Attachment B - Northern Wasco County PUD Wood Pole Spec.pdf

PDF 517 KB Posted

Attached to
40 Class 4 Wood Power Pole Purchase
Solicitation number
S-R33123-00009156
Issued by
Wasco County, Oregon

About this file

This document is the Wood Pole Specifications for Northern Wasco County P.U.D. in Oregon. The purpose of the specification is to cover Northern Wasco County PUD's requirements for wood poles used in overhead electrical line construction. The poles must meet the requirements of the ANSI 05.1 standard for wood utility products, with some exceptions as outlined in the specification. Poles must be cut from Pacific Coast Douglas fir timber, treated with a preservative such as UltraPole NXT or Copper Naphthenate, and meet specific requirements for workmanship, framing, and defects. The poles will be inspected by a qualified third-party inspector, who has the authority to accept or reject any pole that does not meet the requirements. Delivery and rejection terms are also specified, including that the supplier is responsible for replacing any rejected poles.

The related state and local contract opportunity is for the purchase of 40 Class 4 wood power poles, to be delivered FOB. The contract is being issued by Wasco County, Oregon. The specifications outlined in the document provided would apply to this contract opportunity. Pricing terms, set asides, and other salient information are not included in the provided materials.

View the file

Other files

File Type Posted
Attachment A - Terms and Conditions for PO.pdf PDF
NWCPUD 40 Class 4 Wood Pole Purchase.pdf PDF
PUBLIC NOTICE.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHERN WASCO COUNTY P.U.D.

Wood Pole Specifications

1. SCOPE

a. The purpose of the specification is to cover Northern Wasco County PUD requirements for wood poles used in overhead electrical line construction.

b. All Poles shall meet the requirements of the latest American National Standards for Wood Utility Products, ANSI 05.1, except as other wise specified herein. Preservative treatments shall be in accordance with the latest American Wood Preservers’ Association (AWPA) Standards, except as modified herein.

2. Pole Classes

a. Poles shall be of the lengths and classes in accordance with requirements referenced in the latest ANSI 05.1.

3. Material Requirements

a. Poles Shall be cut from live Pacific Coast Douglas fir timber. Douglas fir, interior north (intermountain) timber is not acceptable.

i. Poles shall be of uniform taper, with no variation in cross-sectional areas that reduce pole strength.

4. Preservative

a. All poles shall be full-length treated.

b. The preservative used in the treatment of poles shall be one of the following.

i. UltraPole NXT (DCOI)

ii. Coper Naphthenate (CUNap)

c. Poles shall be clean and dry after treatment (bleeders shall be rejected).

5. Workmanship

a. All work shall be performed by skilled craftsmen following the best modern practices of the industry.

6. Incising, Drilling and Boring

a. Through boring is required on all poles 40 feet and longer shall be completed as shown in exhibit 1.

i. Drilling shall be done carefully to avoid charring or glazing of the inner surfaces and tearing or splintering the wood fibers.

b. Incising or radial drilling at the ground-line will be required on all poles 35 feet and shorter.

i. Incising shall be accomplished in a manner which will not unduly damage the surface of the pole by splintering, raising the wood fivers on the surface, gouging, or loosening the sapwood from the heartwood.

7. Framing

a. All poles 35 feet and longer shall be framed in accordance with exhibit 2 unless specified otherwise on the purchase order.

b. Neutral bolt hole should be on the same plane as the face marking.

i. All framing shall be done before preservation treatment of the pole.

c. All poles shall be fitted with a star lock in the top to minimize split tops.

8. Defects

a. Hollow heart or type 1 decayed knots, will not be permitted.

b. Sweep or curvature, for all poles in the inspection lot shall be within 1 inch for each 10 feet of length as measured from the pole butt to pole tip.

c. Poles with sweep in two planes will not be accepted.

d. Checks greater than ½ inch x 6’ in width will be rejected.

i. Checks or combination of two checks through the butt of the pole extending more than a total of 2 feet up the pole is prohibited.

1. “S” irons are prohibited.

e. Hollow pith centers are prohibited.

f. Depressions containing bark more than two inches deep shall not be allowed.

g. Hollowing in the butt is not allowed.

9. Manufacture Markings

a. Butt Marking

i. A weather-durable color-coded aluminum tag shall be affixed thereto in a permanent manner providing the details of the pole as stated in ANSI 7.1.5 and adhering to the Pantone Matching System (PMS) or weather resistant material.

b. Face Marking

i. The face of the pole shall be permanently marked at a spot 6 feet above the ground line as specified in exhibit 2. Marking on the face shall be a 2-inch diameter aluminum disc recessed 1/2 inch into the pole and securely fastened with an aluminum or galvanized nail, with all details specified in ANSI 7.1.5.

10. Storage and Handling

a. In addition to the requirements of ANSI-05.1 the following requirements shall be met:

i. Can hooks, pole tongs, or other pointed tools shall not be applied between the butt and 2 feet above the ground line.

ii. Maximum air seasoning time permitted for poles held for treatment shall be 18 months.

iii. Maximum storage time permitted for treated poles shall be one year, unless re-treated.

11. Inspection

a. Price to include shipping and inspection costs.

i. Poles shall be inspected by a qualified 3 party inspector. The supplier shall be responsible for coordinating inspection at their facilities. The supplier shall give the inspector access to their yard during working hours. The inspector has the authority to accept or reject any pole that in his/her judgment does not meet or exceed the requirements of this specification.

1. The inspector shall hammer stamp the butt of each pole, meeting the requirements of this specification with inspector’s brand.

ii. The manufacture shall supply the utility with documentation certifying all provisions of the ANSI, AWPA and Northern Wasco County specifications have been met.

1. The manufacture shall provide Northern Wasco County at a minimum of once a year or when requested the Safety Data Sheet (SDS) of the chemicals used in the process of treating the poles; Or when any changes in process, chemicals used or medical hazards change.

12. Evaluation and Award

a. For the purpose of evaluating bid, consideration will be given to past performance regarding quality of production and service.

i. Consideration will be given to delivery time.

ii. Equalizing elements or factors not specifically mentioned or provided herein, in addition to price, which would affect the final cost to and the benefits to be derived by the PUD, will be taken into consideration in determining the award of contract.

b. The PUD reserves the right either to make an award which in the judgement of the PUD is in its best interest or at the PUD’s discretion to reject all bids and to waive any informalities in bids received.

13. Delivery and Rejection

a. Delivery

i. All poles shall be shipped on a self-loading truck.

ii. All poles shall be shipped to 2345 River Rd, The Dalles Or. 97058, unless expressly stated otherwise in the purchase order.

iii. Deliveries will be accepted Monday through Thursday, except for observed holidays between the hours of 7:00 am and 3:00 PM.

iv. Call the PUD’s Warehouse at 541-298-3317 no less than 24 hours prior to delivery.

v. The supplier can increase or decrease quantity to facilitate truckload capacities with prior approval.

b. Rejection

i. Poles not conforming to this specification and poles received damaged or broken shall be rejected. The supplier shall either replace such rejected poles with poles complying with this specification at his/her own expense or shall allow credit for such rejected poles.

1. The PUD shall not be responsible for return shipping of rejected poles.

DOCUMENT REVISIONS

REVISED BY TITLE DATE COMMENTS REVISION

Jeff Handley Utility Worker Creation

DOCUMENT REVISIONS