This document is a Pre-Construction Risk Assessment (PCRA) and Infection Control Risk Assessment (ICRA) template used by a healthcare facility to evaluate and manage risks associated with construction and renovation projects.
The template comprises multiple risk assessment sections designed to be completed before construction begins. Section 2A addresses fire safety through Above Ceiling Access Permits (ACAP), Interim Life Safety Measure (ILSM) evaluations, and Hot Work Permits. Section 2B covers utility system impacts including water, sewer, electricity, steam, HVAC, medical gases, IT systems, and telephones. Section 2C evaluates environmental and occupational hazards such as lead-based paint, asbestos, chemical hazards, infectious agents, and mold exposure. Section 2D assesses security risks including badge readers, cameras, physical barriers, and emergency response procedures. Section 2E provides the core ICRA, which classifies construction activities into four types (A through D, ranging from non-invasive inspections to major demolition) and matches them against patient risk groups (Low, Medium, Medium-High, and Highest Risk) to determine required infection control precautions (Classes I through IV). The assessment identifies specific precautions required before, during, and upon completion of construction, including HEPA filtration, negative air pressure maintenance, barrier construction, and decontamination procedures. Supporting sections include Project Revision Requests, Fire Watch Request Forms, Utility Shutdown Requests, and Daily Construction Area Checklists to ensure ongoing compliance throughout the project lifecycle. All assessments require sign-off from facility management, safety officers, infection prevention staff, and project supervisors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table of Contents
PAGE HEADING PG#
Pre-Construction Risk Assessment – Cover Page (PCRAͿ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
P�ZAͬI�ZA �ŚĞĐŬůŝƐƚ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2A(1). Above Ceiling Permit (ACAP)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
ABOVE CEILING ACCESS PERMIT (ACAP)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2A(2). Interim Life Safety Measure Risk Assessment (ILSM)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2B Utility System Risk Assessment (USRA)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2C Environmental and Occupational Risk Assessment (EORA)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2D Security Risk Assessment (SRA)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2E Infection Control Risk Assessment (ICRAͿ ^dEP ϭ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Step 2 AND ϯ Using the following table, identify the Patient Risk Groups that will be affected.͘
Description of Required Infection Control Precautions by Class͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Step 4. Identify the areas surrounding the project area, assessing potential impact Infection͘͘
IŶĨĞĐƚŝŽŶ Control Construction Permit͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
Section 2F Project Revision Request͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
^ĞĐƚŝŽŶ 3A Fire Watch Request Form͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
^ĞĐƚŝŽŶ 3B Utility Shutdown Request (USR)͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
^ĞĐƚŝŽŶ 3C Daily Construction Area Checklist͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘ ϭϵ
^ĞĐƚŝŽŶ ϮA;ϯͿ HŽƚ tŽƌŬ PĞƌŵŝƚ͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘͘
PCRA/ICRA CHECKLIST
DĂƚĞ ĂŶĚ dŝŵĞ
ŽĨ P�ZAͬI�ZA
&A�I>Idz
DEPAZdDENd
PZK:E�d DAdE
&A�I>Idz PK�
IŶĨĞĐƚŝŽŶ �ŽŶƚƌŽů
^ĂĨĞƚLJ PK�
�ŝŽŵĞĚ PK�
CŚĞĐŬůŝƐƚ ƚŽ ĐŽŵƉůĞƚĞ ƉƌŝŽƌ ƚŽ ƐƚĂƌƚŝŶŐ ƚŚĞ ƉƌŽũĞĐƚ IŶĨĞĐƚŝŽŶ �ŽŶƚƌŽů͕ ̂ ĂĨĞƚLJ͕ NƵƌƐŝŶŐ͕ &ĂĐŝůŝƚLJ͕ ĂŶĚ DĞƉĂƌƚŵĞŶƚ PK� ƉƌĞƐĞŶƚ Ăƚ P�ZAͬI�ZA DĞĞƚŝŶŐ
PƌĞǀŝŽƵƐ P�ZAͬI�ZA PƌŽũĞĐƚ ĐŽŵƉůĞƚĞĚ ďĞĨŽƌĞ ƐƚĂƌƚŝŶŐ ŶĞǁ ƉƌŽũĞĐƚ
&ĂĐŝůŝƚLJ ŚĂƐ Ăůů ƐƵƉƉůŝĞƐ ĨŽƌ ƉƌŽũĞĐƚ
Aƚ PƌŽũĞĐƚ >ŽĐĂƚŝŽŶ ƚŽ �ŽŵƉůĞƚĞ P�ZAͬI�ZA
^ƚĂĨĨ ŚĂǀĞ ŶĞĞĚĞĚ PPE ̂ ƵƉƉůLJ ĨŽƌ ƉƌŽũĞĐƚ
HEPA &ŝůƚĞƌ ̂ LJƐƚĞŵ ĂǀĂŝůĂďůĞ ĂŶĚ ŝŶƐƚĂůůĞĚ
ZĞŵŽǀĞ Ăůů ĞƋƵŝƉŵĞŶƚ͕ ƐƵƉƉůŝĞƐ͕ ĂŶĚ ŝŶƐƚƌƵŵĞŶƚƐ ƌĞŵŽǀĞĚ ĨƌŽŵ ƉƌŽũĞĐƚ ĂƌĞĂ
EƋƵŝƉŵĞŶƚ͕ ƐƵƉƉůŝĞƐ͕ ĂŶĚ ŝŶƐƚƌƵŵĞŶƚƐ ĐŽǀĞƌĞĚ ŝĨ ƚŚĞLJ ĂƌĞ ŵŽƵŶƚĞĚ ŝŶ ƉƌŽũĞĐƚ ĂƌĞĂ
�ĂƌƌŝĞƌƐ IŶƐƚĂůůĞĚ ĂŶĚ IŶƐƉĞĐƚĞĚ ďLJ ̂ ĂĨĞƚLJ ĂŶĚ IŶĨĞĐƚŝŽŶ �ŽŶƚƌŽů
&ĂĐŝůŝƚLJ EŵƉůŽLJĞĞ ĞĚƵĐĂƚĞĚ ŽŶ ĐŽŵƉůŝĂŶĐĞ ĚƵƌŝŶŐ ƚŚĞ ƉƌŽũĞĐƚ
^ĂĨĞƚLJ PK� ĐŽŶĚƵĐƚŝŶŐ ƌŽƵŶĚƐ ĨŽƌ ĞŶƚŝƌĞ ƉƌŽũĞĐƚ ĂŶĚ ĨŝŶĂů ŝŶƐƉĞĐƚŝŽŶ
IŶĨĞĐƚŝŽŶ �ŽŶƚƌŽů PK� ĐŽŶĚƵĐƚŝŶŐ ƌŽƵŶĚŝŶŐ ĨŽƌ ĞŶƚŝƌĞ ƉƌŽũĞĐƚ ĂŶĚ ĨŝŶĂů ŝŶƐƉĞĐƚŝŽŶ
HŽƵƐĞŬĞĞƉŝŶŐ ĐŽŵƉůĞƚĞĚ ĚĞĞƉ ĐůĞĂŶ ĂĨƚĞƌ ƉƌŽũĞĐƚ ĐŽŵƉůĞƚĞ
Pre-Construction Risk Assessment – Cover Page Project Title: Project/Contract #:
NNMC Coordinator: PCRA Submit Date:
Project Conducted by:
❑Fac. Mgmt. ❑I.T. ❑Telecom ❑Clin. Eng.
