Attachment Bd.pdf.crdownload
CRDOWNLOAD file 9 MB Posted
- Attached to
- RFQ - Commissioning FMS#1 - Saco
- Solicitation number
- RFQ - 15A - 24051400000000000283
- Issued by
- Maine
About this file
This document is an attachment to a Request for Quote (RFQ) issued by the State of Maine's Department of Defense, Veterans and Emergency Management Military Bureau for commissioning services for a National Guard Vehicle Maintenance Shop in Saco, Maine. The project involves the design, construction, and commissioning of the facility, with the work described in the drawings and specifications provided. The RFQ number is 15A, and the DFE Project Number is 231025-Cx. The services requested include fire alarm riser diagram reviews, mass notification system coordination, and integration with the building automation control system.
The pricing and funding details are not provided in this attachment. However, the document indicates that the project is for the construction of a new National Guard vehicle maintenance facility, with the work to be completed in accordance with the issued construction drawings and specifications.
Text of this file
ATTACHMENT Bd
STATE OF MAINE
DEPARTMENT OF DEFENSE, VETERANS AND EMERGENCY MANAGEMENT
MILITARY BUREAU
RFQ # 15A 240514*0283
National Guard Vehicle Maintenance Shop Commissioning Services – Saco, Maine
DFE Project No. 231025-Cx
Issued for Construction Drawings
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
F:
(2
) 7
-4 w w
.w sp
.c om
A
B
C
D
E
-9
-2
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-9 -2
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
FI
R
E
AL
AR
M
R
IS
ER
D
IA
G
R
AM
FA601
R D
J / B
H G
B A
L
M S
D
A S
N O
TE
D
NOTE
KEYED NOTES
1. SEE SHEET FA001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
NOT TO SCALEA4 FIRE ALARM RISER DIAGRAM
FACP/MASS
NOTIFICATION
SYSTEM
F
TS
(TYP.)
FS
(TYP.)
PS
(TYP.)
F
(TYP.)
S
(TYP.)
S
(TYP.)
INITIATION
CIRCUIT
(TYP.)
FIRE PUMP
CONTROL
PANEL
FAA
LOC
1 2
NOTIFICATION
CIRCUIT(S)
RTI
1. PROVIDE REMOTE CONTROL OUTPUT SIGNAL FOR CONTACT
CLOSURE CONTROL OF EXTERNAL EQUIPMENT IN THE EVENT OF A
MASS NOTIFICATION MESSAGE BROADCAST OR FIRE ALARM SYSTEM
ALERT.
2. PROVIDE CONNECTION TO PUBLIC ADDRESS SYSTEM REMOTE MUTE
INPUT FOR MASS NOTIFICATION AND FIRE ALARM SYSTEM OVERRIDE
DURING ALERT CONDITIONS. PA HEADEND EQUIPMENT IS LOCATED
IN COMMON IT 133 .
3. DEVICE LOCATED AT WATER TANK. SEE CIVIL DRAWINGS FOR WATER
TANK LOCATION.
4. SEE MECHANICAL SHEETS FOR COORDINATION OF CARBON
MONOXIDE DETECTOR LOCATIONS.
B
120V
DEDICATED PHONE LINES AS REQUIRED
MM
FIRE
PUMP
RUNNING
(TYP.)
MM
HIGH/LOW
NITROGEN
GENERATOR
MM
WATER TANK
TEMPERATURE
>40°F
MM
WATER TANK
OFF NORMAL
DROP 4"
MM
WATER TANK
LOW LEVEL
DROP 12"
MM
WATER TANK
OFF NORMAL
TANK OVERFLOW
(TYP.)
3 3 3 3
CONNECTION TO BUILDING AUTOMATION CONTROL SYSTEM
MM
WATER TANK
TEMPERATURE
<40°F
FD
CONNECTION TO ACCESS CONTROL PANEL, ROOM 133
CONNECTION TO CARD READER SYSTEM, ROOM 133
(TYP)
CO
MM
CATHODIC
PROTECTION
RECTIFIER
(IF REQUIRED)
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
FI
R
E
PR
O
TE
C
TI
O N
L
EG
EN
D
AB
BR
EV
IA
TI
O
N S, A N
D G
EN
ER
AL
N
O
TE
S
FP001
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
EL ELEVATION
FAMNS FIRE ALARM MASS NOTIFICATION SYSTEM
FDC FIRE DEPARTMENT CONNECTION
FF FINISHED FLOOR
FM FACTORY MUTUAL GLOBAL
FMCP FIRE ALARM MASS NOTIFICATION CONTROL PANEL
GPM GALLONS PER MINUTE
HYDT HYDRANT
MWC MAINE WATER COMPANY
N.C. NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
O.S.&Y. OUTSIDE SCREW AND YOKE VALVE
PSI POUNDS PER SQUARE INCH
SQ. FT. SQUARE FEET
TS VALVE WITH TAMPER SWITCH
UP/DN PIERCES FLOOR
UL UNDERWRITERS LABORATORIES
UP/DN
CHECK VALVE
VALVE WITH TAMPER SWITCH
OUTSIDE SCREW AND YOKE VALVE
STANDARD DRY SIDEWALL SPRINKLER
SIDEWALL SPRINKLER
UPRIGHT SPRINKLER
TS
O.S.& Y.
UP/DOWN
RISE/DROP
LINE BREAK
PIPE SLOPE DIRECTION
FLUSHING CONNECTION
TEE TURN DOWN
TEE TURN UP
ELBOW TURN DOWN
PIPE TURN UP/PIPE RISE
ALARM CHECK VALVE
DRY PENDENT SPRINKLER
N.C.
O.S.& Y.
POST INDICATOR VALVE
M
SPRINKLER HEAD WITH GUARD
NON SPRINKLERED SPACE
D
FIRE PROTECTION PIPING SYMBOLS
RPZ DETECTOR ASSEMBLYD
WALL POST INDICATOR VALVE
WATER METER
NS
OUTSIDE SCREW AND YOKE NORMALLY CLOSED VALVE
DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY
RPZ BACKFLOW PREVENTION ASSEMBLY
WET PIPE SPRINKLER RISER - AUTO ACTUATED
SIAMESE FIRE DEPARTMENT CONNECTION
BACKFLOW PREVENTER FLOW TEST CONNECTION
(SYMBOLIC ONLY. REFER TO SHEET FP-501 FOR REQUIRED
NUMBER OF HOSE CONNECTIONS)
PIERCES FLOOR
RISE/DROP WITHIN STORY HEIGHT
PENDENT SPRINKLER
BUTTERFLY VALVE
ABBREVIATIONSGENERAL SYMBOLS
DRY PIPE SPRINKLER RISER - AUTO ACTUATED
STORZ FIRE DEPARTMENT CONNECTION
AHU-XX
(XXX)
C5 M-501
X
DETAIL NUMBER
DRAWING WHERE DETAIL IS DRAWN
SYMBOL PER ABBREVIATION LIST
EQUIPMENT SEQUENCE NUMBER
NOTES
KEYED NOTE
GPM
LIMIT OF DEMOLITION
CONNECT TO EXISTING
1. GENERAL NOTES, ABBREVIATIONS AND SYMBOLS APPLY TO FIRE PROTECTION
DRAWINGS. HOWEVER, ALL ABBREVIATIONS AND SYMBOLS MAY NOT BE APPLICABLE
TO THIS PARTICULAR PROJECT. THEY ARE PROVIDED FOR GENERAL REFERENCE ONLY.
2. INSTALLATION OF SPRINKLER SYSTEMS SHALL COMPLY WITH PROJECT SPECIFICATIONS, UFC 3-600-01,NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS ADOPTED BY THE MAINE STATE RULES OF
THE STATE FIRE MARSHAL CHAPTER 4 AND ALL APPLICABLE CODES AND STANDARDS.
3. WATER SUPPLY.REFER TO SPECIFICATION SECTION 21 13 13
4. INSTALLING CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND LICENSES.
5. DESIGN AND INSTALLATION SUBJECT TO FINAL INSPECTION AND APPROVAL BY OWNER'S
REPRESENTATIVE.
6. SPRINKLER CONTRACTOR SHALL BE RESPONSIBLE FOR THE FINAL PIPING LAYOUT
CALCULATIONS FOR THE FIRE SPRINKLER SYSTEMS.
7. CUTTING OF STRUCTURAL AND/OR ARCHITECTURAL MEMBERS SHALL BE DONE ONLY WITH THE
WRITTEN APPROVAL OF THE ARCHITECT OR STRUCTURAL ENGINEER.
8. FIRESTOP ALL PENETRATIONS OF SMOKE/FIRE WALLS, RATED WALLS, CEILINGS OR FLOORS, ETC.
9. SPRINKLER LOCATIONS SHALL BE COORDINATED WITH ALL HVAC DIFFUSERS, LIGHTING
FIXTURES, AND CEILING SYSTEMS.
10. PROVIDE SPARE SPRINKLERS IN ACCORDANCE WITH NFPA 13.
11. METHOD OF HANGING AND SUPPORTING EQUIPMENT, PIPES, HEADERS, AND BRANCH LINES
SHALL BE IN ACCORDANCE WITH NPFA 13. HANGERS SHALL BE OF A TYPE APROVED FOR USE
WITH THE PIPE INVOLVED.
12. SPRINKLER PIPING REQUIRES BRACING FOR SEISMIC PROTECTION.
13. AUTOMATIC SPRINKLER ORIFICE SIZE SHALL BE AS SHOWN ON DRAWINGS.
14. AUTOMATIC SPRINKLER TEMPERATURE RATINGS OF FUSIBLE ELEMENTS SHALL BE IN
ACCORDANCE WITH NFPA 13 AND AS SHOWN ON DRAWINGS.
15. ALL VALVES AND EQUIPMENT FOR FIRE SERVICE SHALL BE LISTED BY THE UNDERWRITER'S LABORATORIES, INC, AND/OR FACTORY MUTUAL. VALVES SHALL BE MARKED “UL” AND/OR “FM”, WITH A MINIMUM 175 PSI WORKING PRESSURE.
