Attachment_B_-_Schedule_of_Work_Items.docx

DOCX document 29 KB Posted

Attached to
HAULOUT, INSPECTION, MAINTENANCE AND REPAIR OF RES
Solicitation number
140G0224Q0200
Issued by

About this file

This document is an attachment titled "Attachment_B_-_Schedule_of_Work_Items.docx" that provides a schedule of pricing for the maintenance and repair of the research vessel ARCTICUS. The key details include:

The schedule lists various work items and associated prices, including hauling/launching, hull maintenance, valve repair, propulsion system inspection and repair, tank maintenance, and other miscellaneous modifications. It specifies the contractor's fully loaded labor rates will be used for negotiating any necessary change orders, and provides examples of direct production labor categories. This attachment is associated with Solicitation Number 140G0224Q0200 for the "HAULOUT, INSPECTION, MAINTENANCE AND REPAIR OF RESEARCH VESSEL ARCTICUS", issued by the Department of the Interior US Geological Survey Office of Acquisitions and Grants.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel ARCTICUS

Spec. Ref.

WORK ITEM
PRICE
4.1
Hauling, Blocking and Launching
6.01
Hull High Pressure Wash and Visual Inspection
6.02
Hull Appendage Leak Test
6.03
Underwater Hull Coating Inspection
Option
6.04
Repair Underwater Hull Coating
Option
6.05
Repaint Aft Deck
7.01
Valve Repair
7.02
Inspect Rudders, and Bearings
7.03
Inspect Propulsion Shafts
7.04
Renew Propulsion Shaft Seals
7.05
Inspect, Clean, and Refurbish Propellers
7.06
Inspect Bow Thruster
8.01
Open, Clean and Inspect Tanks
8.02
Install Wire Chase to Pilothouse
8.03
Modify Stack Fire Damper
option
8.04
Replace Wet Lab WT Door
option
8.05
Replace Port Generator
option
8.06
Modify Net Reel Mounts

TOTAL

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002