❑Contractor:
Proposed Start Date:
Staff/Cont. Name: Est. Duration:
Supervisor Name: Est. Complete Date:
Telephone: Date Project
Completed:Email:
Project Description: (include specific sites and tasks)
Section 1. Initial Project Impact Review Topic Will project negatively impact or involve…? No Yes Action Items If YES to any Fire Safety Section 2A(1)
Ceiling tile removal Complete Above the Ceiling Access Permit (ACAP)Existing fire-stop; minor barrier penetrations
Fire Safety Section 2A(2)
Fire detection/alarm/suppression systems Complete Interim Life Safety Measure (ILSM) evaluation. Exit paths or fire/smoke barriers
Hot work practices Extra fire load or flammable materials
Utilities Section 2B
Water, sewer, electricity, steam, or HVAC (including outside air intakes)
Complete the Utility System Risk Assessment (USRA)
Medical gases or vacuum Call systems, telephones, or IT systems
Environmental/ Occupational Section 2C
Lead or asbestos containing materials Complete Environmental/ Occupational Risk Assessment
(EORA)
Chemical hazards (i.e. mercury, volatile organics) Exposure to infectious agents or mold
Security Section 2D
Security systems (badge readers, cameras) Complete Security Risk Assessment (SRA) Security processes (tours, foot/vehicle traffic)
Infection Control Section 2E
Patient care areas or critical utilities Complete Infection Control Risk Assessment (ICRA). *Classification� ƉoƉƵlatĞs�ǁŚĞn�coŵƉlĞtĞ͘Ύ
Moderate to high levels of dust, noise, vibration More than one work shift
Classification:
Click HERE to choose.
I
L_J LJ L_J LJ
I I
Project Approval Project Close-out
Evaluator
Facility Manager
Facility Manager
Safety Officer
Safety Officer
Infection Prevention
Infection Prevention
Supervisor (impact area)
Supervisor (impact area)
Title Signature Date Title Signature Date
Section 2A(1). Above Ceiling Permit
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
Back to Cover Page
ABOVE CEILING ACCESS PERMIT
PERMIT MUST BE PROMINENTLY DISPLAYED AT THE JOB SITE
NOTICE TO PERMIT HOLDER
READ CAREFULLY
Certain spaces (such as above ceiling tile grids or utility closets) are restricted to authorized personnel, and are controlled in GSU facilities.
Access to these spaces is a privilege, which may be denied for those who do not comply with the Above Ceiling Access Permit Policy. This applies to all staff, as well as vendors and contractor personnel.
This form and the preceding pages are the permit and must be displayed at all times while creating new, or accessing existing penetrations in smoke or fire barriers. It must also be displayed when working above ceiling tile grids, in utility closets or in any other space identified as CONTROLLED SPACE.
Persons found working in these spaces without a valid permit visible are in violation of the ABOVE CEILING ACCESS PERMIT POLICY, and may lose their access privileges. Chronic non-compliers will be disciplined.
SOME EXAMPLES OF POLICY VIOLATIONS:
• Accessing a controlled space without a permit
• Failure to hold and display a valid permit
• Failure to close out a permit
• Performing work outside the scope of a permit
• Providing false information to a permit issuer
• Falsifying data on a permit
• Allowing someone to work under the scope of a permit issued in another’s name
All individuals performing work in a CONTROLLED SPACE shall read and be familiar with the ABOVE CEILING ACCESS PERMIT POLICY, copies of which can be obtained in Facility Management.
I have read and understand the ABOVE CEILING ACCESS PERMIT POLICY, and agree to comply with it.
Staff/Contractor Signature
Back to Cover Page
Date:
Section 2A(2) Interim Life Safety Measure Risk Assessment
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
Topic Issue for Evaluation No Yes Response (If YES to any) Date Initiated Exits 1.Any exit access or travel distances altered/excessive?
• Post signage for an alternate means of egress
• Train staff on alternate means of egress*
• Inspect exit daily for blockage or debris
• Double fire drill frequency*
• Increase hazard surveys*
2.Any exits used by anyone other than contractors obstructed?
3.Absence of two remote exits?
Emergency Access
1.Access to emergency depts. or services obstructed?
• Designate an alternate means of access
• Notify NNMC Security
• Notify Shiprock Fire Dept.
2.Access to construction area obstructed for emergency forces?
Fire Protection 1.Fire alarm/detection impaired >4 hrs?
• Submit fire watch request;
o Or, use/monthly test temp.
alarm/detection/ suppression system
• Notify Shiprock Fire Dept.
• Double fire drill frequency*
• Make affected staff aware
• Increase hazard surveys*
2.Fire suppression impaired >10 hrs?
Fire & Smoke Barriers
1.Major breaches of fire/smoke barriers (including vertical)?
• Construct 1-hr smoke tight temp. barrier (as needed)
• Inspect exits daily
• Double fire drill frequency
• Train staff to compensate*
• Increase hazard surveys*
2.Unprotected corridors or Haz. Areas?
3.Fire/smoke door maintenance/latching problem not immediately repairable?
Addl. Firefighting Equipment
1.Fire load significantly increased above normal for area/building?
• Provide additional fire extinguishers in area
Addl. Firefighting Training
1.Additional firefighting equipment differs from normal equipment?
• Train equipment staff/ contractors to use
Combustible Load Levels
1.New/increased storage of flammable/ combustible materials?
• Minimize debris accumulation
• Increase hazard surveys2.Flammable/combustible debris?
Hazard Surveillance 1.Addl. hazards such as excavations, etc? • Initiate additional surveillance of area
Facility-wide Training
1.Life safety deficiencies or hazards impaired throughout entire building?
• Train employees on ILSM
• Notify Shiprock Fire Dept.
*-Need for response may be waived upon approval of Authority Having Jurisdiction based on scope and duration of project.
Describe any other life safety impacts, as well as specific actions to be implemented, for these and those above.
I I
Back to Cover PageBack to Cover Page
Title Date
Facility-wide
SignatureSignature Evaluator
Facily Manager Safety Officer
Saff/Contractor
Section 2A(3): Hot Work Permit Project Title: Project/
Contract #:
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated
Duration:
REYhIRE��PRECAhTIONS�C,EC<�LIST� tEL�ING�ĂŶĚ�BhRNING�PERMIT� (Work is not permitted unless this card is filled in and posted in work area) Time: Fire protection system(s) in service (sprinklers, CO2, foam).
Cutting and welding equipment in good condition.
Floor: Floor/ground clean (wet down when necessary).
Combustibles at least 35 feet from welding area.
Flammable liquids and other hazards removed from area.
All floor and wall openings within 35 feet covered.
Non-combustible covers used to protect nearby combustibles and equipment.
Date:
Building:
Department:
Work to be done:
Special Precautions:
Fire Watch Required: Containers, tanks, ducts, and other enclosures cleaned and purged of flammable vapors, liquids, dusts, and other hazardous materials.
The location where work is to be done has been examined by me, the necessary precautions have been taken (see checklist), and permission is granted for this work.
Fire extinguishers or small standpipe fire hose provided.
All hazardous operations discontinued in area.
Permit Expires: Time:
Fire watch should be present during, and at least on-half hour after, welding/burning has ceased.
Location of nearest fire alarm box identified.
Signed:
Individual responsible for work authorization (Facility Manager) Time Started: Time Completed:
FINAL CHECK
(Where Fire Watch is Required)
Work area, and all adjacent area where sparks might have spread, were continuously inspected during the entire time cutting, welding, or other hot work was conducted, and 30 minutes after completion. In addition, the work area was check four (4) hours after the cutting, welding, or other hot work was completed, and no fire conditions were noted.
When possible, do work in a non-combustible area.
An individual should generally be assigned to watch for dangerous sparks in the area and the floor below.
YES NO
Signed:
Return this permit, after work is completed, to Facilities Manager or designee for filing.
Section 2B. Utility System Risk Assessment
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
No Yes Minimum Recommended Precautions: (If Yes)
Describe any specific actions to be implemented:
I I
Back to Cover Page
Title Signature Date Evaluator
Facility Manager
Staff/Contractor
Safety Officer
Will project affect?