16. ALL VALVES ON THE FIRE PROTECTION SYSTEM SHALL BE ELECTRICALLY SUPERVISED BY THE
FIRE ALARM SYSTEM AND SHALL BE THE RESPONSIBILITY OF THE FIRE SPRINKLER
CONTRACTOR.
17. PROVIDE A PERMANENTLY ATTACHED HYDRAULIC NAME PLATE STATING THE REQUIRED
DESIGN CRITERIA FOR EACH HYDRAULICALLY DESIGNED SYSTEM IN ACCORDANCE WITH
NFPA 13.
18. ONLY NEW MATERIALS SHALL BE USED IN THE INSTALLATION OF THESE SYSTEMS.
19. ALL FIRE SPRINKLERS MOUNTED IN CEILINGS SHALL BE LOCATED A MINIMUM OF 4 INCHES
AWAY FROM WALLS, CEILING HEIGHT CHANGES, OR OTHER VERTICAL INTERSECTING
SURFACES.
20. ALL BRACING SHALL BE ATTACHED TO THE BUILDINGS STRUCTURAL FRAME IN ACCORDANCE
WITH NFPA 13.
21. INSTALL EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
22. INSTALL PRESSURE GAUGES ON THE SPRINKLER RISERS ABOVE AND BELOW THE ALARM /
CHECK VALVES. PROVIDE GAUGE WITH CONNECTION NOT LESS THAN ¼ INCH AND HAVING A
SOFT METAL SEATED GLOBE VALVE.
23. ROD STIFFENER REQUIRED FOR ALL-THREAD ROD HANGERS OVER 6'-0” IN LENGTH.
24. INSTALL UNIONS IN PIPES 2” AND SMALLER, ADJACENT TO EACH VALVE. UNIONS ARE NOT
REQUIRED ON FLANGED DEVICES OR IN PIPING INSTALLATIONS USING GROOVED MECHANICAL
COUPLINGS.
25. PROVIDE SPRINKLER GUARDS WHERE REQUIRED PER SPECIFICATION SECTION 21 13 13 AND
WHERE SHOWN ON THE DRAWINGS.
26. INSTALL A DRY PIPE SPRINKLER NITROGEN INERTING CORROSION MITIGATION SYSTEM IN
ACCORDANCE WITH SECTION 21 13 16.
27. INSTALL SPRINKLER GUARDS AND DRIP TRAYS IN IT ROOMS WHERE INDICATED ON THE
DRAWINGS.
FIRE PROTECTION GENERAL NOTES:
TS
CONTROLLEDWASTEHANDLING116
M
AT
C H
L
IN
E
SE
E A1
/F P0
BULK POLSTORAGE115
FLAMMABLEMATERIALSSTORAGE118
TELECOM/IT
MECH/ELEC112 BULKYEQUIPMENTSTORAGE111
ENCLOSEDUNHEATEDSTORAGE114
WORK BAY108
WORK BAY107
WORK BAY106
SAFETYWALKWAY
PRODUCTION
CONTROLLER
SUPERVISOR
INSPECTION
ARNG
CORRIDOR
LATRINE
TOOL
ROOM
SUPPLY
OFFICE
SUPPLY
BATTERYROOM
WASHPAD
ARNGCORRIDOR196
BULK POLLUBE SYS115A
NS
M
AT
C
H L
IN
E
SE
E
C 1/
FP
WORK BAY106
SAFETYWALKWAY
WORK BAY
WORK BAY
WORK BAY
POWER PRO
WORK BAY
PRODUCTION
CONTROLLER
SUPERVISOR
INSPECTION
& LIBRARY
ADMIN
ASSISTANT
BREAK
ROOM
MAIN
ENTRANCE
CLASSROOM
ARNG
CORRIDOR
LATRINE
TOOL
ROOM
SPRINKLER
SUPPLY
OFFICE
JANITORIAL
TOOL
ROOM
120A
SUPPLY
ROOM
122A
SUPPLY
ROOM
SECONDARY
ENTRANCE
MECH/
ELEC
ARNG
RACKS
132A
ANG
RACKS
132B
TELECOM/
IT
ANG
CORRIDOR
RECYCLING
STORAGE
149A
243RD
OPEN
OFFICE
265TH
OPEN
OFFICE
PHYSICAL
FITNESS
FEMALE
LOCKER
129A
MALE
VESTIBULE
192MALE
LOCKER
128A
MALE
LATRINE
FEMALE
LATRINE
WASHER/
DRYER
MALE
SHOWER
128B
JANITORIAL
SHARED
CORRIDOR
PPE
STORAGE
COMMON
IT
MECH/
ELEC
BULK POL
STORAGE
RESTROOM
ANG
CORRIDOR
TELECOM/
IT
JAN
TOOL ROOM,
WHEEL &
TIRE SHOP
FEMALE
SHOWER
129B
CLOSET
150A
RESTROOM
HVAC
WORK BAY
POWER
PRO/HVAC
TOOL ROOM
POWER
PRO/HVAC
OFFICE
SAFETY
WALKWAY
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
FI
R
ST
L
EV
EL
H
AZ
AR
D
C
LA
SS
IF
IC
AT
IO
N
P
LA
N
FP011
R D
J
S
TR
M S
D
A S
N O
TE
D
NOTES
1. SEE SHEET FP001 FOR LEGEND ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W. UFC 3-600-01 AND NFPA 13,
UNLESS OTHERWISE NOTED.
3. SPRINKLERS NOT REQUIRED ABOVE NONCOMBUSTIBLE DROPPED CEILINGS WITH
CONCEALED SPACES OF NONCOMBUSTIBLE CONSTRUCTION AND CONTENT.
4. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK AND EQUIPMENT OVER 4
FEET WIDE.
KEYED NOTES
1. SEE DETAIL A3 ON SHEET FP401.
2. CONCRETE PAD ONLY. NO SPRINKLERS FOR THIS CONTRACT IN WASH BAY AREA.
3. IF ABI 15 IS ACCEPTED, KEYED NOTE 2 AND THE NS SYMBOL WILL BE DELETED
AND SPRINKLERS WILL BE INSTALLED AS SHOWN BY ABI 15 ON THE C1 HAZARD
CLASSIFICATION PLAN.
1/16" = 1' - 0" 0 8' 16' 32'A1 FIRST LEVEL HAZARD CLASSIFICATION PLAN
PLAN
NORTH
LEGEND
SPRINKLER HAZARD CLASSIFICATION: LIGHT HAZARD
WET PIPE SYSTEM
DENSITY: 0.10 GPM/SF
AREA: 1500 SF
EXTERIOR HOSE ALLOWANCE: 250 GPM
MAX. COVERAGE PER SPRINKLER: 225 SF
SPRINKLER TYPE: QUICK RESPONSE
K FACTOR: = 5.6
SPRINKLER HAZARD CLASSIFICATION: ORDINARY HAZARD
WET PIPE SYSTEM
DENSITY: 0.20 GPM/SF
AREA: 2500 SF
AREA: 3250 SF WHEN ROOF SLOPE EXCEEDS 2:12
EXTERIOR HOSE ALLOWANCE: 250 GPM
MAX. COVERAGE PER SPRINKLER: 130 SF
SPRINKLER TYPE: QUICK RESPONSE
K FACTOR: = 8.0
SPRINKLER HAZARD CLASSIFICATION: EXTRA HAZARD 1 - 12 FT
MAX HT CLASS IV STG
DRY PIPE SYSTEM
DENSITY: 0.30 GPM/SF
AREA: 3500 SF (1,350 SF CUT-OFF ROOM)
EXTERIOR HOSE ALLOWANCE: 500 GPM
MAX. COVERAGE PER SPRINKLER: 100 SF
SPRINKLER TYPE: STANDARD RESPONSE
K FACTOR: = 11.2
SPRINKLER HAZARD CLASSIFICATION: POL SYSTEM AND
STORAGE AND CONTROLLED WASTE HANDLING AREAS
WET PIPE SYSTEM
DENSITY: 0.60 GPM/SF [POL QUANTITY IS > 660 GAL]
AREA: CUT-OFF ROOM AREA
EXTERIOR HOSE ALLOWANCE: 500 GPM
MAX. COVERAGE PER SPRINKLER: 100 SF
SPRINKLER TYPE: STANDARD RESPONSE
K FACTOR: = 11.2
SPRINKLER HAZARD CLASSIFICATION: FLAMMABLE MATERIALS
STORAGE AREA
WET PIPE SYSTEM
DENSITY: 0.30 GPM/SF
AREA: CONTROL ROOM AREA
EXTERIOR HOSE ALLOWANCE: 500 GPM
MAX. COVERAGE PER SPRINKLER: 100 SF OR AS LISTED
SPRINKLER TYPE: STANDARD RESPONSE
K FACTOR: = 11.2
1/16" = 1' - 0" 0 8' 16' 32'C1 FIRST LEVEL HAZARD CLASSIFICATION PLAN
PLAN
NORTH
NOTE: THE ABOVE HOSE EXTERIOR HOSE ALLOWANCES ARE ALL TAKEN FROM THE
PUBLIC SUPPLY AND NOT THE FIRE PUMP/TANK SUPPLY.
ALTERNATE BID ITEMS
SEE SHEET G-004 FOR ALTERNATE BID ITEM DESCRIPTIONS
15. WASH PAD ENCLOSURE
W O
T1
W O
T2
CT1
C T2
FSC FSC
FS
C
P P
PP
P P
P
O O
O O O O
A A
A
WBH W
T
WR2
WR1HP1
SBC
P1
PLF PLF
PLF PLF
TRM1 PWS1PWS2
PLF
PLF
AC
MW1
GLB
FSC FSC
B1 B2
B3
FS
C
O
O O O O
A
P P
D
1 1.3 1.7 2.0 2.4 2.5
B
B.5
C
2.6
32.3
B.3
1.9
NS
WASH
PAD
BULK POL
STORAGE
CONTROLLED
WASTE
HANDLING
FLAMMABLE
MATERIALS
STORAGE
TELECOM/
IT
ARNG
CORRIDOR
MECH/ELEC
BULKY
EQUIPMENT
STORAGE
BATTERY
ROOM
ENCLOSED
UNHEATED
STORAGE
MATCH LI
NE
SEE A1/F
P10
MATCH LINE
SEE A1/FP102
B1
FP501
B1
FP501
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
A F
IR
ST
L
EV
EL
FI
R E
PR
O
TE
C
TI
O
N P
LA
N
FP101
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
NOTES
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W THE PROJECT
SPECIFICATIONS, UFC 3-600-01, NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS
ADOPTED BY THE MAINE STATE RULES OF THE STATE FIRE MARSHAL
CHAPTER 4, UNLESS OTHERWISE NOTED.
