This is a pricing schedule for the State of Michigan's Request for Proposal No. 220000001506 for as-needed guardrail maintenance and repair services in Baraga and Houghton Counties. The scope of work encompasses a comprehensive range of guardrail-related services including furnishing and installing various guardrail types (MGS-8, MGS-8D, Type B, Type T), bridge railings, approach terminals in multiple configurations (Type 1B, Type 2B, Type 2M variants), impact head assemblies, steel and wood posts in various heights, guardrail offset blocks, reflective sheeting, and terminal components. The pricing schedule lists 102 line items with estimated annual quantities ranging from 1 to 300 units, depending on the service type. Services also include mobilization costs for specific county routes (M-28, M-38, US-41, US-141, M-26, M-203) and traffic control measures such as shoulder closures, lane closures with flag control, and winter repair work. The contract is structured on an as-needed basis with actual work to be determined by the State's Program Manager at scheduled kick-off meetings.
Vendors are required to complete the pricing schedule by entering labor and material costs for each line item, with the total unit cost and annual cost calculated by formula. The State explicitly disclaims any obligation to purchase the listed estimated quantities, which are based on prior usage patterns. All mobilization costs will be paid only once per day based on the work location furthest from the contractor's equipment storage facility. Winter repair work pricing includes costs for snow removal and equipment cleaning necessary to perform guardrail repairs during winter conditions. The contract term and renewal options, along with specific response and award dates, are not detailed in this pricing schedule document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Company Name: |
| STATE OF MICHIGAN |
Request For Proposal No. 220000001506 As-Needed Guardrail Maintenance and Repair Services for Baraga and Houghton Counties
| SCHEDULE B-PRICING | ||||
| # | DESCRIPTION OF SERVICES | UNIT OF MEASURE | ESTIMATED QUANTITIES for 1 year | Installation, Labor,Set Up, Handling, Cost |
(Vendor to Complete) Material /Base Cost for listed service Items
(Vendor Complete) Total Unit Cost
Annual Cost
(formula to populate)
| 1 | Guardrail, Type MGS-8, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 2 | Guardrail, Type MGS-8D, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 3 | Bridge Railing, Thrie Beam Retrofit, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 4 | Guardrail Anch, Bridge 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 5 | Guardrail Anch, Bridge 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 6 | Guardrail Anch, Bridge, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 7 | Guardrail Approach Terminal Type 1B Cable Assembly | Ea | 1.00 | $0.00 | $0.00 |
| 8 | Guardrail Approach Terminal Type 1B Struts | Ea | 1.00 | $0.00 | $0.00 |
| 9 | Guardrail Approach Terminal Type 2B Cable Assembly | Ea | 1.00 | $0.00 | $0.00 |
| 10 | Guardrail Approach Terminal Type 2B Struts | Ea | 1.00 | $0.00 | $0.00 |
| 11 | Guardrail Approach Terminal Type 2M Cable Assembly | Ea | 2.00 | $0.00 | $0.00 |
| 12 | Guardrail Approach Terminal Type 2M Struts | Ea | 2.00 | $0.00 | $0.00 |
| 13 | Guardrail Approach Terminal, Type 1B (FLEAT) | Ea | 1.00 | $0.00 | $0.00 |
| 14 | Guardrail Approach Terminal, Type 1B (FLEAT) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 15 | Guardrail Approach Terminal, Type 1B (FLEAT) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 16 | Guardrail Approach Terminal, Type 1B (FLEAT) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 17 | Guardrail Approach Terminal, Type 1B (FLEAT-SP) | Ea | 1.00 | $0.00 | $0.00 |
| 18 | Guardrail Approach Terminal, Type 1B (FLEAT-SP) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 19 | Guardrail Approach Terminal, Type 1B (FLEAT-SP) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 20 | Guardrail Approach Terminal, Type 1B (FLEAT-SP) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 21 | Guardrail Approach Terminal, Type 1B (SRT) | Ea | 1.00 | $0.00 | $0.00 |
| 22 | Guardrail Approach Terminal, Type 1B (SRT) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 23 | Guardrail Approach Terminal, Type 1B (SRT) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 24 | Guardrail Approach Terminal, Type 1B (SRT) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 25 | Guardrail Approach Terminal, Type 2B (ET) | Ea | 1.00 | $0.00 | $0.00 |
| 26 | Guardrail Approach Terminal, Type 2B (ET) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 27 | Guardrail Approach Terminal, Type 2B (ET) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 28 | Guardrail Approach Terminal, Type 2B (ET) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 29 | Guardrail Approach Terminal, Type 2B (ET) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 30 | Guardrail Approach Terminal, Type 2B (SKT) | Ea | 1.00 | $0.00 | $0.00 |
| 31 | Guardrail Approach Terminal, Type 2B (SKT) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 32 | Guardrail Approach Terminal, Type 2B (SKT) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 33 | Guardrail Approach Terminal, Type 2B (SKT) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 34 | Guardrail Approach Terminal, Type 2B (SKT) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 35 | Guardrail Approach Terminal, Type 2B (SKT-SP) | Ea | 1.00 | $0.00 | $0.00 |
| 36 | Guardrail Approach Terminal, Type 2B (SKT-SP) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 37 | Guardrail Approach Terminal, Type 2B (SKT-SP) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 38 | Guardrail Approach Terminal, Type 2B (SKT-SP) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 39 | Guardrail Approach Terminal, Type 2B (SKT-SP) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 40 | Guardrail Approach Terminal, Type 2M (MAX-Tension) | Ea | 1.00 | $0.00 | $0.00 |
| 41 | Guardrail Approach Terminal, Type 2M (MAX-Tension) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 42 | Guardrail Approach Terminal, Type 2M (MAX-Tension) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 43 | Guardrail Approach Terminal, Type 2M (MAX-Tension) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 44 | Guardrail Approach Terminal, Type 2M (MAX-Tension) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 45 | Guardrail Approach Terminal, Type 2M (MSKT) | Ea | 1.00 | $0.00 | $0.00 |
| 46 | Guardrail Approach Terminal, Type 2M (MSKT) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 47 | Guardrail Approach Terminal, Type 2M (MSKT) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 48 | Guardrail Approach Terminal, Type 2M (MSKT) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 49 | Guardrail Approach Terminal, Type 2M (MSKT) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 50 | Guardrail Approach Terminal, Type 2M (MKST) 5th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 51 | Guardrail Approach Terminal, Type 2M (Soft-Stop) | Ea | 1.00 | $0.00 | $0.00 |
| 52 | Guardrail Approach Terminal, Type 2M (Soft-Stop) 1st Panel | Ea | 1.00 | $0.00 | $0.00 |
| 53 | Guardrail Approach Terminal, Type 2M (Soft-Stop) 2nd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 54 | Guardrail Approach Terminal, Type 2M (Soft-Stop) 3rd Panel | Ea | 1.00 | $0.00 | $0.00 |
| 55 | Guardrail Approach Terminal, Type 2M (Soft-Stop) 4th Panel | Ea | 1.00 | $0.00 | $0.00 |
| 56 | Guardrail Departing Terminal, Type B | Ea | 1.00 | $0.00 | $0.00 |
| 57 | Guardrail Departing Terminal, Type MGS | Ea | 1.00 | $0.00 | $0.00 |
| 58 | Guardrail Reflector | Ea | 16.00 | $0.00 | $0.00 |
| 59 | Delineation, Bidirectional, Guardrail, Offset Block Mtd | Ea | 10.00 | $0.00 | $0.00 |
| 60 | Guardrail, Type B, Furn and Install | Ft | 300.00 | $0.00 | $0.00 |
| 61 | Guardrail, Type T, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 62 | Guardrail Beam Element, Type B, Furn and Install | Ft | 300.00 | $0.00 | $0.00 |
| 63 | Guardrail Beam Element, Type MGS, Furn and Install | Ft | 100.00 | $0.00 | $0.00 |
| 64 | Guardrail Approach Terminal, Type 1B, Beam Element, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 65 | Guardrail Approach Terminal, Type 2B, Beam Element, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 66 | Guardrail Approach Terminal, Type 2M, Beam Element, Furn and Install | Ft | 25.00 | $0.00 | $0.00 |
| 67 | Impact Head Assembly (ET-2000/Plus) | Ea | 1.00 | $0.00 | $0.00 |
| 68 | Impact Head Assembly (FLEAT/FLEAT-SP/FLEAT-MT) | Ea | 1.00 | $0.00 | $0.00 |
| 69 | Impact Head Assembly (SKT/SKT-SP) | Ea | 1.00 | $0.00 | $0.00 |
| 70 | Impact Head Assembly (MAX-Tension) | Ea | 1.00 | $0.00 | $0.00 |
| 71 | Impact Head Assembly (MSKT) | Ea | 1.00 | $0.00 | $0.00 |
| 72 | Impact Head Assembly (Soft-Stop) | Ea | 1.00 | $0.00 | $0.00 |
| 73 | Special End Shoe, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 74 | Steel Guardrail Post, 72 inches, Furn and Install | Ea | 5.00 | $0.00 | $0.00 |
| 75 | Steel Guardrail Post, 84 inches, Furn and Install | Ea | 5.00 | $0.00 | $0.00 |
| 76 | Steel Guardrail Post, 96 inches, Furn and Install | Ea | 5.00 | $0.00 | $0.00 |
| 77 | Steel Guardrail Post, 108 inches, Furn and Install | Ea | 5.00 | $0.00 | $0.00 |
| 78 | Wood Guardrail Post, CRT, Furn and Install | Ea | 10.00 | $0.00 | $0.00 |
| 79 | Wood Breakaway Guardrail Post, Furn and Install | Ea | 10.00 | $0.00 | $0.00 |
| 80 | Guardrail Offset Block, Furn and Install | Ea | 55.00 | $0.00 | $0.00 |
| 81 | MSKT Post #1 Top, Furn and Install | Ea | 3.00 | $0.00 | $0.00 |
| 82 | MSKT Post #1 Bottom, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 83 | MSKT Post #2 Top, Furn and Install | Ea | 2.00 | $0.00 | $0.00 |
| 84 | MSKT Post #2 Bottom, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 85 | SKT Post #1 Top, Furn and Install | Ea | 3.00 | $0.00 | $0.00 |
| 86 | SKT Post #1 Bottom, Furn and Install | Ea | 2.00 | $0.00 | $0.00 |
| 87 | SKT Post #2 Top, Furn and Install | Ea | 2.00 | $0.00 | $0.00 |
| 88 | SKT Post #2 Bottom, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 89 | Steel Sleeve and Soil Plate for Guardrail Approach Terminal Post | Ea | 2.00 | $0.00 | $0.00 |
| 90 | 18 x 18 Reflective Sheeting, Furn and Install | Ea | 4.00 | $0.00 | $0.00 |
| 91 | Terminal End Shoe, Type B, Furn and Install | Ea | 5.00 | $0.00 | $0.00 |
| 92 | Thrie Beam Terminal Connector, Furn and Install | Ea | 1.00 | $0.00 | $0.00 |
| 93 | Thrie Beam Transition, Furn and Install | Ea | 2.00 | $0.00 | $0.00 |
| 94 | Mobilization M-28 Houghton County | Wday | 2.00 | $0.00 | $0.00 |
| 95 | Moblization M-38 Houghton County | Wday | 2.00 | $0.00 | $0.00 |
| 96 | Mobilization M-28, M-38, US-41, US-141 Baraga County | Wday | 5.00 | $0.00 | $0.00 |
| 97 | Mobilization M-26, M-203, US-41 Houghton County | Wday | 5.00 | $0.00 | $0.00 |
| 98 | Shoulder Closure | Wday | 2.00 | $0.00 | $0.00 |
| 99 | Single Lane Closure in Multi-Lane Section | Wday | 2.00 | $0.00 | $0.00 |
| 100 | Single Lane Closure with Flag Control and Temp Rumble Strips | Wday | 2.00 | $0.00 | $0.00 |
| 101 | Single Lane Closure with Flag Control | Wday | 8.00 | $0.00 | $0.00 |
| 102 | Winter Repair Work* | Wday | 4.00 | $0.00 | $0.00 |
| TOTAL | $0.00 | ||||
| Listed Quantities are estimates only from prior usage. The State is not obligated to purchase any listed quantity. | |||||
| Specific project locations will be identified at stated Kick-Off Meetings. | |||||
| Actual work performed will be determined by the Program Manager or their designee on an as-needed basis. | |||||
| The State is not obligated to purchase any listed quantity. | |||||
| Only one mobilization will be paid per day, it will be based on the work location that is furthest from the Contractor's Equipment Storage Facility. | |||||
| *Winter Repair Work will be paid for days that require the removal of snow to repair guardrail and includes the cost of cleaning equipment for winter repairs. |