This document is a Floating Dock Required Specifications sheet that establishes technical and design requirements for a modular floating dock system.

The dock must feature a "T" shape configuration with a long main walkway measuring 32'-40' in length and a wide top section of 32'-40' facing open water. The top of the "T" must be positioned at least 40' from shore. The entire structure must be secured using heavy-duty chains connected to the shore with zero vertical pilings or poles used in water or on shore. All sections must detach easily to enable complete removal from the lake prior to winter storage. Individual sections must measure 8'-9' in width and 8'-10' in length, with each section capable of safely supporting a minimum of 2,000 pounds. Sections connect via modular joints that allow rapid disconnection. Hardware requirements include cleats positioned on the lake-facing top portion of the "T" shape, spaced at minimum intervals of one cleat every 8 feet along the front edge to facilitate vessel mooring operations.

View the file

Other files for this federal contract opportunity

Other files attached to Sawbill Lake Seaplane Dock, newest first.
File Type Posted
QA.pdf PDF
12444526Q0065.pdf PDF
Attachment A-Schedule of Items.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floating Dock Required Specifications Dock Layout and Design

• Shape: "T" shape with a long main walkway 32’-40’ length and a wide top section 32’- 40’ facing the open water.

• Securing Method: Heavy-duty chains connected to the shore.

• No Pilings: Zero vertical poles or pilings used in the water or shore.

• Winter Storage: All sections detach easily so you can pull the entire dock out of the lake before winter.

• Top of the “T” should be at least 40’ from shore

Section Requirements

• Width: 8 feet to 9 feet per section.

• Length: 8 feet to 10 feet per section.

• Weight Support: Each individual section holds at least 2,000 pounds safely.

• Connection: Modular joints let you disconnect sections apart quickly.

Hardware and Safety

• Cleats: Placed on the lake-facing top part of the "T" shape.

• Spacing: At least one cleat every 8 feet along the front edge.

32'-40'

Hinge

32'-40'

Hinge

8'-9'

8'-9'

Hinge

8'-10'

AI Rendering of dock