGE Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during plumbing/electrical/mechanical installation

All branch duct and gravity line vents

Customer or Mechanical contractor using GETINGE

Construction Rough In drawing or customer signed GETINGE

Drawing Package

Customer’s/GC specified Mechanical contractor

While ceilings and walls are open during

GETINGE if installation purchased per sales agreement

Based upon overall construction schedule

Equipment Installation N/A GETINGE if installation purchased per sales agreement

During equipment installation phase based on project schedule Disposal of shipping containers and packing debris to an on installation site customer provided receptacle

N/A

GETINGE if installation purchased per sales agreement

As required during equipment installation phase based on project schedule

Final Installation Checkout N/A GETINGE if installation purchased

Operation: cycle selection, GETINGE GETINGE Following Equipment of equipment in secured protected area N/A

Customer or customer designated shipping contractor

Based upon overall construction schedule

Disposal of any existing equipment N/A Customer After removal from existing

1. Minimum of thirty (30) working days notification will be required for scheduling installation. Additional costs may be billed if less than 30 days’ notice is given.

2. Installation is performed during the hours of 8 a.m. to 5 p.m. excluding weekends and holidays. Overtime charges will apply after 5:00 p.m. and during weekends/holidays.

3. Removal of asbestos or equipment subject to disposal regulations of federal, state or local governments is not included. Pricing must be obtained through local hazardous waste contractors.

4. Pricing does not provide for union labor.

5. Scope of installation work is based upon timely and uninterrupted access, site conditions and utility availability.

Additional visits due to work stoppage beyond the control of Getinge will be billed directly to the buyer at prevailing rates.

6. Purchaser shall provide a site that is compatible to accept the egress of equipment into building, foot print, wall openings, utility supply lines, immediate access valves and which complies with any applicable requirements of any governmental authority.

7. The equipment ordered will be shipped in large crates and ingress into building requires specific height and width.

This includes the path to the final installation location. Dimensions will be provided upon request.

8. If equipment is stored off site, it is the customer’s responsibility to transport equipment to the installation site.

9. Getinge provides layout drawings based on information and/or facility drawings provided. Getinge provides these drawings for reference only to the contractor and architect. It will be the responsibility of the contractor to verify the dimensions for placement within the building based on the required dimensions provided by Getinge.

10. Wall thickness is indicated on the installation/arrangement drawings. For recessed equipment between one or two walls, please pay close attention to the wall thickness indicated to prevent interference with the equipment installation and operation. Wall thickness for the Getinge equipment is vitally important for proper installation, location, fit and function within the facility.

11. Floor protection to protect facility floors during installation is not provided by Getinge.

12. For the purpose of service, Getinge requires adequate permanent lighting in the enclosed service areas of the

Rev P 9/1/2020

VIEW - SIDE

AutoCAD SHX Text

MACHINE FOOT

AutoCAD SHX Text 2'-3 "12"

AutoCAD SHX Text 2'-3 "12"

AutoCAD SHX Text 4"

AutoCAD SHX Text 4"

AutoCAD SHX Text 6'-6"

AutoCAD SHX Text 6'-6"

AutoCAD SHX Text 2'-8 "14"

AutoCAD SHX Text 2'-8 "14"

AutoCAD SHX Text

ALL DIMENSIONS GIVEN ARE FROM FINISHED SURFACES.

AutoCAD SHX Text

DIMENSIONS ARE FEET-INCHES [MILLIMETERS].

AutoCAD SHX Text

VIEW - PLAN

AutoCAD SHX Text

VIEW - FRONT

AutoCAD SHX Text

SERVICE AREA - RECOMMENDED

AutoCAD SHX Text

SERVICE AREA

AutoCAD SHX Text

CLEARANCE

AutoCAD SHX Text

CONTROL CABINET A = STANDARD LOCATION

AutoCAD SHX Text

SERVICE AREA - MIN.

AutoCAD SHX Text

OUTLET TANK

AutoCAD SHX Text

OPTIONAL INTEGRAL STEAM GENERATOR (E)

AutoCAD SHX Text 2'-10 "34"

AutoCAD SHX Text 2'-10 "34"

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text

DISPLAY PANEL ABOVE

AutoCAD SHX Text

CONTROL CABINET B = OPTIONAL LOCATION

AutoCAD SHX Text MAX FLOOR DEVIATION FLAT WITHIN 1/8" (3mm) UNDER UNIT

AutoCAD SHX Text APPROACH AREA TO BE FLAT WITHIN 1/8" (3mm)

AutoCAD SHX Text 6'-3"

AutoCAD SHX Text 6'-3"

AutoCAD SHX Text

ACCESS TO SERVICE AREA TO BE SUPPLIED BY CUSTOMER

AutoCAD SHX Text

CONTROL SIDE

AutoCAD SHX Text

NON CONTROL SIDE

AutoCAD SHX Text

WALL CONNECTION PROFILE

AutoCAD SHX Text

UNIT SHOWN IS A GSS 67N13

AutoCAD SHX Text VACUUM PUMP STANDARD LOCATION CAN ALSO BE LOCATED REMOTELY UP TO 50' (15m) FROM STERILIZER, ON THE SAME FLOOR OR BELOW.