3. SPRINKLERS NOT REQUIRED ABOVE NONCOMBUSTIBLE DROPPED
CEILINGS/ACOUSTICAL CONCEALED SPACES OF NONCOMBUSTIBLE
CONSTRUCTION AND CONTENT.
4. WHERE POSSIBLE CONCEAL SPRINKLER PIPING ABOVE DROPPED CEILINGS.
5. LOCATE SPRINKLER PIPING AWAY FROM ELECTRICAL PANELS I.A.W NFPA
70. INSTALL DRIP PANS WHERE INSTALLING PIPING WITHIN DEDICATED
EQUIPMENT SPACE IS UNAVOIDABLE.
6. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK & EQUIPMENT OVER
4 FEET IN WIDTH.
7. INSTALL GUARDS ON SPRINKLERS THAT ARE 7 FEET OR LESS ABOVE FF OR
ARE OTHERWISE SUSCEPTIBLE TO MECHANICAL DAMAGE.
8. SPRINKLER PIPING TO BE LOCATED AND SIZED PER CONTRACTOR'S SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. INSTALL SPRINKLERS PER
DESIGN PARAMETERS ON SHEET FP501.
KEYED NOTES
1. ONLY A FLOOR SLAB FOR WASH PAD PROVIDED FOR THIS CONSTRUCTION
PHASE. SPRINKLERS NOT INSTALLED IN THIS BAY UNDER THIS CONTRACT.
CONTRACTOR'S HYDRAULIC CALCULATIONS SHALL DEMONSTRATE THAT THE
FUTURE WASH PAD AND FUTURE APPROXIMATE 45-FT WIDE WARMUP BAY ON
WEST SIDE OF WASH PAD (NOT SHOWN) CAN BE ADEQUATELY PROTECTED
MEETING THE FIRE SUPPRESSION SYSTEM CRITERIA ON SHEET FP501 BY
EXTENDING A FUTURE CROSS MAIN / FEED MAIN INTO THIS AREA.
2. IN IT AREAS WHERE SPRINKLERS AND PIPING ARE EXPOSED, INSTALL
SPRINKLERS WITH HEAD GUARDS/CAGES.
3. PROVIDE TELECOM / IT ROOM WITH SEPARATE SUPERVISED SPRINKLER ZONE
CONTROL VALVE ASSEMBLY WHICH INCLUDES THE CONTROL VALVE, CHECK
VALVE, WATER FLOW SWITCH AND INSPECTOR'S TEST CONNECTION. LOCATE
ZONE CONTROL VALVE OUTSIDE THE ROOM IN A LOCATION ACCESSIBLE TO
EMERGENCY RESPONDERS. TEST CONNECTION SHALL BE AN APPROVED
RECIRCULATING PUMP FLOW SWITCH (SEE TECHNICAL SPECIFICATIONS).
4. INSTALL INSPECTOR'S TEST CONNECTION NEAR THE REMOTE END OF THE
SPRINKLER SYSTEM. INSTALL WITH CONCRETE SPLASH BLOCK TO PREVENT
EROSION WHERE DISCHARGE IS AT UNPAVED SURFACE. CAN BE LOCATED TO
DISCHARGE ON WASH PAD SLAB. TO BE LATER RELOCATED TO REMOTE END
OF SYSTEM WHEN SPRINKLER SYSTEM IS EXTENDED INTO FUTURE WASH
PAD ENCLOSURE. LOCATE THE TEST VALVE APPROXIMATELY 7 FEET ABOVE
FF. LOCATE THE DISCHARGE ORIFICE NO GREATER THAN 2 FEET ABOVE
FINISHED GRADE.
5. CAP OR PLUG END OF CROSSMAIN / FEEDMAIN WITHIN AREA A BUILDING FOR
FUTURE EXTENSION INTO THE FUTURE WASH PAD ENCLOSURE AND WARMUP
BAY (WARMUP BAY NOT SHOWN).
6. PROTECT THE ENCLOSED UNHEATED STORAGE (ROOM 114) WITH A DRY PIPE
SYSTEM. ALL OTHER BUILDING AREAS ARE PROTECTED WITH WET PIPE
SYSTEMS.
7. INSTALL INSPECTOR'S TEST CONNECTION AT THE REMOTE END OF THE DRY
PIPE SPRINKLER SYSTEM IN THE ENCLOSED UNHEATED STORAGE AREA. TO
MINIMIZE CONDENSATION OF WATER IN THE DROP TO THE TEST
CONNECTION, PROVIDE A NIPPLE-UP OFF OF THE BRANCH LINE. PROVIDE
WITH REMOVEABLE UNIONED SECTION OF PIPE BETWEEN THE TEST VALVE
AND DISCHARGE PIPE TO BE INSTALLED ONLY DURING TESTING. INSTALL
WITH CONCRETE SPLASH BLOCK TO PREVENT EROSION WHERE DISCHARGE
IS AT UNPAVED SURFACE. LOCATE THE TEST VALVE APPROXIMATELY 7 FEET
ABOVE FF. LOCATE THE DISCHARGE ORIFICE NO GREATER THAN 2 FEET
ABOVE FINISHED GRADE. REFER TO NFPA 13 SECTION 16.14.2 AND
SPECIFICATION SECTION 211316.
8. IF ABI 15 IS ACCEPTED, KEYED NOTE 1 WILL BE MODIFIED, THE NS SYMBOL
WILL BE DELETED AND SPRINKLERS WILL BE INSTALLED WITHIN THE WASH
PAD ENCLOSURE.
9. IF ABI 15 IS ACCEPTED, KEYED NOTE 4 WILL BE MODIFIED AND SHOWN AT
KEYED NOTE 9 LOCATION.
10. IF ABI 15 IS ACCEPTED, KEYED NOTE 5 WILL BE MODIFIED AND SHOWN AT
KEYED NOTE 10 LOCATION TO STATE TO CAP OR PLUG END OF CROSSMAIN /
FEEDMAIN FOR FUTURE EXTENSION INTO THE FUTURE WARMUP BAY
(WARMUP BAY NOT SHOWN).
11. IF ABI 15 IS ACCEPTED, KEYED NOTE 11 WILL BE ADDED TO PROVIDE SEISMIC
SEPARATION ASSEMBLY OR LISTED FLEXIBLE PIPING ON ALL SPRINKLER
FEEDMAINS / CROSSMAINS WHICH CROSS AT THE BUILDING SEISMIC
SEPARATION JOINT LOCATED AT THE COLUMN LINE 1.9/2.0.
PLAN
NORTH
1/8" = 1' - 0" 4' 16'0 8'A1 AREA A FIRST LEVEL FIRE PROTECTION PLAN
ALTERNATE BID ITEMS
B
C
D
B.5
3 4 5 6 7 8 9 10
C.4
B.9
B.3
WORK BAY
WORK BAY
WORK BAY
MATCH LINE
SEE A1/FP101
MATCH LI
NE
SEE A1/F
P10
MATCH LI
NE
SEE A1/F
P10
MATCH LINE
SEE A1/FP103
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
B F
IR
ST
L
EV
EL
FI
R E
PR
O
TE
C
TI
O
N P
LA
N
FP102
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
NOTES
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W THE PROJECT
SPECIFICATIONS, UFC 3-600-01, NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS
ADOPTED BY THE MAINE STATE RULES OF THE STATE FIRE MARSHAL
CHAPTER 4, UNLESS OTHERWISE NOTED.
3. LOCATE SPRINKLER PIPING AWAY FROM ELECTRICAL PANELS I.A.W NFPA 70.
INSTALL DRIP PANS WHERE INSTALLING PIPING WITHIN DEDICATED
EQUIPMENT SPACE IS UNAVOIDABLE.
4. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK & EQUIPMENT OVER
4 FEET IN WIDTH.
5. INSTALL GUARDS ON SPRINKLERS THAT ARE 7 FEET OR LESS ABOVE FF OR
ARE OTHERWISE SUSCEPTIBLE TO MECHANICAL DAMAGE.
6. SPRINKLER PIPING TO BE LOCATED AND SIZED PER CONTRACTOR'S SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. INSTALL SPRINKLERS PER
DESIGN PARAMETERS ON SHEET FP501.
KEYED NOTE
PLAN
NORTH
1/8" = 1' - 0" 4' 16'0 8'A1 AREA B FIRST LEVEL FIRE PROTECTION PLAN
1. PROVIDE SEISMIC SEPARATION ASSEMBLY OR LISTED FLEXIBLE PIPING
ON ALL SPRINKLER FEED MAINS / CROSS MAINS WHICH CROSS AT THE
BUILDING SEISMIC SEPARATION JOINT LOCATED AT COLUMN LINES 10/11.
