July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel ARCTICUS
Spec. Ref.
| 4.1 |
| Hauling, Blocking and Launching |
| 6.01 |
| Hull High Pressure Wash and Visual Inspection |
| 6.02 |
| Hull Appendage Leak Test |
| 6.03 |
| Underwater Hull Coating Inspection |
| Option |
| 6.04 |
| Repair Underwater Hull Coating |
| Option |
| 6.05 |
| Repaint Aft Deck |
| 7.02 |
| Inspect Rudders, and Bearings |
| 7.03 |
| Inspect Propulsion Shafts |
| 7.04 |
| Renew Propulsion Shaft Seals |
| 7.05 |
| Inspect, Clean, and Refurbish Propellers |
| 7.06 |
| Inspect Bow Thruster |
| 8.01 |
| Open, Clean and Inspect Tanks |
| 8.02 |
| Install Wire Chase to Pilothouse |
| 8.03 |
| Modify Stack Fire Damper |
| option |
| 8.04 |
| Replace Wet Lab WT Door |
| option |
| 8.05 |
| Replace Port Generator |
| (This optional work item is deleted in its entirety per Amend. 0001 of RFQ 140G0224Q0200) |
| option |
| 8.06 |
| Modify Net Reel Mounts |
TOTAL
LABOR RATES
Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:
Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing
Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:
Planning Quality Assurance Testing Engineering Design Lofting
| G14PS00428 |
| Attachment D Schedule of Pricing |
Amendment 0002