Attachment B-QASP -Lawn Care FH.pdf
PDF 99 KB Posted
- Solicitation number
- 36C24722Q0966
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24722Q0966_5.docx | DOCX document | |
| Attachment E- Price-Cost Schedule.docx | DOCX document | |
| 36C24722Q0966_4.docx | DOCX document | |
| 36C24722Q0966_3.docx | DOCX document | |
| 36C24722Q0966_2.docx | DOCX document | |
| Attachment E- Price _ Cost Schedule.docx | DOCX document | |
| Attachment F-Clauses.pdf | ||
| Attachment E-Clauses.pdf | ||
| Attachment D-Wage determination.pdf | ||
| 36C24722Q0966_1.docx | DOCX document | |
| Attachment A-PWS-Fisher House Lawn Service.pdf | ||
| Attachment C-Evaluation Factors - Lawn Service Fisher House.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lawn Care Service for the Fisher House
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
For: Charlie Norwood VA Medical Center, One Freedom Way, Augusta, GA 30904
Contract Number: Provided Upon Award.
Contract Description: The intent of this solicitation is to obtain license contactors for Lawn care services for the fisher house at the Charlie Norwood VAMC in Augusta, GA Uptown and Downtown Division.
Contractor’s name: Provided Upon Award.
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
What will be monitored: The vendor doing the work will be monitored based upon the protection of the environment, the prep work, cleaning and clean up.
How monitoring will take place: The COR or designee will conduct inspections periodically to identify any issues that might appear.
How monitoring efforts and results will be documented: On the performance of the vendor. The COR will document findings on a report. The COR will conduct a Daily review with the vendor to discuss reports findings.
2. CONTRACTOR REPRESENTATIVES
The following employees of the contractor serve as the contractor’s program manager for this contract.
a. Program Manager: Completed upon award
b. Other Contractor Personnel: Completed upon award Title: Completed upon award
3. PERFORMANCE STANDARDS
Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
PERFORMANCE STANDARDS SUMMARY
REQUIRED
SERVICE
PERFORMANCE
STANDARD
MONITORING
METHOD
INCENTIVE/DISINCENTIVES
FOR MEETING OR NOT
MEETING THE
PERFORMANCE
STANDARDS
Provide qualified technicians to trouble shoot and repair outside irrigation system
UD
No more than one
(1) failure to properly trouble shoot and repair outside irrigation system UD
Random and daily inspections by VA designated staff person
May affect performance ratings
Ensure work site is secure before leaving
No more than one
(1) failure to properly secure work area
Inspections by VA designated staff.
May affect performance ratings
Clean up at the end of workday
No more than one
(1) time of not cleaning the work area
Inspections by VA designated staff
May affect performance ratings
4. METHODS OF QA SURVEILLANCE
The COTR shall use the surveillance methods listed below in the administration of this
QASP.
a. DIRECT OBSERVATION: Daily Inspection
b. PERIODIC INSPECTION: Inspections will be scheduled daily, and unscheduled, as needed.
c. USER SURVEY: Customer complaints and daily inspections.
d. VALIDATED USER/CUSTOMER COMPLAINTS: Complaints are investigated and validated.
e. PROGESS/STATUS MEETINGS: before and after each cleaning
5. DOCUMENTING PERFORMANCE
a. ACCEPTABLE PERFORMANCE:
The Government shall document positive performance. Any report may become a part of the supporting documentation for any contractual action.
b. UNACCEPTABLE PERFORMANCE:
When unacceptable performance occurs, the COR shall inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR shall document the discussion and place it in the COR file.
When the Contracting Officer determines formal written communication is required a Contract Discrepancy Report (CDR) shall be prepared and presented to the contractor's program manager.
The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the Contracting Officer. The Contracting Officer shall review the contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
6. FREQUENCY OF MEASUREMENT
a. Frequency of Measurement:
During contract performance, the COR will periodically analyze whether the negotiated the number of workers is appropriate for the area that work is being performed.
b. Frequency of Performance Assessment Meetings:
The COR shall meet with the contractor weekly to assess performance and shall provide a written assessment. The written assessment will be placed in the COR file and a copy provided to the Contracting Officer.
Signature – Contractor Program Manager (contractor)
Signature – Contracting Officer’s Representative (COR)
File details come from the government source that posted it. Updated .