This document is a set of construction drawings for an electrical substation upgrade project at the St. Cloud VA Medical Center (VAHCS) in St. Cloud, Minnesota, identified as VAMC Project #656-22-341. The drawings were prepared by Valhalla Engineering Group, LLC and issued on January 18, 2024.
The project involves the conduct of electrical substation upgrades, encompassing demolition and replacement of multiple pad-mounted transformers across the facility. Key work includes isolating and removing existing transformers ranging from 30 kVA to 750 kVA at 13.8 kV primary with secondary voltages of 208/120V, 240/120V, and 480/277V, then installing replacement units with comparable or upgraded specifications. The construction documents include site plans divided into seven sections (A through G), electrical symbols and abbreviations, demolition site plans, new installation site plans, substation power and one-line diagrams, and detailed specifications for transformer installations. Critical requirements include coordination with the VHA Contracting Officer Representative (COR) for outages, retention of existing conductors and connectors for reconnection to new equipment, protection of existing pads where indicated, installation of anti-ram rated vehicle bollards at specified locations, and compliance with the 2023 National Electrical Code. The substation upgrades involve replacement of a 5,000 kVA primary substation transformer with a 6,000 kVA unit, with provisions for maintaining loop continuity during demolition and construction phases. An alternate is included that deducts all work associated with Transformer TF-50, suggesting this as an optional scope modification.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26326B0024_1 4.6.2026.pdf | ||
| Attachment B- Wage Determination.pdf | ||
| Attachment F - Questions Request Form - 1 page.pdf | ||
| Attachment A- Final SOW Conduct Substation Upgrade 3.26.docx | DOCX document | |
| Attachment D- 656-22-341__25_19_Specs_RA 3.26.pdf | ||
| Attachment E - Limitations on Subcontracting - 2 Pages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VESTIBULE
DN
DN
DN
FD
DN
FB
FB
FB
FB
FB
FB
SOUTH
VESTIBULE
PASS
THROUGH
LINK TO
BUILDING 51
C
16"
20"
12"
3"
8"
C
1B
CORRIDOR LINK
1A
SIGNSIGN
TP TP
.3
.33
SN
T
SHEET INDEX
ST CLOUD HEALTH CARE SYSTEM
ST CLOUD, MN
VAMC PROJECT #: 656-22-341
CONDUCT ELECTRICAL SUBSTATION UPGRADE
Plan North
Plan North
11651
11128
1A
AREA OF WORKVICINITY MAP
BIO
GI001
N/A
MMMRA1/18/2024
COVER SHEET
VEG 23.09
656-22-341
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
VA FORM 08 - 6231
A
Fi le
P at h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
ARCHITECT/ENGINEERS:
STAMP:
CONSTRUCTION
DOCUMENTS
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
8' 4'
1/8
1'
8' 4'
2'
1/4
1'
8'
4'
3/1 6"
1'
6' 4'
2'
3/8
1' 4'
2' 1'
1/2
1'
3' 2'
1'
3/4
1' 2'
1' 6"
1"
1'
1'- 6"
1' 6"
1 1
/2"
1' 9"
6" 3"
3"
1'
1"
0'
1"
1"
1"
1"
1/3 2"
1'
8'
1/1 6"
1'
5'
3/3 2"
1'
7'- 6"
5'
1"
5'
Drawing Title
APPROVED: ASSISTANT CHIEF ENGINEER
APPROVED: MEDICAL CENTER DIRECTOR
APPROVED: CHIEF OF POLICE
APPROVED: DIRECTOR FMS DATE: APPROVED: SAFETY MANAGER DATE:
APPROVED: GEMS COORDINATOR
APPROVED: PROJECTS SECTION MANAGER
APPROVED: SERVICE LINE DIRECTOR
DATE:
DATE:
DATE: APPROVED: INFECTION CONTROL NURSE
APPROVED: PATIENT SAFETY
DATE:
DATE:
DATE:
APPROVED: ASSOCIATE HEALTH CARE SYSTEM DIRECTOR
DATE:
DATE:
DATE:APPROVED: EMS MANAGER
APPROVED: OIT MANAGER DATE:
DATE:
DATE:
APPROVED: PROJECT COR DATE:
APPROVED: M/O MANAGERAPPROVED: CHIEF OF STAFF
APPROVED: NURSE EXECUTIVE
DATE:
DATE:
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
GI001 COVER SHEET
GI002 SITE PLAN
E-001 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS
ED101 DEMO SITE PLAN SECTION A
ED102 DEMO SITE PLAN SECTION B
ED103 DEMO SITE PLAN SECTION C
ED104 DEMO SITE PLAN SECTION D
ED105 DEMO SITE PLAN SECTION E
ED106 DEMO SITE PLAN SECTION F
ED107 DEMO SITE PLAN SECTION G
ES101 SITE PLAN SECTION A
ES102 SITE PLAN SECTION B
ES103 SITE PLAN SECTION C
ES104 SITE PLAN SECTION D
ES105 SITE PLAN SECTION E
ES106 SITE PLAN SECTION F
ES107 SITE PLAN SECTION G
EP101 SUBSTATION POWER PLAN
EP601 SUBSTATION ONE-LINE DIAGRAM
EP602 POWER ONE-LINE DIAGRAM
EK501 ELECTRICAL DETAILS
EK502 TRANSFORMER SCHEDULE
SUBSTATION
Pl an
N or th Tr ue N or th
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/128" = 1'-0" 32' 64' 128' 256' 512'0
SITE PLAN1
GI002
N/A
MMMRA1/18/2024
SITE PLAN
X
SECTION A
SECTION BSECTION CSECTION E
SECTION F SECTION D
SECTION G
ED101
EP101
ED103
EP103
ED104
EP104
ED105
EP105
ED106
EP106
ED107
EP107
ED102
EP102
E-001
N/A
MMMRA1/18/2024
ELECTRICAL SYMBOLS
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
A REVISION A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
2.12.2026
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
R
RCP REFLECTED CEILING PLAN
REC RECESSED
RECPT RECEPTACLE
REQ REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
S
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SES SERVICE ENTRANCE SECTION
SF SQUARE FOOT (FEET)
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SURF SURFACE
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
T
TEL TELEPHONE
TM THERMAL MAGNETIC
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
U
UFD UNDERFLOOR DUCT
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V
V VOLT
VA VOLT-AMPERE
VAR VOLT-AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VOLT VOLTAGE
W
W WATT
WH WATER HEATER
WP WEATHERPROOF
X
XFER TRANSFER
XFMR TRANSFORMER
J
J-BOX JUNCTION BOX
K
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAH KILOVOLT-AMPERE PER HOUR
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
KWHM KILOWATT HOUR METER
L
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LPS LOW PRESSURE SODIUM
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTG PNL LIGHTING PANEL
LTNG LIGHTNING
LV LOW VOLTAGE
M
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MEP MECHANICAL ELECTRICAL & PLUMBING
MFR MANUFACTURER
MG MOTOR GENERATOR
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MOCP MAXIMUM OVERCURRENT PROTECTION
MT MOUNT
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT
N
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
O
OC ON CENTER
OCP OVERCURRENT PROTECTION
OD OUTSIDE DIAMETER
OL OVERLOAD
P
P POLE
PA PUBLIC ADDRESS
PB PULLBOX OR PANEL BOARD
PBPU PREFABRICATED BEDSIDE PATIENT UNIT
PCB POLYCHLORINATED BIPHENYL
PEC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PNL PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
D
DB DECIBEL
DC DIRECT CURRENT
DCP DIMMER CONTROL PANEL
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DIAG DIAGRAM
DISC DISCONNECT
DISTR DISTRIBUTION
DISTR PNL DISTRIBUTION PANEL
DMR SW DIMMER SWITCH
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DRSW DOOR SWITCH
DS DISCONNECT SWITCH
DWG DRAWING
E
EC ELECTRICAL CONTRACTOR
EL ELEVATION
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMCP EMERGENCY MONITORING CONTROL PANEL
EMER EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
EPRF EXPLOSION PROOF
ESMT EASEMENT
EST ESTIMATED
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EXST EXISTING
F
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FABL FIRE ALARM BELL
FABX FIRE ALARM BOX
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FIXT FIXTURE
FLA FULL LOAD AMPS
FLEX FLEXIBLE METALLIC CONDUIT
FLT FLOODLIGHT
FLUOR FLUORESCENT
FLUOR FIXT FLUORESCENT FIXTURE
FOUTT TELEPHONE FLOOR OUTLET
FP FIRE PROTECTION
FT FEET OR FOOT
FU SW FUSED SWITCH
FVNR FULL VOLTAGE NON-REVERSING
FVR FULL VOLTAGE REVERSING
G
G OR GND ELECTRICAL GROUND
GC GENERAL CONTRACTOR
GEN GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
H
HD HEAVY DUTY
HID HIGH INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HZ HERTZ
I
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH
AMERICA
IMC INTERMEDIATE METAL CONDUIT
INCAND INCANDESCENT
IOM INSTALLATION AND OPERATION MANUAL
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
1P SINGLE POLE
1PH SINGLE PHASE
2/C TWO-CONDUCTOR
3/C THREE-CONDUCTOR
3P THREE POLE
3PH THREE PHASE
4/C FOUR-CONDUCTOR
4W FOUR WIRE
A
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT / ENGINEER
AAP ALARM ANNUNCIATOR PANEL
AC ALTERNATING CURRENT OR ARMORED CABLE
ACC ACCESSIBLE
ADDL ADDITIONAL
ADJ ADJACENT OR ADJOINING
ADO AUTOMATIC DOOR OPENER
AF AMPERE FRAME OR AMP FUSE
AFC ABOVE FINISHED COUNTER, AUTOMATIC FREQUENCY
CONTROL, OR AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AH AMPERE-HOUR
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMB OR A AMBIENT
AMP AMPERE
ARCH ARCHITECT
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
B
BAT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BIL BASIC INSULATION LEVEL
BLDG BUILDING
BPIP BOILER PLANT INSTRUMENTATION PANEL
BRKR BREAKER
BYP BYPASS
C
C CONDUIT
CAB CABINET
CALC CALCULATE
CAP CAPACITY
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
CD CANDELA OR CONSTRUCTION DOCUMENTS
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED / CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED / OWNER INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CHW CHILLED WATER
CHWP CHILLED WATER PUMP
CKT CIRCUIT
CLF CURRENT LIMITING FUSE
CLG CEILING
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COAX COAX CABLE
COINC COINCIDENT
COMM COMMUNICATION
COMPT COMPARTMENT
CONC CONCRETE
CONN CONNECTED
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CU COPPER
CU FT CUBIC FEET
CUR CURRENT
ELECTRICAL ABBREVIATIONS
SWITCH, NORMALLY CLOSED FLOAT
SWITCH, NORMALLY CLOSED FOOT OPERATED
SWITCH, NORMALLY CLOSED LIMIT
SWITCH, NORMALLY CLOSED TEMPERATURE
ACTIVATED
SWITCH, NORMALLY OPEN FLOAT
SWITCH, NORMALLY OPEN TEMPERATURE ACTIVATED
DELTA CONNECTION
TRANSFORMER
GROUNDED WYE CONNECTION
PULL BOX
PRESSURE SWITCH-CLOSE ON INCREASE
PRESSURE SWITCH-OPEN ON INCREASE
MANHOLE
JUNCTION BOX
TRANSFORMER AND WORKING CLEARANCE, PLAN
EARTH GROUND
BRANCH CIRCUIT HOMERUN. ONE SEPARATE GREEN
GROUNDING CONDUCTOR SHALL BE PROVIDED FOR
EACH HOMERUN; NOT SHOWN
RIGID CONDUIT LINE
SUBSTATION
DIRECT BURIAL CABLE
POWER DUCT
HI VOLTAGE SWITCH ON CONCRETE PAD
LOW VOLTAGE SWITCH ON CONCRETE PAD
DUAL POWER AND TELECOMMUNICATIONS MANHOLE
SWITCH, NORMALLY OPEN TIME DELAY
SWITCH, SINGLE BREAK
FUSE WITH RATING
NORMALLY CLOSED RELAY CONTACT
NORMALLY OPEN RELAY CONTACT
MOLDED CASE CIRCUIT BREAKER
LOW-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
MEDIUM-VOLTAGE OIL CIRCUIT BREAKER
MEDIUM-VOLTAGE DRAWOUT AIR CIRCUIT BREAKER
SWITCH AND FUSE UNIT
FUSED DRAWOUT POTENTIAL TRANSFORMER
FUSIBLE LINK
GENERATOR, POWER
BATTERY
CAPACITOR
RELAY; LETTER INDICATES RELAY TYPE
50 = INSTANTANEOUS OVERCURRENT OR RATE-OF-RISE
51 = AC-TIME OVERCURRENT
67 = AC-DIRECTIONAL OVERCURRENT
86 = LOCK OUT
DISCONNECT SWITCH, FUSED
DISCONNECT SWITCH, UNFUSED, VAV
POTHEAD
STRESS CONE
AMMETER
VOLTMETER
WATTMETER
WATT-HOUR METER
ELECTRICAL SYMBOLS - POWER PLAN
RC
DB
P
A
V
W
WH
T
S
HVS
LVS
P T
J
PB
P
A. PROVIDE ALL ELECTRICAL WORK IN ACCORDANCE WITH THE 2023 NATIONAL
ELECTRICAL CODE AND THE REQUIREMENTS OF THE VHA.
B. COORDINATE ALL OUTAGES WITH VHA COR PER SPECIFICATION 00 01 10 PRIOR TO
WORK BEING DONE.
OR
NEW - EXISTING AND DEMO LINE TYPES
NEW LINE TYPE
EXISTING LINE TYPE
DEMO HATCH
ELECTRICAL SYMBOLS ELECTRICAL GENERAL NOTES
26-SF 3
H4
H7 A
DETAIL REFERENCE
DRAWING NUMBER WHERE SHOWN
SECTION REFERENCE
EQUIPMENT TAG
DRAWING NUMBER WHERE DRAWN
CONNECT TO EXISTING*
LIMIT OF DEMOLITION*
GENERAL SYMBOLS AND TAGS
DEMOLISHED EQUIPMENT (SHAPE VARIES,
REF: SYMBOLS, TAGS, & NOTES)
(E) EXISTING COMPONENT
(X) DEMOLISHED COMPONENT
## GENERAL EQUIPMENT FURNISHED BY
OTHERS, COORDINATE WITH ASSOCIATED
TRADES FOR POWER AND/OR TELECOM
CONNECTIONS PER MFR INSTRUCTIONS
NEW EQUIPMENT (SHAPE VARIES, REF:
SYMBOLS, TAGS, & NOTES. SCHEDULED
ITEMS ARE NEW UNO)
P1
3 APPROXIMATE VIEWING DIRECTION
PHOTO OR AXONOMETRIC VIEW NUMBER
DRAWING NUMBER WHERE SHOWN
*SINGLE SYMBOL MAY APPLY
TO BANKS OF SIMILAR CONDUIT
KEYNOTE00
EXISTING UNDERGROUND ELECTRICAL
A. PORTIONS OF THE ELECTRICAL DISTRIBUTION REQUIRING OUTAGE SHALL BE ISOLATED
FROM THE REST OF THE SYSTEM PRIOR TO WORK. COORDINATE OUTAGES WITH THE
VA AND FOLLOW VA SEQUENCE DIAGRAMS FOR SYSTEM ISOLATION. FOLLOW ALL
LOCK-OUT TAG-OUT PROCEDURES INDICATED WITHIN THE SPECIFICATIONS AND AS
DIRECTED BY THE SITE.
B. CONTRACTOR TO VERIFY EXISTING PRIMARY AND SECONDARY EXISTING
TRANSFORMER CONNECTOR TYPES. REPLACEMENT EQUIPMENT SHALL BE
CONFIGURED WITH THE SAME CONNECTORS AS THE PREVIOUS INSTALLATION.
DEMOLITION GENERAL NOTES
A. A SURVEY FOR EXISTING UNDERGROUND UTILITIES WHEREVER UNDERGROUND WORK
IS TO BE PERFORMED. CARE SHOULD BE TAKEN NOT TO DAMAGE EXISTING
UNDERGROUND INSTALLATIONS. UTILIZE EXCAVATION METHODS APPROPRIATE FOR
THE JOB WHICH CAN PREVENT INADVERTENT DAMAGE, SUCH AS HYDROVAC
EXCAVATION, FOR EXISTING UNDERGROUND UTILITIES.
POWER GENERAL NOTES
A
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION A1
ED101
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION A
1. ISOLATE AND REMOVE EXISTING 112.5KVA, 13800-208/120V RADIAL,
PAD MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND
RETAIN CONDUCTORS AND CONNECTORS FOR RECONNECT.
RETAIN EXISTING PAD.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
X
TF-57
S-18
109 57
T 1
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION B1
ED102
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION B
1. ISOLATE AND REMOVE 300KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
2. ISOLATE AND REMOVE 75KVA, 13800-240/120V RADIAL, PAD MOUNT
TRANSFORMER. DISCONNECT TRANSFORMER AND PROTECT AND
RETAIN CONDUCTORS AND CONNECTORS FOR RECONNECT.
DEMOLISH EXISTING PAD/BOX.
3. ISOLATE AND REMOVE 30KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
X
TF-10
TF-94
TF-111
TF-115
S-1
S-2
S-3
S-3A
T
T
T
TF-9
T
T
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION C1
ED103
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION C
1. ISOLATE AND REMOVE 750KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
2. ISOLATE AND REMOVE 150KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND
PROTECT AND RETAIN CONDUCTORS AND CONNECTORS FOR
RECONNECT. DEMOLISH EXISTING PAD/BOX.
3. ISOLATE AND REMOVE 225KVA, 13800-480/277V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
4. ISOLATE AND REMOVE 500KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
5. ISOLATE AND REMOVE 75KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. DISCONNECT TRANSFORMER AND PROTECT AND
RETAIN CONDUCTORS AND CONNECTORS FOR RECONNECT.
DEMOLISH EXISTING PAD/BOX.
6. ISOLATE AND REMOVE 225KVA, 13800-480/277V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND
PROTECT AND RETAIN CONDUCTORS AND CONNECTORS FOR
RECONNECT. DEMOLISH EXISTING PAD/BOX.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
X
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
A
A
A REVISION A 2.12.2026
TF-1
TF-1A
TF-1B
TF-1C
TF-2A
TF-3
TF-4A
TF-5
TF-7
TF-8
TF-28
TF-59
TF-95
TF-118
TF-4B
S-5 S-6
S-7
S-8
S-14
S-15
S-15A
S-16 S-17
37 69
1A
I.T.