Noise
Vibration
Water
Sewer
Electricity
Steam
Natural Gas
HVAC
Medical Gas & Vacuum
IT Systems
Telephones
Call Systems
Observation Cameras
• Review project and patient care schedules to identify least impactful times, or options to curtail or relocate patient care operations
• Review how workers will access worksite and isolate from patient care as feasible
• Review tools and processes to be used for reasonable, quieter alternatives;
• Install sound attenuating barriers where feasible. Monitor as needed.
• Review work schedules for project and work area to identify least impactful times
• Review tools and processes to be used for reasonable alternatives
• Assess potential impacts on sensitive patient care equipment/processes; Monitor as needed.
• Submit ICRA and Utility Shutdown Request; Submit fire watch request per ILSM evaluation
• Pre-position materials needed to respond to a water leak
• Review need/options to isolate adjacent areas and equipment (i.e. lab analyzers, ice machines, HVAC appurtenances, etc.)
• Flush and/or treat system if potential for residue or stagnation (See Legionella Plan)
• Submit ICRA and Utility Shutdown Request
Pre-position materials needed to respond to leaks or spills, and to handle contaminated construction debris.
• Review need/options to isolate adjacent areas and to curtail or alter patient care routines.
• Review work schedules for project and work area to identify least impactful times
• Review potential impacts to connected utility systems and electronic equipment
• Submit Utility Shutdown Request
• Submit Utility Shutdown Request
• Notify steam-based equipment users of potential impacts
• Submit Utility Shutdown Request
• Submit ICRA and Utility Shutdown Request
• Review work schedules for project and work area to identify least impactful times
• Identify alternate environmental condition options
• Submit Utility Shutdown Request
• Ensure work will be done in accordance with NFPA 99 or other relevant codes
• Notify patient care staff of potential impacts to prompt clinical intervention planning
• Ensure that post-completion testing is completed
• Collaboratively plan project between Facility Mgmt and IT Departments
• Notify patient care staff to plan for clinical process modification as needed
• Collaboratively plan project between Facility Mgmt and IT Departments
• Notify patient care security staff to plan for emergency response modifications
• Collaboratively plan project between Facility Mgmt and IT Departments
• Notify patient care staff to plan for clinical process modification as needed
• Plan for alternate notification means (standalone systems, bells, etc.)
• Collaboratively plan project between Facility Mgmt and IT Departments
• Notify patient care staff to plan for clinical process modifications as needed
SĞĐƚŝŽŶ�ϮC͘�EŶǀŝƌŽŶŵĞŶƚĂů�ĂŶĚ�OĐĐƵƉĂƚŝŽŶĂů�RŝƐŬ�AƐƐĞƐƐŵĞŶƚ�
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
Will project involve: Yes No Minimum Recommended Precautions: (If Yes)
Lead-based paint
• Review facility lead-based paint assessment and management plan
• Ensure project staff are properly trained in precautions necessary to protect facility occupants and themselves
• Establish plan to implement appropriate isolation, work practices, housekeeping, and waste handling
• Establish plan for required air or surface sampling
Asbestos
• Review facility asbestos assessment and management plan
• Ensure project staff are properly trained in precautions necessary to protect facility occupants and themselves
• Establish plan to implement appropriate isolation, work practices, housekeeping, and waste handling
• Establish plan for required air or surface sampling
Chemical hazards
• Review area or initial project plan to identify hazards inherent to work area
• Compile and review listing of chemicals to be used; ensure Safety Data Sheets available
• Review chemicals to be used for potential impacts on areas adjacent to project
• Ensure project staff have receive Haz. Communications training including emergency response processes/responsibilities
• Conduct Job Hazard Assessment and ensure appropriate personal protective equipment is available and used
Infectious Agents
• Review area or initial project plan to identify hazards inherent to work area
• Ensure staff have received Bloodborne Pathogen Training including exposure response processes/responsibilities
• Review need for medical screening/vaccination with employee health program
• Conduct Job Hazard Assessment and ensure appropriate personal protective equipment is available and used
Mold
• Review area or initial project plan to identify hazards inherent to work area
• Consider potential risk of water damage due to compromising wall, ceiling, roof
• Ensure project staff are properly trained in precautions necessary to protect facility occupants and themselves
• Establish plan to implement appropriate isolation, work practices, housekeeping, and waste handling
Describe any specific actions to be implemented:
Back to Cover Page
Evaluator
Facilities Manager
Employee Health
Safety Officer
Staff/Contractor
Title Signature Date
Badge Readers
SĞĐƚŝŽŶ�Ϯ�͘�SĞĐƵƌŝƚLJ�RŝƐŬ�AƐƐĞƐƐŵĞŶƚ� Project Title: Project/Contract #:
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
Will project affect... Yes No Minimum Recommended Precautions: (If Yes)
• Collaborative plan project with IT Department
• Notify Security staff of impaired system to plan for alternative access control methods
• Notify affected work area staff of alternative access control methods
Security Cameras
• Collaboratively plan project between Facility Mgmt and IT Departments
• Notify security to plan for surveillance process modifications
Physical Barriers
• Review need for temporary physical barriers
Security Processes
• Review changes to area access with security to plan for alternate rounding paths
• Review pedestrian/facility occupant foot traffic patterns to identify potential vulnerabilities
• Review vehicle traffic patterns with security to ensure required access and to plan for traffic management as needed Security sensitive areas
• Review project staff listing with security
• Notify project staff of access control requirements
• Provide identification as needed.
Emergency Response Procedures
• Notify external first responders/partners as appropriate
• Provide training to staff regarding procedural changes
• Relocate equipment and/or signage as needed
• Review emergency response communications procedures/plan
Describe any specific actions to be implemented:
Back to Cover Page
Title Signature Date Evaluator
Staff/Contractor
Security Supervisor
Safety Officer
Facility Manager
Section 2E. Infection Control Risk Assessment
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration:
Building: Floor(s): Department Name(s): Room Number(s) & Description(s)
Project Description: (include specific sites and tasks)
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
Step 1: Using the following table, identify the Type of Construction Project Activity (Type A-D)
TYPE A
Inspection and Non-Invasive Activities.
Includes, but is not limited to:
▪ removal of ceiling tiles for visual inspection only, e.g., limited to 1 tile per 50 square feet
▪ painting (but not sanding)
▪ wallcovering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection.
TYPE B
Small scale, short duration activities which create minimal dust Includes, but is not limited to:
▪ installation of telephone and computer cabling
▪ access to chase spaces
▪ cutting of walls or ceiling where dust migration can be controlled.
TYPE C
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes, but is not limited to:
▪ sanding of walls for painting or wall covering
▪ removal of floorcoverings, ceiling tiles and casework
▪ new wall construction
▪ minor duct work or electrical work above ceilings
▪ major cabling activities
▪ any activity which cannot be completed within a single workshift.
TYPE D
Major demolition and construction projects Includes, but is not limited to:
▪ activities which require consecutive work shifts
▪ requires heavy demolition or removal of a complete cabling system
▪ new construction.
Step 1:
I I
Back to Cover Page
Scott Lund
Scott Lund
Scott Lund
Step 2: Using the following table, identify the Patient Risk Groups that will be affected.
Low Risk Medium Risk Medium-High Risk Highest Risk
▪ Office areas ▪ Cardiology ▪ Emergency Room ▪ Any area caring for
▪ Nonpatient-care areas not otherwise
Echocardiography Endoscopy Local Room
Labor & Delivery Laboratories (specimen) Medical Units immunocompromised patients
▪ Central Sterile Supply
▪ Intensive Care Units specified
(NOS)
Physical Therapy Radiology/MRI Respiratory Therapy Infusion Clinic Orthopedic Clinic
Newborn Nursery Outpatient Surgery Pediatrics Pharmacy Post Anesthesia Care Unit
▪ Negative pressure isolation rooms
▪ Operating rooms including C-section rooms
If more than one risk group will be affected, select the higher risk group:
Step 2:
Step 3: Match the following;
Construction Project Type (A, B, C, D) oQ tKe IoOOoZLQg PatrL[� to ILQG tKe « Patient Risk Group (Low, Medium, High, Highest) with the planned … Class of Precautions (I, II, III or IV) or level of infection control activities required.
Type of Construction Patient Risk Group Type A Type B Type C Type D
Low Risk Group I II II III/IV Medium Risk Group I II III IV
Medium-High Risk Group
I II III/IV IV
Highest Risk Group I –III Consult ICP
III/IV III/IV IV
Back to Cover Page
* Note Infection Preventionist approval will be required when the Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary.
Step 3: ___________________________
ComEined IroP 6teSV ��� aEove� ZLOO Ee VKoZQ oQ PC5$ Cover Page�
6tep � 6tep� 6tep �
Scott Lund
Scott Lund
Description of Required Infection Control Precautions by Class
Before Construction During Construction Project Upon Completion of Project
C L
A
SS
I 1. Notify Department Supervisor
�� Execute work by methods to minimize raising dust from construction operations.
�� Immediately replace a ceiling tile displaced for visual inspection
1. Clean work area upon completion of task.
C L
A
SS
II
1. Notify Department Supervisor
�� Provide active means to prevent airborne dust from dispersing into atmosphere.
�� Water mist work surfaces to control dust while cutting.
�� Seal unused doors with duct tape.
�� Block off and seal air vents.
�� Place dust mat at entrance and exit of work area �� Remove or isolate HVAC system in areas where work is being performed.
1. Wipe work surfaces with cleaner/disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work area.
4. Upon completion, restore HVAC system where work was performed.
C L
A
SS
II
I
1. Contact Housekeeping Supervisor to schedule Post-work cleaning
2. Review ICRA with Department Supervisor(s)
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Department.
2. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
3. Vacuum work area with HEPA filtered
�� Remove or Isolate HVAC system in area where work is being done to prevent contamination of duct system.
�� Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
�� Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
�� Contain construction waste before transport in tightly covered containers.
�� Cover transport receptacles or carts. Tape covering unless solid lid.
vacuums.
4. Wet mop area with cleaner/disinfectant.
5. Upon completion, restore HVAC system where work was performed.
C L
A
SS
IV
1. Contact Housekeeping Supervisor to schedule Post-work cleaning
2. Notify Tour Supervisor
3. Review ICRA with Department Supervisor(s)
�� Isolate HVAC system in area where work is being done to prevent contamination of duct system.
�� Complete all critical barriers i.e. sheetrock, plywood, plastic, to seal area from non-work area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.
�� Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
�� Seal holes, pipes, conduits, and punctures.
�� Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that are removed each time they leave work site.
�� All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
1. Do not remove barriers from work area until completed project is inspected by the owner’s Safety Department and Infection Prevention & Control Department and thoroughly cleaned by the owner’s Environmental Services Dept.
2. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.
3. Contain construction waste before transport in tightly covered containers.
4. Cover transport receptacles or carts. Tape covering unless solid lid.
5. Vacuum work area with HEPA filtered vacuums.
6. Wet mop area with cleaner/disinfectant.
7. Upon completion, restore HVAC system where work was performed.
Back to Cover Page
Step 4. Identify the areas surrounding the project area, assessing potential impact Adjacent Area Impacts: Identify the areas surrounding the project area, to assess potential impact
Below Above Lateral Lateral Behind in Front Adjacent Unit Name
Patient Risk Group (per Table 1)
Step 5. Identify specific site of activity e.g., patient rooms, medication room, etc.
Step 6. Identify containment measures, using prior assessment. What type of barriers? (E.g., solid wall barriers);
Will HEPA filtration be required. Do plans allow for adequate number of isolation/negative airflow rooms?
(Note: Renovation/construction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas)
Step 7. Consider potential risk of water damage. Is there a risk due to compromising structural integrity? (e.g., wall, ceiling, roof)
Step 8. Work hours: Can or will the work be done during non-patient care hours?
Step 9. Do plans allow for adequate number of isolation/negative airflow rooms?
Step 10. Do the plans allow for the required number & type of handwashing sinks?
Step 11. Does the infection prevention & control staff agree with the minimum number of sinks for this project?
Step 12. Does the infection prevention & control staff agree with the plans relative to clean and soiled utility rooms?
Step 13. Plan to discuss the following containment issues with the project team. (E.g., traffic flow, housekeeping, debris removal [how and when])
Appendix: Identify and communicate the responsibility for project monitoring that includes infection prevention & control concerns and risks. The ICRA will be modified throughout the project.
Revisions must be communicated to the Project Manager.
Back to Cover Page
&OiFN Kere Ior DssisWDQFe ZiWK 723 )Ooor OoFDWioQs� 0DiQ DQG :esW :iQJ� 7Kis ZiOO opeQ D ZeE siWe� &OiFN Kere Ior DssisWDQFe ZiWK %27720 )Ooor OoFDWioQs� 0DiQ DQG :esW :iQJ� 7Kis ZiOO opeQ D ZeE siWe� http://navsrhhome2/sites/main/FacilitiesDocs/Top%20Floor.pdf http://navsrhhome2/sites/main/FacilitiesDocs/Bottom%20Floor.pdf
Infection Control Construction Permit Permit No:
Location of Construction: Project Start Date:
Project Coordinator: Estimated Duration:
Contr� 'oLQg Work� Permit Expiration Date:
Supervisor: Telephone:
Additional Requirements:
Date� Initials� Exceptions/Additions to this permit Date�
Permit Request By: Permit Authorized By:
Date: Date:
**Post Completed & Signed ICRA at worksite.
I
Back to Cover Page
ProMect 7LtOe�
Section 2F: Project Revision Request
KSU Coordinator: Facility Management Original PCRA Date:
Project Conducted ❑Fac. Mgmt. ❑I.T. ❑Telecom ❑Clin. Eng. Original Start Date:
by: ❑Contractor: __________________________ Original Duration:
Staff/Cont. Name: Orig Complete Date Supervisor Name: Actual Start Date:
Telephone: Revised Duration:
Email: Rev. Complete Date
Changes to Project Project Description: (include specific sites and tasks)
ICRA Classification Class I Class II Class III* Class IV*
Reasons for Project Changes Summary of Reasons:
New Areas Affected by Project:
Building: Floor(s): Department Name(s): Room Number(s) & Description(s)
Changes to Initial Impact Assessment Topic Will project revision affect the…? No Yes Responses (If YES) Fire Safety Section 2A(1)
Above the Ceiling Access Permit (ACAP) • Consult with Facility Manager
Fire Safety Section 2A(2)
Interim Life Safety Measure (ILSM) evaluation • Consult with Facility Manager and Safety Officer
Utilities Section 2B
Utility Risk Assessment (URA) • Consult with Facility Manager
Environmental/ Occupational Section 2C
Env./Occ. Risk Assessment (EORA) • Consult with Safety Officer
Security Section 2D
Security Risk Assessment (SRA) • Consult with Safety Officer
Infection Control Section 2E
Infection Control Risk Assessment (ICRA) • Consult with Infection Prevention
I
L_J LJ L_J LJ
I I
I I
-R -R
Project Revision Approval
Title Signature Date Evaluator
Facilities Manager
Safety Officer
Infection Prevention
Back to Cover Page 16
Section 3A. Fire Watch Request Form
NNMC
Coordinator:
Fire Watch Start Date:
Staff/Cont. Name: Fire Watch Start Time:
Supervisor Name: Est. Complete Date:
Telephone: Date Project
Completed: Email:
Building: Floor(s): Department Name(s): Room Number(s) & Description(s)
A written ILSM assessment is required on all construction projects, repairs, or other activities that will impair any part of the life safety features. Whenever the automatic fire alarm system is disabled for four (4) or more hours in a given 24-hour period, or whenever the automatic sprinkler system is disabled for ten (10) or more hours in a given 24-hour period, a Fire Watch shall be implemented in all areas affected. Project manager must send a completed copy of the ILSM assessment form along this request to the Facility Manager, Safety Officer, and Security Department Manager who will conduct the fire watch in the areas affected for the duration of impairment according to facility procedures. A fire watch log must be maintained to document each inspection.
