This document contains a preventive maintenance checklist for emergency generators and related electrical components at a Veterans Affairs medical center in Milwaukee, Wisconsin. The checklist specifies required inspections and services for generators' cooling, electrical, air induction and exhaust, lubrication, and fuel systems. Technicians must inspect, service, and replace specified consumable parts such as air filters, oil, and fuel filters according to manufacturers' specifications. The related federal contract opportunity is a solicitation for maintenance of emergency generators at the medical center over a base year plus four option years. The required services appear to match those outlined in the preventive maintenance checklist.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S02 36C25221Q0286_1.pdf | ||
| ATTACHMENT A EQUIPMENT LIST.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment B PM Checklist
PREVENTIVE MAINTENANCE CHECKLIST
EMERGENCY GENERATORS/SWITCHES/CONTROLS
REQUIRED FOR ALL GENERATORS AT THE VAMC, MILWAUKEE, WI
| Agency Representative:_________________________ | __________________________ | ||
| (Print Name) | (Signature) |
Location:_______________________ Time: ____________ Date:______________________
Hour Meter: _____________________
Unit Mfg. ___________________ Model:_______________ S/N:_______________________
Engine Mfg.:_________________ Model:_______________ S/N:_______________________
Gen. Mfg.:___________________ Model:_______________ S/N:_______________________
| A. |
| COOLING SYSTEM |
| SAT. |
| UNSAT. |
| CORRECTIVE ACTION |
1. Engine coolant level
2. Radiator core/heat exchanger
3. Coolant lines/connections/ hoses & connections
4. Water jacket heater(s)
Note: Contractor is responsible for replacing air cleaners (per manufacturer specs), all types.
| B. |
| D.C. ELECTRICAL SYSTEM |
1. Battery(s) electrolyte level/specific gravity.
2. Battery compartment/heater cooperation
3. Battery connections/cables/casing
4. Shutdown mechanisms
5. Electrical starter/alternator generator
6. Electrical system, accessories & components
Note: Contractor is responsible for indicator lights, indicator lamps, gauges, switches, relays, contactors, solenoids, coils, voltage regulators, sensors, fuses, pressure sensing switches, transformers, power supplies, battery cables and connections. (per manufacturer specs)
| C. |
| A.C. ELECTRICAL SYSTEM |
1. A.C. wiring
2. Battery charger
3. Control panel/switchgear
4. A.C. generator voltage regulator
5. Electrical system accessories & components
Note: Contractor is responsible for the same components listed under Section B-D.C. Electrical System.
| D. |
| AIR INDUCTION & EXHAUST SYSTEM |
1. Air cleaner units/oil bath and dry type
2. Air induction piping and connections
3. Turbocharger/blower
4. Exhaust manifold/piping/connections
Note: Contractor is responsible for replacing air cleaners (per manufacturer specs), all types.
| E. |
| POWER UNIT |
1. Generator structure
2. Clutch assembly (power take off)
3. Coupling(s)
| F. |
| LUBRICTION SYSTEM |
1. Engine oil level
2. Engine oil change
3. Engine oil filter change
4. Engine oil sample for analysis
5. Crankcase pressure
6. Crankcase breather
7. Oil leaks (hoses, connectors)
8. Engine governor – NO LEAKS
9. Fan drive bearings
10. Generator bearings
11. Engine starter
12. Gauges and safety mechanism
13. Accessory drives
Note: Contractor is responsible for replacing any and all engine oil, lubricant, filters and/or belts (per manufacturer specs).
| G. |
| FUEL SYSTEM |
1. Fuel Tank/Day tank
2. Fuel filters – primary/secondary
3. Fuel system components/hoses/piping
4. Gauges and Safety Mechanism
5. Condensation water in fuel
Note: Contractor is responsible for replacing all fuel filters (primary and secondary), per manufacturer specs.