TT
T
T
TF-88
T T
T
T T
T
T
T
T
TF-2
TF-4
T
T
T
T
T
2 3
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION D1
ED104
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION D
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. SHEET INDICATES EXISTING TRANSFORMER AND LOOP LOCATION.
NO WORK ON THIS SHEET.
TF-PG-1
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION E1
ED105
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION E
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
1. ISOLATE AND REMOVE 500KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND
PROTECT AND RETAIN CONDUCTORS AND CONNECTORS FOR
RECONNECT. DEMOLISH EXISTING PAD/BOX.
X
TF-29
TF-48A
TF-48
TF-49
S-11
S-12
S-12A
S-13
T101
T
TF-88
T
T
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION F1
ED106
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION F
1. ISOLATE AND REMOVE 500KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN
CONDUCTORS AND CONNECTORS FOR RECONNECT. RETAIN
EXISTING PAD.
2. ISOLATE AND REMOVE 500KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. DISCONNECT TRANSFORMER AND
PROTECT AND RETAIN CONDUCTORS AND CONNECTORS FOR
RECONNECT. DEMOLISH EXISTING PAD/BOX.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
X
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
A
A REVISION A 2.12.2026
TF-50
TF-51A
TF-51B
TF-116
S-9
S-10
S-11
TF-UNKNOWN
T
T
T
T
T1
Deduct: Alternate 1 - Base bid less all work associated with Transformer TF-50
VHASTCSchraC2 Rectangle
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
DEMO SITE PLAN SECTION G1
ED107
N/A
MMMRA1/18/2024
DEMO SITE PLAN SECTION G
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. SHEET INDICATES EXISTING TRANSFORMER AND LOOP LOCATION.
NO WORK ON THIS SHEET.
X
TF-96
TF-114
S-9A
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION A1
ES101
N/A
MMMRA1/18/2024
SITE PLAN SECTION A
1. PROVIDE REPLACEMENT 112.5KVA, 13800-208/120V, RADIAL, PAD-MOUNT,
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD. RECONNECT
EXISTING CONNECTORS RETAINED DURING DEMOLITION TO NEW
TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR ADDITIONAL
INFORMATION.
2. PROVIDE PASSIVE, ANTI-RAM RATED VEHICLE BOLLARDS. DETERMINE THE
LOCATION OF EXISTING SITE UTILITIES PRIOR TO EXCAVATING OR DRIVING OF
BOLLARD COMPONENTS. BOLLARDS LOCATED WITHIN THE WORKING SPACE OF
ELECTRICAL EQUIPMENT SHALL BE REMOVEABLE. PLACE BOLLARDS A
MINIMUM OF 3 FEET AWAY FROM TRANSFORMER PAD. AVOID PLACING
BOLLARDS WITHIN EXISTING WALKWAYS. SPACING BETWEEN BOLLARDS NOT
TO EXCEED 5 FEET. COORDINATE FINAL PLACEMENT OF BOLLARDS WITH COR
IN THE FIELD. SEE SHEET EK501 FOR ADDITIONAL BOLLARD INFORMATION.
EQUIVALENT ANTI-RAM RATED SUBSTITUTIONS MAY BE ACCEPTED.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. TRANSFORMER SYMBOL IS DIAGRAMMATIC AND NOT INDICATIVE OF ACTUAL
SIZE.
E. DO NOT CREATE ANY SPLICES ON OR OTHERWISE MODIFY EXISTING MEDIUM
VOLTAGE (MV) CABLES. EQUIPMENT SHALL BE LOCATED AND PLACED IN THE
FIELD FOR REUSE OF MV CABLES OF EXISTING LENGTHS. MODIFICATION OF
480V LINE-TO-LINE AND LOWER SYSTEMS ARE PERMITTED.
X
TF-57
S-18
109 57
T 1
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION B1
ES102
N/A
MMMRA1/18/2024
SITE PLAN SECTION B
1. PROVIDE REPLACEMENT 300KVA, 13800-208/120V, RADIAL, PAD-MOUNT,
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
2. PROVIDE REPLACEMENT 75KVA, 13800-240/120V, RADIAL, PAD-MOUNT,
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD
AS INDICATED ON THE DRAWINGS AND PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INTERCEPT AND EXTEND SECONDARY
CONDUCTORS INTO SECONDARY OPENING / COMPARTMENT AS REQUIRED
FOR NEW PAD CONFIGURATION. MOUNT TRANSFORMER TO NEW PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
3. PROVIDE REPLACEMENT 30KVA, 13800-208/120V, RADIAL, PAD-MOUNT,
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
4. PROVIDE PASSIVE, ANTI-RAM RATED VEHICLE BOLLARDS. DETERMINE THE
LOCATION OF EXISTING SITE UTILITIES PRIOR TO EXCAVATING OR DRIVING
OF BOLLARD COMPONENTS. BOLLARDS LOCATED WITHIN THE WORKING
SPACE OF ELECTRICAL EQUIPMENT SHALL BE REMOVEABLE. PLACE
BOLLARDS A MINIMUM OF 3 FEET AWAY FROM TRANSFORMER PAD. AVOID
PLACING BOLLARDS WITHIN EXISTING WALKWAYS. SPACING BETWEEN
BOLLARDS NOT TO EXCEED 5 FEET. COORDINATE FINAL PLACEMENT OF
BOLLARDS WITH COR IN THE FIELD. SEE SHEET EK501 FOR ADDITIONAL
BOLLARD INFORMATION. EQUIVALENT ANTI-RAM RATED SUBSTITUTIONS
MAY BE ACCEPTED.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. TRANSFORMER SYMBOL IS DIAGRAMMATIC AND NOT INDICATIVE OF ACTUAL
SIZE.
E. DO NOT CREATE ANY SPLICES ON OR OTHERWISE MODIFY EXISTING MEDIUM
VOLTAGE (MV) CABLES. EQUIPMENT SHALL BE LOCATED AND PLACED IN THE
FIELD FOR REUSE OF MV CABLES OF EXISTING LENGTHS. MODIFICATION OF
480V LINE-TO-LINE AND LOWER SYSTEMS ARE PERMITTED.
X
TF-10
TF-94
TF-111
TF-115
S-1
S-2
S-3
S-3A
T
T
T
TF-9
T
T
EP101
an
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION C1
ES103
N/A
MMMRA1/18/2024
SITE PLAN SECTION C
1. PROVIDE REPLACEMENT 750KVA, 13800-208/120V, RADIAL, PAD-MOUNT,
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
2. PROVIDE REPLACEMENT 150KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD
AS INDICATED ON THE DRAWINGS AND PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INTERCEPT AND EXTEND SECONDARY
CONDUCTORS INTO SECONDARY OPENING / COMPARTMENT AS REQUIRED
FOR NEW PAD CONFIGURATION. MOUNT TRANSFORMER TO NEW PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
3. PROVIDE REPLACEMENT 225KVA, 13800-480/277V RADIAL, PAD MOUNT
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
4. PROVIDE REPLACEMENT 500KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
5. PROVIDE REPLACEMENT 75KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD
AS INDICATED ON THE DRAWINGS AND PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INTERCEPT AND EXTEND SECONDARY
CONDUCTORS INTO SECONDARY OPENING / COMPARTMENT AS REQUIRED
FOR NEW PAD CONFIGURATION. MOUNT TRANSFORMER TO NEW PAD.
RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
6. PROVIDE NEW 300KVA, 13800-480/277V RADIAL, PAD MOUNT
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD
AS INDICATED ON THE DRAWINGS AND PER THE MANUFACTURER'S
INSTALLATION INSTRUCTIONS. INTERCEPT AND EXTEND CONDUCTORS
INTO OPENING / COMPARTMENT AS REQUIRED FOR NEW PAD
CONFIGURATION. MOUNT TRANSFORMER TO NEW PAD. RECONNECT
EXISTING CONNECTORS RETAINED DURING DEMOLITION TO NEW
TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
7. PROVIDE PASSIVE, ANTI-RAM RATED VEHICLE BOLLARDS. DETERMINE THE
LOCATION OF EXISTING SITE UTILITIES PRIOR TO EXCAVATING OR DRIVING
OF BOLLARD COMPONENTS. BOLLARDS LOCATED WITHIN THE WORKING
SPACE OF ELECTRICAL EQUIPMENT SHALL BE REMOVEABLE. PLACE
BOLLARDS A MINIMUM OF 3 FEET AWAY FROM TRANSFORMER PAD. AVOID
PLACING BOLLARDS WITHIN EXISTING WALKWAYS. SPACING BETWEEN
BOLLARDS NOT TO EXCEED 5 FEET. COORDINATE FINAL PLACEMENT OF
BOLLARDS WITH COR IN THE FIELD. SEE SHEET EK501 FOR ADDITIONAL
BOLLARD INFORMATION. EQUIVALENT ANTI-RAM RATED SUBSTITUTIONS
MAY BE ACCEPTED.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. TRANSFORMER SYMBOL IS DIAGRAMMATIC AND NOT INDICATIVE OF ACTUAL
SIZE.
E. DO NOT CREATE ANY SPLICES ON OR OTHERWISE MODIFY EXISTING MEDIUM
VOLTAGE (MV) CABLES. EQUIPMENT SHALL BE LOCATED AND PLACED IN THE
FIELD FOR REUSE OF MV CABLES OF EXISTING LENGTHS. MODIFICATION OF
480V LINE-TO-LINE AND LOWER SYSTEMS ARE PERMITTED.
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
A
A
A REVISION A 2.12.2026
TF-1
TF-1A
TF-1B
TF-1C
TF-2A
TF-3
TF-4A
TF-5
TF-7
TF-8
TF-28
TF-59
TF-95
TF-118
TF-4B
S-5 S-6
S-7
S-8
S-14
S-15
S-15A
S-16 S-17
37 69
1A
I.T.
TT
T
T
TF-88
T T
T
T T
T
T
T
T
TF-2
TF-4
T
T
T
T
T 5
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION D1
ES104
N/A
MMMRA1/18/2024
SITE PLAN SECTION D
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. SHEET INDICATES EXISTING TRANSFORMER AND LOOP LOCATION.
NO WORK ON THIS SHEET.
TF-PG-1
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION E1
ES105
N/A
MMMRA1/18/2024
SITE PLAN SECTION E
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. TRANSFORMER SYMBOL IS DIAGRAMMATIC AND NOT INDICATIVE OF ACTUAL
SIZE.
E. DO NOT CREATE ANY SPLICES ON OR OTHERWISE MODIFY EXISTING MEDIUM
VOLTAGE (MV) CABLES. EQUIPMENT SHALL BE LOCATED AND PLACED IN THE
FIELD FOR REUSE OF MV CABLES OF EXISTING LENGTHS. MODIFICATION OF
480V LINE-TO-LINE AND LOWER SYSTEMS ARE PERMITTED.
1. PROVIDE REPLACEMENT 500KVA, 13800-208/120V, RADIAL, PAD MOUNT
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD AS
INDICATED ON THE DRAWINGS AND PER THE MANUFACTURER'S INSTALLATION
INSTRUCTIONS. INTERCEPT AND EXTEND SECONDARY CONDUCTORS INTO
SECONDARY OPENING / COMPARTMENT AS REQUIRED FOR NEW PAD
CONFIGURATION. MOUNT TRANSFORMER TO NEW PAD. RECONNECT EXISTING
CONNECTORS RETAINED DURING DEMOLITION TO NEW TRANSFORMER
BUSHINGS. REFER TO DETAIL SHEET EK501 FOR ADDITIONAL INFORMATION.
X
TF-29
TF-48A
TF-48
TF-49
S-11
S-12
S-12A
S-13
T101
T
TF-88
T
T
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION F1
ES106
N/A
MMMRA1/18/2024
SITE PLAN SECTION F
1. PROVIDE REPLACEMENT 500KVA, 13800-208/120V RADIAL, PAD
MOUNT TRANSFORMER. MOUNT NEW TRANSFORMER TO EXISTING
PAD. RECONNECT EXISTING CONNECTORS RETAINED DURING
DEMOLITION TO NEW TRANSFORMER BUSHINGS. REFER TO
DETAIL SHEET EK501 FOR ADDITIONAL INFORMATION.
2. PROVIDE NEW 750KVA, 13800-208/120V RADIAL, PAD MOUNT
TRANSFORMER. PROVIDE AND ORIENT NEW PRECAST
TRANSFORMER PAD AS INDICATED ON THE DRAWINGS AND PER
THE MANUFACTURER'S INSTALLATION INSTRUCTIONS. INTERCEPT
AND EXTEND PRIMARY CONDUCTORS INTO OPENING /
COMPARTMENT AS REQUIRED FOR NEW PAD CONFIGURATION.
MOUNT TRANSFORMER TO NEW PAD. RECONNECT EXISTING
CONNECTORS RETAINED DURING DEMOLITION TO NEW
TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL
TEMPORARY OR PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES
REQUIRED FOR COMPLETE TRANSFORMER INSTALLATION AND
OPERATION THAT ARE DAMAGED DURING DEMOLITION SHALL BE
REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE VHA.
D. TRANSFORMER SYMBOL IS DIAGRAMMATIC AND NOT INDICATIVE
OF ACTUAL SIZE.
E. DO NOT CREATE ANY SPLICES ON OR OTHERWISE MODIFY
EXISTING MEDIUM VOLTAGE (MV) CABLES. EQUIPMENT SHALL BE
LOCATED AND PLACED IN THE FIELD FOR REUSE OF MV CABLES
OF EXISTING LENGTHS. MODIFICATION OF 480V LINE-TO-LINE AND
LOWER SYSTEMS ARE PERMITTED.
X
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
A
A REVISION A 2.12.2026
TF-50
TF-51A
TF-51B
TF-116
S-9
S-10
S-11
TF-UNKNOWN
T
T
T
T
T1
Deduct: Alternate 1 - Base bid less all work associated with Transformer TF-50
N or th Tr ue N or th
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
1/32" = 1'-0" 8' 16' 32' 64' 128'0
SITE PLAN SECTION G1
ES107
N/A
MMMRA1/18/2024
SITE PLAN SECTION G
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS,
ABBREVIATIONS, AND GENERAL NOTES.
B. SHEET INDICATES EXISTING TRANSFORMER AND LOOP LOCATION.
NO WORK ON THIS SHEET.
X
TF-96
TF-114
S-9A
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
EP101
N/A
MMMRA1/18/2024
SUBSTATION POWER PLAN
NO SCALE
PRIMARY SUBSTATION ELEVATION PLAN3
NO SCALE
ALTERNATE SUBSTATION ELEVATION PLAN2
2' 4' 8' 16' 32'
1/8" = 1'-0"
PRIMARY SUBSTATION POWER PLAN1
EP101
EP101
No rth
A. REFER TO EP602 FOR MORE INFORMATION.
X
SUBSTATION
PREFERED
UTILITY
BREAKER
N/C
ALTERNATE
UTILITY
BREAKER
N/O
CONTROL
PANEL
T1
PREFERED
UTILITY
BREAKER
N/C
ALTERNATE
UTILITY
BREAKER
N/O
CONTROL
PANEL
T2
EX
IS
TI
NG
R
OA
D
SUBSTATION
SG1 T1 SG3
SG2 T2 SG4
SOURCE TRANSFER SWITCH #2 (ST2)
XCEL PRIMARY FEEDER (BY UTILITY)
XCEL ALTERNATE FEEDER (BY UTILITY)
CHAIN LINK FENCE
SITE LIGHT POLES, TYP
SOURCE TRANSFER SWITCH #1 (ST1)
SUBSTATION CONCRETE PAD
TO SWITCH 1
TO SWITCH 18
7'-0" 7'-0" 7'-0"
7'-0" 7'-0" 7'-0"
CHAIN LINK GATE
NO SCALE
SUBSTATION NEW SUBSTATION ONE-LINE DIAGRAM2
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
EP601
N/A
MMMRA1/18/2024
SUBSTATION ONE-LINE DIAGRAM
NO SCALE
SUBSTATION DEMO SUBSTATION ONE-LINE DIAGRAM1
1. ISOLATE AND REMOVE EXISTING 5,000KVA, 34500-13800V, PAD MOUNT
TRANSFORMER. DISCONNECT TRANSFORMER AND RETAIN CONDUCTORS AND
CONNECTORS FOR RECONNECT. RETAIN EXISTING PAD.
2. PROVIDE REPLACEMENT 6,000KVA, 34500-13800V, PAD-MOUNT, TRANSFORMER.
MOUNT NEW TRANSFORMER TO EXISTING PAD. RECONNECT EXISTING
CONNECTORS RETAINED DURING DEMOLITION TO NEW TRANSFORMER
BUSHINGS.
3. THE Y-Y NEUTRALS ARE CONNECTED AND SHARE ONE GROUND.
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. PHASE DEMOLITION OF THE TRANSFORMERS SUCH THAT ONE SUBSTATION
TRANSFORMER ALWAYS REMAINS IN SERVICE DURING THE DURATION OF
CONSTRUCTION.
E. RETAIN ALL GROUNDING CONDUCTORS, EXCEPT AS EXPLICITLY INDICATED ON
THE DRAWINGS, FOR RECONNECTION TO GROUNDING TERMINALS ON THE NEW
EQUIPMENT AS INDICATED BY THE MANUFACTURER.
A REVISION A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
2.12.2026
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
A
ALTERNATE
FEEDER
T1
6000KVA
>6.5%Z 34500-13800V
T2
6000KVA
>6.5%Z 34500-13800V
PRIMARY /
PREFERRED
FEEDER
SG1
MAIN
SG2
MAIN 51/5051/50
CAPACITOR
BANK FILTER
SG1-ST2
MAIN
51/50 51/50
CAPACITOR
BANK FILTER
SG2-ST1
MAIN
51/5051/50
SG1
13800V
SG2
13800V
TO SWITCH S-18 TO SWITCH S-1
ST2
13800V
ST1
13800V
AUTO
THROWOVER
CONTROLS
AUTO
THROWOVER
CONTROLS
SG1-ST1
MAIN
SG2-ST2
MAIN
N.O.N.C.
M
SM-5-80E FUSED
SERVICE DISCONNECT
M
SM-5-80E FUSED
SERVICE DISCONNECT
A
000_MR_SG1
SEL SEL 351-6
000_MB_SG1
GE VB1-13.8-500
1200AF
A
000_MR_SG1
SEL SEL 351-6
000_MB_SG1
GE VB1-13.8-500
1200AF
A
000_MR_ST2 MAIN
SEL SEL 351-7
000_MB_ST2 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
A
000_SW_SG2-ST2000_SW_SG1-ST2
000_MR_ST2 MAIN (ALT)
SEL SEL 351-7
000_MB_ST2 MAIN (ALT)
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_MR_ST1 MAIN ALT
SEL SEL 351-7
000_MB_ST2 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_MR_ST1 MAIN
SEL SEL 351-7
000_MB_ST1 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_SW_SG1-ST1 000_SW_SG2-ST1
A
AA
ALTERNATE
FEEDER
SG1
MAIN
SG2
MAIN
PRIMARY /
PREFERRED
FEEDER
51/5051/50
CAPACITOR
BANK FILTER
SG1-ST2
MAIN
51/50 51/50
CAPACITOR
BANK FILTER
SG2-ST1
MAIN
51/5051/50
SG1
13800V
T1
5000KVA
6.6%Z 34500-13800V
T2
5000KVA
6.6%Z 34500-13800V
SG2
13800V
TO SWITCH S-18 TO SWITCH S-1
ST2
13800V
ST1
13800V
AUTO
THROWOVER
CONTROLS
AUTO
THROWOVER
CONTROLS
SG1-ST1
MAIN
SG2-ST2
MAIN
1 1
N.O.N.C.
000_MR_SG1
SEL SEL 351-6
000_MB_SG1
GE VB1-13.8-500
1200AF
A
000_MR_ST2 MAIN
SEL SEL 351-7
000_MB_ST2 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
A
000_SW_SG2-ST2
M
SM-5-80E FUSED
SERVICE DISCONNECT
M
SM-5-80E FUSED
SERVICE DISCONNECT
AA
000_MR_SG1
SEL SEL 351-6
000_MB_SG1
GE VB1-13.8-500
1200AF
A
000_SW_SG1-ST2
000_MR_ST2 MAIN (ALT)
SEL SEL 351-7
000_MB_ST2 MAIN (ALT)
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_MR_ST1 MAIN ALT
SEL SEL 351-7
000_MB_ST2 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_MR_ST1 MAIN
SEL SEL 351-7
000_MB_ST1 MAIN
EATON/CUTLER-HAMMER
150 VCP-W-1000
1200AF
000_SW_SG1-ST1 000_SW_SG2-ST1
A
AA
NO SCALE
POWER ONE-LINE DIAGRAM1
KEYNOTES
KEY PLAN
GENERAL NOTES
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
EP602
N/A
MMMRA1/18/2024
POWER ONE-LINE DIAGRAM
A. REFER TO SHEET E-001 FOR ELECTRICAL SYMBOLS, ABBREVIATIONS, AND
GENERAL NOTES.
B. COORDINATE WITH THE VHA COR A TIME FOR A POTENTIAL TEMPORARY OR
PARTIAL OUTAGE.
C. CONDUCTOR, CONNECTORS, PADS, AND OTHER ANCILLARIES REQUIRED FOR
COMPLETE TRANSFORMER INSTALLATION AND OPERATION THAT ARE
DAMAGED DURING DEMOLITION SHALL BE REPAIRED OR REPLACED AT NO
ADDITIONAL COST TO THE VHA.
D. RETAIN ALL GROUNDING CONDUCTORS, EXCEPT AS EXPLICITLY INDICATED ON
THE DRAWINGS, FOR RECONNECTION TO GROUNDING TERMINALS ON THE NEW
EQUIPMENT AS INDICATED BY THE MANUFACTURER.
E. TRANSFORMER IMPEDANCE VALUES SHALL BE AS CLOSE TO BUT NOT LESS
THAN INDICATED ON THE ONE-LINE.
1. REPLACE EXISTING TRANSFORMER IN KIND AS INDICATED ON THE ONE LINE
DIAGRAM. ISOLATE POWER TO THE TRANSFORMER FROM THE SWITCH
CABINET. MAINTAIN LOOP CONTINUITY AT ALL TIMES DURING DEMOLITION AND
CONSTRUCTION. REFER TO THE 'ED' AND 'ES' SERIES DRAWINGS FOR
ADDITIONAL INFORMATION ON TRANSFORMER DEMOLITION AND
REPLACEMENT.
2. REPLACE EXISTING TRANSFORMER WITH NEW TRANSFORMER AS INDICATED
ON THE ONE LINE DIAGRAM. ISOLATE POWER TO THE TRANSFORMER FROM
THE SWITCH CABINET. MAINTAIN LOOP CONTINUITY AT ALL TIMES DURING
DEMOLITION AND CONSTRUCTION. REFER TO THE 'ED' AND 'ES' SERIES
DRAWINGS FOR ADDITIONAL INFORMATION ON TRANSFORMER DEMOLITION
AND REPLACEMENT.
3. PROVIDE 2000A SECONDARY DISCONNECT INTEGRAL TO TRANSFORMER
COMPARTMENT. REFER TO SPEC 26 12 19
4. PROVIDE NEW 300KVA, 13800-480/277V RADIAL, PAD MOUNT TRANSFORMER.
PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD AS INDICATED ON
THE DRAWINGS AND PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INTERCEPT AND EXTEND CONDUCTORS INTO OPENING / COMPARTMENT AS
REQUIRED FOR NEW PAD CONFIGURATION. MOUNT TRANSFORMER TO NEW
PAD. RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
5. PROVIDE NEW 750KVA, 13800-208/120V RADIAL, PAD MOUNT TRANSFORMER.
PROVIDE AND ORIENT NEW PRECAST TRANSFORMER PAD AS INDICATED ON
THE DRAWINGS AND PER THE MANUFACTURER'S INSTALLATION INSTRUCTIONS.
INTERCEPT AND EXTEND CONDUCTORS OPENING / COMPARTMENT AS
REQUIRED FOR NEW PAD CONFIGURATION. MOUNT TRANSFORMER TO NEW
PAD. RECONNECT EXISTING CONNECTORS RETAINED DURING DEMOLITION TO
NEW TRANSFORMER BUSHINGS. REFER TO DETAIL SHEET EK501 FOR
ADDITIONAL INFORMATION.
6. THE Y-Y NEUTRALS ARE CONNECTED AND SHARE ONE GROUND.
112111
1 1
1 1 1
A
A
A
A
A
A
A REVISION A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
AAA
A A
A
AA
A REVISION A 2.12.2026
6 6 6 6
6 6
6 6
TF-94
30 kVA
3.21 %Z 13800-208/120 V
BUILDING 94
TF-10
75 kVA
1.6 %Z 13800-240/120 V
BUILDING 10 AND 11
TF-9
300 kVA
5.5 %Z 13800-208/120 V
BUILDING 9
T-111 500 kVA
4.94 %Z 13800-208/120 V
BUILDING 111
T-115 300 kVA
4.5 %Z 13800-480/277 V
BUILDING 115
TF-28
750 kVA
5.75 %Z 13800-208/120 V
BUILDING 28
TF-2A
225 kVA
5.51 %Z 13800-480/277 V
BUILDING 28
TF-2
150 kVA
4.2 %Z 13800-208/120 V
BUILDING 28
TF-1
750 kVA
5.96 %Z 13800-208/120 V
BUILDING 1
MSB-1
TF-1C
500 kVA
5.3 %Z 13800-208/120 V
BUILDING 1
CHILLER
TF-1B
750 kVA
5.75 %Z 13800-480/277 V
BUILDING 1
MRI
TF-1A
500 kVA
6.81 %Z 13800-208/120 V
BUILDING 1A
TF-3
300 kVA
4.2 %Z 13800-208/120 V
BUILDING 3
TF-116
1000 kVA
5.75 %Z 13800-480/277 V
BUILDING 116
TF-114
750 kVA
5.75 %Z 13800-480/277 V
BUILDING 114 BUILDING 96
TF-51A
500 kVA
5.5 %Z 13800-208/120 V
BUILDING 51
TF-51B
750 kVA
5.73 %Z 13800-480/277 V
BUILDING 51
TF-50
750 kVA
7.47 %Z 13800-208/120 V
BUILDING 50
TF-49
750 kVA
5.75 %Z 13800-480/277 V
BUILDING 49
TF-48
500 kVA
5.1 %Z 13800-208/120 V
BUILDING 48
TF-48A
750 kVA
5.59 %Z 13800-480/277 V
BUILDING 48
TF-29
500 kVA
4.49 %Z 13800-208/120 V
BUILDING 29
TF-95
225 kVA
4.4991 %Z 13800-208/120 V
BUILDING 95
TF-88
75 kVA
4.08 %Z 13800-208/120 V
BUILDING 88
TF-4
500 kVA
5.41 %Z 13800-208/120 V
BUILDING 4
TF-5
150 kVA
4.2 %Z 13800-208/120 V
BUILDING 5
TF-4B
750 kVA
5.0 %Z 13800-480/277 V
BUILDING 4
TF-4A
750 kVA
5.0 %Z 13800-480/277 V
BUILDING 4
TF-7
500 kVA
5.3 %Z 13800-208/120 V
BUILDING 7
TF-59
300 kVA
4.09 %Z 13800-480/277 V
BUILDING 59
TF-8
150 kVA
4.2 %Z 13800-208/120 V
BUILDING 8
TF-118
750 kVA
5.0 %Z 13800-480/277 V
BUILDING 118
TF-57
112.5 kVA
4.9 %Z 13800-208/120 V
BUILDING 57
TF-96
75 kVA
3.2 %Z 13800-208/120 V
TO SUBSTATION
ST2
TO SUBSTATION
ST1
10A 60A 20A 35A 20A 15A
60A 80A 60A
25A 20A 80A 60A
20A 15A 6A
A A A A A
A
A A A
A A
Deduct: Alternate 1 - Base bid less all work associated with Transformer TF-50
EK501
MMMRA1/18/2024
ELECTRICAL DETAILS
Drawing Title
VA FORM 08 - 6231
F
CONSULTANTS:
Date:Revisions:
10987654321
10987654321
E
D
C
B
A
F
E
D
C
B
A
ARCHITECT/ENGINEERS: STAMP:
Approved: Project Director
Phase Project Title
Location
Issue Date Checked Drawn
Project Number
Drawing Number
Building Number
Number:
CONDUCT ELECTRICAL
SUBSTATION UPGRADE
VAHCS 4801 VETERANS DRIVE, ST CLOUD, MN 56303
656-22-341
VEG 23.09
CONSTRUCTION
DOCUMENTS
750 W HAMPDEN AVE
SUITE 300
ENGLEWOOD, CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
NO SCALE
TYPICAL PADMOUNT TRANSFORMER9
NO SCALE
UD PRIMARY CABLE
METALLIC TAPE SHIELD CABLE7 NO SCALE
ACCESSORIES FOR USE
WITH 15kV LOADBREAK FITTINGS8
NO SCALE
TYPICAL 13800V PRIMARY PAD-MOUNTED TRANSFORMER3NO SCALE
TYPICAL 13800V PRIMARY PAD-MOUNTED TRANSFORMER INSTALL1 NO SCALE
200 AMP LOADBREAK CABLE
TERMINATOR/APPARATUS CONNECTOR2
NO SCALE
PIPE BOLLARD - REMOVEABLE4 NO SCALE
DUCTBANK - TRENCH CUT6NO SCALE
PIPE BOLLARD - STANDARD5
A
A
A REVISION A
REVISION A WAS COMPLETED UNDER
THE SUPERVISION OF TIMOTHY JAMES
MUECK.
2.12.2026
A
REVISION STAMP
A
Professional Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the state of Minnesota.
Signature:
Typed or Printed Name: TIMOTHY JAMES MUECK
Date: License Number: 625032.12.2026
A
NOTE:
1. MINIMUM BENDING RADIUS IS 12 TIMES CABLE OUTSIDE DIAMETER.
UNCOATED CONDUCTOR
EXTRUDED SEMICONDUCTING EPR
STRAND SCREEN
EPR INSULATION
EXTRUDED SEMICONDUCTING EPR
INSULATION SCREEN
COPPER TAPE SHIELD
JACKET
HORIZONTAL TYPE
VERTICAL TYPE
GROUND CONNECTOR
SELECT EITHER VERTICAL OR HORIZONTAL TYPE TO BEST FIT EACH APPLICATION.
6' FLEX. CU CABLE
GROUNDING ELBOW (BRIGHT YELLOW COLOR)
DEADEND RECEPTACLE
WITH GROUND LEAD
NOTE:
1. SEE SPECIFICATIONS FOR MATERIAL COLORS AND MANNER OF INSTALLATION.
8.3/15KV PORTABLE FEED THRU OR GROUNDING DEVICE
6'
MI
N
6' MIN
CONNECT TO TRANSFORMER ENCLOSURE GROUND LUGS
CONNECT TO NEUTRAL
PRI…