AutoCAD SHX Text POWER CABINET - STANDARD MOUNTING LOCATION SEE DWG E2, SHT 9, FOR OPTIONAL MOUNTING OPTIONS

AutoCAD SHX Text 1'-11 "12"

AutoCAD SHX Text 1'-11 "12"

AutoCAD SHX Text

CONTROL SIDE

AutoCAD SHX Text

CUSTOM TRIM IS AN OPTION

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text HEATING OPTIONS: A = HOUSE STEAM E = ELECTRIC - INTEGRAL ELECTRIC STEAM GENERATOR D = INTEGRAL STEAM TO STEAM GENERATOR

AutoCAD SHX Text NOTES: S1) CLEARANCE SHOWN ARE MINIMAL FOR EQUIPMENT FUNCTION AND SERVICING. CHECK STATE AND LOCAL CODES FOR APPLICABLE CLEARANCE REQUIREMENTS.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DJL

AutoCAD SHX Text 4/16/19

AutoCAD SHX Text

NONE

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9615-002

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

XX

AutoCAD SHX Text S1

MODEL 67N13 STEAM STERILIZER, SINGLE DOOR, LEFT SERVICE, RECESSED THROUGH WALL, 51" CHAMBER, DISPLAY ABOVE CHAMBER, ROUGH-IN DRAWING (STRUCTURAL)

%%uNOTICE: Work by others

AutoCAD SHX Text herein as well as any other normally accepted electrical, mechanical or plumbling interface between user's supply

AutoCAD SHX Text Safe and efficient operation of this product is dependent upon the owner/user providing the services specified

AutoCAD SHX Text and this product. Getinge USA will not assume responsibility for problems that result from non-compliance with

AutoCAD SHX Text the above conditions. The following conditions and services are required by Getinge USA equipment and are to be

AutoCAD SHX Text provided by others.

AutoCAD SHX Text 26x24x51

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 2.7

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.6

AutoCAD SHX Text 0:32

AutoCAD SHX Text 0:49

AutoCAD SHX Text

MINIMUM CLEARANCE REQUIRED FOR MOVING INTO POSITION:

AutoCAD SHX Text

DISMANTLED:35.43"W X 66.14"H X 52.36"L [900W X 1680H X 1630L].

AutoCAD SHX Text 39.37"W X 85.83"H X 64.17"L + 7.87" [1000W X 2180H X 1630L + 200].

AutoCAD SHX Text

(HEIGHT INCLUDES 5.91" [150MM] BOTTOM OF PACKING)

AutoCAD SHX Text

CONTROL PANEL OPTIONS: : A = CONTROL END B = REMOTE END

AutoCAD SHX Text

POWER CABINET OPTIONS: SEE DRAWING E2, ON SHT 9

AutoCAD SHX Text HEATING OPTIONS: A = HOUSE STEAM E = ELECTRIC - INTEGRAL ELECTRIC STEAM GENERATOR D = INTEGRAL STEAM TO STEAM GENERATOR

AutoCAD SHX Text TOTAL HEAT DISSIPATED FROM STERILIZER WITH EMPTY CHAMBER AND 2 DOORS BOTH CLOSED AT AN AMBIENT TEMP OF 23° C (73° F) +/- 2° C (36° F). HEAT DISSIPATED AT THE FRONT IS 2218 BTU/SIDEWITH CLOSED DOOR AND 5937 BTU/SIDE WITH OPEN DOOR.

AutoCAD SHX Text

PERFORMANCE AND DIMENSIONS

AutoCAD SHX Text Process Time, metal load

AutoCAD SHX Text Usable Space (WxHxL) Inside Chamber

AutoCAD SHX Text Loading Capacity

AutoCAD SHX Text Sterilizer Weight

AutoCAD SHX Text Sound Power Level LwA

AutoCAD SHX Text Sound Pressure Level LpA

AutoCAD SHX Text Heat Generation

AutoCAD SHX Text (h:mm)

AutoCAD SHX Text (mm)

AutoCAD SHX Text Instrument trays

AutoCAD SHX Text (kg)

AutoCAD SHX Text (lbs)

AutoCAD SHX Text (dBA)

AutoCAD SHX Text (dBA)

AutoCAD SHX Text (kW)

AutoCAD SHX Text (kg)

AutoCAD SHX Text (lbs)

AutoCAD SHX Text 660x610x1000

AutoCAD SHX Text

AutoCAD SHX Text <70

AutoCAD SHX Text Heat Generation

AutoCAD SHX Text (kW)

AutoCAD SHX Text OPTION: INTEGRAL ELECTRICAL STEAM GENERATOR (E) OPTION: INTEGRAL STEAM TO STEAM GENERATOR (D)

AutoCAD SHX Text Sterilizer weight

AutoCAD SHX Text Comments

AutoCAD SHX Text Prevac 1, 135 C including 16 min vacuum drying.

