Attachment B - ScheduleOfItems SNRASawtooth.pdf

PDF 146 KB Posted

Attached to
SNRA Window & Door Replacement Project
Solicitation number
1240LT26Q0050
Issued by

About this file

This is a pricing schedule for the Sawtooth National Recreation Area Admin Site Window & Door Replacements Project, located in the Sawtooth National Forest in Blaine & Custer County, Idaho.

The schedule itemizes 17 base contract line items and 2 optional line items for which contractors must provide unit or lump sum pricing. Base items include 12 fiberglass exterior doors and sliding patio doors (quantities ranging from 1 to 4 units each) and 5 fiberglass window replacement projects priced as lump sums. Option Item #1 comprises 2 steel garage doors (1 each for Housing Units #2 and #5), and Option Item #2 includes 1 fiberglass window replacement project for the NF Warehouse. All base items use Contract Quantities (DQ) as the method of measurement, while window replacement items use Lump Sum Quantities (LSQ). Options are awarded at the time of initial contract award as funds allow. Performance and payment bonds are required at 100% of the original contract price if the contract value exceeds $150,000, with bonds due within 10 days of award. For contracts exceeding $35,000 but not exceeding $150,000, only payment protections are required, with an irrevocable letter of credit or payment bond permitted per FAR 52.228-13, due within 10 days of contract award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment B – The Schedule Sawtooth National Recreation Area Admin Site Window & Door Replacements Project

Sawtooth National Forest Sawtooth National Recreation Area

Blaine & Custer County, Idaho

* Designated Method of Measurement:

AQ - Actual Quantities

DQ – Contract Quantities LSQ - Lump Sum Quantities

Schedule of Items

Base Item No. Description Qty Unit of

Measure Method of Measure Unit Price Total Price

1 Solid Fiberglass Exterior Door – Housing Unit #1 1 Each DQ $_________ $_____________

2 Solid Fiberglass Exterior Door – Housing Unit #2 1 Each DQ $_________ $_____________

3 Solid Fiberglass Exterior Door – Housing Unit #4 2 Each DQ $_________ $_____________

4 Fiberglass Exterior Door with Glass – Housing Unit #5 3 Each DQ $_________ $_____________

5 Solid Fiberglass Exterior Door – Housing Unit #6 4 Each DQ $_________ $_____________

6 Fiberglass Exterior Door with Glass – Housing Unit #7 2 Each DQ $_________ $_____________

7 Solid Fiberglass Exterior Door – Housing Unit #8 3 Each DQ $_________ $_____________

8 Solid Fiberglass Exterior Door – Housing Unit #12 2 Each DQ $_________ $_____________

9 Fiberglass Sliding Patio Door – Housing Unit #1 1 Each DQ $_________ $_____________

10 Fiberglass Sliding Patio Door – Housing Unit #2 1 Each DQ $_________ $_____________

11 Fiberglass Sliding Patio Door – Housing Unit #3 1 Each DQ $_________ $_____________

12 Fiberglass Sliding Patio Door – Housing Unit #4 1 Each DQ $_________ $_____________

13 Fiberglass Window Replacement Complete – Housing Unit #6 1 Lump

Sum LSQ $_________ $_____________

14 Fiberglass Window Replacement Complete – Housing Unit #7 1 Lump

Sum LSQ $_________ $_____________

15 Fiberglass Window Replacement Complete – Housing Unit #8 1 Lump

Sum LSQ $_________ $_____________

16 Fiberglass Window Replacement Complete – Housing Unit #12 1 Lump

Sum LSQ $_________ $_____________

17 Fiberglass Window Replacement Complete – Caretaker’s House 1 Lump

Sum LSQ $_________ $_____________

TOTAL BASE $_____________________

Option Item #1 Item No. Description Qty Unit of

Measure Method of Measure Unit Price Total Price

1 Steel Garage Door – Housing Unit #2 1 Each DQ $_________ $_____________

2 Steel Garage Door – Housing Unit #5 1 Each DQ $_________ $_____________

TOTAL OPTION ITEM #1 $_________________________

Option Item #2 Item No. Description Qty Unit of

Measure Method of Measure Unit Price Total Price

1 Fiberglass Window Replacement Complete – NF Warehouse 1 LS LSQ $_________ $_____________

TOTAL OPTION ITEM #2 $_________________________

GRAND TOTAL – BASE plus OPTION ITEM #1 plus

OPTION ITEM #2 $________________________

*Schedule Notes: Options are to be awarded at time of initial award, as funds allow.

*Performance and Payment Bonds: Both required at 100% of original contract price if value in excess of $150,000, due 10 days after award. Only payment protections required for contracts exceeding $35,000 but not exceeding $150,000, irrevocable letter or credit or payment bond allowed per FAR 52.228-13, due within 10 days of contract award.

File details come from the government source that posted it. Updated .