ATTACHMENT_B_Orangeburg_and_Mallard_Intersection_Plans_20260227.pdf
PDF 6 MB Posted
- Solicitation number
- 2026-52
- Issued by
- Dillon County, South Carolina
About this file
This document comprises detailed construction plans prepared by Stantec Consulting Services for Dorchester County, South Carolina's Orangeburg Road (S-22) and Mallard Road (S-58) Intersection Improvements Project (Project 24TSYR). The plans encompass approximately 0.25 miles of roadway improvements including right-turn lane installation at the southbound Orangeburg Road and westbound Mallard Road approaches, with associated drainage, erosion control, traffic control, and pavement marking improvements. Major work items include 907 cubic yards of unclassified excavation, 100 cubic yards of muck excavation, 990 tons of asphalt paving (comprised of 500 tons base course Type A, 160 tons intermediate course Type B, and 330 tons surface course Type B), 161 linear feet of 18-inch smooth wall drainage pipe installation, 195 linear feet of sediment tubes, 550 square yards of stabilized construction entrance, and 368 square feet of permanent construction signage. The project also requires installation of traffic signal equipment including two 40-foot wood poles with back guys, conduit, and copper wire, along with various pavement markings totaling approximately 7,000 linear feet across temporary and permanent applications. The written question deadline is April 13, 2026 at 8:00 a.m., with bid opening scheduled for April 23, 2026 at 2:00 p.m. via virtual attendance option. Substantial completion is required within 180 calendar days from the Notice to Proceed issuance, with final completion within an additional 30 calendar days.
Bids must be submitted on a unit cost basis for all line items, with bid security of at least five percent of the total bid amount required for bids exceeding $25,000 in the form of a bid bond, certified check, or cashier's check. The successful bidder must provide performance and payment bonds each equal to 100 percent of the contract amount. All work must comply with SCDOT 2025 Standard Specifications for Highway Construction and applicable SCDOT standard drawings, and the contractor must be SCDOT pre-qualified. The contractor is responsible for obtaining all necessary environmental permits including USACE permits, NEPA documentation, 401 water quality certification, and OCRM permits. General liability insurance with $1,000,000 limits, automobile liability, workers' compensation, and owners' and contractors' protective liability are mandatory. Payment shall be made within 30 days of approved invoices with ten percent retainage of contract payments until 75 percent completion by dollar value, at which point retainage reduces to five percent. Liquidated damages are assessed at $1,000 per calendar day for delays beyond the completion date. The project is funded through local appropriations, and bids must remain valid for 60 days from opening. No specific contract value or budget ceiling is disclosed in the available procurement documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydraulic Design Reference for these plans is the:
Hydraulic Design Studies"
Edition of SCDOT's "Requirements for
NPDES PERMIT INFORMATION
Acre(s) Disturbed Area =
Approximate Location of Roadway is
Begin
Latitude
Longitude
Latitude
Longitude
End provided by:
Hydraulic and NPDES Design
Stantec Consulting
Acre(s)
80º14'54"
Project Area =
FOR
PROPOSED PLANS
TOTAL
MILES
MILES
NET LENGTH OF PROJECT MILES
NET LENGTH OF BRIDGES MILES
NET LENGTH OF ROADWAY MILES
LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
MILESNET LENGTH OF SIDE STREETS
LAYOUT
SCALE 1 INCH = FEETN.T.S.
SOUTH CAROLINA
3 DAYS BEFORE DIGGING IN
ALL UTILITIES MAY NOT BE A MEMBER OF SC811
www.SC811.COM
SOUTH CAROLINA 811 (SC811)
CALL 811
YES / NO
RAILROAD INVOLVEMENT?
X
ENVIRONMENTAL PERMIT INFORMATION
USACE PERMIT
NEPA DOCUMENT
401 CERTIFICATION
OCRM CAP
NAVIGABLE WATERS SC USCG
YES
YES
YES
X
X NO
NO
NO
NO
USACE X N/A
INDEX OF SHEETS
SHEET NO. SHEET SUBTOTALSDESCRIPTION
Design Reference for these plans is the:
SCDOT ROADWAY DESIGN MANUAL
0.11
0.11
0.11
0.23
0.23 www.stantec.com
Fax: 843.740.7707
Tel: 843.740.7700
North Charleston, SC 29418
4969 Centre Pointe Drive, Suite 200
Stantec Consulting Services No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S
CONSULTING ENGINEERING FIRM ENGINEER OF RECORD
DATE
FOR CONSTRUCTION :
No. 24051 R E
E
NI
G N
E L
ANOISSEFOR
P
D
E S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
0.86
2.86
33º2'33"
0.12
0.12
0.12
S-22S-58
ADT
ADT2026 15,100
TRAFFIC DATA
TRUCKS
S-22
27,200
ADT
ADT2026 11,200
TRAFFIC DATA
TRUCKS
S-58
17,300
33º2'29"
80º14'57"
DORCHESTER COUNTY
SHEETS
TOTAL
NO.
SHEET
INTERSECTION IMPROVEMENTS
S-22 (ORANGEBURG ROAD) & S-58 (MALLARD ROAD)
0.23
DORCHESTER COUNTY PROJECT 24TSYR
CROSS SECTIONS
EROSION CONTROL PLAN
PAVEMENT MARKING & SIGNING PLAN
TRAFFIC CONTROL PLAN
PROFILE SHEETS
PLAN SHEETS
GENERAL CONSTRUCTION NOTE
SURVEY CONTROL & REFERENCE DATA SHEET
PROPERTY STRIP MAP
R/W DATA SHEET
TYPICAL SECTIONS
MOVING ITEMS
SUMMARY OF ESTIMATED QUANTITIES
R/W TITLE SHEET
TITLE SHEET
TOTAL
X1-X9
EC1-EC3
PM1
TC1-TC2
11-12
6-10
5B
5A
4A
2A
1A
DRAWINGS FOR ROAD CONSTRUCTION IN EFFECT AT THE TIME OF LETTING.
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2025 EDITION) AND THE STANDARD
CONFORM TO THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
PROVISIONS, ALL MATERIALS AND WORKMANSHIP ON THIS PROJECT SHALL
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON THE PLANS OR IN THE SPECIAL NOTE:
U s e r a b a r r
U S P
P F S
S 1\ s h a r e d p r o j e c t s t r a n s p o r t a t io n r o a d w a y d r a w in g s p la n s h e e t s 1_ t s h f in a l.
d g n
STA. 117+05.00
S-58 (MALLARD ROAD)
END CONSTRUCTION
STA. 3+35.00
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END CONSTRUCTION
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
2/27/2026
Hydraulic Design Reference for these plans is the:
Hydraulic Design Studies"
Edition of SCDOT's "Requirements for
NPDES PERMIT INFORMATION
Acre(s) Disturbed Area =
Approximate Location of Roadway is
Begin
Latitude
Longitude
Latitude
Longitude
End provided by:
Hydraulic and NPDES Design
Stantec Consulting
Acre(s)
80º14'54"
Project Area =
FOR
PROPOSED PLANS
TOTAL
MILES
MILES
NET LENGTH OF PROJECT MILES
NET LENGTH OF BRIDGES MILES
NET LENGTH OF ROADWAY MILES
LENGTH OF EXCEPTIONS
GROSS LENGTH OF PROJECT
MILESNET LENGTH OF SIDE STREETS
LAYOUT
SCALE 1 INCH = FEETN.T.S.
SOUTH CAROLINA
3 DAYS BEFORE DIGGING IN
ALL UTILITIES MAY NOT BE A MEMBER OF SC811
www.SC811.COM
SOUTH CAROLINA 811 (SC811)
CALL 811
YES / NO
RAILROAD INVOLVEMENT?
X
ENVIRONMENTAL PERMIT INFORMATION
USACE PERMIT
NEPA DOCUMENT
401 CERTIFICATION
OCRM CAP
NAVIGABLE WATERS SC USCG
YES
YES
X NO
NO
NO
NO
USACE X N/A
INDEX OF SHEETS
SHEET NO. SHEET SUBTOTALSDESCRIPTION
Design Reference for these plans is the:
SCDOT ROADWAY DESIGN MANUAL
0.11
0.11
0.11
0.25
0.25 www.stantec.com
Fax: 843.740.7707
Tel: 843.740.7700
North Charleston, SC 29418
4969 Centre Pointe Drive, Suite 200
Stantec Consulting Services No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S
CONSULTING ENGINEERING FIRM ENGINEER OF RECORD
DATE
FOR CONSTRUCTION :
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
0.98
2.98
33º2'33"
0.14
0.14
0.14
S-22S-58
ADT
ADT2026 15,100
TRAFFIC DATA
TRUCKS
S-22
27,200
ADT
ADT2026 11,200
TRAFFIC DATA
TRUCKS
S-58
17,300
33º2'29"
80º14'57"
DORCHESTER COUNTY
Date
For Right of Way Acquisition:
Consultant Engineer of Record
1A
SHEETS
TOTAL
NO.