The following elements must be included in all fire watch inspections:
1. Outside doors are closed and secured, and windows, fire doors are closed.
2. All waste, rags, paint residue, rubbish, and similar combustible items are removed from the building.
3. All remaining operable fire protection equipment is in place and not obstructed.
4. Ensure that all aisles are clear.
5. Confirm that all motors or machines not required to operate are turned off.
6. All unsecured offices and conference rooms are checked for unapproved smoking material that may have been carelessly discarded.
7. All unnecessary heat-producing devices are turned off in the impairment area
8. Ensure that flammable and combustible materials are properly stored in approved containers. (NOTE: Flammable compressed gas cylinders must be stored in a 1-hour fire resistance rated room.)
9. Ensure that sprinkler valves are in the open position. (NOTE: If sprinkler control valves are electronically supervised by the Automatic Fire Alarm System and are not impaired by this scope of work, then visual examination is not required.
10. Check for proper ventilation in the impaired area.
11. Ensure there are no leaks from the plumbing fixtures and piping
Individuals performing the Fire Watch will make clear precise entries on the Fire Watch Log, and immediately report any unsafe or unusual situations to the Safety Officer and Facility Manager, or their designees. At the conclusion of the Fire Watch, a copy of the Fire Watch Log must be forwarded to the Safety Officer and project file.
Fire Watch Approval
I I
Title Signature Date Requestor
Facilities Manager Safety Officer
Security Supervisor
Back to Cover Page 17
Section 3B. Utility Shutdown Request
NNMC Coordinator: Request submit date Staff/Cont. Name:
Prime Contractor (if different)
Requested Shutdown Date:
Supervisor Name: Shutdown Time:
Telephone: Est. Duration:
Email:
NOTE: A separate utility shutdown request must be submitted for each separate work period during which the utility(ies) will be interrupted.
Utility Requested to be Shutdown Yes Comments
Water
Sewer
Electricity
Steam
Natural Gas
HVAC
Medical Gas & Vacuum
IT Systems
Telephones
Call systems
Observation Cameras
Title Signature Date
Back to Cover Page
EǀĂůƵĂƚŽƌ
&ĂĐŝůŝƚLJ DĂŶĂŐĞƌ hƚŝůŝƚLJ ^LJƐƚĞŵ DĂŶĂŐĞƌ
Section 3C. Daily Construction Area Checklist
Staff/Cont. Name: Start Date:
Supervisor Name: Estimated Duration Telephone: Est. Complete Date
Building: Floor(s): Department Name(s): Room Number(s) & Description(s)
Requirements First Check Second Check
YesNo N/A YesNo N/A
1. Entrance Doors/ ICRA Barriers properly closed and sealed. Doors secured.
2. Enclosures free of penetrations
3. Holes, pipes, conduits sealed at ICRA Barrier
4. Air vents sealed (supply and return)
5. HVAC system isolated
6. Unused doors taped
7. Windows closed
8. HEPA filtration on and running
9. HEPA filter log up-to-date
10. HEPA vacuum and/or coveralls available
11. Negative pressure monitor in place and running
• Negative Pressure reading: ________________
12. Hot work permit obtained
13. Exit signs installed and lighted
14. Fire extinguishers in place and tag up-to-date
15. All routes of egress clear of debris
16. Construction signs in place
17. Dust (sticky) mats in place and clean
18. Routine cleaning completed
19. Surrounding areas free of dust
20. Debris removed daily
21. Transport carts covered and wiped down
22. Trash in appropriate containers
23. All workers wearing ID badges (If no – provide #): _____________
24. FIRE WATCH IN EFFECT (note time complete)
25. Compressed Gas Cylinders Secured
Describe any deficiencies and specific actions taken to correct:
I I
I I I
I I
| 1. Table of Contents |
| 2. PCRA/ICRA CHECKLIST |
| 3. PCRA Cover Page |
| 4. 2A(1) ACAP |
| 5. ACAP PERMIT |
| 6. 2A(2) ILSM |
| 7. 2A(3) HOT WORK PERMIT |
| 8. 2B USRA |
| 9. 2C EORA |
| 10. 2D SRA |
| 11. 2E ICRA STEP 1 |
| 12. 2E ICRA STEP 2 AND 3 |
| 13. 2E ICRA Description By Class |
| 14. 2E ICRA STEP 4 |
| 15. 2E IC CONST PERMIT |
| 16. 2F PROJ REV REQ |
| 17. 3A FIRE WATCH REQ FORM |
| 18. 3B UTILITY SHUTDOWN REQ |
| 19. 3C DAILY CONST AREA CHKLST |
| PI CHECK D/T OF PI: |
| PI CHECK FACILITY: |
| PI CHECK DEPT: |
| PI CHECK PROJ DATE: |
| PI CHECK FACILITY POC: |
| PI CHECK INFECTION CONTROL: |
| PI CHECK SAFETY POC: |
| PI CHECK BIOMED POC: |
| PI CHECK 1: Off |
| PI CHECK 2: Off |
| PI CHECK 3: Off |
| PI CHECK 4: Off |
| PI CHECK 5: Off |
| PI CHECK 6: Off |
| PI CHECK 7: Off |
| PI CHECK 8: Off |
| PI CHECK 9: Off |
| PI CHECK 10: Off |
| PI CHECK 11: Off |
| PI CHECK 12: Off |
| PI CHECK 13: Off |
| PCRA-CP-NNMC Coordinator: |
| PCRA-CP-Submit Date: |
| PCRA-CP-FM: Off |
| PCRA-CP-IT: Off |
| PCRA-CP-TELCO: Off |
| PCRA-CP-CLINENG: Off |
| PCRA-CP-CNTRCTR: Off |
| Contractor: |
| PCRA-CP-TELE: |
| PCRA-CP-Actual Date Project Completed: |
| PCRA-CP-EMAIL: |
| PCRA-CP-Project Description include specific sites and tasks: |
| PCRA-CP-2A1NorY: PCRA-CP-2A1N |
| PCRA-CP-2A1N2NorY: PCRA-CP-2A1N2 |
| PCRA-CP-2A2N1NorY: PCRA-CP-2A2N1 |
| PCRA-CP-2A2N2NorY: PCRA-CP-2A2N2 |
| PCRA-CP-2A2N3NorY: PCRA-CP-2A2N3 |
| PCRA-CP-2A2N4NorY: PCRA-CP-2A2N4 |
| PCRA-CP-2BNNorY: PCRA-CP-2BN |
| PCRA-CP-2BN2NorY: PCRA-CP-2BN2 |
| PCRA-CP-2BN3NorY: PCRA-CP-2BN3 |
| PCRA-CP-2CN1NorY: PCRA-CP-2CN1 |