AutoCAD SHX Text 25 lbs (11.3 kg) per tray

AutoCAD SHX Text Packaging not included

AutoCAD SHX Text SS-EN 285:2006+A2:2009 and ISO 3746:2010

AutoCAD SHX Text Heat dissipated to the surrounding

AutoCAD SHX Text Packaging not included

AutoCAD SHX Text

EMPTY

AutoCAD SHX Text

FULL

AutoCAD SHX Text (Btu/hr)

AutoCAD SHX Text

AutoCAD SHX Text 11270

AutoCAD SHX Text (inch)

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DJL

AutoCAD SHX Text 4/16/19

AutoCAD SHX Text

NONE

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9615-002

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

XX

AutoCAD SHX Text S2

MODEL 67N13 STEAM STERILIZER, SINGLE DOOR, LEFT SERVICE, RECESSED THROUGH WALL, 51" CHAMBER, DISPLAY ABOVE CHAMBER, ROUGH-IN DRAWING (STRUCTURAL)

= CENTER OF GRAVITY

AutoCAD SHX Text

A MODEL VIEW - SIDE

AutoCAD SHX Text

A MODEL VIEW - FRONT

AutoCAD SHX Text

CONTROL SIDE

AutoCAD SHX Text

NON CONTROL SIDE

AutoCAD SHX Text

ALL DIMENSIONS GIVEN ARE FROM FINISHED SURFACES.

AutoCAD SHX Text

DIMENSIONS ARE FEET-INCHES [MILLIMETERS].

AutoCAD SHX Text

UNIT SHOWN IS A GSS 67N13

AutoCAD SHX Text

D & E MODEL VIEW - FRONT

AutoCAD SHX Text

D & E MODEL VIEW - SIDE

AutoCAD SHX Text

CONTROL SIDE

AutoCAD SHX Text

NON CONTROL SIDE

AutoCAD SHX Text HEATING OPTIONS: A = HOUSE STEAM E = ELECTRIC - INTEGRAL ELECTRIC STEAM GENERATOR D = INTEGRAL STEAM TO STEAM GENERATOR

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SHEET #:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

DJL

AutoCAD SHX Text 4/16/19

AutoCAD SHX Text

NONE

AutoCAD SHX Text

AutoCAD SHX Text

REV

AutoCAD SHX Text

BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

TITLE:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9615-002

AutoCAD SHX Text

DRAWING NUMBER / FILE NAME:

AutoCAD SHX Text

REVISION:

AutoCAD SHX Text

XX

AutoCAD SHX Text S3

MODEL 67N13 STEAM STERILIZER, SINGLE DOOR, LEFT SERVICE, RECESSED THROUGH WALL, 51" CHAMBER, DISPLAY ABOVE CHAMBER, ROUGH-IN DRAWING (STRUCTURAL)

D

D

AS

E

CWS

N

S

CW

ASE

FW

FW

N

AutoCAD SHX Text

VIEW - SIDE

AutoCAD SHX Text

VIEW - FRONT

AutoCAD SHX Text HEATING OPTIONS: A = HOUSE STEAM E = ELECTRIC - INTEGRAL ELECTRIC STEAM GENERATOR D = INTEGRAL STEAM TO STEAM GENERATOR

AutoCAD SHX Text 2'-1 "12"

AutoCAD SHX Text 2'-1 "12"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-11"

AutoCAD SHX Text 1'-11"

AutoCAD SHX Text 2'-3"

AutoCAD SHX Text 2'-3"

AutoCAD SHX Text 2'-1 "12"

AutoCAD SHX Text 2'-1 "12"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-3"

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text 1'-8"

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text 7'-0"

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text

FINISHED WALL

AutoCAD SHX Text

ALL DIMENSIONS GIVEN ARE FROM FINISHED SURFACES.

AutoCAD SHX Text

DIMENSIONS ARE FEET-INCHES [MILLIMETERS].

AutoCAD SHX Text

UNIT SHOWN IS A GSS 67N10

AutoCAD SHX Text

FINISHED FLOOR

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text 1'-7"

AutoCAD SHX Text 1'-7"

AutoCAD SHX Text

*SITE UTILITY DROP RECOMMENDATION*

AutoCAD SHX Text

CW = CITY WATER

AutoCAD SHX Text

AS = AIR SUPPLY

AutoCAD SHX Text

S = STEAM (A)

AutoCAD SHX Text

D = PROCESS DRAIN

AutoCAD SHX Text

E = ELECTRICAL (A)

AutoCAD SHX Text

N = NETWORK

AutoCAD SHX Text

UTILITY

A…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .