ATTACHMENT BARBARA MABRITY PRICING SHEET.xls
XLS spreadsheet 52 KB Posted
- Attached to
- CGC BARBARA MABRITY
- Solicitation number
- 70Z08526QIBCT0069
- Issued by
- Not on record
About this file
This is a pricing schedule for drydock maintenance and repair services for the USCGC Barbara Mabrity (WLM-175) during FY2027. The document outlines over 100 line items with associated unit prices and quantities for a comprehensive vessel availability that includes hull inspection, plating renewal, structural repairs, propulsion system maintenance, and preservation work.
The pricing schedule covers definite items and optional items, with unit pricing based on various measurement types including per-job, square feet, linear feet, hours, and days. Key service categories include hull plating inspection and testing; structural steel renewal at varying weights; underwater body preservation; appendage maintenance; engine and Z-drive propulsion alignment and overhaul; heat exchanger cleaning; sea valve and strainer maintenance; thruster and anchor windlass service; tank cleaning and preservation (fuel, ballast, potable water, sewage, and waste); deck and superstructure preservation; cathodic protection renewal; drydock services; and specialized items such as window and door renewal, piping replacement, and fire detection system upgrades. The schedule includes labor rates by the hour and five layday days, with separate subtotals for definite and optional pricing. Quotations must be submitted to the U.S. Coast Guard by November 6, 2026, at 1:00 p.m. Eastern Time, with quotes valid for 120 days. The contractor's facility serves as the place of performance, with the vessel's home port listed as Mobile, Alabama.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||
| USCGC BARBARA MABRITY (WLM-175) DRYDOCK AVAILABILITY FY2027 | |||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT |
| D-001 | Fire Prevention Requirements | NSP | |
| D-002 | Hull Plating, Side Scan, Ultrasonic Testing | JOB | |
| D-003 | U/W Body, Preserve, 100 percent | JOB | |
| O-004 | Hull Plating Freeboard, Preserve, Partial | JOB | |
| O-005 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | |
| O-006 | Hull and Structural Plating, General, 10.2 lbs. Steel, Renew | SQFT | |
| O-007 | Hull and Structural Plating, General, 12.75 lbs. Steel Plate, Renew | SQFT | |
| O-008 | Hull and Structural Plating, General, 15.3 lbs. Steel Plate, Renew | SQFT | |
| O-009 | Hull And Structural Plating, General, 20.4 lbs. Steel Plate, Renew | SQFT | |
| O-010 | Hull and Structural Plating, General, 7.5 lbs., 3/16 in. Steel Plate, Renew | SQFT | |
| O-011 | Hull and Structural Plating, General, 7.65 lbs. Steel Plate, Renew | SQFT | |
| O-012 | Hull And Structural Plating, General, Cracked Steel Welds, Repairs | LINIAR FT | |
| O-013 | Hull and Structural Plating, General, Degraded Weld, Steel, Repair | LINIAR FT | |
| D-014 | Appendages, U/W, Leak Test | JOB | |
| O-015 | Appendages, U/W, Internal, Preserve | JOB | |
| D-016 | Chain Lockers, Clean and Inspect | JOB | |
| D-017 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | |
| D-018 | Tanks, MP Fuel Service, Clean and Inspect | JOB | |
| D-019 | Tanks, Potable Water, Clean and Inspect | JOB | |
| D-020 | Tanks, Lube Oil, Clean and Inspect | JOB | |
| D-021 | Tanks, Ballast, Clean and Inspect | JOB | |
| D-022 | Voids, Accessible, Clean and Inspect | JOB | |
| D-023 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | |
| D-024 | Hydraulically Operated Cargo Hatch, Inspect and Service | JOB | |
| O-025 | Both Main Diesel Engine Mounts, Renewal | JOB | |
| O-026 | Main Diesel Engine, Check Alignment | JOB | |
| O-027 | Both Z-Drive Propulsion Trains, Alignment | JOB | |
| D-028 | Propulsion Shaft Bulkhead Seals, Overhaul | JOB | |
| D-029 | Z-Drive Input Drive Shaft, Bearings Inspect | JOB | |
| O-030 | Z-Drive Input Drive Shaft, Alignment Check | JOB | |
| D-031 | Z-Drive Propulsion Units, Overhaul | JOB | |
| D-032 | Z-Drive Coolers, Clean and Inspect | JOB | |
| O-033 | Z-Drive Input Drive Shaft, Thrust Bearing Renewal | JOB | |
| D-034 | Heat Exchangers, Clean, Inspect And Hydro | JOB | |