| PCRA-CP-2CN2NorY: PCRA-CP-2CN2 |
| PCRA-CP-2CN3NorY: PCRA-CP-2CN3 |
| PCRA-CP-2DN1NorY: PCRA-CP-2DN1 |
| PCRA-CP-2DN2NorY: PCRA-CP-2DN2 |
| PCRA-CP-2EN1NorY: PCRA-CP-2EN1 |
| PCRA-CP-2EN2NorY: PCRA-CP-2EN2N |
| PCRA-CP-2EN3NorY: PCRA-CP-2EN3 |
| PCRA-CP-PA-Evaluator-Date: |
| PCRA-CP-PA-FM-Date: |
| PCRA-CP-PC-FM-Date: |
| PCRA-CP-PA-Safety-Date: |
| PCRA-CP-PC-Safety-Date: |
| PCRA-CP-PA-Infection-Date: |
| PCRA-CP-PC-Infection-Date: |
| PCRA-CP-PA-SPVSRAffectedArea-Date: |
| PCRA-CP-PC-SPVSRAffectedArea-Date: |
| Clear PCRA/ICRA: |
| PCRA-CP-Project Title: |
| PCRA-CP-ProjectContract: |
| PCRA-CP-STAFF/CONT NAME: |
| PCRA-CP-Proposed Start Date: |
| PCRA-CP-SPRVSRNAME: |
| PCRA-CP-Est Duration: |
| 2A1 TRAIN Notes: |
| Date CompletedSchedule training with Facility Mgr or Safety Ofcr Review policy and sign acknowledgement below: |
| 2A1 TRAIN 1 NorY: 2A1 TRAIN N1 |
| 2A1 TRAIN 2 NorY: 2A1 TRAIN N2 |
| Date CompletedSchedule training with Facility Mgr or Safety Ofcr Review policy and sign acknowledgement below_2: |
| 2A1 PPD 1 NorY: 2A1 PPD N1 |
| 2A1 PPD Notes: |
| Date CompletedProvide Facility Mgr with written plan or drawing If reqd by Facility Mgr request and redline Life Safety Plan drawings: |
| Date CompletedProvide Facility Mgr with written plan or drawing If reqd by Facility Mgr request and redline Life Safety Plan drawings_2: |
| 2A1 PPD 2 NorY: 2A1 PPD N2 |
| 2A1 PD Notes: |
| Date CompletedProvide complete project details to Facility Manager or utilize facility approved systemsmaterials: |
| 2A1 PD 1 NorY: 2A1 PD N1 |
| Date CompletedProvide complete project details to Facility Manager or utilize facility approved systemsmaterials_2: |
| 2A1 PD 2 NorY: 2A1 PD N2 |
| Date CompletedProvide complete project details to Facility Manager or utilize facility approved systemsmaterials_3: |
| 2A1 PD 3 NorY: 2A1 PD N3 |
| Date CompletedProvide complete project details to Facility Manager or utilize facility approved systemsmaterials_4: |
| 2A1 PD 4 NorY: 2A1 PD N4 |
| Date CompletedProvide complete project details to Facility Manager or utilize facility approved systemsmaterials_5: |
| 2A1 PD 5 NorY: 2A1 PD N5 |
| 2A1 PWI 1 NorY: 2A1 PWI N1 |
| 2A1 PWI Notes: |
| Date CompletedConduct prework inspection and notify Facility Manager of existing deficiencies: |
| 2A1 PWI 2 NorY: 2A1 PWI N2 |
| Date CompletedConduct prework inspection and notify Facility Manager of existing deficiencies_2: |
| 2A1 PWI 3 NorY: 2A1 PWI N3 |
| Date CompletedConduct prework inspection and notify Facility Manager of existing deficiencies_3: |
| 2A1 ILSM Notes: |
| Date CompletedConduct a full ILSM evaluation: |
| 2A1 ILSM NorY: 2A1 ILSM N |
| 2A1 Approval FM Date: |
| 2A1 CloseOut FM Date: |
| ACAP-PERMIT-DATE: |
| 2A2 ILSM EXITS 1NorY: 2A2 ILSM EXITS 1N |
| Date InitiatedPost signage for an alternate means of egress Train staff on alternate means of egress Inspect exit daily for blockage or debris Double fire drill frequency Increase hazard surveys: |
| 2A2 ILSM EXITS 2NorY: 2A2 ILSM EXITS 2N |
| Date InitiatedPost signage for an alternate means of egress Train staff on alternate means of egress Inspect exit daily for blockage or debris Double fire drill frequency Increase hazard surveys_2: |
| Date InitiatedPost signage for an alternate means of egress Train staff on alternate means of egress Inspect exit daily for blockage or debris Double fire drill frequency Increase hazard surveys_3: |
| 2A2 ILSM EXITS 3NorY: 2A2 ILSM EXITS 3N |
| Date InitiatedPost signage for an alternate means of egress Train staff on alternate means of egress Inspect exit daily for blockage or debris Double fire drill frequency Increase hazard surveys_4: |
| Date InitiatedPost signage for an alternate means of egress Train staff on alternate means of egress Inspect exit daily for blockage or debris Double fire drill frequency Increase hazard surveys_5: |
| 2A2 ILSM EMERGENCY ACCESS: 2A2 ILSM EMERGENCY ACCESS 1N |
| Date InitiatedDesignate an alternate means of access Notify GIMC Security Notify Gallup Fire Dept: |
| 2A2 ILSM EMERGENCY ACCESS 2NorY: 2A2 ILSM EMERGENCY ACCESS 2N |
| Date InitiatedDesignate an alternate means of access Notify GIMC Security Notify Gallup Fire Dept_2: |
| Date InitiatedDesignate an alternate means of access Notify GIMC Security Notify Gallup Fire Dept_3: |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys: |
| 2A2 ILSM FIRE PROTECT: 2A2 ILSM FIRE PROTECT 1N |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys_2: |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys_3: |
| 2A2 ILSM FIRE PROTECT 2YorN: 2A2 ILSM FIRE PROTECT 2NO |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys_4: |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys_5: |
| Date InitiatedSubmit fire watch request o Or usemonthly test temp alarmdetection suppression system Notify Gallup Fire Dept Double fire drill frequency Make affected staff aware Increase hazard surveys_6: |
| 2A2 ILSM FIRE SMOKE 1NorY: 2A2 ILSM FIRE SMOKE 1NO |
| Date InitiatedConstruct 1hr smoke tight temp barrier as needed Inspect exits daily Double fire drill frequency Train staff to compensate Increase hazard surveys: |
| 2A2 ILSM FIRE SMOKE 2NorY: 2A2 ILSM FIRE SMOKE 2NO |
| Date InitiatedConstruct 1hr smoke tight temp barrier as needed Inspect exits daily Double fire drill frequency Train staff to compensate Increase hazard surveys_2: |
| Date InitiatedConstruct 1hr smoke tight temp barrier as needed Inspect exits daily Double fire drill frequency Train staff to compensate Increase hazard surveys_3: |
| 2A2 ILSM FIRE SMOKE 3NorY: 2A2 ILSM FIRE SMOKE 3NO |
| Date InitiatedConstruct 1hr smoke tight temp barrier as needed Inspect exits daily Double fire drill frequency Train staff to compensate Increase hazard surveys_4: |
| Date InitiatedConstruct 1hr smoke tight temp barrier as needed Inspect exits daily Double fire drill frequency Train staff to compensate Increase hazard surveys_5: |
| 2A2 ILSM FF EQUIP: 2A2 ILSM FF EQUIP NO |
| Date InitiatedProvide additional fire extinguishers in area: |
| 2A2 ILSM FF TRAIN: 2A2 ILSM FF TRAIN NO |
| Date InitiatedTrain equipment staff contractors to use: |
| 2A2 ILSM COMBUST 1NorY: 2A2 ILSM COMBUST 1NO |
| Date InitiatedMinimize debris accumulation Increase hazard surveys: |
| 2A2 ILSM COMBUST 2NorY: 2A2 ILSM COMBUST 2NO |
| Date InitiatedMinimize debris accumulation Increase hazard surveys_2: |
| 2A2 ILSM HAZARD: 2A2 ILSM HAZARD NO |
| Date InitiatedInitiate additional surveillance of area: |
| 2A2 ILSM FAC WIDE TRAIN: 2A2 ILSM FAC WIDE TRAIN NO |
| Date InitiatedTrain employees on ILSM Notify Gallup Fire Dept: |
| Date InitiatedTrain employees on ILSM Notify Gallup Fire Dept_2: |
| Describe any other life safety impacts as well as specific actions to be implemented for these and those above: |
| 2A(2)EVALUATOR-DATE: |
| 2A(2)-FM-DATE: |
| 2A(2)SAFETYOFFICER-DATE: |
| 2A(2)STAFFCONTRACTOR-DATE: |
| 2A3-Estimated Duration: |
| 2A3-WELDING/BURN PERMIT DATE: |
| 2A3-WELDING/BURN PERMIT TIME: |
| 2A(3)FIRE PROTECTION SYS: Off |
| 2A(3)BUILDING: |
| 2A(3)CUTTING AND WELDING: Off |
| 2A(3)DEPT: |
| 2A(3)FLOOR: |
| 2A(3)FLOOR GROUND: Off |
| 2A(3)COMBUSTIBLES: Off |
| 2A(3)WORK TO BE DONE: |
| 2A(3)FLAMMABLE: Off |
| 2A(3)ALL FLOOR: Off |
| 2A(3)SPECIAL PRECAUTIONS: |
| 2A(3)NON COMBUSTIBLE: Off |
| 2A(3)FireWatchRequired: |
| 2A(3)CONTAINERS: Off |
| 2A(3)EXTINGUISHERS: Off |
| 2A(3)HAZARDS: Off |
| 2A(3)FIRE WATCH: Off |
| 2A(3)PERMIT EXPIRES DATE: |
| 2A(3)PERMIT EXPIRES TIME: |
| 2A(3)LOCATION: Off |
| 2A(3)PERMIT SIGNED: |
| 2A(3)PERMIT TIME STARTED: |
| 2A(3)PERMIT TIME COMPLETED: |
| 2A(3)FINAL CHECK SIGNED: |
| 2B NOISE: 2B NOISE NO |
| 2B VIBRATION: 2B VIBRATION NO |
| 2B WATER: 2B WATER NO |
| 2B SEWER: 2B SEWER NO |
| 2B ELECTRICITY: 2B ELECTRICITY NO |
| 2B STEAM: 2B STEAM NO |
| 2B NAT GAS: 2B NAT GAS NO |
| 2B HVAC: 2B HVAC NO |
| 2B MEDGAS: 2B MEDGAS NO |
| 2B IT: 2B IT NO |
| 2B TELCO: 2B TELCO NO |
| 2B CALLSYS: 2B CALLSYS NO |
| 2B OBSCAMS: 2B OBSCAMS NO |
| Describe any specific actions to be implementedRow1: |
| 2B-USRA-EVAL-DATE: |
| 2B-USRA-FM-DATE: |
| 2B-USRA-SAFETYOFFICER-DATE: |
| 2B-USRA-STAFFCONTRACTOR-DATE: |
| 2C LEAD: 2C LEAD NO |
| 2C ASBESTOS: 2C ASBESTOS NO |
| 2C CHEMS: 2C CHEMS NO |
| 2C INFECT: 2C INFECT NO |
| 2C MOLD: 2C MOLD NO |
| Describe any specific actions to be implementedRow1_2: |
| 2C-EORA-EVALUATOR-DATE: |
| 2C-EORA-FM-DATE: |
| 2C-EORA-EMPLOYEEHLTH-DATE: |
| 2C-EORA-SAFETY-DATE: |
| 2C-EORA-STAFFCONTRACTOR-DATE: |
| 2D BADGE: 2D BADGE NO |
| 2D CAMERAS: 2D CAMERAS NO |
| 2D BARRIERS: 2D BARRIERS NO |
| 2D PROCESS: 2D PROCESS NO |
| 2D SENSITIVE: 2D SENSITIVE NO |
| 2D ER: 2D ER NO |
| Describe any specific actions to be implementedRow1_3: |
| 2D-SRA-EVALUATOR-DATE: |
| 2D-SRA-FM-DATE: |
| 2D-SRA-SECURITY-DATE: |
| 2D-SRA-SAFETY-DATE: |
| 2D-SRA-STAFFCONTRACTOR-DATE: |
| 2E-ICRA Building: |
| 2E-ICRA Floors: |
| 2E-ICRA Department Names: |
| 2E-ICRA Room Numbers Descriptions: |
| 2E-ICRA-Project Descrip: |
| ICRA STEP 1: Type A-D: [CHOOSE TYPE] |
| ICRA STEP 2: Patient Risk Group: [CHOOSE RISK] |
| ICRA STEP 3: CLASS of IC: [CHOOSE CLASS] |
| BelowAdjacent Unit Name: |
| AboveAdjacent Unit Name: |
| LateralAdjacent Unit Name: |
| LateralAdjacent Unit Name_2: |
| BehindAdjacent Unit Name: |
| in FrontAdjacent Unit Name: |
| BelowPatient Risk Group per Table 1: |
| AbovePatient Risk Group per Table 1: |
| LateralPatient Risk Group per Table 1: |
| LateralPatient Risk Group per Table 1_2: |
| BehindPatient Risk Group per Table 1: |
| in FrontPatient Risk Group per Table 1: |
| Step 5 Identify specific site of activity eg patient rooms medication room etcRow1: |
| Step 6 Identify containment measures using prior assessment What type of barriers Eg solid wall barriers Will HEPA filtration be required Do plans allow for adequate number of isolationnegative airflow rooms Note Renovationconstruction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas: |
| Step 7 Consider potential risk of water damage Is there a risk due to compromising structural integrity eg wall ceiling roof: |
| Step 8 Work hours Can or will the work be done during nonpatient care hours: |
| Step 9 Do plans allow for adequate number of isolationnegative airflow rooms: |
| Step 10 Do the plans allow for the required number type of handwashing sinks: |
| Step 11 Does the infection prevention control staff agree with the minimum number of sinks for this project: |
| Step 12 Does the infection prevention control staff agree with the plans relative to clean and soiled utility rooms: |
| Step 13: |
| Plan to discuss how and when: |
| Permit No: |
| Location of Construction: |
| Project Coordinator: |
| Permit Expiration Date: |
| Additional Requirements: |
| IC-CONSTRUCT-PERMIT-Date: |
| Initials: |
| ExceptionsAdditions to this permit Date: |
| Permit Request By: |
| Permit Authorized By: |
| INFECTION-CONTROL-CONST-PERMIT-REQUESTED-BY-DATE: |
| INFECTION-CONTROL-CONST-PERMIT-AUTH-BY-DATE: |
| Facility Management: |
| Original PCRA Date: |
| FM2: Off |
| IT2: Off |
| TELCO2: Off |
| CLINENG2: Off |
| CONTRCTR2: Off |
| Contractor_2: |
| Staff/Cont: |
| Name: |
| PCRA-CP-Est Complete Date: |
| Supervisor Name: |
| Actual Start Date: |
| Telephone: |
| Revised Duration: |
| Rev Complete Date: |
| 2F Project Description Revision: |
| 2F ICRA CLASSIFICATION: |
| 2F Project Summary of Reasons for Revision: |
| 2F Building: |
| 2F Floors: |
| 2F Dept Names: |
| 2F Room# Descriptions: |
| 2F 2A1: |
| 2F 2A2: |
| 2F 2B: |
| 2F 2C: |
| 2F 2D: |
| 2F 2E: |
| 2F Evaluator Date: |
| 2F FM Date: |
| 2F USM Date: |
| 2F Infection Control Date: |
| NNMC Coordinator_2: |
| Fire Watch Start Date: |
| Fire Watch Start Time: |
| Telephone_2: |
| Date Project Completed_2: |
| Email: |
| BuildingRow1_2: |
| FloorsRow1_2: |
| Department NamesRow1_2: |
| Room Numbers DescriptionsRow1_2: |
| 2A Requestor Date: |
| 2A FM Date: |
| 2A Safety Officer Date: |
| 2A Security Supervisor Date: |
| NNMC Coordinator_3: |
| Request submit date: |
| Prime Contractor if different: |
| Requested Shutdown Date: |
| Shutdown Time: |
| Telephone_3: |
| Est Duration_2: |
| Email_2: |
| 3B WATER YES: Off |
| Comments: |
| 3B SEWER YES: Off |
| Comments_2: |
| Comments_3: |
| 3B ELECTRICITY YES: Off |
| 3B STEAM YES: Off |
| Comments_4: |
| 3B NAT GAS YES: Off |
| Comments_5: |
| 3B HVAC YES: Off |
| Comments_6: |
| 3B MEDGAS&VAC YES: Off |
| Comments_7: |
| 3B IT YES: Off |
| Comments_8: |
| 3B TELCO YES: Off |
| Comments_9: |
| 3B CALL SYS YES: Off |
| Comments_10: |
| 3B OBS CAMS YES: Off |
| Comments_11: |
| 3B Evaluator Date: |
| 3B FM Date: |
| 3B USM Date: |
| Telephone_4: |
| Building:: |
| Floor(s): |
| Department Name(s): |
| Room Numbers DescriptionsRow1_3: |
| 3C REQ 1 1ST NO: |
| 3C REQ 1 1ST YES: |
| 3C REQ 1 1ST NA: |
| 3C REQ 1 2ND NO: |
| 3C REQ 1 2ND YES: |
| 3C REQ 1 2ND NA: |
| 3C REQ 2 1ST NO: Off |
| 3C REQ 2 1ST YES: Off |
| 3C REQ 2 1ST NA: Off |
| 3C REQ 2 2ND NO: Off |
| 3C REQ 2 2ND YES: Off |
| 3C REQ 2 2ND NA: Off |
| 3C REQ 3 1ST NO: Off |
| 3C REQ 3 1ST YES: Off |
| 3C REQ 3 1ST NA: Off |
| 3C REQ 3 2ND NO: Off |
| 3C REQ 3 2ND YES: Off |
| 3C REQ 3 2ND NA: Off |
| 3C REQ 4 1ST NO: |
| 3C REQ 4 1ST YES: |
| 3C REQ 4 1ST NA: |
| 3C REQ 4 2ND NO: |
| 3C REQ 4 2ND YES: |
| 3C REQ 4 2ND NA: |
| 3C REQ 5 1ST NO: |
| 3C REQ 5 1ST YES: |
| 3C REQ 5 1ST NA: |
| 3C REQ 5 2ND NO: |
| 3C REQ 5 2ND YES: |
| 3C REQ 5 2ND NA: |
| 3C REQ 6 1ST NO: |
| 3C REQ 6 1ST YES: |
| 3C REQ 6 1ST NA: |
| 3C REQ 6 2ND NO: |
| 3C REQ 6 2ND YES: |
| 3C REQ 6 2ND NA: |
| 3C REQ 7 1ST NO: |
| 3C REQ 7 1ST YES: |
| 3C REQ 7 1ST NA: |
| 3C REQ 7 2ND NO: |
| 3C REQ 7 2ND YES: |
| 3C REQ 7 2ND NA: |
| 3C REQ 8 1ST NO: |
| 3C REQ 8 1ST YES: |
| 3C REQ 8 1ST NA: |
| 3C REQ 8 2ND NO: |
| 3C REQ 8 2ND YES: |
| 3C REQ 8 2ND NA: |
| 3C REQ 9 1ST NO: |
| 3C REQ 9 1ST YES: |
| 3C REQ 9 1ST NA: |
| 3C REQ 9 2ND NO: Off |
| 3C REQ 9 2ND YES: |
| 3C REQ 9 2ND NA: |
| 3C REQ 10 1ST NO: |
| 3C REQ 10 1ST YES: |
| 3C REQ 10 1ST NA: |
| 3C REQ 10 2ND NO: Off |
| 3C REQ 10 2ND YES: |
| 3C REQ 10 2ND NA: |
| 3C REQ 11 GAUGE 1ST N: |
| 3C REQ 11 GAUGE 1ST YES: |
| 3C REQ 11 GAUGE 2ND N: |
| 3C REQ 11 GAUGE 2ND YES: |
| 3C REQ 11 NegPressRdg: |
| 3C REQ 11 1ST NA: Off |
| 3C REQ 11 2ND NA: Off |
| 3C REQ 12 1ST NO: |
| 3C REQ 12 1ST YES: |
| 3C REQ 12 1ST NA: |
| 3C REQ 12 2ND NO: Off |
| 3C REQ 12 2ND YES: |
| 3C REQ 12 2ND NA: |
| 3C REQ 13 1ST NO: |
| 3C REQ 13 1ST YES: |
| 3C REQ 13 1ST NA: |
| 3C REQ 13 2ND NO: Off |
| 3C REQ 13 2ND YES: |
| 3C REQ 13 2ND NA: |
| 3C REQ 14 1ST NO: |
| 3C REQ 14 1ST YES: Off |
| 3C REQ 14 1ST NA: |
| 3C REQ 14 2ND NO: Off |
| 3C REQ 14 2ND YES: |
| 3C REQ 14 2ND NA: |
| 3C REQ 15 1ST NO: |
| 3C REQ 15 1ST YES: |
| 3C REQ 15 1ST NA: |
| 3C REQ 15 2ND NO: Off |
| 3C REQ 15 2ND YES: |
| 3C REQ 15 2ND NA: |
| 3C REQ 16 1ST NO: Off |
| 3C REQ 16 1ST YES: |
| 3C REQ 16 1ST NA: |
| 3C REQ 16 2ND NO: Off |
| 3C REQ 16 2ND YES: |
| 3C REQ 16 2ND NA: |
| 3C REQ 17 1ST NO: |
| 3C REQ 17 1ST YES: |
| 3C REQ 17 1ST NA: |
| 3C REQ 17 2ND NO: Off |
| 3C REQ 17 2ND YES: |
| 3C REQ 17 2ND NA: |
| 3C REQ 18 1ST NO: |
| 3C REQ 18 1ST YES: |
| 3C REQ 18 1ST NA: |
| 3C REQ 18 2ND NO: Off |
| 3C REQ 18 2ND YES: |
| 3C REQ 18 2ND NA: |
| 3C REQ 19 1ST NO: |
| 3C REQ 19 1ST YES: |
| 3C REQ 19 1ST NA: |
| 3C REQ 19 2ND NO: |
| 3C REQ 19 2ND YES: |
| 3C REQ 19 2ND NA: |
| 3C REQ 20 1ST NO: Off |
| 3C REQ 20 1ST YES: Off |
| 3C REQ 20 1ST NA: Off |
| 3C REQ 20 2ND NO: Off |
| 3C REQ 20 2ND YES: Off |
| 3C REQ 20 2ND NA: Off |
| 3C REQ 21 1ST NO: Off |
| 3C REQ 21 1ST YES: Off |
| 3C REQ 21 1ST NA: Off |
| 3C REQ 21 2ND NO: Off |
| 3C REQ 21 2ND YES: Off |
| 3C REQ 21 2ND NA: Off |
| 3C REQ 22 1ST NO: Off |
| 3C REQ 22 1ST YES: Off |
| 3C REQ 22 1ST NA: Off |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .