This document is a Statement of Work (SOW) for a federal contract opportunity issued by the U.S. Department of Agriculture (USDA) Forest Service to conduct Golden Eagle surveys in the Cleveland National Forest (CNF) over a one-year period.
The key requirements include: 1) Conduct protocol surveys in approximately 10 Golden Eagle nesting areas within the CNF; 2) Prepare and submit an Interim and Final Report on the survey results. The work will be completed in three phases - pre-field review, field surveys, and documentation of findings. The contractor will be provided government-furnished items such as keys, letters, and data/mapping files to support the surveys. The contract will require a pre-work meeting, and field work is expected to be conducted from December 2024 through 2025. No extended travel is anticipated, and there are no security clearances required. The work must meet strict inspection and acceptance criteria, and failure to perform may result in contract termination.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment H- WD 2015-5635.pdf | ||
| Attachment F- Protocol Survey Data.pdf | ||
| Attachment D- Wildlife Observations.pdf | ||
| Attachment A- Golden Eagle RFQ 127EAT24Q0063.pdf | ||
| Attachment C- Wildlife Data Spreadsheets.pdf | ||
| Attachment G- Definition Glossary.pdf | ||
| Attachment E- Site Locations.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
6.0 Travel
7.0 Contractor’s Key Personnel
8.0 Security Requirements
9.0 Data Rights .............................................................................................. Error! Bookmark not defined.
10.0 Section 508 – Electronic and Information Technology Standards ........ Error! Bookmark not defined.
Attachment
Project Cleveland National Forest Golden Eagle Surveys FY 2024-2025
General Information
1.0 Scope of Work
The Contractor shall furnish all necessary personnel, facilities, equipment, materials, and transportation to perform one year of Golden Eagle Surveys within the Cleveland National Forest (CNF).
2.0 Background
Provide a general description of the requirement, describing the acquisition history (if applicable), the current environment, and the vision of the future of the requirement. If information technology is a factor, provide pertinent technical facts.
Insert Background Here
Contractor Requirements
3.0 Technical Requirements / Tasks
The Contractor shall complete the following: 1) conduct protocol surveys in approximately ten Golden Eagle nesting areas located on the CNF. The survey area is identified in Exhibit A. This contract is to be executed in one year and, 2) prepare and submit an Interim and Final Report on the status of the survey results.
The project will require three phases of work:
I. Pre-field Review: The Contractor shall review maps of survey areas and prioritize work plans according to habitat, terrain, access and priority numbers on the maps. A written work plan with a schedule of survey dates shall be supplied by the Contractor to the Contracting Officer and the Contracting Officer’s Representative before field work begins.
II. Field Surveys and reporting: Surveys shall be performed in sufficient depth and in a manner that conforms to the protocol (Attachment 1). For safety and efficiency, it is expected that surveys will be conducted by helicopter. Phone calls shall be held at least monthly during the field season between the Contractor and the COR to discuss work completed to date. During each phone call the Contractor shall address the following:
1. Golden Eagle nest locations found or not found, and areas surveyed.
2. Any other biological observations of significance such as sightings of rare species.
3. Any problems encountered during survey.
4. Suggestions.
5. Results and status of surveys and if on schedule.
III. Documentation of Findings: See section 5.0 Deliverables.
4.0 Government Furnished
The Government will deliver to the Contractor the following listed materials, supplies, property, and/or services (hereinafter referred to as "Government-furnished property"). The Contractor shall be liable for all loss or damage of such Government-furnished property until completion and final acceptance of all work required under the contract. Signature at the end of this document will indicate that you agree to the Transfer of Government property upon acceptance of Government-furnished property. All Government-furnished property will be given to you in person.
1. Keys to Forest Service gates if applicable.
2. A letter from the Forest stating that you are performing biological work for the CNF (to be provided at onset of work).
3. USFS “Administrative Passes”, allowing contractor to park vehicles on USFS lands (to be provided at onset of work).
4. Data and NRM spreadsheet in electronic files.
5.0 Deliverables / Schedule
Documentation of Findings The contractor shall perform surveys in sufficient depth and in a manner that conforms to the protocol (Attachment 1). The Final Report of Findings shall contain the following information:
o A title page, and sections: Introduction, Methods, Results, Discussion.
o Report shall show on title page the contract number and state that funding was provided by the Cleveland National Forest.
o GPS coordinates shall be recorded in lat long coordinates, WGS 84 datum. Include description of GPS manufacturer and model number used to collect data.
o GPS locations (within 40 feet accuracy) and maps of Golden Eagle responses, nest sites – map legend shall include USGS Quad name, Township, Range, and Section of nest sites, name of person who created map, and date map was created.
o GPS locations with time stamps and accompanying maps of survey transects and call points. Map legend shall include USGS Quad name, Township, Range and Section of survey areas, name of person who created map and date map was created.
o Copies of field notes.
o Photos of nests/roosts and areas where sightings occur.
o Text and table summarizing survey results.
o NRM Wildlife database spreadsheet (Excel spreadsheet).
The Final Report of Findings will be submitted as a digital document.
LEGIBILITY
The Contractor shall ensure that all submitted forms are properly filled out and all information, reports and maps are legible. Any copied forms must be dark enough to be easily read and must include all margins of the form. All writing and marks must be dark enough to reproduce clearly on a copy machine.
GOVERNMENT INSPECTION PROCEDURES
The COR shall determine if the specifications have been met. Failure of the Contractor to meet the specifications shall require prompt corrective action. Repeated failure to meet specifications may be cause for termination of Contractor's right to proceed for default.
The Contractor's work will be inspected prior to acceptance through field reviews, examination of survey and site documentation and review of final report packages. All reports will be inspected for completeness and legibility. Any work that does not conform to the specifications found in this contract will be found unacceptable and shall be corrected at no additional expense to the Government.
The Contractor shall notify the COR/Inspector when work commences and shall keep the COR/Inspector informed of any changes in the Contractor's work schedule.
A final inspection meeting between the Contractor and COR shall be held before final payment is approved or this information may be relayed to the CNF by mail. If not previously submitted, the contractor shall provide the following material to the government: all field survey forms, maps, aerial photos, and Government-furnished property. Final decisions concerning the technical phases of the work and its acceptance will rest with the COR.
ACCEPTANCE
Acceptable work includes presentation of all documentation required in the Project Description of this contract.
If all documentation is not fully legible and correctly completed, or if the inspection results in unsatisfactory findings, the CO will immediately notify the Contractor in writing and direct him/her to improve the quality of the field surveys or reports. Repeated failure to perform at the standards specified may be considered reason for contract termination for default. Rework shall be performed within 5 calendar days or by a predetermined date agreed upon by the COR and contractor after receipt of phone call from the CO of unsatisfactory work. Failure of the Contractor to comply with this order may be cause for the Contractor's right to proceed to be terminated for default.
CONTRACT TIME
The Contractor shall be required to commence work under this contract according to the dates listed below and after the Contractor receives the notice to proceed.
Contract time, whether stated in terms of calendar days or a completion date, has made allowance for inclement weather, fire closures, and seasonal shutdowns. Contract time will run continuously from issuance of the notice to proceed without suspension during periods when no work is performed.
Item Name Required Start Work Date Anticipated Completion Date CNF Golden Eagle surveys July 1st, 2024 December 31, 2025
Start date may vary depending on weather and access. Approval of the CO is needed for any adjustments to the start date.
PRE-WORK MEETING AND WORK PLAN
A pre-work meeting between the Contractor and the CO and COR will be required prior to commencement of fieldwork. The purpose of this meeting is to ensure a clear understanding of the scope of the contract, technical specifications, documentation requirements, and inspection schedules. This meeting will be held in July, 2024. Additional meetings or phone calls may occur quarterly if needed.
Field Work Field work will be conducted during the golden eagle breeding season and is expected to start in December, 2024 and continue into 2025 when the reproductive period ends.
6.0 Travel
No extended travel is anticipated to be required for this contract.
7.0 Contractor’s Key Personnel
For personnel qualifications reference from contract package:
Pagel, JE, DM Whittington, GT Allen. 2010. Interim Golden Eagle Technical Guidance: Inventory and Monitoring Protocols; and Other Recommendations in Support of Golden Eagle Management and Permit Issuance. Pg 17-18.
8.0 Security Requirements
No security clearances are anticipated to be required for this project.
Attachment The following attachments are made a part of this contract:
Exhibit A: Maps of survey area, and historic Golden Eagle sites to be surveyed Attachment 2: NRM Wildlife database spreadsheet
EXHIBIT A
MAPS OF SURVEY AREA
ATTACHMENT 1
FWS Golden Eagle Survey protocol
Reference from contract package Pagel, JE, DM Whittington, GT Allen. 2010. Interim Golden Eagle Technical Guidance: Inventory and Monitoring Protocols; and Other Recommendations in Support of Golden Eagle Management and Permit Issuance. Pg 10-17.
ATTACHMENT 2
NRM Wildlife Database Spreadsheet
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |
| PRE-WORK MEETING AND WORK PLAN |
| Field Work |
| Field work will be conducted during the golden eagle breeding season and is expected to start in December, 2024 and continue into 2025 when the reproductive period ends. |
| 6.0 Travel |
| 7.0 Contractor’s Key Personnel |
| 8.0 Security Requirements |
| Attachment |
File details come from the government source that posted it. Updated .