Attachment B - QASP.pdf
PDF 101 KB Posted
- Solicitation number
- N3943021R2307
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C - RFI.docx | DOCX document | |
| Attachment E- Financial Institution Bank Information.pdf | ||
| N3943021R2307 Solicitation.pdf | ||
| Attachment A- CDRL.docx | DOCX document | |
| Attachment D- Past Performance Questionnaire Cover sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
for Steam Flow Rate Verification
This Quality Assurance Surveillance Plan (QASP) has been developed to evaluate contractor actions. It is designed to provide an effective surveillance method of monitoring contractor performance for the installation contract.
The QASP provides a systematic method to evaluate the services the contractor is required to furnish.
This QASP is based on the premise the Government desires to maintain a quality standard for verification of the steam flow rates of steam being measured and transferred from one lease property to another at the Coso geothermal field and that a service contract to provide this service is the best means of achieving that objective.
The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved.
Performance
Objective
Performance
Standards
Acceptable
Quality Levels
Method Used/
Frequencies
Collect and analyze
Coso steam flow rates for the three steam transfer sites (Navy I to
Navy II, BLM North to
Navy I, and Navy II to
BLM) for duration of the contract: FY2021 (base year), FY2022 (option year 1), FY2023 (option year 2), FY2024 (option year 3) and FY2025
(option year 4).
The Contractor shall submit within 30 days via email, the analysis results for the samples collected.
QA/QC and analysis shall be thoroughly conducted and at industry standards and maintaining historical consistency.
Government Representative shall review submitted analysis results and provide comments to Contractor as necessary.
File details come from the government source that posted it. Updated .