This combined synopsis and solicitation requests quotes for third-party survey data collection and analysis services to support compensation planning at the Department of Veterans Affairs. Quotes are due by July 17, 2020 for a one-year base period of performance with four one-year options. Services include project management, identification and purchase of national and regional salary survey data, matching survey job descriptions to VA positions, delivery of a web-based compensation system, and project support and reporting. Pricing is requested for recurring deliverables such as executive briefings, status reports, surveys, and meetings. Evaluation will consider price, technical capabilities, and past performance. The solicitation is open to all contractors registered in the System for Award Management and seeks to meet small business subcontracting goals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT A - PWS 20200730.docx | DOCX document | |
| Third Party Survey - Updated Price Schedule 20200730.docx | DOCX document | |
| RFQ Q_A 36C77620Q0121.docx | DOCX document | |
| 36C77620Q0121 0001.docx | DOCX document | |
| ATTACHMENT F - Security Request Packet.pdf | ||
| ATTACHMENT A - PWS.docx | DOCX document | |
| ATTACHMENT C - CONTRACTOR STAFF ROSTER.doc | DOC document | |
| ATTACHMENT G - SubcontractingPlan Template.docx | DOCX document | |
| ATTACHMENT H - PAST PERFORMANCE_UPDATED.docx | DOCX document | |
| 36C77620Q0121.docx | DOCX document | |
| ATTACHMENT E - TRAVEL AUTHORIZATION REQUEST.doc | DOC document | |
| ATTACHMENT D - CONTRACTOR PERSONNEL CHANGE FORM.doc | DOC document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
TITLE: Third-Party Survey Data
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:
· What will be monitored
· How monitoring will take place
· Who will conduct the monitoring
· How monitoring efforts and results will be documented
This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance.
This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor. Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.
2. Government Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The CO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
· Assigned Contracting Officer (CO): Adeitra Jimmison, Adeitra.Jimmison@va.gov
· Assigned Contract Specialist: Clayton Smith, Clayton.Smith2@va.gov
· Organization or Agency: U.S. Department of Veterans Affairs
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR(S): Tiffiany Harrington, tiffiany.harrington@va.gov
c. Other Key Government Personnel: Leah Brady, Leah.Brady@va.gov, VA Program Manager
3. Performance Standards The Government will utilize a Quality Assurance Surveillance Plan (QASP) throughout the life of the contract to ensure that the Contractor is performing the services required by this PWS in an acceptable manner. The Government reserves the right to alter or change the surveillance methods in the QASP at its own discretion.
The Contractor shall perform the tasks and complete the associated deliverables under this task order by the scheduled due dates within the overall period of performance. If the Contractor cannot deliver those deliverables specified by this task order by the required due date, then the Contractor shall provide a written explanation to the Contracting Officer (CO) within one (1) business day of the deliverable due date. This written transmittal shall include the reasons for the delay; when the Contractor knew or should have known a delay would incur; due diligence taken to mitigate the problems, the impact on the overall project; and a firm commitment of when the work is to be completed.
The Government will have ten (10) business days to review each deliverable and provide feedback/comments. The contractor shall have five (5) business days to incorporate feedback/comments and make appropriate revisions. The contractor shall provide the revised version of each deliverable to the Contracting Officer Representative (COR) and VA Program Manager (VA PM). The COR will review and determine final acceptance by the Government. The COR will notify the contractor of final acceptance within five (5) business days.
The contractor shall be responsible for adhering to all pertinent VA standards including but not limited to ensuring that all documentation and deliverables are stored in accordance with the requirements of the contract. The contractor shall use either Microsoft Teams, the VA Nationwide Teleconferencing System (VANTS), or other VA approved web-based video conferencing technology for all pertinent conference calls and virtual meetings. The contractor shall use VA employees’ VA email accounts to share and disseminate information and documents related to the contract requirements. The contractor shall be responsible for adhering to all pertinent VA information technology policies and procedures, which will be made available at the contractor’s request on award.
Late Deliverables and/or Significant Errors or Omissions shall be handled in the following manner:
| 1st Attempt |
| Meets or exceeds all acceptable quality levels and expectations of task/ deliverable |
| 2nd Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 5 days to remedy and resubmit. |
| 3rd Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 3 days to remedy and resubmit with 5% deduction off line item price |
| 4th Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: 1 day to remedy and resubmit with 10% off line item price |
| 5th Attempt |
| Does not meet all acceptable quality levels and expectations of task/ deliverable: The Government may not accept a deliverable that does not meet all acceptable quality levels and expectations of task/ deliverable after the 5th round of revisions from a Contractor. The contract in whole or part may be terminated for cause for failure to perform. |
The above QASP is only a sample and may change based on what the Contractor(s) submits in for the proposed approach to meeting the requirements of the PWS.
Late deliverables:
a. Deliverables must be provided on the dates specified. Any changes to the delivery date must have prior approval (in writing) by the PM/CO or designate at least five business days prior to the deliverable due date
b. If the deliverable cannot be provided within the scheduled time frame, the Vendor is required to contact the Project Manager/Contract Manager in writing with a reason for the delay and the proposed revised schedule. The request for a revised schedule must include the impact on related tasks and the overall project
c. A request for a revised schedule must be reviewed and approved by the PM/CO before placed in effect. Contract Terms and Conditions may dictate penalties, costs, and other actions based on the facts related to the request for a revised schedule
Note 1: Significant errors or omissions are defined as deliverables not meeting the intent of the task and the work considered to be within scope of this order.
Note 2: Continued repetitive errors may result in an unacceptable rating on performance report to be used as part of the evaluation criteria on future order competition.
4. Incentives/RATING STANDARDS Incentives shall be based on exceeding, meeting, or not meeting performance standards.
5. Methods of QA Surveillance
Various methods exist to monitor performance.
a. DIRECT OBSERVATION
b. PERIODIC INSPECTION
c. PROGRESS OR STATUS MEETINGS
d. ANALYSIS OF CONTRACTOR’S PROGRESS REPORTS
6. Frequency of Measurement
a. Frequency of Measurement.
During contract performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the contractor as needed to assess performance and shall provide a written assessment.
Signature – Contractor
Signature – Contracting Officer Representative