Attachment B_Pricing Sheet.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Paving and Drainage Improvements at Eisenhower Lock
Solicitation number
6923G524Q1362
Issued by

About this file

This document is an Attachment B - Pricing Sheet for a federal contract opportunity. It details the Schedule of Supplies/Services and estimated quantities for a Paving and Drainage Improvements project at the Eisenhower Lock in Massena, NY. The contract opportunity has a Solicitation Number of 6923G524Q1362 and is a 100% Small Disadvantaged Business Set-aside. The anticipated contract value is between $500,000 and $1,000,000. Key items include mobilization/demobilization, paving for four different areas, concrete slab and drainage work, storm piping and catch basins, electrical conduits and manhole, and fencing and gates. A mandatory site visit is scheduled for October 9, 2024, and offers are due by October 25, 2024. The federal agency issuing this opportunity is the Department of Transportation Saint Lawrence Seaway Development Corporation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Item No.Schedule of Supplies/ServicesQuantityUnitUnit PriceTotal
0001Mobilization/Demobilization:
Furnish all plant, labor, equipment, materials, and perform the work to mobilize and demobilize.1L.S.
0002Paving Area 1 (Visitors Center):

Furnish all plant, labor, equipment, materials, and perform the work to pave this area per PWS.

1L.S.
0003Paving Area 2 (Stop Log Storage Area): Furnish all plant, labor, equipment, materials, and perform the work to pave this area per PWS1L.S.
0004Paving Area 3 (Emergency Generator): Furnish all plant, labor, equipment, materials, and perform the work to pave this area per PWS.1L.S.
0005Paving Area 4 (Overlook Access Road): Furnish all plant, labor, equipment, materials, and perform the work to pave this area per PWS1L.S.
0006Concrete Slab (Stop Log Storage Area): Furnish all plant, labor, equipment, materials, and perform the work to install concrete slab per PWS.
1L.S.
0007Drainage Swale (Stop Log Storage Area): Furnish all plant, labor, equipment, materials, and perform the work to install drainage swale per PWS.1L.S.
0008Storm Piping and Catch Basins: Furnish all plant, labor, equipment, materials, and perform the work to install catch basins and storm piping
per PWS.1L.S.
0009Electrical Conduits and Manhole:
Furnish all plant, labor, equipment, materials, and perform the work to install electrical conduits and an electrical manhole per PWS.1L.S.
0010Fencing and Gates: Furnish all plant, labor, equipment, materials, and perform the work to install fencing and gates per PWS.1L.S.
Total: $_______________________________

File details come from the government source that posted it. Updated .