Attachment B Schedule B-Pricing.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
As-Needed Guardrail Maintenance, Baraga & Houghton Counties
Solicitation number
RFP - 591 - 220000001506
Issued by
Baraga County, Houghton County, Michigan

About this file

This document is an attachment, titled "Schedule B-Pricing," related to a Request for Proposal (RFP) issued by the State of Michigan for As-Needed Guardrail Maintenance and Repair Services for Baraga and Houghton Counties. The RFP includes a detailed pricing schedule for various guardrail installation, labor, and material services, with estimated quantities for a 1-year term. The services requested include furnishing and installing different types of guardrail, approach terminals, and associated components. The State is not obligated to purchase any listed quantities, and specific project locations will be identified at kick-off meetings.

The pricing schedule provides unit costs and estimated annual costs for over 100 line items. Pricing is requested for mobilization, shoulder closures, lane closures, and winter repair work. The State will only pay for one mobilization per day, based on the location furthest from the contractor's equipment storage facility. The listed quantities are estimates only, and the actual work performed will be determined by the program manager on an as-needed basis.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Company Name:
STATE OF MICHIGAN

Request For Proposal No. 220000001506 As-Needed Guardrail Maintenance and Repair Services for Baraga and Houghton Counties

SCHEDULE B-PRICING
#DESCRIPTION OF SERVICESUNIT OF MEASUREESTIMATED QUANTITIES for 1 yearInstallation, Labor,Set Up, Handling, Cost

(Vendor to Complete) Material /Base Cost for listed service Items

(Vendor Complete) Total Unit Cost

Annual Cost

(formula to populate)