SHEET
INTERSECTION IMPROVEMENTS
S-22 (ORANGEBURG ROAD) & S-58 (MALLARD ROAD)
0.25
DORCHESTER COUNTY PROJECT 24TSYR
TOTAL
X1-X10
EC1-EC3
PM1
TC1
11-12
6-10
5B
5A
4A
CROSS SECTIONS
EROSION CONTROL PLAN
PAVEMENT MARKING & SIGNING PLAN
TRAFFIC CONTROL PLAN
PROFILE SHEETS
PLAN SHEETS
GENERAL CONSTRUCTION NOTE
SURVEY CONTROL & REFERENCE DATA SHEET
PROPERTY STRIP MAP
R/W DATA SHEET
TYPICAL SECTIONS
SUMMARY OF ESTIMATED QUANTITIES
R/W TITLE SHEET
DRAWINGS FOR ROAD CONSTRUCTION IN EFFECT AT THE TIME OF LETTING.
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION (2025 EDITION) AND THE STANDARD
CONFORM TO THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
PROVISIONS, ALL MATERIALS AND WORKMANSHIP ON THIS PROJECT SHALL
EXCEPT AS MAY OTHERWISE BE SPECIFIED ON THE PLANS OR IN THE SPECIAL NOTE:
U s e r a b a r r
U t r a n s p o r t a t io n r o a d w a y d r a w in g s p la n s h e e t s 1_ t s h .d g n
STA. 117+05.00
S-58 (MALLARD ROAD)
END CONSTRUCTION
STA. 4+96.00
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END CONSTRUCTION
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
SECTION UNITQUANTITYITEM SECTION ITEM UNITQUANTITY
SUMMARY OF ESTIMATED QUANTITIES
LS1031000 MOBILIZATION 1.000
LS1032010 BONDS AND INSURANCE 1.000
EA1050800 CONSTRUCTION STAKES, LINES & GRADES 1.000
EA6301100 PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 9.000
EA6092155 TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.-4"X4" 18.000
ACRE8100100 PERMANENT COVER 0.627
ACRE8100200 TEMPORARY COVER 1.254
LB8104005 FERTILIZER (NITROGEN) 62.700
LB8104015 FERTILIZER (POTASH) 62.700
ACRE8109901 MOWING 3.762
ACRE8101110 STRAW OR HAY MULCH TACKIFIER 3.653
LF609115B PAVEMENT MARKINGS (TEMP-PAINT) 4" YELLOW SOLID LINES 2,868.000
LB8105005 AGRICULTURAL GRANULAR LIME 1,254.000
GAL8109050 SELECTIVE WATERING 54,300.000
LF6271010 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMOPLASTIC - 90 MIL. 1,385.000
LF609115A PAVEMENT MARKINGS (TEMP-PAINT) 4" WHITE SOLID LINES 2,770.000
LS1080300 CPM PROGRESS SCHEDULE 1.000
LS2012000 CLEARING & GRUBBING WITHIN ROADWAY 1.000
TON3059900 MAINTENANCE STONE 80.000
LF7143618 18" SMOOTH WALL PIPE 161.000
TON8041020 RIP-RAP (CLASS B) 28.000
EA7199100 BEVELING OF PIPE END 4.000
LS8091050 RIGHT OF WAY PLAT 1.000
ACRE8151203 HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.110
LS6011000 TRAFFIC CONTROL 1.000
CY2033000 BORROW EXCAVATION 400.000
TON4011004 LIQUID ASPHALT BINDER PG64-22 60.000
SF6051120 PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 368.000
LF609105A PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 388.000
LF609135A PAVEMENT MARKINGS (TEMPORARY-PAINT)-24"WHITE SOLID LINES 584.000
EA609160A PAVEMENT MARKINGS (TEMPORARY PAINT) WHITE SINGLE ARROW 8.000
EA609180A PAVEMENT MARKINGS (TEMPORARY PAINT) WHITE WORD 'ONLY' 8.000
EA6092100 TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.-4"X4" 10.000
LF6271005 4" WHITE BROKEN LINES (GAPS EXCL.) THERMOPLASTIC - 90 MIL. 194.000
LF6271025 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 292.000
EA6271030 WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO- 125 MIL. 4.000
EA6271035 WHITE WORD MESSAGE "ONLY" THERMO- 125 MIL. 4.000
EA6300005 PERMANENT CLEAR PAVEMENT MARKERS BI-DIR.- 4"X4" 5.000
SF6510105 FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 21.000
LF6531210 U-SECTION POST FOR SIGN SUPPORTS - 3P 42.000
LF7149999 CLEANING EXISTING PIPE 36.000
SY8048210 GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP (CLASS 2) TYPE C 4.000
EA8091010 RIGHT OF WAY MARKER (REBAR & CAP) 14.000
LB8104010 FERTILIZER (PHOSPHORIC ACID) 62.700
S-22/S-58N/A
S-58/S-22 2
SUMMARY OF ESTIMATED QUANTITIES
TON4020310 ASPHALT BASE COURSE - TYPE A 500.000
TON4040320 ASPHALT SURFACE COURSE TYPE B 330.000
LF8152007 SEDIMENT TUBES 195.000
SY8156490 STABILIZED CONSTRUCTION ENTRANCE 550.000
CY8154010 CLEANING SILT BASINS 4.000
CY2103000 FLOWABLE FILL 3.000
MI6321000 MILLED-IN RUMBLE STRIP 0.262
SY4012100 FULL DEPTH ASPH. PAV. PATCHING 10" UNIFORM 50.000
TON4030320 ASPHALT INTERMEDIATE COURSE TYPE B 160.000
SY4013120 MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,500.000
CY2031000 UNCLASSIFIED EXCAVATION 907.000
CY2034000 MUCK EXCAVATION 100.000
LF2034518 18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 81.000
LF6271074 4" YELLOW SOLID LINES (PVT. EDGE LINES) THERMO - 90 MIL. 1,434.000
LF6750278 FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 30.000
LF6770388 FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 780.000
EA6800499 FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 1.000
EA6825021 FURNISH & INSTALL 40' WOOD POLE - CLASS II-CCA TREATED(0.60) 2.000
EA6825045 FURNISH & INSTALL 3/8" BACK GUY FOR WOOD POLE 2.000
LF6825092 FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 290.000
EA6845655 FURNISH & INSTALL SPLICE-CABINET/FLASHER CABINET 1.000
EA6865736 F&I - 12" 1-WAY-1 SECTION(RED)VEHICLE TRAFFIC SIGNAL 4.000
EA6885991 REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 s e q .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
S-22/S-58N/A
S-58/S-22 2A
MOVING ITEMS
REMOVAL AND DISPOSAL ITEMS
NO.
ITEM LOCATION
STATIONFEET-RT.orLT.
NEW FENCES
STA. TO STA. LINEAR FT.LT.orRT. DESCRIPTION
DESCRIPTION WORK TO BE DONE OWNER
MOVING ITEMS
NO.
ITEM
STATIONFEET-RT.orLT.
LOCATION
UNITDESCRIPTION OWNERUNITWORK TO BE DONE
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0
A m o v .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
LEGEND
4 EXISTING PAVEMENT (RETAIN)
TYPE "A" (650 lbs/sy)
HOT MIX ASPHALT BASE COURSE,
TYPE "B" (200 lbs/sy)
HOT MIX ASPHALT INTERMEDIATE COURSE,
TYPE "B" (200 lbs/sy)
HOT MIX ASPHALT SURFACE COURSE,
DESIGN SPEED
ROUTE MPH
EXCEPTIONS TO DESIGN SPEED
FUNCTIONAL CLASSIFICATION
CLASSIFICATIONROUTE
URBAN MINOR ARTERIAL
TYPICAL SECTIONS
SC 56N.T.S.
URBAN MINOR ARTERIAL
S-22 (ORANGEBURG ROAD)
S-58 (MALLARD ROAD)
S-22 (ORANGEBURG ROAD)
S-58 (MALLARD ROAD)
2' PAVED SHOULDER
8' SHOULDER
8.00%
0.5'
GRADE POINT
PROFILE
RIGHT-TURN LANE
VARIES 0' TO 12'
GROUND LINE
EXISTING
S-58/S-22
11' THROUGH LANE THROUGH LANE
VARIES 10.5' TO 11'
PAVED SHOULDER
VARIES 1' TO 2'
GROUND LINE
EXISTING
STA. 112+51.34 TO 117+05.00
S-58 (MALLARD ROAD)
STA. 0+31.00 TO 2+91.00
S-22 (ORANGEBURG ROAD)
USE THIS SECTION:
4:
GROUND LINE
EXISTING
THROUGH LANE
VARIES 10.5' TO 11'
PAVED SHOULDER
VARIES 1' TO 2'
THROUGH LANE
VARIES 10.5' TO 11'
PAVED SHOULDER
VARIES 1' TO 2'
8.00%
3:
GROUND LINE
EXISTING
SHOULDER
EXISTING
2:1 TO 3:1
VARIES
STA. 109+27.40 TO 111+75.57
S-22 (ORANGEBURG ROAD)
USE THIS SECTION:
EXISTING SLOPEEXISTING SLOPE
EXISTING SLOPE EXISTING SLOPE50:1
WIDTH VARIES
WIDTH
MATCH EXISTING
SHOULDER
RE-GRADE EXISTING
EXISTING PAVEMENT
2" MILL & OVERLAY
EXISTING PAVEMENT
2" MILL & OVERLAY
SCDOT GENERAL NOTES
1. THE PERMITTEE MUST UTILIZE AN SCDOT PRE-QUALIFIED CONTRACTOR FOR ALL WORK
COMPLETED IN SCDOT RIGHT OF WAY
2. CONTRACTOR SHALL REFERENCE MOST CURRENT EDITION OF ALL SCDOT STANDARD
DRAWINGS REFERENCED WITHIN PLAN SET.
3. POINT OF CONTACT FOR RIGHT OF TRANSFER:
MARK A. WESTBURY
SOUTHERN REGION ADMINISTRATOR
PO BOX 308
858 HIGHWAY 15 NORTH
ST GEORGE, SC 29477
843.636.9681
4. POINT OF CONTACT FOR CONSTRUCTION AND INSPECTION CONSTRUCTION AND INSPECTION OF
ALL WORK IN THE SCDOT RIGHT OF WAY:
DANIEL BURTON
SCDOT DISTRICT CONSTRUCTION ENGINEER
843-371-0342
4:1
8' SHOULDER
8.00%
6:
GROUND LINE
EXISTING
4:1
GROUND LINE
EXISTING
THROUGH LANE
VARIES 10.5' TO 11'
PAVED SHOULDER
VARIES 1' TO 2'
THROUGH LANE
VARIES 10.5' TO 11'
PAVED SHOULDER
VARIES 1' TO 2'
EXISTING SLOPEEXISTING SLOPE
STA. 2+91.00 TO 3+35.00
S-22 (ORANGEBURG ROAD)
USE THIS SECTION:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 ty p ic a l.
d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
RIGHT OF WAY DATA SHEET
S-22/S-58N/A
S-22/S-58
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 ro w d a ta s h t.
d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
SCALE IN FEET
50 100 2000
CONSTRUCTION ACTIVITIES.
2. CONTRACTOR TO VERIFY DATUM, BENCHMARK, AND CONTROL POINT DATA PRIOR TO
CONTROL AND SURVEY INFORMATION WERE PROVIDED BY COX AND DINKINS, INC. 1.
NOTE:
PROPERTY STRIP MAP
SC 56/HEARON CIRCLE1" = 50'
4A
18.
A.R .B.
PRESENT
' R /W
18.
A.R .B.
PRESENT
' R /W
18.263 A.R.B.
PRESENT 33' R/W
18.245 A.R.B.
PRESENT 33' R/W
18.245 A.R.B.
PRESENT 33' R/W
18.
A.R .B.
PRESENT
' R /W
18.
A.R .B.
PRESENT
' R /W
18.263 A.R.B.
PRESENT 33' R/W
P.B. K-182 A.R.B.
PRESENT TRANS. R/W
P.B. L-185 A.R.B.
PRESENT TRANS. R/W
2 3
+91.93 +14.94
S- -22
(O
RANGEBURG
ROAD)
S- -22
(O
RANGEBURG
ROAD)
S-18-58 (EAST BUTTERNUT ROAD)
+15.31
+72.23
+20.20
+78.54
S-18-58 (MALLARD ROAD)
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0
A p ro p s tr ip m a p .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
33.00' RT
7+81.97
END NEW R/W
33.00' LT
119+24.05
END NEW R/W
33.00' RT
4+50.22
END NEW R/W
33.00' LT
4+90.22
END NEW R/W
NEW 55' R/W
NEW
TRANS.
R/ W
55.00' LT
4+50.22
75.00' LT
115+00.00
NEW TRANS. R/W
65.00' LT
116+80.00
NEW 65' R/W
65.00' LT
119+15.64
NEW 75' R/W
55.00' RT
7+66.53
75.00' LT
114+30.00
55.00' RT
1+85.00
NEW
' R /W
60.00' LT
4+90.92
60.00' LT
3+55.00
75.00' LT
1+60.03
75.00' LT
0+25.00
55.00' RT
0+65.00
NEW TRANS. R/W
NEW 75' R/W
NEW TRANS. R/W
NEW
' R /W
CONSTRUCTION ACTIVITIES.
2. CONTRACTOR TO VERIFY DATUM, BENCHMARK, AND CONTROL POINT DATA PRIOR TO
CONTROL AND SURVEY INFORMATION WERE PROVIDED BY COX AND DINKINS, INC. 1.
NOTE:
S-58/S-22
DATUM INFORMATION
VERTICAL CONTROL
HORIZONTAL CONTROL
COORDINATES
ORIENTATION
SOUTH CAROLINA STATE PLANE COORDINATE SYSTEM
GRID NORTH
NORTH AMERICAN VERTICAL DATUM 1988 - NAVD 88
SOUTH CAROLINA STATE PLANE GRID - NAD 83 (2011)
NORTHING EASTING ALIGNMENT STATION OFFSET ELEVATION DESCRIPTION
BENCHMARK DATA
COMBINED SCALE FACTOR
ID
CP-1 2,229,998.55 49.65' RT 60.26
CP-2 117+81.89 28.62' LT
#5 RBR W/ ALUMINUM DISK
#5 RBR W/ ALUMINUM DISK
440,323.62 BUTTERNUT 0+60.91
MALLARD 60.63440,820.94 2,230,319.08
SURVEY & REFERENCE DATA SHEET
S-58/S-221" = 50'
5A
N: 439,542.584
E: 2,230,340.243
E ,2
,4
.1
N ,9
.9
N: 441,128.034
E: 2,229,804.243
N ,7
.7
E ,2
,6
.6
E: 2,230,072.277
N: 440,350.419
STA. 0+00.00
S-22 (ORANGEBURG ROAD)
STA. 112+51.34
S-58 (MALLARD ROAD)
TIE EQUALITY
E: 2,230,071.951
N: 440,349.871
STA. 0+00.00
S-58 (EAST BUTTERNUT ROAD)
STA. 112+50.70
S-22 (ORANGEBURG ROAD)
STA. 112+50.70
S-58 (MALLARD ROAD)
TIE EQUALITY
0.99985530
1. SURVEY BY: CORNERSTONE SURVEYING & ENGINEERING, INC.
NOTE:
S-18-58 (MALLARD ROAD)
S-18-58 (EAST BUTTERNUT ROAD)
S- 18-
ORANGEBURG
ROAD)
S- 18-
ORANGEBURG
ROAD)
CP-1
CP-2
P O
T .7
P O
T
.0
POT = 8+22.51
P O
T
.7
P O
T
.8
P O
T
.0
P O
T
.1
POT = 104+00.00
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0
A s u rv re f.
d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
INSET
INSET
NTS
PROJECT NOTES
1. PROJECT DESCRIPTION
2. SURVEY AND DESIGN INFORMATION
3. EROSION CONTROL
COMMENTSUNITQUANTITYITEM
GENERAL INCLUSIONS
ACTIVITY BEGINS AND SHOULD BE MAINTAINED UNTIL FINAL STABILIZATION HAS OCCURRED.
