Attachment_B_Scope_of_Work.docx

DOCX document 16 KB Posted

Attached to
MSU IFB Brand Specific Aerowerks Rotary Tray Accumulator/Conveyor System Purchase and Installation
Solicitation number
MSU-IFB-2027-0880
Issued by
Montana

About this file

This Scope of Work document outlines the contractor's responsibilities for furnishing, delivering, installing, testing, and placing into operation an Aerowerks Rotary Tray Accumulator/Conveyor System for Montana State University Culinary Services at a high-volume residential dining facility. The contractor must provide the complete system with all associated components, coordinate with University personnel on scheduling and site access, deliver equipment to the project site, and perform all installation labor, supervision, and services in accordance with project drawings and manufacturer requirements. Key responsibilities include integrating the new system with existing dish room operations and utility connections, performing operational testing and startup activities, correcting any installation-related deficiencies, providing on-site training to University personnel, and supplying applicable warranties and operating manuals. The system must be delivered by the end of April 2027, with installation and replacement of the existing tray accumulator/conveyor system anticipated to occur in May 2027 following Montana State University's Spring Commencement activities. The contractor must complete installation and achieve full system operability no later than August 2, 2027.

The Scope of Work document does not specify pricing terms, payment schedules, contract duration, or renewal options. No set-asides are identified in this document. The solicitation is identified as IFB MSU-IFB-2027-0880 with bids due November 16, 2026 at 2:00 p.m. MST. Bidders must submit a current W-9, company information, contract liaison details, and manufacturer descriptive literature demonstrating compliance with specifications. The University requires disclosure of all costs in proposals, with undisclosed costs deemed non-applicable and the University bearing no liability for payment. Bidders must certify nondiscrimination against firearm entities and trade associations under Montana Code Annotated 30-20-301 and disclose any use of artificial intelligence in proposal development. Payment terms are Net 30 with no early-payment discount, and successful bidders must register in SmartBuyMSU, the University's e-procurement platform.

View the file

Other files

File Type Posted
Attachment_A_Required_Specifications.docx DOCX document
PD-78 MSU Standard Terms Conditions_11.20.2023msuLC.pdf PDF
1460262-event.pdf PDF
DRAFT contract .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B: Aerowerks Rotary Tray Accumulator/Conveyor System Scope of Work

The Contractor shall furnish, deliver, install, test, and place into operation an Aerowerks Rotary Tray Accumulator/Conveyor System for Montana State University Culinary Services at a high-volume residential dining facility.

The Contractor's responsibilities shall include:

· Providing an Aerowerks Rotary Tray Accumulator/Conveyor System and all associated components necessary for a complete and fully operational installation.

· Coordinating with University personnel regarding project scheduling, site access, installation requirements, and project execution.

· Delivering all equipment to the project site and inspecting equipment upon arrival to verify completeness and condition.

· Providing labor, supervision, materials, equipment, and services necessary to install and commission the system in accordance with the project drawings, manufacturer's requirements, and final field conditions.

· Coordinating integration of the new system with the existing dish room operation, dish machine, utility connections, and building components identified for reuse.

· Performing operational testing, startup activities, adjustments, and verification of all system functions to ensure proper performance.

· Correcting installation-related deficiencies identified during testing and startup.

· Providing on-site training to University personnel on the operation and routine use of the system.

· Providing all applicable warranties and operating manuals customarily supplied with the equipment.

The Contractor shall deliver the system by the end of April 2027. Installation and replacement of the existing tray accumulator/conveyor system are anticipated to occur in May 2027, following Montana State University's Spring Commencement activities. The Contractor shall complete installation within this timeframe, and the system shall be fully operational no later than August 2, 2027.