1Guardrail, Type MGS-8, Furn and InstallFt25.00$0.00$0.00
2Guardrail, Type MGS-8D, Furn and InstallFt25.00$0.00$0.00
3Bridge Railing, Thrie Beam Retrofit, Furn and InstallFt25.00$0.00$0.00
4Guardrail Anch, Bridge 1st PanelEa1.00$0.00$0.00
5Guardrail Anch, Bridge 2nd PanelEa1.00$0.00$0.00
6Guardrail Anch, Bridge, Furn and InstallEa1.00$0.00$0.00
7Guardrail Approach Terminal Type 1B Cable AssemblyEa1.00$0.00$0.00
8Guardrail Approach Terminal Type 1B StrutsEa1.00$0.00$0.00
9Guardrail Approach Terminal Type 2B Cable AssemblyEa1.00$0.00$0.00
10Guardrail Approach Terminal Type 2B StrutsEa1.00$0.00$0.00
11Guardrail Approach Terminal Type 2M Cable AssemblyEa2.00$0.00$0.00
12Guardrail Approach Terminal Type 2M StrutsEa2.00$0.00$0.00
13Guardrail Approach Terminal, Type 1B (FLEAT)Ea1.00$0.00$0.00
14Guardrail Approach Terminal, Type 1B (FLEAT) 1st PanelEa1.00$0.00$0.00
15Guardrail Approach Terminal, Type 1B (FLEAT) 2nd PanelEa1.00$0.00$0.00
16Guardrail Approach Terminal, Type 1B (FLEAT) 3rd PanelEa1.00$0.00$0.00
17Guardrail Approach Terminal, Type 1B (FLEAT-SP)Ea1.00$0.00$0.00
18Guardrail Approach Terminal, Type 1B (FLEAT-SP) 1st PanelEa1.00$0.00$0.00
19Guardrail Approach Terminal, Type 1B (FLEAT-SP) 2nd PanelEa1.00$0.00$0.00
20Guardrail Approach Terminal, Type 1B (FLEAT-SP) 3rd PanelEa1.00$0.00$0.00
21Guardrail Approach Terminal, Type 1B (SRT)Ea1.00$0.00$0.00
22Guardrail Approach Terminal, Type 1B (SRT) 1st PanelEa1.00$0.00$0.00
23Guardrail Approach Terminal, Type 1B (SRT) 2nd PanelEa1.00$0.00$0.00
24Guardrail Approach Terminal, Type 1B (SRT) 3rd PanelEa1.00$0.00$0.00
25Guardrail Approach Terminal, Type 2B (ET)Ea1.00$0.00$0.00
26Guardrail Approach Terminal, Type 2B (ET) 1st PanelEa1.00$0.00$0.00
27Guardrail Approach Terminal, Type 2B (ET) 2nd PanelEa1.00$0.00$0.00
28Guardrail Approach Terminal, Type 2B (ET) 3rd PanelEa1.00$0.00$0.00
29Guardrail Approach Terminal, Type 2B (ET) 4th PanelEa1.00$0.00$0.00
30Guardrail Approach Terminal, Type 2B (SKT)Ea1.00$0.00$0.00
31Guardrail Approach Terminal, Type 2B (SKT) 1st PanelEa1.00$0.00$0.00
32Guardrail Approach Terminal, Type 2B (SKT) 2nd PanelEa1.00$0.00$0.00
33Guardrail Approach Terminal, Type 2B (SKT) 3rd PanelEa1.00$0.00$0.00
34Guardrail Approach Terminal, Type 2B (SKT) 4th PanelEa1.00$0.00$0.00
35Guardrail Approach Terminal, Type 2B (SKT-SP)Ea1.00$0.00$0.00
36Guardrail Approach Terminal, Type 2B (SKT-SP) 1st PanelEa1.00$0.00$0.00
37Guardrail Approach Terminal, Type 2B (SKT-SP) 2nd PanelEa1.00$0.00$0.00
38Guardrail Approach Terminal, Type 2B (SKT-SP) 3rd PanelEa1.00$0.00$0.00
39Guardrail Approach Terminal, Type 2B (SKT-SP) 4th PanelEa1.00$0.00$0.00
40Guardrail Approach Terminal, Type 2M (MAX-Tension)Ea1.00$0.00$0.00
41Guardrail Approach Terminal, Type 2M (MAX-Tension) 1st PanelEa1.00$0.00$0.00
42Guardrail Approach Terminal, Type 2M (MAX-Tension) 2nd PanelEa1.00$0.00$0.00
43Guardrail Approach Terminal, Type 2M (MAX-Tension) 3rd PanelEa1.00$0.00$0.00
44Guardrail Approach Terminal, Type 2M (MAX-Tension) 4th PanelEa1.00$0.00$0.00
45Guardrail Approach Terminal, Type 2M (MSKT)Ea1.00$0.00$0.00
46Guardrail Approach Terminal, Type 2M (MSKT) 1st PanelEa1.00$0.00$0.00
47Guardrail Approach Terminal, Type 2M (MSKT) 2nd PanelEa1.00$0.00$0.00
48Guardrail Approach Terminal, Type 2M (MSKT) 3rd PanelEa1.00$0.00$0.00
49Guardrail Approach Terminal, Type 2M (MSKT) 4th PanelEa1.00$0.00$0.00
50Guardrail Approach Terminal, Type 2M (MKST) 5th PanelEa1.00$0.00$0.00
51Guardrail Approach Terminal, Type 2M (Soft-Stop)Ea1.00$0.00$0.00
52Guardrail Approach Terminal, Type 2M (Soft-Stop) 1st PanelEa1.00$0.00$0.00
53Guardrail Approach Terminal, Type 2M (Soft-Stop) 2nd PanelEa1.00$0.00$0.00