SEWER SYSTEM. EROSION CONTROL MEASURES SHALL BE IMPLEMENTED BEFORE GROUND DISTURBING
AROUND EXISTING CATCH BASINS SO AS TO PREVENT SEDIMENT FROM ENTERING THE STORM
SEDIMENT LEAVES THE PROJECT LIMITS. SILT FENCE SHALL BE PLACED WHERE PRACTICAL
S.C.D.O.T. STANDARD DRAWINGS FOR EROSION CONTROL. SILT FENCE SHALL BE PLACED WHERE
EROSION CONTROL MEASURES ON THIS PROJECT SHOULD BE IMPLEMENTED AS DETAILED BY
COMMENTSUNITQUANTITYITEM
EROSION CONTROL INCLUSIONS
SEE INDIVIDUAL CURVES ON REFERENCE DATA SHEET FOR SUPERELEVATION RATE AND DESIGN SPEED, AS APPLICABLE.
QUANTITIES AND MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER.
THE FOLLOWING QUANTITIES ARE NOT SHOWN IN DETAIL ON THE PLANS BUT ARE INCLUDED IN THE SUMMARY OF ESTIMATED
SCDOT GENERAL CONSTRUCTION NOTES:
TO THE COLUMBIA OFFICE AS SOON AS POSSIBLE.
THE STANDARD PRACTICES OF THE DEPARTMENT. FORWARD INFORMATION ON ANY PROPOSED CHANGES IN ALIGNMENT DIRECTION OF THE DEPUTY SECRETARY FOR ENGINEERING TO AUTHORIZE MINOR ALTERATIONS NOT IN CONFLICT WITH THE PROJECT OR CHANGES IN ALIGNMENT. THE DISTRICT ENGINEERING ADMINISTRATOR IS PERMITTED UNDER THE THE DEPUTY SECRETARY FOR ENGINEERING MUST SPECIFICALLY AUTHORIZE CHANGES INVOLVING INCREASED COST OF
ENGINEERING DESIGN PERFORMED BY STANTEC CONSULTING, INC.
CONTROL AND SURVEYS PERFORMED BY CORNERSTONE SURVEYING & ENGINEERING, INC.
4. GENERAL EMBANKMENT CONSTRUCTION
ACREPERMANENT COVER 0.627
ACRETEMPORARY COVER 1.254
ACRESTRAW OR HAY MULCH TACKIFIER 3.653
LBFERTILIZER (PHOSPHORIC ACID) 62.700
LBFERTILIZER (POTASH) 62.700
GALSELECTIVE WATERING 54,300.000
ACREMOWING 3.762
SYSTABILIZED CONSTRUCTION ENTRANCE 550.000
LBFERTILIZER (NITROGEN) 62.700
LSMOBILIZATION 1.000
LSBONDS AND INSURANCE 1.000
EACONSTRUCTION STAKES, LINES & GRADES 1.000
LSCPM PROGRESS SCHEDULE 1.000
SFPERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 368.000
LFPAVEMENT MARKINGS (TEMP-PAINT) 4" WHITE SOLID LINES 2,770.000
LFPAVEMENT MARKINGS (TEMP-PAINT) 4" YELLOW SOLID LINES 2,868.000
EAPAVEMENT MARKINGS (TEMPORARY PAINT) WHITE SINGLE ARROW 8.000
EAPAVEMENT MARKINGS (TEMPORARY PAINT) WHITE WORD 'ONLY' 8.000
EARIGHT OF WAY MARKER (REBAR AND CAP) 14.000
LSRIGHT OF WAY PLAT 1.000
PER CONTRACT DOCUMENTS
PER CONTRACT DOCUMENTS
PER CONTRACT DOCUMENTS
PER CONTRACT DOCUMENTS
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
FOR TRAFFIC CONTROL
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
FOR ALL DISTURBED AREAS
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
BORROW WILL BE PLACED IN ACCORDANCE WITH SECTION 205 OF THE SCDOT 2025 STANDARD
203.2.1.8 OF SCDOT 2025 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION.
ALL ROADWAY FILL MATERIAL WILL MEET THE BORROW EXCAVATION REQUIREMENTS ON SECTION
WESTBOUND MALLARD ROAD.
INSTALLATION OF RIGHT TURN LANES AT THE APPROACHES OF SOUTHBOUND ORANGEBURG ROAD, AND
MAJOR WORK ITEMS INCLUDE:
S-18-22 (ORANGEBURG ROAD) AND S-18-58 (MALLARD ROAD).
THE PROJECT IS LOCATED IN DORCHESTER COUNTY, SOUTH CAROLINA AT THE INTERSECTION OF
LFPAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 388.000
LFPAVEMENT MARKINGS (TEMPORARY-PAINT)-24"WHITE SOLID LINES 584.000
EATEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.-4"X4" 10.000
LBAGRICULTURAL GRANULAR LIME 1,254.000
CYBORROW EXCAVATION 140.000
CYMUCK EXCAVATION 100.000 WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
WHERE DIRECTED BY ENGINEER
CYCLEANING SILT BASINS 4.000
LFCLEAN EXISTING PIPE 36.000
WHERE DIRECTED BY ENGINEER
TONMAINTENANCE STONE 80.000
TONFULL DEPTH ASPH. PAV. PATCHING 10" UNIFORM 80.000
S-22/S-58N/A
S-8-24 5B
GENERAL CONSTRUCTION NOTE
AS NEEDED FOR MUCK EXCAVATION
LF18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 81.000
EATEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.-4"X4" 18.000
5. OVERHEAD FLASHER INSTALLATION
WITH APPLICABLE SCDOT STANDARD DRAWINGS AND SUPPLEMENTAL SPECIFICATIONS.
INSTALL NEW OVERHEAD FLASHER SYSTEM PER THE SPECIAL PROVISIONS AND IN ACCORDANCE
FLASHER) SYSTEM THROUGHOUT PROJECT DURATION.
PROVIDE CONTINUITY OF OPERATIONS FOR THE INTERSECTION CONTROL BEACON (OVERHEAD
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0
B g e n c o n s tr n o te s .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
S-18-22 6
1" = 20' S-18-22
PLAN SHEET
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
ALIGNMENT CONTROL CAN BE FOUND ON REFERENCE DATA SHEET1.
NOTES:
ELECTRICAL
GAS
WATER
COMMUNICATIONS
UTILITIES LOCATED ON PROJECT
SEWER
BERKELEY ELECTRIC COOPERATIVE - KEVIN MIMMS - (843) 499-2507
DOMINION ENERGY - VICTOR FLEIFEL - (864) 764-4057
DORCHESTER COUNTY WATER & SEWER - JASON COFFMAN
HOME TELEPHONE - SCOTT PATE - (843) 761-9538
AT&T - ANDY FOLZ - (843) 513-7408
CHARTER - JOHN PIPPIN
DORCHESTER COUNTY WATER & SEWER - JASON COFFMAN
DORCHESTER WATER AUTHORITY - RICHARD MURDAUGH - (843) 709-0675
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p s h o ra n g e b u rg .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
SCALE IN FEET
20 40 800
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
30'C 30'C
18" RCP
IE: 55.24'
IE: 55.30'
18" RCP
IE: 55.57' IE: 56.16'
15" RCP
IE: 55.77'
IE: 56.06'
IPF 5RBR
IPF 4RBRIPF 4RBR
104 105 106 107 108 109
S-18-22 (ORANGEBURG ROAD)
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
RETAIN EXISTING PIPE
RETAIN EXISTING PIPE RETAIN EXISTING PIPE
CROSS SECTIONS
CLEAN DITCH PER
S
S-18-22 7
1" = 20' S-18-22
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
S E E S
H E E T
S
TA
. 1
+5
M A
TC
H
LI
N E
S E E S
H E E T
S
TA
. 1
+5
M A
TC
H
LI
N E
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
PLAN SHEET
SEE SHEET 8 FOR PIPE TABLE2.
ALIGNMENT CONTROL CAN BE FOUND ON REFERENCE DATA SHEET1.
NOTES:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p s h in te rs e c ti o n .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
SCALE IN FEET
20 40 800
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
49'C 56'C
55'C
52'C
46'C
37'C
'C
'C
30'C 30'C 30'C 29'C 32'C
30'C
46'C
'C
15" RCP
IE: 58.24' IE: 58.23'
15" RCP
IE: 56.76' IE: 56.57'
15" RCP
IE: 58.79' IE: 58.83'
18" RCP
IE: 57.58'
IE: 58.06'
18" RCP
END NOT FOUND
IE: 57.17'
IPF 1OT DIST
IPF 4RBR
IPF 1OT
IPF 5RBR
BOLTED LID
SMH
RIM: 62.04'
18.263 A.R.B.
PRESENT 33' R/W
18.263 A.R.B.
PRESENT 33' R/W18.245 A.R.B.
PRESENT 33' R/W
18.263 A.R.B.
PRESENT 33' R/W
P.B. L-185 A.R.B.
PRESENT TRANS. R/W
S- 18-
58 (EA
ST B
U
TTER
N U T R
O A D
S-18-22 (ORANGEBURG ROAD)
.2
A .R .B
P R E S E
N T
' R
W
+72.23
S-18-22 (ORANGEBURG ROAD)
P O
T
.0
0 1 2 3 110 111 112
P O
T
.7
P O T
.7
P O T = 0+
00.00
+14.94
+15.31
+20.20+91.93 P.B. K-182 A.R.B.
PRESENT TRANS. R/W
+78.60
S (M
A
LLA
R D R
O A D
IPF 5RBR
IPF 1.25OT
RETAIN EXISTING PIPE
11'
12'
10.6'
75' TAPER
90' R
2' PAVED SHOULDER
23.00' LT
0+42.00
11.00' LT
2+91.00
15.00' RT
0+58.54
12.12' RT
2+00.00
21.34' RT
1+38.73
NEW 75' R/W
NEW TRANS. R/W
N E
W
' R
W
75.00' LT
0+25.00
75.00' LT
1+60.03
NEW 55' R/W
NEW TRANS. R/W
55.00' RT
1+85.00
75.00' LT
114+30.00
10' 12'
12'
23.00' LT
0+45.15
23.00' LT
0+85.15
23.00' LT
1+22.08
23.00' LT
1+64.08
NP-104
25.00' LT
113+72.37
46.65' LT
113+47.60
30' R
69' R
23.00' LT
113+49.89
MILL & OVERLAY LIMIT
25' R
11'
11.1'
55.00' RT
0+65.00
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
NEW 75' R/W
CROSS SECTIONS
CLEAN DITCH PER
NP-102
NP-103
CLOSE DRIVEWAY
10.00' RT
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END CONSTRUCTION
' S
T O R
A G E
' P
A V E D
S
H O
U L D E R
PLUG & FILL EXISTING PIPE
NEW TRANS. R/W
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
RETAIN EXISTING PIPE
EXISTING PIPE
REMOVE
EXISTING PIPE
REMOVE
EXISTING PIPE
REMOVE
PIPE 25 LF @ 1.33% (NP-105)
EXTEND EX. 18" SMOOTH WALL
23.00' LT
2+16.00
MILL & OVERLAY LIMIT
MILL & OVERLAY LIMIT
185' STORAGE
FOR NEW OVERHEAD FLASHER
NEW WOOD POLE WITH BACK GUY
APPROXIMATE LOCATION SHOWN
INSTALLED BY OTHERS
REMOVE EXISTING SIDEWALK
FOR NEW OVERHEAD FLASHER
NEW WOOD POLE WITH BACK GUY
S-58 (EAST BUTTERNUT ROAD) STA. 0+00.00
S-58 (MALLARD ROAD) STA. 112+50.70
S-22 (ORANGEBURG ROAD) STA. 112+50.70
TIE EQUALITY
S-58 (MALLARD ROAD) STA. 112+51.34
S-22 (ORANGEBURG ROAD) STA. 0+00.00
TIE EQUALITY
S-18-22 8
1" = 20' S-18-22
(M A
LLA
R D R
O A D
S- 18-
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
PLAN SHEET
TYPE
HDPE Built
CLASS
RCP Built
GAUGE
SRAP Built
Smooth Wall Options
Node
Description
Node
Station
Node
(ft)
Link Invert
(ft)
Min.
(ft)
Max.
below invert
SPT "N"
Min. Field
(psi)
Pressure
Joint Downstream Fill Height
Smooth Wall Pipe
(ft)
Pipe Length
Slope Node
Description
Node
Station
Node
(ft)
Link Invert
Upstream
Barrels
No. of
Geometry
(in)
DiameterLink ID
S III 16ga
NP-102 18 1 32 0.40 - PIPE INLET 1+59.08 57.64 - PIPE OUTLET 1+27.08 57.51 1.74 1.85 -
NP-103 18 1 32 0.20 - PIPE INLET 0+81.15 57.36 - PIPE OUTLET 0+49.15 57.30 1.12 1.17 -
S III 16ga
NP-104 18 1 72 0.47 - PIPE INLET 0+66.92 57.10 - PIPE OUTLET 0+66.92 56.77 1.35 1.63 -
NP-105 18 1 25 1.33 - PIPE INLET 113+60.66 58.40 - PIPE OUTLET 113+60.66 57.58 1.13 1.51 -
IV 16ga
IV 16ga
BEVEL ENDS OF DRIVEWAY PIPES2.
ALIGNMENT CONTROL CAN BE FOUND ON REFERENCE DATA SHEET1.
NOTES:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p s h o ra n g e b u rg .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
SCALE IN FEET
20 40 800
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
46'C
IPF 1PT
IPF 1OT
IPF .5ROD
3 4 5 6 7 8
P O
T
.5
18.263 A.R.B.
PRESENT 33' R/W
18.263 A.R.B.
PRESENT 33' R/W
S-18-22 (ORANGEBURG ROAD)
18" RCP
IE: 58.75'
IE: 58.95'
33.00' RT
7+81.97
END NEW R/W
33.00' LT
4+90.22
END NEW R/W
BY OTHERS
PROPOSED DRIVEWAY
60.00' LT
3+55.00
60.00' LT
4+90.92
STA. 3+35.00
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
55.00' RT
7+66.53
NEW 60' R/W
NEW 55' R/W
NEW TRANS. R/W
EXISTING PIPE
RETAIN
APPROXIMATE LOCATION SHOWN
INSTALLED BY OTHERS
REMOVE EXISTING SIDEWALK
APPROXIMATE LOCATION SHOWN
INSTALLED BY OTHERS
REMOVE EXISTING SIDEWALK
S-18-58 9
S-18-581" = 20'
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
PLAN SHEET
NO CONSTRUCTION ON THIS SHEET 2.
ALIGNMENT CONTROL CAN BE FOUND ON REFERENCE DATA SHEET 1.
NOTES:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p s h b u tt e rn u t.
d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
SCALE IN FEET
20 40 800
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
15" RCP
IE: 58.05' IE: 56.81'
18" RCP
IE: 56.42' IE: 56.45'
S-18-58 (EAST BUTTERNUT ROAD)
2 3 4 5 6 7
P O
T
.1
S-18-58 (EAST BUTTERNUT ROAD)
33.00' RT
4+50.22
END NEW R/W
NEW 55' R/W
55.00' RT
4+50.22
P
LU
G
F
ILL E
X
IS
T
IN
G
P
IP
E
M
ILL &
O V E
R
LA
Y
LIM
IT
F
R
N
W
E
R H E
A D
F
LA
S H E
R
N
O D
P
LE
IT
H
B
C K
G U Y
S
S-18-58 10
S-18-581" = 20'
S E
E S
H E
E T
S T
A
M A
T C
H L
IN
E
PLAN SHEET
ALIGNMENT CONTROL CAN BE FOUND ON REFERENCE DATA SHEET1.
NOTES:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p s h m a ll a rd .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
SCALE IN FEET
20 40 800
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
18.245 A.R.B.
PRESENT 33' R/W
18.245 A.R.B.
PRESENT 33' R/W
49'C 48'C 46'C
44'C
37'C
49'C
S-18-58 (MALLARD ROAD)
18" RCP
IE: 59.85'IE: 59.18'
BOLTED LID
SMH
RIM: 62.57'
115 116 117 118 119
P O
T
.8
33.00' LT
119+24.05
END NEW R/W
2' PAVED SHOULDER
MILL & OVERLAY LIMIT
23.00' LT
115+25.00
180' TAPER
11.00' LT
116+80.00
STA. 117+05.00
S-58 (MALLARD ROAD)
END CONSTRUCTION
11.80' LT
117+05.00
N E
W
T R
A N S . R
W
.0
L T
.0
NEW 75' R/W
11'
10.9'
12'
75.00' LT
115+00.00
65.00' LT
116+80.00
65.00' LT
119+15.64
NEW TRANS. R/W
NEW 65' R/W
N E
W
R
W
RETAIN EXISTING PIPE
F
E
R H E
A D
F
LA
S H E
R
N
O D
P
LE
IT
H
B
C K
G U Y
40 40
S-18-22 11
S-22
(ORANGEBURG
ROAD)
1" = 20' S-18-22
PROFILE SHEET
ROAD)
(ORANGEBURG
S-22
EXISTING PROFILE SHOWN FOR REFERENCE ONLY. 1.
NOTES:
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p ro o ra n g e b u rg .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
EXISTING GRADE
0+00 1+00 2+00 3+00 4+00 5+00 6+00
.6
.7
.0
.2
.3
.2
.3
.3
.3
.4
.5
.5
.5
SCALE
SCALE
VERTICAL: 1"=5'
HORIZONTAL: 1"=20'
VERTICAL: 1"=5'
HORIZONTAL: 1"=20'
PROFILE
PROFILE
107+00 108+00 109+00 110+00 111+00 112+00
.5
.6
.0
.3
.5
.6
.9
.0
.1
.4
.7
.0
.6
EXISTING GRADE
ELEV. 60.70
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
ELEV. 60.64
S-58 (MALLARD ROAD) STA. 112+51.34
S-22 (ORANGEBURG ROAD) STA. 0+00.00
TIE EQUALITY
ELEV. 61.34
STA. 3+35.000
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
ELEV. 61.32
STA. 2+91.00
S-22 (ORANGEBURG ROAD)
END MILL & OVERLAY
ELEV. 58.83
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
ELEV. 60.64
S-58 (BUTTERNUT ROAD) STA. 0+00.00
S-58 (MALLARD ROAD) STA. 112+50.70
S-22 (ORANGEBURG ROAD) STA. 112+50.70
TIE EQUALITY
ELEV. 60.11
STA. 112+33.75
S-22 (ORANGEBURG ROAD)
BEGIN MILL & OVERLAY
40 40
S-18-22 12
S-58
ROAD)
1" = 20' S-18-22
PROFILE SHEET
ROAD)
S-58
EXISTING PROFILE SHOWN FOR REFERENCE ONLY. 1.
NOTES:
(BUTTERNUT
(MALLARD
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \0 p ro o ra n g e b u rg .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
-+00 1+00 2+00 3+00 4+00 5+00
.6
.2
.0
.9
.8
.6
.5
.4
.2
.1
.9
.8
EXISTING GRADE
SCALE
SCALE
VERTICAL: 1"=5'
HORIZONTAL: 1"=20'
VERTICAL: 1"=5'
HORIZONTAL: 1"=20'
PROFILE
PROFILE
113+00 114+00 115+00 116+00 117+00 118+00
.7
.0
.4
.7
.8
.1
.3
.4
.5
.5
.5
EXISTING GRADE
ELEV. 60.64
S-58 (BUTTERNUT ROAD) STA. 0+00.00
S-58 (MALLARD ROAD) STA. 112+50.70
S-22 (ORANGEBURG ROAD) STA. 112+50.70
TIE EQUALITY
ELEV. 60.52
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
ELEV. 59.96
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END MILL & OVERLAY
END CONSTRUCTION
ELEV. 60.64
S-58 (MALLARD ROAD) STA. 112+51.34
S-22 (ORANGEBURG ROAD) STA. 0+00.00
TIE EQUALITY
ELEV. 62.54
STA. 117+05.00
S-58 (MALLARD ROAD)
END MILL & OVERLAY
END CONSTRUCTION
S-22/S-58
NEW CONSTRUCTION
LEGEND
RCE:
MAINTAIN ALL LANES OPEN; LANE CLOSURES ARE PROHIBITED DURING THE FOLLOWING PERIODS OR AS DIRECTED BY THE 2.
STANDARD DRAWING NUMBER 601-005-00, AND AS DIRECTED BY THE PLANS.
PORTABLE PLASTIC DRUMS INSTALLED ADJACENT TO INTERSECTION SHALL BE INSTALLED IN ACCORDANCE WITH 1.
CONSTRUCTION NOTES
SAT: 11AM-7PM
MON-FRI: 6AM-9AM, 2PM-7PM
SUN: 11AM-7PM
SHOWN.
3. CONSTRUCT SHADED PORTION OF NEW ROADWAY UP TO INTERMEDIATE COURSE AS
INSTALL PORTABLE PLASTIC DRUMS.2.
INSTALL PERMANENT CONSTRUCTION SIGNS.1.
CONSTRUCTION SEQUENCE (STAGE 1)
TRAFFIC CONTROL PLAN STAGE 1
S-22/S-581" = 50'
TC1
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
INSTALL PERMANENT
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
INSTALL PERMANENT
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
INSTALL PERMANENT
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
INSTALL PERMANENT
100' TYP.
S- -22
(O
RANGEBURG
ROAD)
S-18-58 (MALLARD ROAD)
S-18-58 (EAST BUTTERNUT ROAD)
S- -22
(O
RANGEBURG
ROAD)
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U \t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \T
C tc s tg
.d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 117+05.00
S-58 (MALLARD ROAD)
END CONSTRUCTION
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
10.00' RT
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END CONSTRUCTION
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 3+35.00
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
DWG. 601-005-00 (TYP.)
DRUMS PER SCDOT STD.
INSTALL PORTABLE PLASTIC
S-22/S-58
NEW CONSTRUCTION
LEGEND
RCE:
MAINTAIN ALL LANES OPEN; LANE CLOSURES ARE PROHIBITED DURING THE FOLLOWING PERIODS OR AS DIRECTED BY THE 2.
STANDARD DRAWING NUMBER 601-005-00, AND AS DIRECTED BY THE PLANS.
PORTABLE PLASTIC DRUMS INSTALLED ADJACENT TO INTERSECTION SHALL BE INSTALLED IN ACCORDANCE WITH 1.
CONSTRUCTION NOTES
SAT: 11AM-7PM
MON-FRI: 6AM-9AM, 2PM-7PM
SUN: 11AM-7PM
TRAFFIC CONTROL PLAN STAGE 2
S-22/S-581" = 50'
TC2
PLACE SURFACE COURSE ON SHADED PORTION OF NEW ROADWAY AS SHOWN. 5.
4. MILL EXISTING PAVEMENT ADJACENT TO ALL NEW PAVEMENT.
UTILIZING FLAGMEN.
MAINTAIN MINIMUM ONE LANE OF TRAFFIC IN EACH DIRECTION ON EXISTING LANES, 3.
MAINTAIN PORTABLE PLASTIC DRUMS.2.
MAINTAIN PERMANENT CONSTRUCTION SIGNS.1.
CONSTRUCTION SEQUENCE (STAGE 2)
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
MAINTAIN PERMANENT
100' TYP.
S- -22
(O
RANGEBURG
ROAD)
S-18-58 (MALLARD ROAD)
S-18-58 (EAST BUTTERNUT ROAD)
S- -22
(O
RANGEBURG
ROAD)
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
MAINTAIN PERMANENT
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
MAINTAIN PERMANENT
605-010-01, SCHEME C
PER SCDOT STD. DWG.
CONSTRUCTION SIGNING
MAINTAIN PERMANENT
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \T
C tc s tg
.d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
STA. 0+31.00
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 117+05.00
S-58 (MALLARD ROAD)
END CONSTRUCTION
STA. 0+29.50
S-58 (BUTTERNUT ROAD)
BEGIN CONSTRUCTION
10.00' RT
STA. 1+40.46
S-58 (BUTTERNUT ROAD)
END CONSTRUCTION
STA. 109+27.40
S-22 (ORANGEBURG ROAD)
BEGIN CONSTRUCTION
STA. 3+35.00
S-22 (ORANGEBURG ROAD)
END CONSTRUCTION
DWG. 601-005-00 (TYP.)
DRUMS PER SCDOT STD.
MAINTAIN PORTABLE PLASTIC
S-22/S-58
PAVEMENT MARKING AND SIGNING PLAN
S-22/S-581" = 50'
PM1
APPLY TO THIS PROJECT.
THE FOLLOWING SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD DRAWINGS FOR ROAD CONSTRUCTION
630-205-00
625-305-00 630-105-00
DRAWING NUMBER:
S- -22
(O
RANGEBURG
ROAD)
S-18-58 (MALLARD ROAD)
S-18-58 (EAST BUTTERNUT ROAD)
S- -22
(O
RANGEBURG
ROAD)
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \P
M p v m t m a rk in g s ig n in g .d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
ORANGEBURG & MALLARD
PAVEMENT EDGE LINE
APPLY 4" WHITE
SOLID LINE (TYP.)
APPLY 24" WHITE
STOP BAR
APPLY 24" WHITE
STOP BAR
APPLY 24" WHITE
ARROW (TYP.)
APPLY TURN
"ONLY" (TYP.)
APPLY WHITE WORD
ARROW (TYP.)
APPLY TURN
"ONLY" (TYP.)
APPLY WHITE WORD
PAVEMENT MARKINGS
TIE TO EXISTING
PAVEMENT MARKINGS
TIE TO EXISTING
PAVEMENT MARKINGS
TIE TO EXISTING
PAVEMENT EDGE LINE
APPLY 4" WHITE
10'-30'
APPLY 4" WHITE
YELLOW SOLID LINE
APPLY 4" DOUBLE
YELLOW SOLID LINE
APPLY 4" DOUBLE
YELLOW SOLID LINE
APPLY 4" DOUBLE
10'-30' LINE
APPLY 4" WHITE
2'-6' LINE
APPLY 4" WHITE
PAVEMENT EDGE LINE
APPLY 4" WHITE
2'-6' LINE
APPLY 4" WHITE
PAVEMENT EDGE LINE
APPLY 4" WHITE
PAVEMENT EDGE LINE
APPLY 4" WHITE
PAVEMENT EDGE LINE
APPLY 4" WHITE
2'-6'
APPLY 4" WHITE
1- P
1- P
1- P
R 1-
R 1-
1-
R 1-
R 1-
1-
R 1-
1-
R 1-
STATION SIDE
DITCH
OUTFALL
SIDESTATION
DITCH
OUTFALL
ZONE
SOIL TYPES
(COARSE / FINE)
PARTICLE SIZE
SOIL
STATION
TO
STATION
RECEIVING WATERS TEMPORARY EROSION CONTROL BLANKET
STATION
TO
STATION
SEDIMENT TUBES IN DITCHES
SIDE
(FT)
BLANKET
DEPTH OF
BACKFRONT
SLOPES
WIDTH (FT)
BOTTOM
DITCH
x
WATERS
RECEIVING
NAME OF
RECEIVING WATERS
NAME OF ULTIMATE
STATION
TO
STATION
: 1
SIDE COMMENTSTOTAL
(FT)
SPACING
LENGTH
AVERAGE
SIDENO STATION
NOT DRAINED
OR
DRAINED
TURF REINFORCED MATTING (TRM)
SEDIMENT DAM
STATION
TO
STATION
SIDE
(MSY)
TYPE 2
(MSY)
TYPE 3
(MSY)
TYPE 1
(FT)
MAT
DEPTH OF
WIDTH (FT)
BOTTOM
DITCH SLOPES
BACKFRONT
EROSION CONTROL DATA SHEET
TOTALS
TOTAL
GRAND TOTAL
0.000 0.000 0.000
0.000
MSY
ROUTE
ROAD /
ROUTE
ROAD /
ROUTE
ROAD /
ROUTE
ROAD /
RECEIVING WATERS
NAME OF ULTIMATE
WATERS
RECEIVING
NAME OF
ROUTE
ROAD /
ROUTE
ROAD /
ROUTE
ROAD /
(x : 1)
BASIN
OF SILT
LENGTH
BASIN
OF SILT
WIDTH
HEIGHT
DAM
SILT BASIN
OF
SIDE SLOPE
WIDTH
BOTTOM
SPILLWAY
CLASS
RIP RAP
VOLUME
STORAGE
TOTAL
HEIGHT
STORAGE
SEDIMENT
WIDTH
CHANNEL
OUTFALL
DEPTH
CHANNEL
OUTFALL
LENGTH
CHANNEL
OUTFALL
WIDTH
BOTTOM
DAM
N/A
EC1
EROSION CONTROL DATA SHEET
112+50109+25
COASTAL
COASTALFINE
FINE0+00
LT 15
112+50
PROPOSED DITCH
4515LT109+25
S-22/S-58
S-22/S-58
S-22
S-22
S-58 FINE COASTAL
5+00
S-58 112+50 116+80 FINE COASTAL
0+00 1+40
S-22 112+00 RT RUMPHS HILL CREEK ASHLEY RIVER
S-22 109+00 LT RUMPHS HILL CREEK ASHLEY RIVER
S-22 0+31 4+96
S-22
S-58 113+60 116+80 LT 15 60
REGRADED DITCH
PROPOSED DITCH
VARIES
VARIES
VARIES
195.0
No. 24051 R E
E
NI
G N
E L
S
N E
CI
L
A
NIL
ORAC HTU
O
S
SILLIG TERB
PLANS PREPARED BY:
No. C02310
SERVICES, INC.
CONSULTING
STANTEC
N
OI
T A
ZI
R
OHTUA FO
ETA
CI
FI
T R
E C
A
NIL
ORAC HTU
O
S Stantec Consulting Services Inc.
www.stantec.com
North Charleston, SC 29418
4969 Centre Pointe Drive Suite 200
/2
/2
U s e r:
a b a rr
U
S -P
P F S
S \s h a re d p ro je c ts \1
\t ra n s p o rt a ti o n \r o a d w a y \d ra w in g s \p la n s h e e ts \E
C e c d a ta s h t.
d g n
STATE SHEET NO.ROUTE NO.PROJECT IDCOUNTY
S.C.
REV. NO. BY DATE DESCRIPTION OF REVISION SCALE: RTE.
DORCHESTER COUNTY
DORCHESTER
IMPROVEMENTS
S-22/S-58N/A
S-8-24 EC2
EROSION CONTROL NOTES
RUBBLE AND OTHER UNSUITABLE MATERIALS.
MAXIMUM DIMENSIONS AND SHALL BE FREE OF VEGETATION, ORGANIC MATTER, DEBRIS,
FILL MATERIAL SHALL NOT CONTAIN ROCKS OR HARD LUMPS GREATER THAN 3 INCHES IN 7.
METHODS.
STABILIZE THE AFFECTED AREA USING SPRINKLING, IRRIGATION OR OTHER ACCEPTABLE
IF WIND EROSION BECOMES SIGNIFICANT DURING CONSTRUCTION, THE CONTRACTOR SHALL 6.
PAVEMENT, SIDEWALK, LANDSCAPED AREA WHEREIN THEY LIE.
VALVES AND SIMILAR STRUCTURES SHALL BE ADJUSTED TO MATCH FINISH GRADE OF THE
ALL EXISTING OR CONSTRUCTED MANHOLES, CLEANOUTS, MONUMENTS, GAS VALVES, WATER 5.
APPURTENANCES ARE BEING PLACED.
METHODS SHALL BE USED AS REQUIRED TO KEEP TRENCHES DRY WHILE PIPE AND
COLLAPSE AND WILL PROVIDE BRACING SHEETING OR SHORING AS NECESSARY. DEWATERING
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST 4.
SITE.
ANY PERMITS THAT ARE NECESSARY FOR REMOVING DELETERIOUS MATERIAL FROM THE
COMPACTED AS SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR ACQUIRING
ENGINEER. EXCAVATED AREAS TO BE BACKFILLED WITH APPROVED MATERIALS AND
STOCKPILED OR REMOVED FROM THE SITE AS DIRECTED BY THE OWNER OR THE OWNER'S
OWNER'S ENGINEER, OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO BE
EXCAVATED IN ACCORDANCE WITH THESE PLANS OR AS DIRECTED BY THE OWNER, THE
ALL DELETERIOUS SUBSURFACE MATERIAL (I.E. MUCK, PEAR, BURIED DEBRIS) IS TO BE 3.
DIRECTED BY THE OWNER OR THE OWNER'S ENGINEER.
OFF-SITE IN ACCORDANCE WITH APPLICABLE REGULATORY AGENCY REQUIREMENTS OR AS
ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIALS SHALL BE DISPOSED OF 2.
IMMEDIATELY FOLLOWING CONSTRUCTION.
PLANTED WITH OTHER APPROVED LANDSCAPE MATERIAL TO EXISTING OR BETTER CONDITION
NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SEEDED, MULCHED, SODDED OR
THE CONTRACTOR SHALL CLEAR AND GRUB ONLY THOSE PORTIONS OF THE SITE 1.
CLEARING & GRADING NOTES
GROWTH ON ALL UN-PAVED DISTURBED AREAS.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING 80% COVERAGE OF PERMANENT GRASS 1.
SEDIMENT AND EROSION CONTROL NOTES
CONTRACTOR TO PROVIDE AS-BUILT MEETING SCDOT REQUIREMENTS.6.
OWNER'S ENGINEER FOR ACCEPTANCE PRIOR TO PROCEEDING WITH WORK.
INDEPENDENT GEOTECHNICAL ENGINEER SHALL BE SUBMITTED TO THE OWNER AND
TYPE OF NEW BEDDING AND BACKFILL MATERIAL. THE RECOMMENDATIONS BY THE
MATERIAL AND MAKE RECOMMENDATIONS ON THE REMOVAL AND THE PLACEMENT AND
WILL ENGAGE AN INDEPENDENT GEOTECHNICAL ENGINEER TO VERIFY UNSUITABLE
SHOULD THE CONTRACTOR ENCOUNTER UNSUITABLE MATERIAL, THEN THE CONTRACTOR 5.
STANDARD SPECIFICATION FOR HIGHWAY CONSTRUCTION" LATEST EDITION.
THE CONTRACTOR IS RESPONSIBLE FOR BEDDING ALL PIPE PER SCDOT'S "THE 2007 4.
PURPOSES.
CONTRACTOR MAY BE REQUIRED TO RECLEAN PIPES AND STRUCTURES FOR THESE
STORM DRAINAGE SYSTEM UNTIL FINAL ACCEPTANCE OF THE PROJECT. THE
THE CONTRACTOR SHALL MAINTAIN AND PROTECT FROM MUD, DIRT, DEBRIS, ETC THE 3.
NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTIONS.
AND OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. CONTRACTOR TO
ALL STORM DRAIN PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER 2.
714-105-00 FOR DRAINAGE PIPE CULVERTS.
STANDARDS AND DETAILS INCORPORATED IN THIS PLAN. REFERENCE STANDARD DRAWING
SHALL BE IN ACCORDANCE WITH SCDOT STANDARDS, APPLICABLE GOVERNING AGENCY
SPECIFICATION FOR PERMANENT PIPE CULVERTS SC-M-714. ALL DRAINAGE STRUCTURES
PLANS, AND FOLLOW REQUIREMENTS FROM THE SCDOT SUPPLEMENTAL TECHNICAL
ALL STORM DRAIN PIPE SHALL BE SMOOTH WALL PIPE, UNLESS OTHERWISE NOTED ON 1.
DRAINAGE NOTES
ON-SITE UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.
NON-LINEAR PROJECTS THAT DISTURB 10 ACRES OR MORE THIS CONFERENCE MUST BE HELD
APPROVED ON-SITE SWPPP PRIOR TO THE IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR
A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION SITE WITH AN 19.
IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.
SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPS MUST BE
PRACTICABLE. IF IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE
IMPLEMENTATION MUST BE COMPLETED BEFORE THE NEXT STORM EVENT WHENEVER
WITH THE REQUIREMENTS OF THIS PERMIT AND/OR SC'S WATER QUALITY STANDARDS,
IF EXISTING BMPS NEED TO BE MODIFIED OR IF ADDITIONAL BMPS ARE NECESSARY TO COMPLY 18.
REACHED ON ALL AREAS OF THE CONSTRUCTION SITE.
LEAST ONCE EVERY CALENDAR WEEK AND MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS
AFTER CONSTRUCTION ACTIVITIES BEGIN, INSPECTIONS MUST BE CONDUCTED AT A MINIMUM OF AT 17.
CONTACT SCDOT FOR FINAL INSPECTION AND CLOSEOUT.10.
REMOVE PERIMETER EROSION CONTROL DEVICES.9.
REMOVE INTERNAL TEMPORARY EROSION CONTROL DEVICES FOR STABILIZED AREAS.8.
PLACE PERMANENT VEGETATION AS GRADING IS COMPLETED.7.
REMOVE BUILT-UP SEDIMENT AS NEEDED.6.
ACTIVITIES.
INSTALL INTERNAL TEMPORARY EROSION CONTROL DEVICES AS NEEDED DURING GRADING 5.
BEGIN GRADING AND STORM DRAINAGE CONSTRUCTION.4.
INSTALL PERIMETER EROSION CONTROL DEVICES.3.
CLEAR OUTER CONSTRUCTION LIMITS.2.
CONTACT SCDOT 48 HOURS PRIOR TO COMMENCEMENT OF CONSTRUCTION.1.
SEDIMENT AND EROSION CONTROL CONSTRUCTION SEQUENCE
-SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.
MAINTENANCE; AND
-FUELS, OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND EQUIPMENT OPERATION AND
COMPOUNDS AND OTHER CONSTRUCTION MATERIALS;
-WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT, FORM RELEASE OILS, CURING
-WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED BY AN APPROPRIATE CONTROL;
THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:16.
FILTER BAG, ETC.).
AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH APPROPRIATE BMPS (SEDIMENT BASIN, MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES AND EXCAVATED 15.
DISCHARGE.
ALTERNATIVE CONTROL THAT PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO
WATER, AND OTHER WASH WATERS. WASH WATERS MUST BE TREATED IN A SEDIMENT BASIN OR
MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE WASHING, WHEEL WASH 14.
MINIMIZE SOIL COMPACTION AND, UNLESS INFEASIBLE, PRESERVE TOPSOIL.13.
RESUME FOR A PERIOD OF 7 CALENDAR DAYS.
LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR TEMPORARILY CEASED, AND WILL NOT
INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR GREATER) WHERE 12.
FINAL STABILIZATION IS REACHED.
HOURS, FROM THE DATE OF COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT
CONSTRUCTION SITE OR A NEARBY LOCATION EASILY ACCESSIBLE DURING NORMAL BUSINESS
A COPY OF THE SWPPP, INSPECTIONS RECORDS, AND RAINFALL DATA MUST BE RETAINED AT THE 11.
FROM BECOMING A POLLUTANT SOURCE IN STORM WATER DISCHARGES.
CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED TO STORM WATER MUST BE PREVENTED
POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY TREATED LUMBER) AND
LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH SIGNIFICANT 10.
AND ALL WOS.
ALL WOS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE
AREAS WHERE A 50-FOOT BUFFER CAN'T BE MAINTAINED BETWEEN THE DISTURBED AREA AND
CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL
ALL WATERS OF THE STATE (WOS), INCLUDING WETLANDS, ARE TO BE FLAGGED OR OTHERWISE 9.
SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS OR STABLE OUTLETS.
CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE RUNOFF AND/OR TO DIVERT
TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS NEEDED DURING 8.
WITH S.C REG. 72-300 ET SEQ. AND SCR100000.
PLANS DURING CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN ACCORDANCE
AS FOR INDIVIDUAL LOT CONSTRUCTION. INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE
RESIDENTIAL SUBDIVISIONS REQUIRE EROSION CONTROL FEATURES FOR INFRASTRUCTURE AS WELL 7.
CONTRACTOR SHALL DAILY REMOVE MUD/SOIL FROM PAVEMENT, AS MAY BE REQUIRED.
PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE GENERATION OF DUST. THE
THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING OF MUD ONTO 6.
SITE IS STABILIZED.
TEMPORARY CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE AND THE
CONSTRUCTION IN ORDER TO CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL
AREAS HAVE BEEN STABILIZED. ADDITIONAL CONTROL DEVICES MAY BE REQUIRED DURING
CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION ACTIVITIES AND ALL DISTURBED
ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL PHASES OF 5.
PUMPED BACK INTO ANY WATERS OF THE STATE.
WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO REMOVE SEDIMENT BEFORE BEING
TEMPORARY SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS ENCOUNTERED
STABILIZED WITH GRASSING IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND
EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED AREAS SHALL BE CLEANED, GRADED, AND
PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED, TO CONTROL SOIL 4.
IDENTIFICATION.
REPLACEMENT OR MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF
INAPPROPRIATELY OR INCORRECTLY INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY
WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION INDICATES THAT A BMP HAS BEEN
ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED…
This is the start of the file's text. The full file is on GovTribe.