Attachment_B_-_Maintenance_Log.pdf

PDF 169 KB Posted

Attached to
Coir Log, Furnish & Install Peacock Pond
Solicitation number
24-0150-ITQ
Issued by
Pinellas County, Florida

About this file

This document is a Maintenance Report (Exhibit B) form for Project Peacock Pond, designed to be submitted with an invoice, likely associated with a Pinellas County contract for shoreline restoration work. The form is a comprehensive tracking document for environmental maintenance activities, requiring detailed documentation of applicator information, work hours, targeted plant species, control methods, herbicide usage, and weather conditions. The form provides structured fields for recording first and last names of applicators, their spray license details, work times, total hours worked, plant control specifics including the number of plants treated, control methods, herbicide names and application rates, and precise weather observations.

The maintenance report form appears specifically tailored for environmental management projects, potentially related to invasive species control or habitat restoration. It enables precise tracking of fieldwork by requiring granular data on treatment methods, including cut stump, basal bark, hand pulling, and mechanical interventions. The form includes space for documenting herbicide application details such as name, application rate, and quantity used, along with comprehensive weather condition tracking. The document is part of a standardized reporting process, with a master revision date of 07/21/2022, suggesting ongoing refinement of the documentation protocols for environmental maintenance projects.

View the file

Other files

File Type Posted
Coir_Log,_Furnish_&_Install_Peacock_Pond.pdf PDF
Images_1-4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Peacock Pond

Page 7 of 13 (Master Rev. 07/21/2022)

EXHIBIT B - MAINTENANCE REPORT (Submit with invoice)

Date: Day of Week: Contract or P.O. #

List each applicator’s first & last names, spray license information, the time they started, time they ended, and total worked for all applicators. This also applies to manual/mechanical efforts.

Name Applicator License #

Aquatics Natl. Areas Mgmt

Expiration Date

Time In

Time Out

Hours Worked

Total Hours Worked:

List the names of all plants targeted (per EPPC list or approved additions), control method (cut stump, basal bark, hand pulled, mechanical), number of plants controlled, herbicide used (if any), rate and quantity of herbicide used.

Name of Target Plant Control Method # Plants

Controlled Herbicide Name Application Rate (%)

Quantity Used (Gallons)

Weather Conditions

Sunny Cloudy Rainy Wind Temperature

( °F ) Start Time End Time Speed Direction (from)

Comments:

General / Other Comments:

Contractor’s Signature: Date:

File details come from the government source that posted it. Updated .