About this file
This document is a specifications attachment for a paving project by the Oregon Department of Transportation (ODOT) at the The Dalles Maintenance Yard. The project involves cold plane pavement removal, roadway reconditioning, and placement of a 3-inch Hot Mix Asphalt Concrete (HMAC) layer at the maintenance station located at 3313 Bret Clodfelter Way in The Dalles, Oregon. The project will be managed by Ramon Alonso, with a preconstruction conference to be scheduled, and work expected to commence within 10 working days of the meeting. The contractor will be required to submit a detailed project schedule and comply with the 2024 Oregon Standard Specifications for Construction.
The contract specifies that payment will be made upon completion of work, with no retainage held. All work is to be included in the bid items contained in the Bid Schedule, and there will be no separate payments for unlisted items. The specifications provide detailed requirements for mobilization, roadway reconditioning, pavement removal, and asphalt concrete placement, including specific guidelines for materials, paving equipment, and placement techniques. The contractor must utilize dense graded Commercial Asphalt Concrete Pavement (CACP) and follow strict installation protocols outlined in the standard specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00013791 Preliminary Results.xlsx | XLSX spreadsheet | |
| 00013791 Intent To Award.xlsx | XLSX spreadsheet | |
| Culvert Legal Advertisement.pdf.pdf | ||
| Invitation To Bid~4.docx | DOCX document | |
| Attachment A Plans~14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A – Specifications
Special Provisions
PROJECT NAME: The Dalles ODOT Maintenance Yard Paving
SCOPE OF WORK: Work includes cold plane pavement removal, roadway reconditioning, and placement of 3 inch HMAC.
WORK LOCATION: The Dalles Oregon Department of Transportation Maintenance Station, 3313 Bret Clodfelter Way # D, The Dalles, OR 97058.
PROJECT MANAGER:
Ramon Alonso 63055 N. Hwy 97. Bldg. M Bend, OR 97701 Phone: (541) 419-9481 Email: Ramon.ALONSO@odot.oregon.gov
APPLICABLE SPECIFICATIONS: The Specifications which are applicable to the work on this project are the 2024 Oregon Standard Specifications for Construction (“Standard Specifications”), which are by this reference incorporated herein and the Special Provisions. The Standard Specifications include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Specifications. Sections of the technical specifications not identified in the Plans and Specifications remain applicable to the Contract according to their original terms.
Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Specifications as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:
http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx
COOPERATION WITH UTILITIES: This project is located within the Oregon Utility Notification Center area, which is a utilities notification system for notifying owners of utilities about work being performed in the vicinity of their facilities. The contractor shall notify owners of Utilities prior to the performance of work in the vicinity of their Utilities. The utilities notification system telephone number is 811 (or use the old number which is 1-800-332-2344).
PAYMENT: Payment for all work under this contract is to be included in the bid items contained in the Bid Schedule. Payment constitutes full compensation to the Contractor for furnishing all Materials, Equipment, labor and incidentals necessary to complete the work as specified. There will be no separate payment for items not listed, as that work will be included in payment made for the items listed in the Bid Schedule.
PAYMENT TO CONTRACTOR: The Contractor shall be paid upon completion of contract work. A bill must be submitted to the Project Manager for payment processing. There shall be no retainage for work performed under this contract.
PRECONSTRUCTION CONFERENCE, SCHEDULE AND LIMITATIONS OF OPERATIONS: The Contractor shall meet with the Project Manager for a preconstruction conference at a mutually agreed upon time. Work shall commence within 10 working days of this meeting providing the Notice to Proceed has been received. At the preconstruction conference, submit a project schedule to plan, coordinate and control the progress of construction and traffic control installations. The project schedules will take into account the orderly, timely, and efficient prosecution of the work in sufficient detail to enable both the Contractor and the Project Manager to plan, coordinate, appraise, document, and control their respective contract responsibilities. The predicted Completion date(s) for the project schedule shall be within the specified contract time.
SECTION 00210 - MOBILIZATION
Comply with Section 00210 of the Standard Specifications.
SECTION 00610 – RECONDITIONING EXISTING ROADWAY
Comply with Section 00610 of the Standards Specifications.
SECTION 00620 – COLD PLANE PAVEMENT REMOVAL
Comply with Section 00620 of the Standards Specifications.
SECTION 00740 – COMMERCIAL ASPHALT CONCRETE PAVEMENT (CACP)
Comply with Section 00740 of the Standards Specifications modified as follows:
00740.10 Materials – Replace the last sentence of this subsection with the following:
The contractor shall utilize ½ Inch Dense Graded CACP.
Add the following subsection:
00740.20 General – Provide Pavers according to Section 00744.23 and Compactors according to Section 00744.24.
00740.44 Placing Asphalt Concrete – Replace the first paragraph of this subsection with the following:
Place the Commercial Asphalt Concrete Pavement (CACP) according to Sections 00744.40, 00744.41, 00744.42, 00744.43, 00744.44, 00744.45, and 00744.60.