54Guardrail Approach Terminal, Type 2M (Soft-Stop) 3rd PanelEa1.00$0.00$0.00
55Guardrail Approach Terminal, Type 2M (Soft-Stop) 4th PanelEa1.00$0.00$0.00
56Guardrail Departing Terminal, Type BEa1.00$0.00$0.00
57Guardrail Departing Terminal, Type MGSEa1.00$0.00$0.00
58Guardrail ReflectorEa16.00$0.00$0.00
59Delineation, Bidirectional, Guardrail, Offset Block MtdEa10.00$0.00$0.00
60Guardrail, Type B, Furn and InstallFt300.00$0.00$0.00
61Guardrail, Type T, Furn and InstallFt25.00$0.00$0.00
62Guardrail Beam Element, Type B, Furn and InstallFt300.00$0.00$0.00
63Guardrail Beam Element, Type MGS, Furn and InstallFt100.00$0.00$0.00
64Guardrail Approach Terminal, Type 1B, Beam Element, Furn and InstallFt25.00$0.00$0.00
65Guardrail Approach Terminal, Type 2B, Beam Element, Furn and InstallFt25.00$0.00$0.00
66Guardrail Approach Terminal, Type 2M, Beam Element, Furn and InstallFt25.00$0.00$0.00
67Impact Head Assembly (ET-2000/Plus)Ea1.00$0.00$0.00
68Impact Head Assembly (FLEAT/FLEAT-SP/FLEAT-MT)Ea1.00$0.00$0.00
69Impact Head Assembly (SKT/SKT-SP)Ea1.00$0.00$0.00
70Impact Head Assembly (MAX-Tension)Ea1.00$0.00$0.00
71Impact Head Assembly (MSKT)Ea1.00$0.00$0.00
72Impact Head Assembly (Soft-Stop)Ea1.00$0.00$0.00
73Special End Shoe, Furn and InstallEa1.00$0.00$0.00
74Steel Guardrail Post, 72 inches, Furn and InstallEa5.00$0.00$0.00
75Steel Guardrail Post, 84 inches, Furn and InstallEa5.00$0.00$0.00
76Steel Guardrail Post, 96 inches, Furn and InstallEa5.00$0.00$0.00
77Steel Guardrail Post, 108 inches, Furn and InstallEa5.00$0.00$0.00
78Wood Guardrail Post, CRT, Furn and InstallEa10.00$0.00$0.00
79Wood Breakaway Guardrail Post, Furn and InstallEa10.00$0.00$0.00
80Guardrail Offset Block, Furn and InstallEa55.00$0.00$0.00
81MSKT Post #1 Top, Furn and InstallEa3.00$0.00$0.00
82MSKT Post #1 Bottom, Furn and InstallEa1.00$0.00$0.00
83MSKT Post #2 Top, Furn and InstallEa2.00$0.00$0.00
84MSKT Post #2 Bottom, Furn and InstallEa1.00$0.00$0.00
85SKT Post #1 Top, Furn and InstallEa3.00$0.00$0.00
86SKT Post #1 Bottom, Furn and InstallEa2.00$0.00$0.00
87SKT Post #2 Top, Furn and InstallEa2.00$0.00$0.00
88SKT Post #2 Bottom, Furn and InstallEa1.00$0.00$0.00
89Steel Sleeve and Soil Plate for Guardrail Approach Terminal PostEa2.00$0.00$0.00
9018 x 18 Reflective Sheeting, Furn and InstallEa4.00$0.00$0.00
91Terminal End Shoe, Type B, Furn and InstallEa5.00$0.00$0.00
92Thrie Beam Terminal Connector, Furn and InstallEa1.00$0.00$0.00
93Thrie Beam Transition, Furn and InstallEa2.00$0.00$0.00
94Mobilization M-28 Houghton CountyWday2.00$0.00$0.00
95Moblization M-38 Houghton CountyWday2.00$0.00$0.00
96Mobilization M-28, M-38, US-41, US-141 Baraga CountyWday5.00$0.00$0.00
97Mobilization M-26, M-203, US-41 Houghton CountyWday5.00$0.00$0.00
98Shoulder ClosureWday2.00$0.00$0.00
99Single Lane Closure in Multi-Lane SectionWday2.00$0.00$0.00
100Single Lane Closure with Flag Control and Temp Rumble StripsWday2.00$0.00$0.00
101Single Lane Closure with Flag ControlWday8.00$0.00$0.00
102Winter Repair Work*Wday4.00$0.00$0.00
TOTAL$0.00
Listed Quantities are estimates only from prior usage. The State is not obligated to purchase any listed quantity.
Specific project locations will be identified at stated Kick-Off Meetings.
Actual work performed will be determined by the Program Manager or their designee on an as-needed basis.
The State is not obligated to purchase any listed quantity.
Only one mobilization will be paid per day, it will be based on the work location that is furthest from the Contractor's Equipment Storage Facility.
*Winter Repair Work will be paid for days that require the removal of snow to repair guardrail and includes the cost of cleaning equipment for winter repairs.