PRODUCTION
CONTROLLER
SUPERVISOR
INSPECTION
& LIBRARY
ADMIN
ASSISTANT
BREAK
ROOM
MAIN
ENTRANCE
CLASSROOM
ARNG
CORRIDOR
LATRINE
TOOL
ROOM
SPRINKLER
SUPPLY
OFFICE
JANITORIAL
TOOL
ROOM
120A
SUPPLY
ROOM
122A
SUPPLY
ROOM
SECONDARY
ENTRANCE
MECH/
ELEC
ARNG
RACKS
132A
ANG
RACKS
132B
TELECOM/IT
ANG
CORRIDOR
RECYCLING
STORAGE
149A 243RD
OPEN
OFFICE
265TH
OPEN
OFFICE
PHYSICAL
FITNESS
FEMALE
LOCKER
129A
MALE
VESTIBULE
MALE
LOCKER
128A
MALE
LATRINE
FEMALE
LATRINE
WASHER/
DRYER
MALE
SHOWER
128B
JANITORIAL
SHARED
CORRIDOR
PPE
STORAGE
COMMON
IT
FEMALE
SHOWER
129B
CLOSET
150A
T T
T
T
10.9
14 15 16
A
16.8
12.7
16.9
C.8
B.1
181312
B.7
14.1
C.2
3" DOMESTIC WATER
MAKEUP TO FIRE
PROTECTION WATER
STORAGE TANK
6" FIRE PUMP
BYPASS
8" FIRE PUMP SUCTION
FROM FIRE
PROTECTION WATER
STORAGE TANK
6" PUMP TEST
TANK RETURN
B
M
ATCH LINE
SEE
A1/FP102
MATCH LINE
SEE A1/FP102
M
AT
CH
L
IN
E
SE
E
A1 /F
P1
MATCH LINE
SEE A1/FP104
A3
FP401 1
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
C F
IR
ST
L
EV
EL
FI
R E
PR
O
TE
C
TI
O
N P
LA
N
FP103
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
NOTES
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W THE PROJECT
SPECIFICATIONS, UFC 3-600-01, NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS
ADOPTED BY THE MAINE STATE RULES OF THE STATE FIRE MARSHAL
CHAPTER 4, UNLESS OTHERWISE NOTED.
3. SPRINKLERS NOT REQUIRED ABOVE NONCOMBUSTIBLE DROPPED CEILINGS /
ACOUSTICAL CONCEALED SPACES OF NONCOMBUSTIBLE CONSTRUCTION
AND CONTENT.
4. WHERE POSSIBLE CONCEAL SPRINKLER PIPING ABOVE DROPPED CEILINGS.
5. LOCATE SPRINKLER PIPING AWAY FROM ELECTRICAL PANELS I.A.W NFPA 70.
INSTALL DRIP PANS WHERE INSTALLING PIPING WITHIN DEDICATED
EQUIPMENT SPACE IS UNAVOIDABLE.
6. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK & EQUIPMENT OVER 4
FEET IN WIDTH.
7. INSTALL GUARDS ON SPRINKLERS THAT ARE 7 FEET OR LESS ABOVE FF OR
ARE OTHERWISE SUSCEPTIBLE TO MECHANICAL DAMAGE.
8. SPRINKLER PIPING TO BE LOCATED AND SIZED PER CONTRACTOR'S SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. INSTALL SPRINKLERS PER
DESIGN PARAMETERS ON SHEET FP501.
1/8" = 1' - 0" 4' 16'0 8'A1 AREA C FIRST LEVEL FIRE PROTECTION PLAN
PLAN
NORTH
KEYED NOTES
1. SEE ENLARGED PLAN ON DRAWING FP 401 FOR DETAIL ON EQUIPMENT
LAYOUT.
2. IN IT AREAS WHERE SPRINKLERS AND PIPING ARE
EXPOSED, INSTALL SPRINKLERS WITH HEAD GUARDS/CAGES.
3. PROVIDE THE SPRINKLERS WITHIN THE THREE TELECOM / IT ROOMS (132A,
132B AND 132) WITH A SEPARATE SUPERVISED SPRINKLER ZONE CONTROL
VALVE ASSEMBLY WHICH INCLUDES THE CONTROL VALVE, CHECK VALVE,
WATER FLOW SWITCH AND INSPECTOR'S TEST CONNECTION. LOCATE ZONE
CONTROL VALVE OUTSIDE THE ROOM IN A LOCATION ACCESSIBLE TO
EMERGENCY RESPONDERS. TEST CONNECTION SHALL BE AN APPROVED
RECIRCULATING PUMP FLOW SWITCH (SEE TECHNICAL SPECIFICATIONS).
4. ROOM 133 IS LIMITED TO INCIDENTAL ELECTRONIC EQUIPMENT (PRINTERS).
SPRINKLERS IN THIS ROOM ARE NOT REQUIRED TO BE PART OF THE
SEPARATE SPRINKLER ZONE FOR ROOMS 132A, 132B AND 132.
5. PROVIDE SEISMIC SEPARATION ASSEMBLY OR LISTED FLEXIBLE PIPING ON
ALL SPRINKLER FEED MAINS / CROSS MAINS WHICH CROSS AT THE BUILDING
SEISMIC SEPARATION JOINT LOCATED AT COLUMN LINES 17/18 AND AT
COLUMN LINES 10/11.
A.7
B.2
21 22 23 24 25
B.6
201917 18
C.3
C.5
B.8
WORK BAY
WORK BAY
WORK BAY
POWER PRO
WORK BAY
MECH/
ELEC
BULK POL
STORAGE
RESTROOM
ANG
CORRIDOR
TELECOM/
IT
JAN
TOOL ROOM,
WHEEL &
TIRE SHOP
RESTROOM
HVAC
WORK BAY
POWER
PRO/HVAC
TOOL ROOM
POWER
PRO/HVAC
OFFICE
MATCH LINE
SEE A1/FP103
MATCH LI
NE
SEE A1/F
P10
B1
FP501
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
D F
IR
ST
L
EV
EL
FI
R E
PR
O
TE
C
TI
O
N P
LA
N
FP104
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
NOTES
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W THE PROJECT
SPECIFICATIONS, UFC 3-600-01, NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS
ADOPTED BY THE MAINE STATE RULES OF THE STATE FIRE MARSHAL
CHAPTER 4, UNLESS OTHERWISE NOTED.
3. SPRINKLERS NOT REQUIRED ABOVE NONCOMBUSTIBLE DROPPED CEILINGS /
ACOUSTICAL CONCEALED SPACES OF NONCOMBUSTIBLE CONSTRUCTION
AND CONTENT.
4. WHERE POSSIBLE CONCEAL SPRINKLER PIPING ABOVE DROPPED CEILINGS.
5. LOCATE SPRINKLER PIPING AWAY FROM ELECTRICAL PANELS I.A.W NFPA 70.
INSTALL DRIP PANS WHERE INSTALLING PIPING WITHIN DEDICATED
EQUIPMENT SPACE IS UNAVOIDABLE.
6. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK & EQUIPMENT OVER 4
FEET IN WIDTH.
7. INSTALL GUARDS ON SPRINKLERS THAT ARE 7 FEET OR LESS ABOVE FF OR
ARE OTHERWISE SUSCEPTIBLE TO MECHANICAL DAMAGE.
8. SPRINKLER PIPING TO BE LOCATED AND SIZED PER CONTRACTOR'S SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. INSTALL SPRINKLERS PER
DESIGN PARAMETERS ON SHEET FP501.
KEYED NOTES
PLAN
NORTH
1/8" = 1' - 0" 4' 16'0 8'A1 AREA D FIRST LEVEL FIRE PROTECTION PLAN
1. PROVIDE SEISMIC SEPARATION ASSEMBLY OR LISTED FLEXIBLE PIPING ON
ALL SPRINKLER FEED MAINS / CROSS MAINS WHICH CROSS AT THE
BUILDING SEISMIC SEPARATION JOINT LOCATED AT COLUMN LINES 17/18.
2. IN IT AREAS WITH SMOOTH DROPPED CEILINGS, INSTALL FULLY CONCEALED
SPRINKLERS. IN IT AREAS WHERE SPRINKLERS AND PIPING ARE EXPOSED,
INSTALL SPRINKLERS WITH HEAD GUARDS/CAGES.
3. PROVIDE TELECOM / IT ROOM WITH SEPARATE SUPERVISED SPRINKLER
ZONE CONTROL VALVE ASSEMBLY WHICH INCLUDES THE CONTROL VALVE,
CHECK VALVE, WATER FLOW SWITCH AND INSPECTOR'S TEST CONNECTION.
LOCATE ZONE CONTROL VALVE OUTSIDE THE ROOM IN A LOCATION
ACCESSIBLE TO EMERGENCY RESPONDERS. TEST CONNECTION SHALL BE
AN APPROVED RECIRCULATING PUMP FLOW SWITCH (SEE TECHNICAL
SPECIFICATIONS).
4. INSTALL INSPECTOR'S TEST CONNECTION NEAR THE REMOTE END OF THE
SPRINKLER SYSTEM TO FACILITATE AIR REMOVAL. INSTALL WITH CONCRETE
SPLASH BLOCK TO PREVENT EROSION WHERE DISCHARGE IS AT UNPAVED
SURFACE. LOCATE THE TEST VALVE APPROXIMATELY 7 FEET ABOVE FF.
LOCATE THE DISCHARGE ORIFICE NO GREATER THAN 2 FEET ABOVE
FINISHED GRADE.
SPRINKLER
M
M
TS
TS
TS
TS
TS
TS
3" MAKE-UP WATER TO FIRE
PROTECTION WATER
STORAGE TANK
6" FIRE PUMP BYPASS
(FROM PUBLIC SUPPLY
MAIN. SEE CIVIL UTILITY
DRAWINGS)
8" FIRE PUMP SUCTION
FROM FIRE PROTECTION
STORAGE TANK
6" PUMP TEST TANK RETURN
NITROGEN
GENERATOR
FIRE PUMP
CONTROLLER
JOCKEY PUMP
CONTROLLER
15 18
D5
FP501
D5
FP501
D2
FP501
D5
FP501
A1
FP501
A1
PL501
10 11
A
B.1
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
FI
R
E
PR
O
TE
C
TI
O N
EN
LA
R G
ED
P
AR
T
PL
AN
FP401
R D
J / B
H G
S
TR
M S
D
A S
N O
TE
D
NOTES
1/2" = 1' - 0" 0 1' 2' 4'A3 SPRINKLER 121 ENLARGED PLAN
KEYED NOTES
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. THIS BUILDING SHALL BE FULLY SPRINKLERED I.A.W THE PROJECT
SPECIFICATIONS, UFC 3-600-01, NFPA 13 (2019 ED) AND NFPA 13 (2016 ED) AS
ADOPTED BY THE MAINE STATE RULES OF THE STATE FIRE MARSHAL CHAPTER 4,
UNLESS OTHERWISE NOTED.
3. LOCATE SPRINKLER PIPING AWAY FROM ELECTRICAL PANELS I.A.W NFPA 70.
INSTALL DRIP PANS WHERE INSTALLING PIPING WITHIN DEDICATED EQUIPMENT
SPACE IS UNAVOIDABLE.
4. SPRINKLERS SHALL BE INSTALLED UNDER DUCTWORK & EQUIPMENT OVER 4
FEET IN WIDTH.
5. INSTALL GUARDS ON SPRINKLERS THAT ARE 7 FEET OR LESS ABOVE FF OR ARE
OTHERWISE SUSCEPTIBLE TO MECHANICAL DAMAGE.
6. SPRINKLER PIPING TO BE LOCATED AND SIZED PER CONTRACTOR'S SHOP
DRAWINGS AND HYDRAULIC CALCULATIONS. INSTALL SPRINKLERS PER DESIGN
PARAMETERS ON SHEET FP501.
1. 6" FIRE PUMP TEST HEADER W/ MIN OF THREE SEPARATELY VALVED 2-1/2 IN
CONNECTIONS.
2. PUMP SUCTION OS&Y VALVE.
3. FLOW METER / TEST HEADER OS&Y VALVE.
4. 6 IN FLOW METER. LOCATE NOT LESS THAN 5 PIPE DIAMETERS UPSTREAM AND 2
DIAMETERS DOWNSTREAM OF ELBOWS/VALVES OR AS RECOMMENDED BY
MANUFACTURER.
5. ELECTRIC DRIVEN CENTRIFUGAL HORIZONTAL SPLIT CASE FIRE PUMP RATED
750 GPM AT RATED NET PRESSURE OF 70 PSI.
6. PRESSURE MAINTENANCE (JOCKEY) PUMP.
7. PUMP DISCHARGE CHECK VALVE
8. PUMP DISCHARGE OS&Y VALVE.
9. 6 IN DRY PIPE VALVE RISER W/OS&Y OR BUTTERFLY VALVE TO ENCLOSED
UNHEATED STORAGE 114.
10. 6 IN WET PIPE VALVE RISER W/OS&Y OR BUTTERFLY VALVE TO ALL HEATED
BUILDING AREAS (ARNG AND ANG WINGS).
11. N.C. 3" OS&Y VALVE W/TS FOR FILLING FIRE PROTECTION WATER TANK.
MOUNT AT ACCESSIBLE LOCATION.
12. 2 IN DRAIN.
13. 6 IN DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY.
14. 4 IN FDC CHECK VALVE.
15. 5 IN X 4 IN STORZ FDC; LOCATE MAXIMUM 4 FT ABOVE GRADE.
16. BACKFLOW PREVENTER FLOW TEST CONNECTION OS&Y OR BUTTERFLY VALVE
CONTROL VALVE (NOTE: TEST CONNECTION PIPE INSTALLED UNDER FDC PIPE
BUT SHOWN OFF-SET FOR CLARITY).
17. POTABLE WATER 3" DOUBLE CHECK BACKFLOW PREVENTER
ASSEMBLY W/ METER AND SHUT-OFF VALVES FOR MAKE-UP WATER TO FIRE
PROTECTION WATER STORAGE TANK .
18. BACKFLOW PREVENTER FLOW TEST CONNECTION.
19. SEE PLUMBING DRAWING PL401 AND CIVIL DRAWING C-106 FOR CONTINUATION OF
UPSTREAM DOMESTIC SUPPLY RISER AND DOMESTIC SUPPLY PIPING BELOW
FLOOR SLAB AND BUILDING EXTERIOR.
20. DROP THROUGH FLOOR SLAB. SUCTION PIPE DISTANCE BETWEEN PUMP FLANGE
AND BELOW GRADE ELBOW FLANGE (PARALLEL WITH PUMP SHAFT) SHALL BE
GREATER THAN 6.7 FT.
21. DROP THROUGH FLOOR SLAB.
22. DROP W/ ELBOW TO FEED FIRE PUMP TEST HEADER.
23. COLUMN PIER.
PLAN VIEW
PIPE SLEEVES SHALL BE 2'' LARGER THAN PIPE SIZES 2'' THROUGH 3" AND 4"
LARGER FOR PIPE SIZES 4" AND LARGER. ALTERNATELY PROVIDE FLEXIBLE
COUPLING AS SHOWN IN LIEU OF STATED PIPE CLEARANCE.
NOTE:
NOTE:
ALL ATTACHMENTS TO TANK WALL AND ROOF
ASSEMBLY SHALL BE INSTALLED PER TANK
MANUFACTURER RECOMMENDATION
ELEVATION
N O
M
IN
AL
T
AN
K
H
EI
G H
T (1
[ E
ST
IM
AT
ED
T O
B E
AP
R
R O
X
F T]
RISER CLAMP
FLOOR SLAB
BITUMASTIC
SEALANT
PIPE SLEEVE
PROVIDE BUTTERFLY OR
OS&Y VALVE WITH TAMPER
SWITCH ON RISER
2" MAIN DRAIN. PIPE TO
SPLASH GUARD AT
EXTERIOR OF BUILDING
PROVIDE 6" RISER CHECK VALVE WITH
ASSOCIATED TRIM AND FLOW SWITCH.
SEE SPECIFICATION SECTION 211313
FOR TRIM REQUIREMENTS.
SCALE:A1 SPRINKLER RISER MANIFOLD SECTION
NOT TO SCALE
12" MAX
TYPICAL EACH SIDE
FLEXIBLE
COUPLING
TYPICAL
EACH SIDE FLEXIBLE COUPLING
TYPICAL EACH SIDE
PIPE SLEEVE
WALL
SCALE:B1
WET PIPE INSPECTOR'S TEST CONNECTION
NOT TO SCALE
TEST VALVE IN READILY
ACCESSIBLE LOCATION BUT
NOT LESS THAN 4 FEET OF
EXPOSED PIPE BETWEEN
VALVE AND EXTERIOR WALL
PENETRATION FOR WET PIPE
SYSTEM.
FROM END OF REMOTE
BRANCH LINE
SMOOTH BORE CORROSION-
RESISTANT OUTLET GIVING FLOW
EQUIVALENT TO ONE SPRINKLER.
45° ELL
FLOAT LEVEL ALARM LOCATION,
SEE DETAIL A3, LOCATE WITHIN
ACCESS FROM LADDER
ELECTRICAL JUNCTION BOX
SERVING FLOAT ALARM DEVICE
RECTIFIER BOX
MAN WAY PLATFORM
LIQUID LEVEL GAUGE
LADDER AND SAFETY
CAGE KIT PER NFPA 22
ROOF WALKWAY AND GUARDRAIL
SUCTION PIPE WITH ANTI-VORTEX PLATE. EXTEND SUCTION LINE A
MINIMUM OF 4" ABOVE TANK BOTTOM. LOCATE ANTI-VORTEX PLATE
A MINIMUM OF 6" ABOVE END OF SUCTION LINE. ANTI-VORTEX PLATE
TO BE MINIMUM OF 3/8" X 6" X 16".
ACCESS DOOR
OVERFLOW OUTLET 12" TO
18" ABOVE GRADE
(ROTATED FOR CLARITY)
FLOOR LEVEL
TOP OF SHELL SHEET
TOP OF ROOF CAP
GRAVITY VENTILATOR
APPROX 22FT
INSIDE DIA
TANK FLOAT SWITCH ASSEMBLY FOR WATER LEVEL TROUBLE SIGNALS PER NFPA 72
AND NFPA 22. MOUNT ON TOP OF TANK. AUTOMATION PRODUCTS GROUP INC (APG),
MODEL FLE-4T2-S6-H3-A33SS OR APPROVED EQUAL. THREE SWITCH POINTS:
A. OFF-NORMAL (DROP TO 4" AND FOR OVERFLOW)
B. LOW-LEVEL (DROP TO 12")
PLUG MOUNT TYPE 2, 2" NPT, 316SS, CABLE ENTRY 3/4" FITTING.
STEM 316LSS; LENGTH: APPROXIMATELY 72" BUT CONTRACTOR TO VERIFY BASED
ON FINAL MOUNTING LOCATION.
THREE SWITCHES, TYPE A, 20 VA
FLOATS: TYPE S.S.: 316SS, 0.65 SG; 316 S.S. FLOAT STOP COLLARS
A. SET L1 AT APPROXIMATE OVERFLOW; L2 AT 4" BELOW OVERFLOW AND L3
AT 12" BELOW OVERFLOW.
JUNCTION BOX/HOUSING: 316SS
INSTALL PVC COATED RIGID STEEL CONDUIT DOWN OUTSIDE OF TANK AND
TERMINATE WITHIN RECTIFIER BOX.
6" FLANGED ACCESS NOZZLE; 316S.S. W/316SS FASTENERS. INSTALL CLOSE TO
ROOF HATCH FOR ACCESS FROM INTERNAL LADDER.
6" STILLING WELL, SCH 40 PVC PIPE.
TOP OF TANK
1" VENT OPENING
SCALE:A3 FLOAT LEVEL ALARM - DETAIL
NOT TO SCALE
4 5
1 6
SCALE:A4 TANK DETAIL
NOT TO SCALE
TO DRY PIPE SPRINKLER SYSTEM
(ENCLOSED UNHEATED STORAGE 114)
FIRE SUPPRESSION SYSTEM SCHEDULE
OCCUPANCY BUILDING AREA / ROOM FIRE PROTECTION CRITERIA REFERENCE
LIGHT HAZARD
OFFICES, LOCKER,
BATHROOMS, HALLWAYS,
STAIRWAYS
0.1 GPM/SF OVER 1,500 SF; K=5.6;
250 GPM HOSE STREAMS; 60 MIN
DURATION
UFC 3-600-01 SECTION
B-1.1 TABLES 9-3 & 9-4
ORDINARY HAZARD
VEHICLE WORK BAYS,ANG
POL STG MECHANICAL/
ELECTRICAL ROOMS,OTHER
ASSOCIATED SUPPORT
AREAS,
FUTURE WASH PAD,
AND FUTURE WARMUP BAY
(NOT SHOWN)
0.2 GPM/SF OVER 3,250 SF
(INCLUDES 30% PENALTY FOR
> 2:12 ROOF SLOPE); K=8.0; 250
GPM HOSE STREAMS; 60 MIN
DURATION
UFC 3-600-01 SECTION
B-1.2 TABLES 9-3 & 9-4
EXTRA HAZARD
ARNG POL STORAGE / LUBE
SYSTEM AND CONTROLLED
WASTE HANDLING AREA
(GREATER THAN 660 GAL
STORAGE)
0.6 GPM/SQ.FT.OVER CUT-OFF
ROOM SIZE; K=11.2; 500 GPM;
UFC 3-600-01, SECTIONS
4-37, 4-17.1.1.2 REF NFPA
30; NFPA 30 SECTION 18.5
EXTRA HAZARD
FLAMMABLE MATERIAL
STORAGE AND GAS
STORAGE
0.3 GPM/SQ.FT.OVER CUT-OFF
ROOM SIZE; K=11.2; 500 GPM
UFC 3-600-01 SECTION
B-1.2 TABLES 9-3 & 9-4;
NFPA 30, TABLE 9.6.1; AND
NFPA 55 SECTION 6.11.2.2
/ UFC 3-600-01 TABLE 9-3
EX HAZ
RACK OR BACK TO
BACK SHELF STORAGE
EXRA HAZARD
ENCLOSED UNHEATED
STORAGE AREA
0.3 GPM/SF OVER 1,350 SF
(CUT-OFF ROOM SIZE); DRY
SYSTEM; K=11.2; 500 GPM HOSE
STREAMS; 120 MIN DURATION
UFC 3-600-01 SECTION
4-46.2.3.1; NFPA 13 TABLE
4.3.1.7.1
NOTE: THE ABOVE EXTERIOR HOSE ALLOWANCES ARE ALL TAKEN FROM THE PUBLIC SUPPLY AND NOT THE FIRE
PUMP/TANK SUPPLY.
NOT TO SCALED5
PIPE SLEEVE THROUGH
FLOOR SLAB
NOT TO SCALED3 PIPE SLEEVE THROUGH WALL
FIREPROOF SEALANT
OVERFLOW PIPE EXTERIOR LADDER W/
SAFETY CAGE
PROVIDE 6" DRY PIPE VALVE WITH
ASSOCIATED TRIM AND FLOW
PRESSURE SWITCH. SEE
SPECIFICATIONS SECTION 211316 FOR
TRIM REQUIREMENTS AND
SUPERVISORY NITROGEN SYSTEM.
TO WET PIPE
SPRINKLER SYSTEM
SPLASH GAURD
FOR DRY PIPE SYSTEM, NIPPLE UP OFF BRANCH LINE AND PITCH TEST
CONNECTION PIPE TOWARD TEST VALVE. SEE NFPA 13, FIG A.16.14.2
FOR DRY PIPE SYSTEM,PROVIDE PLUG AT VALVE AND TEMPORARY UNIONED
CONNECTION TO DISCHARGE PIPE. SEE NFPA 13, FIG A.16.14.2
5" STORZ CONNECTION
30 DEGREE FIXED ELBOW
FINISH GRADE
CHECK VALVE
4" FDC PIPING
BALL DRIP
SCALE:D2
FIRE DEPARTMENT
STORZ CONNECTION
NOT TO SCALE
" T
O
8"
AB
O
VE
F
IN
IS
H
G R
AD
E
12"
MAX
TO SYSTEM
FOUNDATION DESIGN BY TANK
MANUFACTURER.SEE TECHNICAL
SPECIFICATIONS 221219.
NOTES:
1. DIMENSIONS ARE NOMINAL FOR TANK HAVING USABLE CAPACITY OF 78000 GAL. DIMENSIONS SHOWN INCLUDE A
MINIMUM OF 1.25' SEISMIC FREEBOARD AND 6" ANTI-VORTEX PLATE CLEARANCE.
2. FINAL DIMENSIONS TO BE DETERMINED BASED ON VENDORS APPROVED SHOP DRAWINGS.
3. DESIGN SHALL BE BASED ON 112 MPH WIND SPEED AND SEISMIC DESIGN CATEGORY D. SEE TECHNICAL
SPECIFICATION 221219 FOR ADDITIONAL PERFORMANCE DESIGN PARAMETERS.
4. NOMINAL DIMENSIONS SHOWN ARE A VENDOR'S STOCK DIMENSIONS. OTHER NOMINAL TANK DIMENSIONS ARE
ACCEPTABLE PROVIDING MINIMUM USABLE CAPACITY REQUIREMENTS ARE ACHIEVED.
5. TANK TO BE INSULATED, HEATED AND PROVIDED WITH CATHODIC PROTECTION. SEE TECHNICAL SPECIFICATION
SECTIONS 221219 AND 134713.
6. FOR UNDERGROUND PIPING, APPURTENANCE AND TRENCHING DETAILS, REFER TO CIVIL DRAWING C-504 AND
TECHNICAL SPECIFICATION SECTION 221113.
7. FOR TANK HEATING, AND MONITORING DETAILS REFER TO ELECTRICAL AND FIRE ALARM RISER DIAGRAM DRAWINGS
AND TECHNICAL SPECIFICATIONS.
NOTES:
FOR UNDERGROUND WATER SERVICE, PIPING, APPURTENANCE AND TRENCHING DETAILS, REFER TO CIVIL DRAWING C-504.
(SEE NOTES FOR DRY PIPE TEST CONNECTION)
HIGHEST POINT OF TANK: MAX EL = 105 FT
TOP OF FOUNDATION:
EL = 60 FT
GRADE LEVEL
15 1
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
FI
R
E
PR
O
TE
C
TI
O N
D
ET
AI
LS
FP501
R D
J
S
TR
M S
D
A S
N O
TE
D
NOTE
1. SEE SHEET FP001 FOR LEGEND, ABBREVIATIONS AND GENERAL NOTES
ALTERNATE BID ITEMS
SEE SHEET G-004 FOR ALTERNATE BID ITEM DESCRIPTIONS
15. WASH PAD ENCLOSURE
KEYED NOTES
1. IF ABI 15 IS ACCEPTED, "FUTURE WASH PADS" WILL BE CHANGED TO "WASH PAD".
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
PL
U
M
BI
N G
L
EG
EN
D
AB
BR
EV
IA
TI
O N
S
AN
D G
EN
ER
AL
N
O
TE
S
P-001
JS
G
M E
B
M S
D
A S
N O
TE
D
LEGEND
HOSE BIB
L LOCKING VALVE
ABBREVIATIONS
AC
AFF
ANG
ARNG
B
BFP
C, CW
CA
CD
CFH
CHP
CO/WCO/FCO
COND
DCW
DHW
DHWR
DIW
DN
DWH
DWV
EE
ERV
EX
EWH
ELEV
ERV
EWC
EWT
F
FCU
FD
FFE
FLR
FPHB
FS
GAL
G
GI
GPF
GPM
GW
H, HW
HB
HC
HWPW
HWR
IW OR ID
IN
INV
LAV
LM
LPC
LPG
MBH
MEANG
MEARNG
MECH
MR
MSHP
MV
NIC
NG
PDI
PET
POL
PRV
PSI
PTANK
(R)
RP
RPD
ST
S
SD
SH
SK
TD
T&P
TMV
TP
UR
US
V
VIF
VOL
VTR
W
WB
WC
WH
WHA
W&T W&V
AIR COMPRESSOR
ABOVE FINISHED FLOOR
AIR NATIONAL GUARD
ARMY NATIONAL GUARD
BOILER
BACKFLOW PREVENTOR DEVICE
COLD WATER
COMPRESSED AIR
CONDENSATE DRAIN
CUBIC FEET PER HOUR
COMBINED HEAT AND POWER
CLEANOUT/WALL/FLOOR
CONDENSATE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
DOWN IN WALL
DOWN
DOMESTIC WATER HEATER
DRAINAGE, WASTE AND VENT
EMERGENCY EYE/SHOWER STATION
ENERGY RECOVERY VENTILATORS
EXAMPLE
ELECTRIC WATER HEATER
ELEVATION
ENERGY RECOVERY VENTILATOR
ELECTRIC WATER COOLER
ENTERING WATER TEMPERATURE
FURNACE
FAN COIL UNIT
FLOOR DRAIN
FINISH FLOOR ELEVATION
FLOOR
FREEZE PROOF HOSE BIBB
FLOOR SINK
GALLON
GAS
GREASE INTERCEPTOR
GALLONS PER FLUSH
GALLONS PER MINUTE
GREASE WASTE
HOT WATER
HOSE BIBB
HANDICAPPED ACCESSIBLE, HEATING COIL
HOT WATER PRESSURE WASHER
HOT WATER RECIRCULATION
INDIRECT WASTE
INCHES
INVERT
LAVATORY
LOAD MODULE
LIMIT OF PLUMBING CONTRACT
LIQUIFIED PETROLEUM GAS
1000 BTU PER HOUR
MAINE AIR NATIONAL GUARD
MAINE ARMY NATIONAL GUARD
MECHANICAL
MOP RECEPTOR
MINI SPLIT HEAT PUMP
MIXING VALVE
NOT IN CONTRACT
NATURAL GAS
PLUMBING & DRAINAGE INSTITUTE
PLUMBING EXPANSION TANK
PETROLEUM, OIL, LUBRICANTS
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
PROPAN TANK
REMOVE AND RETAIN
RECIRCULATION PUMP
REDUCED PRESSURE BACKFLOW PREVENTOR
STORM
SANITARY
STORM DRAIN
SHOWER
SINK
TRENCH DRAIN
TEMPERATURE & PRESSURE RELIEF VALVE
THERMOSTATIC MIXING VALVE
TRAP PRIMER
URINAL
UTILITY SINK
VENT
VERIFY IN FIELD
VOLUME
VENT THRU ROOF
WASTE
WALL BOX
WATER CLOSET
WALL HYDRANT
WATER HAMMER ARRESTOR
WASTE AND TRAP
WASTE AND VENT
LINETYPES
DOMESTIC COLD WATER PIPING
DOMESTIC HOT WATER PIPING
DOMESTIC HOT WATER RECIRCULATION PIPING
SANITARY PIPING
VENT PIPING
PIPE BREAK
PIPE ELBOW
PIPE END CAP
PIPE RISE
PIPE TEE FROM BOTTOM
PIPE TEE FROM TOP
PRESSURE GAUGE W/BALL VALVE
PRESSURE REDUCING VALVE
SAFETY RELIEF VALVE
STRAINER W/BALL DRAIN VALVE, HOSE
BIB AND CAP (GATE VALVE FOR STEAM)
STRAINER W/ BLOW OFF
UNION AS DICTATED BY PIPE SIZE
THERMOMETER
TEMPERATURE/PRESURE WELL
FLANGE AS DICTATED BY PIPE SIZE
GENERAL SYMBOLS
AHU-XX
(XXX)
C5 M-501
X
DETAIL NUMBER
DRAWING WHERE DETAIL IS DRAWN
SYMBOL PER ABBREVIATION LIST
EQUIPMENT SEQUENCE NUMBER
NOTES
KEYED NOTE
GPM
BALL VALVE
CHECK VALVE
GATE VALVE
PUMP
BOILER DRAIN VALVE W/ HOSE BIB
DIRECTION OF FLOW
METER
REDUCED PRESSURE BACKFLOW PREVENTER
REDUCER (CONCENTRIC)
COMBINATION FLOW MEASURING/ BALANCING
VALVE (CIRCUIT SETTER)
PIPE PITCH DOWN IN DIRECTION OF FLOW
X
M
COMPRESSED AIR PIPE
FUEL OIL RETURN PIPE
FUEL OIL SUPPLY PIPE
GENERAL NOTES
1. GENERAL NOTES, SYMBOLS LIST AND DETAILS ARE
APPLICABLE TO ALL PLUMBING DRAWINGS INDICATED BY
P-###, PS###, OR PL###.
2. PERFORM MANUFACTURER RECOMMENDED FUNCTION
PERFORMANCE TESTING. TEST AND BALANCE SYSTEM UPON
STARTUP.
3. LAYDOWN AND STAGING AREAS TO BE COORDINATED WITH
OWNER
4. CONTRACTOR SHALL COORDINATE ANY UTILITY
INTERRUPTIONS IN SERVICE WITH OWNER.
5. PLANS ARE DIAGRAMMATIC AND SYSTEMS SHALL BE
CONSTRUCTED TO CODE.
6. CONTRACTOR SHALL PROVIDE COMPLETE AND FUNCTIONAL
SYSTEMS.
7. ALL WORK SHALL BE COORDINATED WITH ALL TRADES
INVOLVED.
8. SCALE IS APPROXIMATE.
9. OFFSETS IN PIPING AND TRANSITIONS AROUND
OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL
COST TO THE OWNER.
10. VERIFY EQUIPMENT CONNECTIONS WITH MANUFACTURER'S
CERTIFIED DRAWINGS. FIELD VERIFY AND COORDINATE
DIMENSIONS BEFORE FABRICATION.
11. CONTROL WIRE AND CONDUIT SHALL COMPLY WITH NEC AND
SPECIFICATIONS.
12. PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS
AND GUIDES AS RECOMMENDED BY MANUFACTURER AND
DEFINED BY SPECIFICATIONS TO PREVENT STRESS ON
PIPING.
13. ALL ROOF/WALL PENETRATIONS, FITTINGS, AND
CONNECTIONS SHALL BE PROPERLY SEALED TO ENSURE
THE EFFICIENT OPERATION OF THE SYSTEM AND TO AVOID
THE INFILTRATION OF MOISTURE OR PRECIPITATION.
14. MANUFACTURERS NAMES AND MODELS ARE USED TO
PROVIDE CAPACITY, SIZE, AND QUALITY AND PERFORMANCE
ONLY AND SUBSTITUTIONS MEETING THE PROJECT NEEDS
ARE ALLOWED PENDING SUBMITTAL APPROVAL.
15. REFER TO MECHANICAL DRAWINGS FOR SEQUENCE OF
OPERATIONS AND CONTROLS DIAGRAMS FOR PLUMBING
EQUIPMENT.
16. MINIMUM SANITARY PIPE SIZE BELOW SLAB TO BE 2".
17. EXPOSED INSULATED PIPING SHALL RECEIVE FIELD APPIED
ALUMINUM JACKET FOR EXTERIOR PIPING AND PVC JACKET
FOR INTERIOR PIPING.
18. ALL CONDUCTORS AND WIRING SHALL BE IN RACEWAY.
19. MAINTAIN MANUFACTURER RECOMMENDED CLEARANCES.
WHERE EQUIPMENT IS ELEVATED MAINTAIN CLEARANCE ON
THE GROUND TO ALLOW LADDER ACCESS.
20. PROVIDE TRAP PRIMERS TO ALL FLOOR DRAINS AS
SCHEDULED.
21. CONTRACTOR SHALL FILL PROPANE TANKS FOR STARTUP OF
EQUIPMENT AND AT SUBSTANTIAL COMPLETION.
CONDENSATE DRAIN
V
X BID ALTERNATE ITEM
PT PLUG
W O
T1
W O
T2
CT1
CT
FSC
FSC
FS
C
P P
P P
P P
P
O
OO OO O
A A
A
WBH
W T
WR2
WR1
HP1
SBC
P1
PLF
PLF
PLF
PLF
TRM1
PWS1
PWS2
PLF
PLF
AC
MW1
GLB
FSC
FSC
B1 B2
B3
FS
C
O
O OO O
A
P P
T
T
T
T
D W
W/D
VENDING
FE
1FUEL TANK-1
FUEL TANK-2
CHP-1
PTANK-2
PTANK-3
PTANK-4
PTANK-1
PTANK-5
11 11
CHP-2
AREA A
AREA B
AREA C
AREA D
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
PL
U
M
BI
N G
S
IT
E
PA
N
PS101
JS
G
S
TR
M S
D
A S
N O
TE
D
1" = 50' 50' 100'25'0A1 PLUMBING SITE PLAN
NOTES
1. SEE SHEET P-001 FOR LEGEND ABBREVIATIONS AND GENERAL NOTES.
2. SEE CIVIL DRAWINGS FOR LOCATION OF OIL WATER SEPARATOR, SOLIDS
INTERCEPTOR, UNDERGROUND LPG PIPING, AND LIFT STATION.
3. REFERENCE CIVIL DRAWINGS FOR UNDERGROUND UTILITY ROUTING.
KEYED NOTES
1. FUEL TANK IS OWNER PROVIDED AND OWNER INSTALLED. COORDINATE
CONTROLS CONDUIT AND CONDUCTOR FOR LEAK DETECTION WITH
ELECTRICAL AND CIVIL CONTRACTOR.
2. 1/2" ABOVE GROUND LPG PIPING AND SUPPORTS RUN ALONG GROUND
SERVING CHP. SEE MECHANICAL DETAILS FOR PIPE PROTECTION.
3. UNDERGROUND LPG PIPING CONNECTION SEE CIVIL FOR CONTINUATION.
4. FUEL TANK IS OWNER PROVIDED AND OWNER INSTALLED.
PLAN
NORTH
ALTERNATE BID ITEMS
SEE SHEET G-004 FOR ALTERNATE BID ITEM DESCRIPTIONS
4. PURCHASE PROPANE TANKS.
11. COMBINED HEAT AND POWER UNITS.
1 1.3 1.7 2.0 2.4 2.5
B
B.5
C
2.6
32.3
B.3
1.9 MATCH LI
NE
SEE A1/P
L1
MATCH LINE
SEE A1/PL102
4"4"
3" W&T
UP TO
FD-A
4" S-UP TO FCO-B
STARTING INVERT
ELEVATION = 55'-7"
4" S
INV ELEV = 55'-0"
FOR CONTINUATION
SEE CIVIL DRAWINGS
FFE = 60'-0"
1/ 8"
/F T
1/8"/FT
4" S-UP TO
FCO-B
5' -0
" L
PC
3" W&T UP
TO FD-A
1/ 8"
/F T
4" SD-UP
TO FCO-B
1/2" DCW-UP
5' -0
" L
PC
4" S-DROP INTO
TOP OF MAIN
4" SD-UP TO
FCO-B
WASH
PAD
BULK POL
STORAGE
CONTROLLED
WASTE
HANDLING
FLAMMABLE
MATERIALS
STORAGE
TELECOM/
IT
ARNG
CORRIDOR
MECH/ELEC
BULKY
EQUIPMENT
STORAGE
BATTERY
ROOM
ENCLOSED
UNHEATED
STORAGE
3" SD (1515 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1300 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" SD (15430 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
2 2 2
4" SD (15430 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1300 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1515 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" W&T
UP TO
FD-A
2" V-UP
2" V-UP
3 3
33 4
6" SD
INV ELEV = 56'-6"
FOR CONTINUATION
SEE CIVIL DRAWINGS
HWPW-1
4" S
3" W&T
UP TO
FD-A
4" S UP
TO FCO-B
3" W&T
UP TO
FD-A
1/2" TP
1/2" TP UP
2" V-UP
2" V-UP
1/2" TP UP
(TYP 2)
4"
V
V
V V
V V
V V
V VD
C
W
DCW
V
V
V V
1/2" TP UP
(TYP 2)
3" SD (835 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (835 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4 15
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
A F
IR
ST
L
EV
EL
U
N D
ER
SL
AB
P
LU
M
BI
N
G P
LA
N
PL101
JS
G
M E
B
M S
D
A S
N O
TE
D
NOTE
1. SEE SHEET P-001 FOR LEGEND ABBREVIATIONS AND GENERAL NOTES
1/8" = 1' - 0" 4' 16'0 8'A1 AREA A FIRST LEVEL UNDERSLAB PLUMBING PLAN
PLAN
NORTH
KEYED NOTES
1. 1/2" DCW BELOW SLAB. ROUTE FULL SIZE TO CB-A DRIVE LINE PORT AS
PART OF BASE BID. PROVIDE INSULATION AND SELF REGULATING HEAT
TRACE PER SPECIFICATIONS. RUN HEAT TRACE ALONG ENTIRE PIPE
LENGTH BELOW SLAB AND ON VALVES IN CB-A AS PART OF BASE BID.