| D-035 | Circuit Breakers (60 Hz), Inspect and Test | JOB | |
| D-036 | Fathometer Transducer, Renew | JOB | |
| D-037 | Underwater Speed Log, Transducers, Renew | JOB | |
| D-038 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | |
| D-039 | Sea Strainers, All Sizes, Renew | JOB | |
| D-040 | Sea Strainers, Duplex, All Sizes, Overhaul | JOB | |
| D-041 | Sea Strainers, Simplex, All Sizes, Clean and Inspect | JOB | |
| O-042 | Sea Bay, Preserve - Partial | JOB | |
| D-043 | Sea Bay, Clean and Inspect | JOB | |
| O-044 | Sea Bay, Preserve 100% | JOB | |
| D-045 | Thruster Unit (General), Overhaul | JOB | |
| D-046 | Thruster Unit Bearings, Renew | JOB | |
| D-047 | Anchor Windlass, Inspect And Service | JOB | |
| D-048 | Anchor Chains and Ground Tackle, Inspect and Repair | JOB | |
| D-049 | Anchor Chain and Ground Tackle, Preserve | JOB | |
| D-050 | Anchors, Preserve | JOB | |
| D-051 | Hawse Pipes, Preserve | JOB | |
| O-052 | Towing Bitts, Chocks, and Fairleads, Inspect and Test | JOB | |
| D-053 | Hull Fittings (Mooring and Towing), Inspect and Test | JOB | |
| D-054 | Warping Capstan (Aft), Inspect and Service | JOB | |
| D-055 | Grey Water Holding Tanks, Clean and Inspect | JOB | |
| D-056 | Sewage Holding Tanks, Clean and Inspect | JOB | |
| O-057 | Tanks, Grey Water Holding, Preserve, Partial | JOB | |
| O-058 | Tanks (Sewage Holding), Preserve, 100 percent | JOB | |
| O-059 | Tanks (Sewage Holding), Preserve, Partial | JOB | |
| O-060 | Tanks, Ballast, Preserve, 100 Percent | JOB | |
| O-061 | Tanks, Ballast, Preserve, Partial | JOB | |
| O-062 | Chain Locker, Preserve, 100 Percent | JOB | |
| O-063 | Tanks, Dirty Oil and Waste, Preserve, 100 Percent, | JOB | |
| O-064 | Tanks, Dirty Oil and Waste, Preserve, Partial, | JOB | |
| O-065 | Tanks, Grey Water Holding, Preserve, 100 Percent | JOB | |
| O-066 | Tanks, MP Fuel Service, Preserve, Partial | JOB | |
| O-067 | Tanks, MP Fuel Storage and Overflow, Preserve, Partial | JOB | |
| O-068 | Tanks, MP Fuel Storage and Overflow, Preserve 100 Percent | JOB | |
| O-069 | Tanks, Potable Water Preserve, 100 Percent | JOB | |
| O-070 | Tanks, Potable Water, Preserve, Partial, | JOB | |
| D-071 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | |
| O-072 | Decks - Exterior, Preserve, Non-Skid MIL-PRF-24667 System, | SQFT | |
| O-073 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | |
| O-074 | Superstructure, Preserve, 100 Percent | JOB | |
| O-075 | Superstructure, Preserve, Partial | JOB | |
| O-076 | Exhaust Stacks, Exterior, Preserve | JOB | |
| O-077 | Exhaust Stacks (Exterior), Preserve - Partial | JOB | |
| D-078 | Cathodic Protection, Zinc Anodes, Renew, | JOB | |
| D-079 | Drydock | JOB | |
| D-080 | Temporary Services, Provide - Cutter | JOB | |
| D-081 | Cargo Hatch Gasket, Renew | JOB | |
| O-082 | Mast (FWD), Preserve | JOB | |
| O-083 | Main Mast, Preserve, 100% | JOB | |
| O-084 | Main Mast, Preserve - Partial | JOB | |
| O-085 | Cargo Hold Deck, Preserve 100% | JOB | |
| O-086 | Superstructure Surfaces (Buoy Deck Area), Preserve | JOB | |
| D-087 | ATON Tie-down, Install | JOB | |
| D-088 | Flame Detectors, Replace | JOB | |
| D-089 | Chief Petty Officer Engineer Stateroom Window, Renew | JOB | |
| D-090 | Watertight Scuttles, Renew | JOB | |
| D-091 | Weathertight Doors, Renew | JOB | |
| D-092 | Buoy Chain Port Renew | JOB | |
| D-093 | Quick Acting Watertight Door, Renew | JOB | |
| D-094 | Fuel Oil (FO) System Piping, Renew | JOB | |
| D-095 | Bow Thruster Room Plating Repair | JOB | |
| D-096 | Engine Room Demister, Inspect, Repair, and Preserve | JOB | |
| D-097 | Supply/Exhaust System, Renew | JOB | |
| D-098 | Exterior Window, Renew | JOB | |
| D-099 | Tenting, Provide | NSP | |
| D-100 | Independent NACE Inspector (Level 3), Provide | NSP | |
| O-00A | Composite Labor Rate | Hour | |
| O-00Z | Laydays (5 Total) | Day (5) | |
| Total Price of Definite Items | |||
| Total Price of Option Items | |||
| Total Price of Definite and Optional Items |
&C(7/16/2026) Draft-2 - Page &P of &N
File details come from the government source that posted it. Updated .