COORDINATE INSTALLATION WITH ELECTRICAL CONTRACTOR. DO NOT
PROVIDE DCW AND HEAT TRACE AS PART OF ABI 15.
2. SD PIPING UP TO DOWNSPOUT FROM GUTTERS. REFER TO
ARCHITECTURAL DRAWINGS FOR CONTINUATION.
3. RADON PIT WITH 6" UNDERSLAB PIPING TO VENT. SEE STRUCTURAL
DRAWINGS FOR RADON PIT DETAIL.
4. 6" RADON UP THROUGH ROOF.
5. BASE BID INCLUDES DIVERTING VALVE, UNDERSLAB DCW LINE, AND
STORM DRAIN PIPING. ABI 15 SCOPE DOES NOT INCLUDE FCO-B,
DIVERTING VALVE, UNDERSLAB PIPING AND CONNECTION TO SITE.
ALTERNATE BID ITEMS
D
B.5
3 4 5 6 7 8 9 10
C.4
B.9
B.3
MATCH LINE
SEE A1/PL101
MATCH LI
NE
SEE A1/P
L1
MATCH LI
NE
SEE A1/P
L1
MATCH LINE
SEE A1/PL103
4"
4"
4" S-UP
TO FCO-B
4"
4" S-UP TO
FCO-B
4"
4" S-UP
TO FCO-B
1/ 8"
/F T
1/ 8"
/F T
1/ 8"
/F T
1/ 8"
/F T
1/8"/FT
FFE = 60'-0"
4" S-UP
TO FCO-B
3" W&T UP
TO FD-A
2" V-UP
3" W&T UP
TO FD-A
2" V-UP
WORK BAY
WORK BAY
WORK BAY
4" SD (1500 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" SD (1500 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (740 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" SD (1550 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" S UP
TO FCO-B
4" SD (1550 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (750 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
2 2 2
1/2" TP UP
1/2" TP
UP
4" S UP
TO FCO-B
V
V
V V
V
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
NOTE
1. SEE SHEET P-001 FOR LEGEND ABBREVIATIONS AND GENERAL NOTES
KEYED NOTE
1. STARTING INVERT ELEVATION = 58'-4"
2. SD PIPING UP TO DOWNSPOUT FROM GUTTERS. REFER TO
ARCHITECTURAL DRAWINGS FOR CONTINUATION.
3. RADON PIT WITH 6" UNDERSLAB PIPING TO VENT. SEE STRUCTURAL
DRAWINGS FOR RADON PIT DETAIL.
4. 6" RADON UP THROUGH ROOF.
PLAN
NORTH
1/8" = 1' - 0" 4' 16'0 8'A1 AREA B FIRST LEVEL UNDERSLAB PLUMBING PLAN
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
B F
IR
ST
L
EV
EL
U
N D
ER
SL
AB
P
LU
M
BI
N
G P
LA
N
PL102
JS
G
M E
B
M S
D
A S
N O
TE
M
ATCH LINE
SEE
A1/PL102
MATCH LINE
SEE A1/PL102
M
AT
CH
L
IN
E
SE
E
A1 /P
L1
MATCH LINE
SEE A1/PL104
5' -0
" L
PC
2" W-UP
2" S-UP
FFE = 60'-0"
2" W-UP
TO WB-A
2" W-UP
3"
2" S-UP
2"
3"
3 4
4"
4"
4" 4"
4"
4" 4"
23"
4"
1/8"/FT 1/8"/FT
1/8"/FT
1/8"/FT
1/8"/FT
4"
PRODUCTION
CONTROLLER
SUPERVISOR
INSPECTION
& LIBRARY
ADMIN
ASSISTANT
BREAK
ROOM
MAIN
ENTRANCE
CLASSROOM
ARNG
CORRIDOR
LATRINE
TOOL
ROOM
SPRINKLER
SUPPLY
OFFICE
JANITORIAL
TOOL
ROOM
120A
SUPPLY
ROOM
122A
SUPPLY
ROOM
SECONDARY
ENTRANCE
MECH/
ELEC
ARNG
RACKS
132A
ANG
RACKS
132B
TELECOM/IT
ANG
CORRIDOR
RECYCLING
STORAGE
149A
243RD
OPEN
OFFICE
265TH
OPEN
OFFICE
PHYSICAL
FITNESS
FEMALE
LOCKER
129A
MALE
VESTIBULE
MALE
LOCKER
128A
MALE
LATRINE
FEMALE
LATRINE
WASHER/
DRYER
MALE
SHOWER
128B
JANITORIAL
SHARED
CORRIDOR
PPE
STORAGE
COMMON
IT
FEMALE
SHOWER
129B
CLOSET
150A
2"
2"
4"
3" SD (1140 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1140 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1140 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (760 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (760 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (460 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1170 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" SD (1330 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
4" SD (1400 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (1200 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
3" SD (300 SF)
FOR CONTINUATION
SEE CIVIL DRAWINGS
5 5 5 5
55555
4" S
INV ELEV = 56.5'
FOR CONTINUATION
SEE CIVIL DRAWINGS
10.9
14 15 16
A
16.8
12.7
16.9
C.8
B.1
181312
B.7
14.1
C.2
3" W&T 3" W&T
1/2" TP
UP
1/2" TP
UP
1/2" TP
UP
1/2" TP UP
1/2" TP UP
1/2" TP
UP
1/2" TP UP
(TYP 2)
1/2" TP UP
(TYP 2)
V V
V V
V
V
V
V
V V
V V V
V
V
OFSHEET:
D
I R EC T ORA T E
M
I L I TARY BUREAU
FA
C
I L
IT
IES ENGINEER
ING
PL
AN
R
EV
IS
IO
N S
PLAN PROGRESS
D
FE
P R
O
JE
C T
N O
S
TA
TE
O
F M
A
IN
E
DE
PA
RT
M
EN
T
OF
D
EF
EN
SE
, V
ET
ER
AN
S
AN
D
EM
ER
GE
NC
Y
M
AN
AG
EM
EN
T
En vi ro nm en t &
In fra st ru ct ur e In c.
C on gr es s
St
Su ite
, P or tla nd
M E
P:
(2
) 7
-5
) 7
-4 w
.w sp
.c om
A
B
C
D
E
-1
8-
VE
H
IC
LE
M
AI
N
TE
N
AN
C E
SH
O
P N
AT
IO
N
AL
G U
AR
D
DRAFT
35% REVIEW
60% REVIEW
95% REVIEW
FINAL REVIEW
FOR BIDDING
ISSUED FOR CONSTRUCTION
RECORD DRAWINGS
SA
C
O , M
AI
N
E
A
C DB
KEY PLAN
A
IS
SU
ED
F O
R C
O N
ST
R
U C
TI
O
N
-1 8-
JR
W
D es cr ip tio n
Ap pr
D at e
R ev
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
D
AT
E:
SC
AL
E:
C H
EC
KE
D B
Y:
SHEET ID:
AR
EA
C F
IR
ST
L
EV
EL
U
N D
ER
SL
AB
P
LU
M
BI
N
G P
LA
N
PL103
JS
G
M E
B
M S
D
A S
N O
TE
D
NOTE
1. SEE SHEET P-001 FOR LEGEND ABBREVIATIONS AND GENERAL NOTES
KEYED NOTE
1/8" = 1' - 0" 4' 16'0 8'A1 AREA C FIRST LEVEL UNDERSLAB PLUMBING PLAN
PLAN
NORTH
1. 3" W&T UP TO FD-A.
2. 2" V-UP.
3. 4" S-UP TO FCO-A.
4. 2" W&T-UP.
5. SD PIPING UP TO DOWNSPOUT FROM GUTTERS. REFER TO
ARCHITECTURAL DRAWINGS FOR CONTINUATION.
6. RADON PIT WITH 6" UNDERSLAB PIPING TO VENT. SEE STRUCTURAL
DRAWING FOR RADON PIT DETAIL.
7. 6" RADON UP THRU ROOF.
21 22 23 24 25
B.6
201917 18
C.3
C.5
B.8
MATCH LINE
SEE A1/PL103
MATCH LI
NE
SEE A1/P
L1
4" S-UP
TO FCO-B
4" S-UP
TO FCO-B
4"
4" 4"
4" S-UP
TO FCO-B
4" S
INV ELEV = 56'-10"
FFE = 60'-0"
4" S-UP
TO FCO-B
4" S-UP
TO FCO-B
4" S-UP
TO FCO-B
2" W-UP
4" S-UP
TO FCO-B
2" W-UP
3" S-UP
5' -0
" L
PC
4"
1/8"/FT 1/8"/FT
4" S-UP
4" S-UP
TO FCO-A
1/8"/FT
4"
WORK BAY
WORK BAY
WORK BAY
POWER PRO
WORK BAY
MECH/
ELEC
BULK POL
ANG
CORRIDOR
TELECOM/
IT
JAN
TOOL ROOM,
WHEEL &
TIRE SHOP
RESTROOM
HVAC
WORK BAY
POWER
PRO/HVAC
TOOL ROOM
POWER
PRO/HVAC
OFFICE
3" SD…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Attachment Be.pdf.crdownload | CRDOWNLOAD file | |
| Attachment Ba.pdf.crdownload | CRDOWNLOAD file | |
| Attachment Bb.pdf.crdownload | CRDOWNLOAD file | |
| Attachment Aa.pdf | ||
| Attachment Ab.pdf.crdownload | CRDOWNLOAD file | |
| Attachment Bc.pdf.crdownload | CRDOWNLOAD file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .