This is a Mitigation and Monitoring Plan prepared by ICF International for the City of Palo Alto, specifically addressing wetland mitigation and monitoring requirements for the Palo Albert Municipal Golf Course Reconfiguration Project located at 1875 Embarcadero Road in Palo Alto, California. The project involves comprehensive monitoring and restoration of impacted federal and state wetlands as mandated by Clean Water Act Section 404 permits from the U.S. Army Corps of Engineers and Section 401 Water Quality Certification from the San Francisco Bay Region Water Quality Control Board. The monitoring plan encompasses five years of intensive biological, physical, and hydrologic assessments across 8.45 acres of compensatory wetland mitigation, consisting of 8.03 acres of expanded wetlands and 0.42 acres of enhanced wetlands. The monitoring protocol includes quarterly biological assessments measuring native hydrophytic vegetation cover, species richness, and health and vigor; annual physical evaluations using California Rapid Assessment Method (CRAM) scoring and hydric soil indicator assessments; hydrologic monitoring with biweekly site visits during storm season documenting ponding extent, depth, and duration; salinity tracking; and photographic documentation from permanent stations. Performance criteria are tiered annually, requiring minimum native vegetation cover increasing from 30% in year one to 70% by year five, and species richness escalating from two native species to five species over the monitoring period.

The City of Palo Alto assumes full financial and operational responsibility for all mitigation plan implementation, maintenance, and monitoring activities throughout the five-year period or until success criteria are met. A restoration ecologist must be present during all project phases, with particular emphasis on adaptive management during initial clearing, grading, and planting activities. Annual monitoring reports must be submitted by December 31 to the California Department of Fish and Wildlife, Regional Water Quality Control Board, and other requesting resource agencies, detailing vegetation establishment, hydrologic function, invasive species management, and remedial measures implemented. The mitigation planting palette includes eight native brackish marsh species deployed through combined hydroseeding and plugging methodologies at densities of 10,890 plants per acre. Plant establishment period maintenance includes weekly irrigation during the first year, transitioning to bimonthly application in years two and three, with biannual weed control focused on California Invasive Plant Council-ranked high and moderate risk species. Long-term site protection will be secured through a perpetual real estate instrument such as a conservation easement or deed restriction, precluding future golf course development within mitigation wetland areas without regulatory agency approval, and the City will provide permanent financial resources for ongoing management and monitoring beyond the initial five-year period.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PALO ALTO MUNICIPAL GOLF COURSE

RECONFIGURATION PROJECT

MITIGATION AND MONITORING PLAN

P R E P A R E D F O R :

CityofPaloAlto
250HamiltonAvenue,6thFloor
PaloAlto,CA94301
Contact:JoeTeresi

650.329.2129

P R E P A R E D B Y :

ICFInternational
75EastSantaClaraStreet,Suite300
SanJose,CA
Contact:ShilpaTrisal

408.216.3452

June 14, 2016

ICFInternational.2016.PaloAltoMunicipalGolfCourseReconfiguration
ProjectMitigationandMonitoringPlan.(ICF631.12)SanJose,CA.
PreparedfortheCityofPaloAlto,PaloAlto,CA.

Palo Alto Municipal Golf Course Reconfiguration Project Mitigation and Monitoring Plan i June 2016

ICF 631.12

Contents

Page

List of Tables and Figures ...................................................................................................................... iii

List of Acronyms and Abbreviations ...................................................................................................... iv

Chapter 1 Introduction

Project Location

Project Description

Chapter 2 Purpose and Need

Need for Mitigation

Purpose of the Mitigation and Monitoring Plan

Chapter 3 Site Conditions

Elevation

Precipitation and Growing Season

Hydrology/Hydrologic Features

Soils and Miscellaneous Land Types

Vegetation and Land Use Types in the Project Site

Chapter 4 Planting Plan

Mitigation Planting Design

Hydrology

Vegetation

Plant Establishment Period and Maintenance

As‐Built Report and Drawings

Responsible Parties

Chapter 5 Monitoring and Adaptive Management

Monitoring Protocol and Performance Criteria

Physical

Biological

Hydrophytic Vegetation

Natural Recruitment

Hydrologic Monitoring

Salinity

Photographic Documentation

Adaptive Management

Data Analysis

Post‐Construction Jurisdictional Delineation ii

Documentation and Reporting

Chapter 6 Compensatory Mitigation

Compensatory Wetland Mitigation

Site Protection

Chapter 7 References Cited

Appendix

Appendix A Landscaping Plan iii

Tables and Figures

Tables Page

Table 1. Project Impacts on Waters of the United States by Activity Type

Table 2. Summary Total Impact Areas of Waters of the United States by Wetland ID

Table 3. Soil Map Units and Land Types within the Project Site

Table 4. Summary of Potential Waters of the United States

Table 5. Wetland Planting Palette

Table 6. Physical Performance Criteria

Table 7. Performance Criteria for Wetlands

Table 8. Compensatory Wetland Mitigation Quantities

Figures Follows Page

1 Regional Location

2 Project Location

3 Proposed Golf Course Reconfiguration

4 Delineation of Potential Waters of the United States, Including Wetlands

5 Mitigation Areas

6 Wetland Expansion and Enhancement Cross‐Section

7 Trend Line for Mean Cover of Wetland Species along a Hypothetical

Transect iv

Acronyms and Abbreviations

Baylands Master Plan Palo Alto Baylands Master Plan

CEQA California Environmental Quality Act

CRAM California rapid assessment method

CWA Clean Water Act

DFW California Department of Fish and Wildlife

EPA Environmental Protection Agency

MHHW mean higher high water

MHW mean high water

MMP Mitigation and Monitoring Plan

PEP plant establishment period

Project Palo Alto Municipal Golf Course Reconfiguration Project

RWQCB Region Water Quality Control Board

SF Bay San Francisco Bay

SPD South Pacific Division

SPD Mitigation Guidelines Draft 2013 Regional Compensatory Mitigation and Monitoring Guidelines for South Pacific Division the City City of Palo Alto

USACE U.S. Army Corps of Engineers

Chapter 1 Introduction

ThisMitigationandMonitoringPlan(MMP)isdesignedforrestorationofimpactedwaterbodies
withinthePaloAltoMunicipalGolfCourseintheCityofPaloAlto(theCity),hereinreferredtoasthe
PaloAltoMunicipalGolfCourseReconfigurationProject(Project).TheMMPfulfillstheCity’s
commitmentsundertheCaliforniaEnvironmentalQualityAct(CEQA)toprovidein‐kind
replacementforimpactsonFederalandStatewetlandsandwatersduetotheProject.TheMMPalso
fulfillstheanticipatedconditionsoftheCleanWaterAct(CWA)Section404permitissuedbythe
ArmyCorpsofEngineersandCWASection401WaterQualityCertification(inprocess)issuedbythe
SanFranciscoBayRegionWaterQualityControlBoard(RWQCB).

This MMP includes the following components.

An introduction to the MMP and Project – Chapter 1.

AdescriptionoftherequirementsformitigationduetotheProjectandtheroleoftheMMPto
fulfilltheserequirements–Chapter2.
AdescriptionofexistingconditionsattheGolfCourse,includinginformationontopography,
hydrology,soils,andvegetation–Chapter3.
Anoverviewofthemitigationplantingdesignandmaintenancerequirementsfollowingproject
completion–Chapter4.
Adiscussionoftheperformancecriteriaforthemitigationwetlands,adaptivemanagement,and
documentationrequirements–Chapter5.
Adiscussionoftherealestateinstrumenttoberecordedforpermanentmitigationsite
protection–Chapter6.

References – Chapter 7.

Project Location

TheGolfCourseison169.8acreslocatedat1875EmbarcaderoRoadinthenorthernpartoftheCity
ofPaloAlto,SantaClaraCounty,California.TheProjectsiteissituatedeastofU.S.Highway101and
isboundbySanFrancisquitoCreekandtheFaberTracttothenorthandwest,thePaloAltoAirport
ofSantaClaraCounty(PaloAltoAirport)totheeast,andEmbarcaderoRoadtothesouth.The
ProjectlocationisshownonFigure1andFigure2.
AccordingtotheCity’sComprehensivePlan,theProjectsite’slandusedesignation,includingboth
theGolfCourseandAthleticCenter,isPublicParks(CityofPaloAlto2007).TheProjectsite
comprisesAssessor’sParcelNumbers008‐06‐001and008‐002‐032.

ALAMEDA

CONTRA

COSTA

MARIN

NAPA

SAN

JOAQUIN

SAN

FRANCISCO

SAN

MATEO

SANTA

CLARA

SOLANO

Livermore

Mountain View

Walnut Creek

Fair�eld Petaluma

San Rafael

Tracy

Berkeley

Napa

Santa Rosa

San Francisco

San Jose

Oakland

Project Location

Base map: © OpenStreetMap contributors (http://www.openstreetmap.org/), CC BY-SA (http://creativecommons.org/licenses/by-sa/3.0/)

6,0002,000 Feet0

0 0.5 1.0 1.5 Miles

4,000 8,000

Figure 1 Regional Location

Palo Alto Municipal Golf Course Reconfiguration Project

G ra ph ic s

.1

(2

-1 3-

) t m

Project Site

Embarcadero Rd

Alma St

El Camino Real

Central Expressway

Sa n

A nt ol io

R d

Bay Rd

N or th S ho re lin e

Bl vd

Project Site

Alameda County

Santa Clara County

San Mateo County

Santa Cruz County

Contra Costa CountyMarin County Major Road

Highway

County

Creek

Project Site

0 500 1,000

Feet

Figure 2 Project Location

P a th

K

P ro je ct s_

\C ity o f_ P a lo

A lto \0

_1

G o lf_

C o u rs e

E

IR

\m a p d o c\

F ig u re

_2

P ro je ct

L o ca tio n

.m xd

Project Description

Golf Course Reconfiguration

TheProjectwouldreconfiguretheentireGolfCoursetoan18‐hole,par71,PGA‐regulationcourse
thatwouldmeasure6,685yardsfromthebacktees.Figure3showsthelayoutofthereconfigured
GolfCourse.Approximately10.5acresoftheexistingGolfCoursewouldbeincorporatedintoa
futureexpansionoftheadjacentBaylandsAthleticCenter,and7.4acresoftheGolfCoursewouldbe
incorporatedintotheSanFranciscoJointPowerAuthority’sSanFrancisquitoFloodReduction
Project.TheresultantreconfiguredGolfCoursewouldbeapproximately156acres.Theexisting
drivingrangewouldbeexpandedtothenorthbyapproximately8,000squarefeettoaccommodate
approximatelysixnewdrivingstationsor“bays.”TheProjectwouldincludenew,approximately6.5‐
foot‐wideconcretegolfcartpaths,concretefootpathsatthepracticeputtinggreenarea,and
compactedgravelmaintenancepathconnectionsbetweentheconcretecartpaths.OtherProject
featuresaredescribedbelow.
Apedestrian/bicycletrailwouldbeconstructedtolinktheBayTrailtotheGolfCourse
clubhousearea.ThenewtrailwouldstartattheEmbarcaderoRoadtrailandtravelnorthbehind
theexistingdrivingrange,thenalongtheproposedsouthernmostathleticfield.Thetrailwould
thenturneastbetweenthefieldsontotheBaylandsforeasyaccesstotheleveetrail.Figure3
showsthelocationofthenewtrail.
TheexistingchainlinkfencealongthenorthandeastsideoftheGolfCoursewouldremainin
place.TheexistingchainlinkfencealongthewestsideoftheGolfCoursewouldberemovedand
replacedwithanewchainlinkfenceaspartoftheFloodReductionProject.
ThereconfiguredGolfCoursewouldnotresultinachangetolighting,operationalhours,or
numberofemployees.However,roundsofgolfplayedperyearareexpectedtoriseto62,700
roundsbyFY2019and71,000roundsbyFY2020.In2011,65,653roundsofgolfwereplayed.

The Golf Course reconfiguration would involve the following changes.

Relocate 18 golf holes

Construct 18 new greens on the course and two new greens in the practice areas

Create a par 71 course

Create a course with the following yardages from each of the tees.

Championship Tee: 6,685

Back Tee: 6,091

Regular Tee: 5,374

Forward Tee: 4,588

Reconstruct existing or construct new bunkers

Transform 66 irrigated acres to naturalized areas (non‐managed turf)

Reduce irrigated turf from 135 acres to 81.3 acres

Developanewplayerdevelopmentarea,practicegreen,andshortgameareaandayouth
golfarea

Baylands Athletic Center

GENG ROAD

EM

BARCADERO ROAD

Palo Alto Municipal Golf Course

Palo Alto Airport

Palo Alto Airport

San Francisquito Creek

Future Athletic Fields

(City)

Youth Golf Area

Range Tee Expansion

Practice Putting Greens

Parking (E)

Maintenance Facility (E)

Clubhouse (E)

New On-Course Restroom

Practice Range

(Existing Arti�cial

Turf)

Player Development

Area

Bu�er Mounds

Trail Connection

G ra ph ic s

.1

(4

-2 6-

) t m

Figure 3 Proposed Golf Course Reconfiguration Palo Alto Municipal Golf Course Reconfiguration Project

Feet

200 300 400 500 6001000

Source: Forrest Richardson & Associates, 2012.

Expand practice range tee area

Install new signage

Replace irrigation system (all areas of the 18‐hole Golf Course)

Temporarilypreparethefield/recreationarea(notfielddevelopmentorimprovement).At
minimumitwillbegradedandseededwithdrainage.

Construct a new restroom on the 15th hole

Golf Course Design

TheGolfCoursewouldbedesignedwitha“Baylands”theme.ThePaloAltoBaylandsMasterPlan
(CityofPaloAlto2008)(BaylandsMasterPlan)“advocatesaunificationoftheBaylands”and
providesgoalsandpoliciesintendedtofosterthatunification.Theseincludeafocusonoverall
environmentalquality,suchasminimizingurbanintrusion,fosteringpedestrianandbicycle
activities,preservingenvironmentallysensitiveareas,andrestoringdiversityofnativespecies.
Facility‐specificpoliciesallowcontinuationofcurrentuseoftheGolfCourseandAthleticCenter.
Further,theSiteAssessmentandDesignGuidelinesdocumentforthePaloAltoBaylandsNature
Preservedetailsthefollowinggeneraldesignprinciples(Richman2005).
Useonlymuted,naturalcolorsexceptwherenecessaryforsafety.Choosematerialsandfinishes
thatwillweatherwithoutdegrading.
Preservethehorizonlinewithlowandhorizontalelements.Mountfences,enclosures,and
identitysignslowtotheground.
Reducethesizeandmountingheightsofregulatorysigns(i.e.,relaxurbanstandardsfor
regulatorysigns,inrecognitionoflowtrafficvolumesandspeeds).

Design for practicality (i.e., easy maintenance and low life‐cycle costs).

Morespecificdesignguidelinesprovidespecificguidanceforsigns,vehiclecontrol,paving,site
furniture(e.g.,benchesandtrashreceptacles),andfencesandenclosures.

Parking and Access

The Golf Course Reconfiguration would not result in any changes in parking or access.

Utilities and Stormwater Quality Management

TheamountofimpervioussurfaceontheGolfCoursewouldincreasebyapproximately14,000
squarefeetduetoanincreaseinthelinearfeetofconcretecartpaths.Theexistingstormwater
drainagesystemthatwasinstalledin1998wouldberetained.Runoffwouldcontinuetoflow
throughturfandnativegrasslandareas(biofilters)andwouldbecollectedinmanydraininletsthat
feedintothepumpstation.Thepumpstationwouldcontinuetodischargethestormwatertothe
regionalstormwaterpumpstationatthePaloAltoAirportandthenceintotheBay.
TheProjectwouldreplacetheexistingirrigationpipesystemsintheGolfCoursewithanewhigh‐
densitypolyethylenepipesystemwithlimitedmetalcomponentstoeliminatecorrosionandleaks.
TheirrigationsystemwoulduseRainBird751orequivalentsprinklers,whichwouldemit
approximately23gallonsperminuteofwaterpersprinklerhead.Thesprinklerheadswouldbe
individuallycontrolledandwouldbeadjustabletoprovidefullorpartcirclecoverage.TheProject
wouldincludeundergroundsoilsensorunitsthatwouldmonitorsoilmoisturelevelstoprevent
overwatering.Waterusageforirrigationisexpectedtobereducedby30%to35%.
TheGolfCoursereconfigurationwouldrequireutilityextensions(i.e.,sanitarysewerpipe,pump,
andelectrical)tothenew300‐square‐footrestroom.ThereconfiguredGolfCoursewouldnot
requireanyothernewutilities.

Chapter 2 Purpose and Need

Need for Mitigation

Impactsonwetlands/watersoftheUnitedStatesandState(waters)duetotheProjectwillbe
mitigatedtoensurethereisnonestlossofwetlands.Impactsonwetlands/watersthatwilloccuras
theresultoftheProjectareasfollows:
Permanentimpactsonwetlandsthatwillbemodifiedforcartpathconstruction,fairway
construction,turfinstallation,andnativegrassplanting.
Temporaryimpactscausedbyremovalanddisturbanceofvegetation,includingremovalofnon‐
nativespeciesandCaliforniaInvasivePlantCouncilranked“high”and“moderate”riskspecies,
withinexistingwetlandsthatwillultimatelybeenhancedwithnewnativewetlandvegetation
andminortransitionfinishingtoblendsuchareastoadjacentexpandedwetlandareas.
Vegetationwithintemporarily‐impactedareasisexpectedtoreturntopre‐projectconditions
withinonetotwoyearsofthedisturbance,lessnon‐nativespeciesthatwillberemovedduring
vegetationdisturbance.

Purpose of the Mitigation and Monitoring Plan

ThefederalCWAistheprimaryfederallawprotectingthequalityofthenation’ssurfacewaters,
includinglakes,rivers,andcoastalwetlands.CWAempowerstheEnvironmentalProtectionAgency
(EPA)tosetnationalwaterqualitystandardsandeffluentlimitations,andestablishespermitreview
mechanismstoenforcethem.MostCWAprovisionsareatleastindirectlyrelevanttothe
managementandprotectionofbiologicalresourcesbecauseofthelinkbetweenwaterqualityand
ecosystemhealth.Theportionsthataremostdirectlyrelevanttobiologicalresourcesmanagement
arecontainedinSection404,whichregulatesthedischargeofdredgedandfillmaterialsintowaters
oftheUnitedStates(comprisingwetlandsandotherwatersoftheUnitedStates),whichinclude:
Allareaswithintheordinaryhighwatermarkofastream,includingnon‐perennialstreamswith
adefinedbedandbankandanystreamchannelthatconveysnaturalrunoff,evenifithasbeen

realigned.

Seasonal and perennial wetlands, including coastal wetlands.

Section404requiresprojectproponentstoobtainapermitfromtheU.S.ArmyCorpsofEngineers
(USACE)foralldischargesofdredgedorfillmaterialintowatersoftheUnitedStates,including
streams,ponds,andwetlands,beforeproceedingwithaproposedactivity.CWASection401
requiresthatapplicantsforaSection404permitmustfirstobtaincertificationfromRWQCBthatthe
proposedprojectwillcomplywithstatewaterqualitystandards.Wetlandcompensationhabitatwill
besetasideandprotectedinperpetuitythroughappropriatelegalmeans,consistentwithU.S.Army
CorpsofEngineers’requirementsandasspecifiedinpermits.ImpactsduetotheProjectare
summarizedinTable1andthepermanentimpactsbywetlandfeatureareprovidedinTable2.

Table 1. Project Impacts on Waters of the United States by Activity Type

Impact

Temporary Permanent

Acres Square Feet Acres Square Feet

Excavation/Fill in Wetlands 0.29 12,632 1.36 59,242

Table 2. Summary Total Impact Areas of Waters of the United States by Wetland ID

WetlandIDExistingAcre(acre)
TotalPermanentImpact
Area(acre)
TotalTemporaryImpact

Area (acre)

NTBM‐3 0.08 0.03 0.013

NTBM‐4 0.88 0.77 0.125

NTBM‐5 0.07 0.07 ‐

NTBM‐6 0.04 0.003 0.021

NTBM‐8 0.03 ‐ ‐

NTBM‐9 0.07 0.02 0.015

NTBM‐10 0.24 0.24 ‐

NTBM‐11 0.1 0.1 ‐

NTBM‐13 0.06 ‐ 0.003

NTBM‐14 0.02 ‐ ‐

NTBM‐15 0.12 ‐ 0.005

NTBM‐16 0.14 0.05 0.011

NTBM‐17 0.13 0.006 0.011

NTBM‐18 0.05 0.02 0.016

NTBM‐20 0.83 ‐ ‐

NTBM‐21 0.07 0.04 0.03

NTBM‐22 0.01 0.01 ‐

Project Total 2.94 1.36 0.24a

Notes:

NTBM=Non‐TidalBrackishMarsh
aThedifferencebetweentemporaryimpacttotalsinTable1andTable2are
duetoroundingdifferencesandrecentchangestothewetlandsaffectedby
theadjacentLowerSanFrancisquitoCreekImprovementProject.

Chapter 3 Site Conditions

Elevation

TheapproximateelevationswithintheProjectsitearebetweenmeansealeveland14feetabove.
Thetopographyoftheregionisrelativelylevel,withtheexceptionofaleveealongthewestand
northwestedgeoftheProjectsitethatbordersSanFrancisquitoCreek.TheProjectsiteexhibitsan
overallgradualslopenorthtowardsthesouthernportionofSanFranciscoBay(SFBay).
TopographicvariationswithintheGolfCoursearegenerallyduetothepreviousreconfiguration,
withfairways,buildingpads,andcartpathsbeingthehighestareas,whiledrainageditchesand
depressionsbetweenGolfCoursefacilitiesarethelowestareas.TheadjacentPaloAltoMunicipal
AirportissurroundedbyleveesthatalsoservetopreventtheintrusionoftheSFBayintotheProject
site.PortionsoftheProjectsitehavebeenartificiallybuiltupfromthenaturalelevationthroughthe
placementoffill.Additionally,apumpstationlocatedimmediatelyeastoftheProjectsiteandwest
oftheAirportrunwaydrainsomeoftheditchesthatflowfromtheGolfCourseintotheAirport
property.ThispumpstationdischargesintotheportionofSFBayimmediatelysoutheastofthe

Airport.

Precipitation and Growing Season

Descriptions of the Project site’s climate are listed below.

Climate type: Mediterranean with cool, wet winters and hot, dry summers.

Precipitation:approximately15.21inchesannuallyforPaloAlto,mostofwhichfallsfrom
NovemberthroughMarch(WesternRegionalClimateCenter2013).
Airtemperature:AirtemperaturesrangebetweenaverageJanuaryhighsof57.4°Fandaverage
Julyhighsof78.4°FforPaloAlto.Theyear‐roundaveragehighsareapproximately69.3°F
(WesternRegionalClimateCenter2012).
Growingseason:Thesoiltemperatureregime(i.e.,thegrowingseason)isthermicthroughout
theProjectsite(U.S.DepartmentofAgriculture,NaturalResourcesConservationService2013),
withanaveragegrowingseasonlengthofapproximately301daysfromFebruarythrough
NovemberforSantaClaraCounty(U.S.DepartmentofAgriculture,NaturalResources
ConservationServiceNationalWaterandClimateCenter2006).

Hydrology/Hydrologic Features

TheProjectsiteislocatedwithinU.S.GeologicalSurveyHydrologicMapUnitNumber
180500041001(SFBayEstuaries).TheGolfCoursewasdesignedtobehydrologicallyseparatedby
leveesfromtheabuttingBayandSanFrancisquitoCreek.Thestudyareaincludesdepressionsand
ditchesthatservetodraintheGolfCourseandsurroundingareas.Thestudyarea(alongGengand
EmbarcaderoRoads)drainseithertotheCity’sstormdrainsystemor(theGolfCourse)througha
seriesofditchestoamanagedpumpstationnearthePaloAltoMunicipalAirport.Boththestorm
drainsystemandpumpstationultimatelydischargeintoSFBay.Onefreshwaterpondthatsupports
freshwatermarshvegetationalongitsmarginsreceivesperiodiccontributionsoffreshwaterfrom
theGolfCoursestaffandismanagedforaestheticvalue.Thefreshwaterpondisshowninahistoric
aerialphotographtakenonSeptember25,1948(U.S.GeologicalSurvey1948)andwaspartofa
largerwetlandfeature.

Soils and Miscellaneous Land Types

OnesoilmapunitandtwolandtypeswereidentifiedwithintheProjectsite.TheSoilSurveyofSanta
ClaraArea,California,WesternPart(U.S.DepartmentofAgriculture,NaturalResourcesConservation
Service2013)classifiesthesoilslocatedwithintheProjectsiteaspredominantlyconsistingofloams
andclays.SoilmapunitsoccurringwithintheProjectsitearedescribedintheaforementionedsoil
survey.Table3liststhesoilmapunitandlandtype,aswellasassociatedcharacteristicswithinthe
Projectsite.

Table 3. Soil Map Units and Land Types within the Project Site

Soil Map Unit Name (Map Symbol) Hydric Status Landform

AquicXerorthents,baymudsubstratum,
0%–2%slopes(120)

Non‐hydric component with no hydric inclusions

Basin floors, marshes

Vegetation and Land Use Types in the Project Site

TheProjectsiteislocatedintheCentralCoastsubregionoftheCaliforniaFloristicProvince
(Baldwinetal.2012)andcontainspredominantlyuplandvegetationcommunities.Upland
vegetationcommunitiesobservedwithintheProjectsiteincludeannualgrassland,ruderal,and

developed/landscaped.

ThenaturalvegetationcommunitytypesfollowtheCaliforniaDepartmentofFishandWildlife’s
(CDFW’s)TheVegetationClassificationandMappingProgram:ListofCaliforniaTerrestrialNatural
CommunitiesRecognizedbytheCaliforniaNaturalDiversityDatabase(CaliforniaDepartmentofFish
andGame2003)whereapplicable.WatersoftheUnitedStatesarepresentasinclusionswithin
thesehabitattypesandareaddressedinsubsequentsections.Adescriptionofeachvegetationand
habitattypeispresentedbelow.

Upland Vegetation and Land Use Types

Annual Grassland

AnnualgrasslandsintheProjectsitearefoundinscatteredpatchesbetweentheGolfCourse
fairwaysandgreens.Annualgrasslandscommonlyintergradewithruderalhabitatintheseareas
andaredominatedbynonnativeannualgrassesandforbs,includingItalianrye(Festucaperennis),
softchess(Bromushordeaceus),rip‐gutbrome(Bromusdiandrus),Mediterraneanbarley(Hordeum
marinumssp.gussoneanum),bristlyoxtongue(Picrisechioides),andcurlydock(Rumexcrispus).

Ruderal

AttheGolfCourse,ruderalareasaretypicallyfoundadjacenttobuildings,landscapewastepiles,
parkinglots,andcartpaths.Ruderalreferstoplantspeciesthatcolonizedisturbedareas,suchas
roadsidesorvacantlots.Ruderalisalsousedtodescribedisturbedareaswherenonnativeand/or
invasivespeciesaredominant.Becauseruderalareasaretypicallydisturbedonaregularbasisby
humanactivity,theygenerallyprovidelow‐qualitywildlifehabitatandprimarilysupportspecies
adaptedtohumanpresence.Ruderalspeciesincludefieldbindweed(Convolvulusarevensis),Italian
thistle(Carduuspynocephalus),bullthistle(Cirsiumvulgare),bristlyoxtongue,andredstemfilaree
(Erodiumcicutarium).

Disturbed/Landscaped

Developed/landscapedlandintheProjectsiteincludestheCity’sMunicipalGolfCourseand
associatedbuildingsandartificialleveesalongbothsidesofSanFrancisquitoCreek.Vegetationin
developed/landscapedareasishighlyvariable,rangingfromnonexistentinpavedareasandalong
thelevees,mowedturfgrassesassociatedwiththeGolfCourse,toornamentalshrubsandshade
treesassociatedwiththeGolfCourseanditsbuildings.

Wetlands/Waters

WetlandandotherwaterswithintheProjectsiteoccurintheformofnon‐tidalbrackishmarsh,
freshwatermarsh,tidalsaltmarsh,tidal,andafreshwaterpond.AnacreagesummaryofWetland
andotherwatersispresentedinTable4.Figure4depictsthelocationsandboundariesofthese
featureswithintheProjectsite.

Table 4. Summary of Potential Waters of the United States

Wetland/Water Type Feature(s) on Figure 4 Total Acreage

Non‐Tidal Seasonal Salt Marsh NTBM‐1 to NBTM‐23 5.819

Freshwater Marsh FM‐1 and FM‐2 0.324

Tidal Salt Marsh TSM‐1 to TSM‐6 1.569

Freshwater Pond FP‐1 1.127

Tidal Channel and Bay Water TC‐1 1.068

Total Waters of the United States 9.906

Non‐tidal Brackish Marsh

Non‐tidalbrackishmarshes(NTBM‐1toNTBM‐23onFigure4)weremappedinareasonthe
landwardsideoftheleveesalongSanFrancisquitoCreekandbetweenfairwayswithintheGolf
Course.Suchareasappeartohavetohavebeentidalsaltmarshbeforeleveeswereconstructedin
theareaandappeartonothavereceivedsignificantamountsoffillmaterialaspartofleveeandGolf
Courseconstruction.
Thenon‐tidalbrackishmarshcommunity(representedbydatapoints1,27,33,35,41,45,and48
onFigure4)metthehydrophyticvegetationcriterionbasedonadominanceofsaltgrass(Distichlis
spicata)(FACW),pickleweed(Salicorniadepressa[=S.virginica])(OBL),alkaliheath(Frankenia
salina)(FACW),Mediterraneanbarley(Hordeummarinumssp.gussoneanum)(FAC),andother
hydrophytes.Percentvegetativecoverislowissomeareas,butoverallgreaterthanthe5%cover
thresholdrequiredforanareatoqualifyasawetland(U.S.ArmyCorpsofEngineers2008).Wetland
hydrologywasdocumentedeitherbyasaltcrust(B11),surfacesoilcracks(B6),oroxidized
rhizospheres(C3).Hydricsoilwasdocumentedeitherbyadepletedmatrix(F3)orredoxdark
surface(F6).

GF

GFGF

GFGF

GFGF

GF

GF

!C !C

GF

GF

TC-1

TSM-6

NTBM-4

NTBM-20

NTBM-19

NTBM-15

NTBM-21

NTBM-22

NTBM-16

NTBM-17

NTBM-3

NTBM-13

NTBM-14

NTBM-18

NTBM-7

NTBM-9

FM-2

NTBM-8NTBM-5

NTBM-6

NTBM-11

NTBM-10

TSM-2

NTBM-23

FP-1

FM-1

NTBM-2

NTBM-12

TSM-1

TSM-3

TSM-4

TSM-5

NTBM-1

dp44 dp46 dp48 dp49 dp47 dp45 dp43 dp28 dp34 dp36 dp38 dp40 dp41 dp42 dp39 dp37 dp35 dp33 dp27 dp1 dp2

°6 '5

"W

°7 '0

"W

°7

'1

"W

°7

'2

"W

°7

'3

"W 37°27'10"N37°27'20"N37°27'30"N37°27'40"N37°27'50"N

P a th

K

P ro je ct s_

\C ity o f_ P a lo

A lto \0

_1

G o lf_

C o u rs e

E

IR

\m a p d o c\

F ig u re

4_

W et

D e ln a n n o ta tio n

.m xd

; A u th o r:

D a te

/1

/2

Palo Alto Golf Course Reconfiguration Project

0 200 400100

Feet

E

1 inch = 400 feet

Notes:

1) See attached spreadsheet for wetland acreage calculations

2) Wetlands outside of delineation boudary are for display only and are not included in acreage calculations

Base Map Source: ICF, 2013 Imagery Source: NAIP 2010 USGS Topo Quad: Palo Alto; Mountain View PLSS: Township: 5S, Range: 2W;

Township: 6S, Range: 2W;

Land Grants, Civil Colonies

Prepared By: ICF International 408.216.2800 Delineated By: Eric Christensen Delineation Date: December 2012 Drawn By: Sacha Selim

Legend Data Point

Delineation Boundary (143.69 acres)

Wetland Type Freshwater Marsh

Freshwater Pond

Non-Tidal Brackish Marsh

Tidal Channel and Bay Waters

Tidal Salt Marsh

Golf Course Infrastructure GF Culvert

!C Drain

Drainage Channel

Figure 4 Delineation of Potential Waters of the United States, Including Wetlands

Thenon‐tidalbrackishmarshesgenerallyappeartobesupportedprimarilybyincident
precipitationandgroundwaterinfiltration.However,themarshesthatoccurwithinoradjoiningthe
GolfCourseareexpectedtoreceiveinputsfromtheturfsprinklersystems,bothindirectlyandas

runoff.

Freshwater Marsh

Thefreshwatermarsh(FM‐1andFM‐2onFigure4)communitywasmappedatonlyonelocation,
alongtheshoreofafreshwaterpondwithinthePaloAltoMunicipalGolfCourse.
Freshwatermarshisrepresentedbydatapoint44onFigure4andisdominatedbycattail(Typha
sp.)andhardstembulrush(Schoenoplectusacutus)(bothobligatewetlandspecies).Themarshmet
thehydrophyticvegetationcriterionbasedondominancebycattail.Wetlandhydrologywas
documentedbythepresenceofsurfacewater.Hydricsoilwasdocumentedbyredoxdarksurface

(F6).

Thefreshwatermarshappearstobesupportedbywaterpipedintotheassociatedfreshwaterpond
and,toalesserdegree,groundwater.

Tidal Salt Marsh

Tidalsaltmarshes(TSM‐1toTSM‐6onFigure4)weremappedalongthesideofSanFrancisquito
Creek.Themarshesaresupportedprimarilybytidalexchange.
Thetidalsaltmarshcommunity(representedbydatapoints37and39onFigure4)metthe
hydrophyticvegetationcriterionbasedonadominanceofPacificcordgrass(Spartinafoliosa)(OBL)
[atapproximatelymeanhighwater(MHW)andbelow],pickleweed(OBL)[bothatapproximately
MHWtomeanhigherhighwater(MHHW)];andperennialpeppergrass(Lepidiumlatifolium)
(FACW),gumplant(Grindeliastricta)(FACW),andalkaliheath(FACW)(allatapproximately
MHHW).Wetlandhydrologywasdocumentedeitherbysedimentdeposits(B2),saturation(A3),or
driftdeposits(B3).Hydricsoilwasdocumentedeitherbyaredoxdarksurface(F6),stratifiedlayers
(A5),Histicepipedon(A2),ordepletedmatrix(F3).
Includedwithinthemappedareasoftidalsaltmarsharetidalchannelsthatweretoonarrowtomap
atthescaleused.Alsoincludedarenarrowbandsofbrackishtidalmarshalongafew‐hundred‐foot‐
longsectionofSanFrancisquitoCreekadjacenttotheBaylandsAthleticCenterandGolfCourse.In
thebrackishmarsh,bulrushisthedominantspeciesratherthancordgrassandpickleweed.

Freshwater Pond

Thefreshwaterpond(FP‐1onFigure4)communitywasmappedatonlyonelocation,onthePalo
AltoMunicipalGolfCourse.ThepondissupportedbydomesticwaterpipedintoitbytheGolf
Courseandtoalesserdegreebygroundwater.

Chapter 4 Planting Plan

Mitigation Planting Design

Themitigationplantingdesignproposesenhancementofexistingwetlandsandexpansion
(creation)ofnewwetlandsattheProjectsite.Wetlandexpansionwillinvolveexcavatingfillfrom
elevatedterrainsurroundingexistingwetlandstoincreasethesurfaceareaandvolumeofthe
existingwetland(Figures5and6).Wetlandenhancementwillinvolverehabilitatingareasof
existingbrackishmarshbyremovinginvasivespeciesandseedingwithnativespecies.

Hydrology

Areasofuplandfillwouldbeexcavatedbyapproximately2feettomatchadjacentwetland
elevationsandextendeduptoapproximately125feet(Figure6).Convertingthelandscapeposition
ofelevatedterrainstocontiguousdepressionswillchangethehydrologiccharacteristicsofthearea
fromdrylandtobrackishmarsh.Intheseareas,wetlandspecies(Table5)willbehydroseededinthe
depression,andnativedrylandspecieswillbeinstalledalongthewetlandborder.

Vegetation

Mitigationwetlandswouldbehydroseededorpluggedwithuptoeightbrackishmarshplant
species:Brown‐HeadedRush(Juncusphaeocephalus),SloughSedge(Carexobnupta),AlkaliBarley
(Hordeumdepressum),ClusteredFieldSedge(Carexpraegracilis),SaltRush(Juncuslescurii),
MeadowBarley(Hordeumbrachyantherum),MarshSunflower(Centromadiapungensmaritimaor
pungens),andCreepingWildrye(Elymustriticoides).(Table5).Theservicesofanurserywillbe
retainedtopropagatealleightplantspeciesinthequantitieslistedinTable5forplantingwithinthe
“enhanced”and“expanded”wetlandstoensuretheiravailabilityduringinitialplantingactivitiesor
within12monthsofinitialplantingactivities.Thetop4inchesofsuitabletopsoilfromexisting
wetlandsproposedtobefilledwillbestrippedandstockpiledforreapplicationaftergradingis
completeinordertosalvagetheexistingseedbank;therefore,existingmarshplantspeciessuchas
PickleweedandSaltgrassareexpectedtorevegetatenaturally.
Acombinationofpluggingandhydroseedingofplantmaterialswillbeconductedasdescribed
belowwithinthemitigationwetlandareas.Plugsoftheavailableplantspecieswillbeplantedata
rateof10,890plantsperacre(deepotsizeplantsatroughly24‐inspacing)ataratiolistedinthe
wetlandplantingpalettetablebelow(Table5).Areasbetweenplugsintheseareaswillbedisked
withharvestedtopsoilsfromdisturbedwetlandstoformamulchbedinandaroundplugplantings.
Hydroseedingwillnotoverlappluggingareasbecauseofthewasteassociatedwithseedsthathang
uponthepluggedplants.Plugareasshallbethoseareasthatformtheouter30feetofall
EnhancementAreasandExpansionAreas(i.e.,theareasoftheperimetersofthewetlandareastobe
enhancedandexpanded.)Thisperimeterrepresentstheslopesoftheenhancedandaddedwetland
areaswhereplugswillbemostadvantageousandhavethemostsuitablesoilsforplug‐type
planting.Hydroseedingpertherateslistedbelow(Table5)shallbeappliedtoallotherareastobe
enhancedandexpanded.Theseareas,ingeneral,formthelowerfloorsoftheareaswheresoilsand

San Francisquito Creek

Palo Alto Airport

San Francisco

Bay

Baylands Athletic Facility

Palo Alto Airport

EMBARCADERO RD

0.41 ac

0.3 ac

1.66 ac

0.25 ac

2.61 ac

0.06 ac

2.73 ac

NTBM-12

0.48 ac

NTBM-10

0.24 ac

NTBM-11

0.10 ac

NTBM-6

0.04 ac

NTBM-5

0.07 acNTBM-8

0.03 ac

NTBM-9

0.07 ac

NTBM-7

0.02 ac

NTBM-18

0.05 ac

NTBM-14

0.02 ac

NTBM-13

0.06 ac

NTBM-3

0.08 ac

NTBM-4

0.88 ac

NTBM-17

0.13 ac

NTBM-16

0.14 ac

NTBM-22

0.01 ac

NTBM-21

0.07 ac

NTBM-15

0.12 ac

NTBM-20

0.83 ac

0.186 ac

0.021 ac

0 ac

0.015 ac

0.016 ac

0.003 ac

0.013 ac

0.112 ac

0.011 ac

0.011 ac

0.03 ac

0.005 ac

P at h : K

P ro je ct s_

\C ity _o f_ P a lo

A lto \0

1_

_G ol f_ C o ur se

E

IR

\m ap d oc

\4

4_ B

A \F ig u re _5

_W e tla n d_ M iti ga tio n_

.m xd

; A ut h or

D at e

: 2 /1

7/

0 200 400

Feet

E

Legend Project Area

Undisturbed Zone

Existing Wetlands (3.44 ac)

Enhanced Wetlands (0.42 ac)

Expanded Wetlands (8.03 ac)

Wetlands Cross-Section (See Figure 6)

Figure 5 Mitigation Areas

Palo Alto Municipal Golf Course Reconfiguration Project

1 inch = 400 feet

NOTE:

Undisturbed Zones shall be staked in the field to provide the best possible transition between existing wetlands and expansion areas.

UN-

DISTURBED

ZONE

EXISTING

WETLAND WETLAND EXPANSION

ENHANCED

WETLAND

WETLAND

EXPANSION

G ra ph ic s

.1

(6

-1 0-

) t m

Figure 6 Wetland Expansion and Enhancement Cross-Section

conditionsarenotassuitableforplug‐typeplanting.Hydroseedingperthespecifiedratesshallbe
appliedtoareasrequiringaugmentationinareastobepreserved(i.e.,“NoDisturbance”Areas).

Table 5. Wetland Planting Palette

Species Name Common Name Rate (lbs./acre) Plant Spacing Propagule

Juncus phaeocephalus Brown‐Headed Rush 5 ‐ live seed

Carex obnupta Slough Sedge 3 ‐ live seed

Hordeum depressum Alkali Barley 5 ‐ live seed

Carex praegracilis Clustered Field Sedge ‐ 24 inches plantlet1

Juncus lescurii Salt Rush ‐ 24 inches plantlet

Hordeum brachyantherum

Meadow Barley 5 24 inches plantlet;

live seed

Centromadiapungens
maritima(or pungens)MarshSunflower4‐liveseed

Elymus triticoides Creeping Wildrye 24 inches plantlet

Total (no./density) 22 10,890 / ac2

1 Plantlets may be as deepots # 16‐50

2 Planting density per combined species

Plant Establishment Period and Maintenance

TheCitywillberesponsibleformaintainingtheplantingareaforthelifeofthemonitoringeffort
(i.e.,5years)toensurethattheplantingsbecomeestablishedandperformancecriteriaaremet.The
plantestablishmentperiod(PEP)willoccurduringthefirst3yearsfollowingcompletionof
constructionactivities.MaintenanceactivitiesduringthePEP,ataminimum,willincludeplant
watering,weedcontrol,removalofdebris,andremovalofnon‐nativeinvasivespeciesiftheyaffect
theviabilityoftheplantings.NoactivemaintenancefollowingthePEP(i.e.,thefinal2yearsofthe
monitoringeffort)isanticipated;theplantingareaswouldonlybemonitoredinyears4and5.Long‐
termmaintenanceactivitiesfollowingthe5‐yearmonitoringperiodwillbetheresponsibilityofthe
PaloAltoGolfCoursestaffandmaintenancecontractor(SeeChapter6).

Plant Watering

ItisanticipatedthatirrigationwillbeappliedtotheplantingareaduringthePEP.Duringthefirst
yearafterplanting,irrigationwillbeappliedweeklyduringthedryseason.Inthesecondandthird
yearsfollowingplanting,irrigationwillbeappliedbimonthlyorasneededbasedonthesuccessof
plantings.Theapplicationmethodandrateswillbedeterminedduringdevelopmentoftheplanting
plan.ThetypicalirrigationseasonwillextendfromApril1toOctober31;however,theirrigation
scheduleandapplicationratesmaybeadjustedbytherevegetationcontractordependingonannual
rainfallpatterns.Theirrigationscheduleandapplicationratesmayalsobeadjustedbythe
revegetationcontractor,asnecessary,duringthePEPbasedonplantperformanceand

establishment.

Weed Control

Weedcontrolwillbeprovidedonanasneededbasistoreducecompetitionwiththeplantings
duringtheentire5‐yearmonitoringperiod.Weedcontrolwillincludethecontrolofinvasiveplants
categorizedas“high”or“moderate”risk,asdefinedintheCaliforniaInvasivePlantCouncil’s
InvasivePlantInventory(Cal‐IPC2006,2007).Siteevaluationswillbeperformedonabi‐annual
basisbyarestorationecologisttodeterminewhetherweedcontrolisnecessary.Weedcontrolmay
includeweedwhacking(outsideplantbasins),hand‐pulling,string‐trimming,orherbicide
treatments.Onlyherbicidesthatareapprovedforuseinornearaquaticenvironmentswillbe
utilized.Weedcontrolactivitieswilleradicatethemajority(>75%)ofinvasiveplantsintheplanting
areas.Ifevidenceexiststhateradicationwouldhaveanegativeeffectonnativeplantpopulations,
theCitywillconsultwithCDFWandRWQCBtofindanappropriatealternative.Inaddition,anylitter
foundontherestorationsitewillberemovedduringeachmonitoringvisitanddisposedofoff‐site.

Plant Replacement

Duringthefirst3yearsofthemonitoringperiod,anyreplacementplantingsthatarerequiredbased
onfailuretomeetsuccesscriteriawillbeprovidedbytheCityandinstalledbytherevegetation
contractor.Replacementwillincludeplantingasufficientnumberofplantsorseedlingssuchthat
thetotalnumberoflivingplantsmeetsorexceedstheperformancecriteriaforpercentcoverand
speciesrichness.Replacementplantswillbeinstalledaccordingtotheoriginalplantinstallation
methods.If,inanyyearduringthe5‐yearmonitoringperiod,morethan20%ofplantsrequire
replacement,theCitywillextendthemonitoringperiodtoensurethatnewplantingsaresubjectto5
yearsofmonitoring.

As‐Built Report and Drawings

PursuanttotheDraft2013RegionalCompensatoryMitigationandMonitoringGuidelinesforSouth
PacificDivision(SPDMitigationGuidelines),aletterreportandas‐builtdrawingwillbesubmittedto
USACEandotherregulatoryagencieswithin60daysfollowingcompletionofconstruction.The
reportwillincludethefollowinginformation:

Date(s) all compensatory mitigation construction activities were completed.

Scheduleforfuturemitigationmonitoring,implementation,andreportingpursuanttofinal,
USACE‐andWaterBoard‐approvedmitigationplan.
SummaryofcompliancestatuswitheachspecialconditionoftheassociatedUSACEandWater
Boardpermitorverification(includinganynoncompliancepreviouslyhavingoccurredor
currentlyoccurringandcorrectiveactionstakentoachievecompliance).
Colorphotographsoftheaquatichabitatsconstructedatthecompensatorymitigationsitefor
thoseaspectsdirectlyassociatedwithpre‐existingwatersoftheUnitedStates.Photostaken
beforeaquatichabitatisconstructedshallalsobeprovided.

One copy of the as‐built drawings as described below.

Theas‐builtdrawingswillbepreparedandsubmittedtoUSACEinaccordancewithSouthPacific
Division(SPD)MapandDrawingCriteria.As‐builtdrawingswillbeprovidedontheoriginal
constructiondrawingsandwillindicatethefollowingfeatures.

Extent of re‐established and rehabilitated areas (in plan view).

Extent of both cut and fill.

Spot elevations to accurately characterize the finished surfaces, including high and low points.

As‐built cross sections.

Location of any permanent markers (e.g., identification stakes, photodocumentation stations).

Seeded and planted areas.

Other pertinent features.

Any changes from the original construction drawings will be indicated in indelible red ink.

Responsible Parties

TheCitywillbetheresponsibleentity,financiallyandotherwise,forensuringthatallaspectsofthis
MMPareimplemented.TheCitymayassignthisresponsibility,inpartorinfull,toanotherentity,
providedthatsuchassignmentwillalsoassign(inalegallyenforceablemanner)thesame
implementationresponsibility.

Chapter 5 Monitoring and Adaptive Management

Toensurethelong‐termsuccessoftherestorationeffort,itwillbenecessarytomonitorthe
conditionoftherestorationsiteandpotentiallyimplementadaptivemanagement1practicesasthe
sitedevelopstowardasustainableequilibriumcondition.Thefollowingsectionsprovidedetailson
eachcomponentofthemonitoringandadaptivemaintenanceprogram,anddescriberequirements
fordocumentationandreporting.

Monitoring Protocol and Performance Criteria

Duringthe5yearsfollowingplanting(oruntilthetimetheestablishedsuccesscriteria,defined
below,aremet),monitoringandadaptivemanagementwillfocusonthephysicalandbiological
developmentofthemitigationwetlands.Thetwodifferenttypesofmitigationwetland,expanded
andenhanced,willbetrackedandanalyzedseparately.Monitoringwilloccurinthespringofeach
calendaryear(MarchthroughMay,dependentonrainfall)sothatannualspeciesmaybeidentified.
Table6summarizestheperformancecriteriathatwillbeusedtoevaluatethesurvivalofwetland
vegetation.Theseplantingswillbeconsideredsuccessfuliftheymeetorexceedthecriteria.Overall
successofthesitemayrequireacceptingamosaicbalanceofnativeandnon‐nativevegetation.Plant
communitieswillbeassessedasawhole,regardlessofwhethertheywereplantedorseeded.

Physical

Toensurethatthemitigationwetlandsarefunctioningasphysicalwetlands,theCaliforniaRapid
AssessmentMethod(CRAM)willbeusedtoperformaqualitativeevaluationofthewetland.In
addition,thepresenceorabsenceofhydricsoilindicatorswillbeassessedannuallyatseveral
locations.Table6liststhephysicalperformancecriteriafortheProjectsite.Physicalperformance
criteriawillbeassessedinyears1,3,and5.

Table 6. Physical Performance Criteria

P1. CRAM Assessment P2. Hydric Soil Indicators

Year 1 Target CRAM score between 90 and 95 Presence of hydric soils

Year 3 Target CRAM score between 90 and 95 Presence of hydric soils

Year 5 Target CRAM score between 90 and 95 Presence of hydric soils

1Adaptivemanagementdescribesaresourcemanagementstylethatembodieschangeormodification
(“adaptation”)inresponsetotheoutcomeofpreviousmanagementactionsortoadvancesinscientific
understanding.Underadaptivemanagement,managementactionisinitiated,resultsaremonitored,and
subsequentmanagementactionsareadjustedforbetteroutcome,basedoninformationcollectedduring
monitoringorothernewdata.

Performance Criteria P1: CRAM Assessment

TheCRAMassessmentwillfollowtheprotocolsfoundinthelatestversionoftheCaliforniaRapid
AssessmentMethodforWetlands:DepressionalWetlandsFieldBook(SanFranciscoEstuaryInstitute
2013).Apre‐ProjectCRAManalysiswillbeperformedtoevaluatethebaselineconditionofthe
wetlandhabitatswithintheProjectsite.Thepre‐ProjectCRAMscoresestablishthebaselinefor
comparativepurposesduringthemonitoringprogram.Representativeassessmentareaswillbe
establishedwithintheexpandedandenhancedwetlandstomeasurethechangeinecosystem
functionsandservicesoverthecourseofthe5‐yearmonitoringprogram.

Performance Criteria P2: Hydric Soils

Hydricsoilindicatorswillbeevaluatedbyexcavatingsoilpitsinseverallocationstoapproximately
20centimetersindepthandexaminingthemorphologicalcharacteristicsofthesoilprofile.In
particular,theprofilewillbeexaminedforthepresenceofthoseredoximorphicfeaturesandother
indicatorsthatmayoccurinthesoils.Suchfeaturesgenerallyincludelowchromacolors,soft
masses,andhighorganicmattercontent.ThesefeaturesandindicatorsaredescribedinField
IndicatorsofHydricSoilsintheUnitedStates,Version7.0,byL.M.Vasilas,G.W.Hurt,andC.V.Noble
(U.S.DepartmentofAgriculture2010).Ifthesoilprofiledisplaystherelevantindicators,thesoilis
regardedashavingmetthecriteriaforahydricsoil.Anyexcavatedsoilpitswillbeimmediately
backfilledaftersoilexaminationandwillnotbeleftopenovernight.

Biological

Successfulestablishmentofwetlandvegetationwillbebasedonhealthandvigorofnative,
hydrophyticwetlandspecies,absolutepercentcoverofbothnative,hydrophyticandinvasive
species,andnativeplantspeciesrichness(Table7).

Table 7. Performance Criteria for Wetlands

B1. Absolute cover (native/invasive) B2. Heath and Vigor B3. Species Richness

Year 1 Target

>30%nativehydrophyticplant
cover/<30%invasiveplantcover

>50% in Good or Fair condition

Atleast2native
wetlandplantspecies

Year 2 Target

>40%nativehydrophyticplant
cover/<25%invasiveplantcover

>70% in Good or Fair condition

Atleast2native
wetlandplantspecies

Year 3 Target

>50%nativehydrophyticplant
cover/<25%invasiveplantcover

>75% in Good or Fair condition

Atleast3native
wetlandplantspecies

Year 4 Target

>60%nativehydrophyticplant
cover/<20%invasiveplantcover

>80% in Good or Fair condition

Atleast4native
wetlandplantspecies

Year 5 Target

>70%nativehydrophyticplant
cover/<15%invasiveplantcover

>90% in Good or Fair condition

Atleast5native
wetlandplantspecies

Hydrophytic Vegetation

Allnativewetlandvegetationwillbeevaluatedbasedonthedominanceofspeciesthatare
hydrophytic,whichisdefinedasspeciesthatpersistininundatedlandscapes.Hydrophytic
vegetationisbasedonthewetlandindicatorstatusofaplantspecies(Lichvar2013).Specieslisted
asfacultativeoccurinbothwetlandsandnon‐wetlands,andspecieslistedasfacultativewetlandor
obligatearemoreoftenfoundoralmostalwaysfound(respectively)inwetlands.Thesespecies
illustratewetlandfunctionalitybecausethehydroperiodiscontrollingtheplantspeciesassemblage.
Absolutecoverofnativehydrophyticvegetationwillbemonitoredusingthelinetransectmethod
describedbelow.

Performance Criteria B1. Absolute Cover

Thelinetransectsurveymethodwillbeusedtodetermineabsolutecoverofnative,hydrophytic
speciesandinvasivespecies.Absolutecoverprovidedbyseededandnaturallyrecruitedwetland
plantspeciesforeachareawillbemonitoredusingrandomlyselected1‐square‐meterquadrats
placedalongpermanent100‐meter‐longtransects.Ifwetlanddimensionsdonotaccommodatea
100‐metertransect,thetransectlengthand/orquantitywillbeshortenedtothedimensionsofthe
wetland.Figure7illustratesatrendlinebasedonplotsamplesfromahypotheticaldatacollection.
Transectmonitoringwillidentifythedominantspeciesandnoteanychangesinthedominant
speciesoverthelengthofeachtransect.Althoughtransectmonitoringwillbeconductedand
trackedineachwetland,PerformanceCriteriaB1willhavebeenmetifthemeanabsolutecoverper
squaremeterintheexpandedwetlandsandthemeanabsolutecoverpersquaremeterinenhanced
wetlandsmeetsorexceedsthatyear’starget.
Absolutecoverofallplantspecies,includinginvasives,willbedeterminedbysamplingrandomly
placed1‐square‐meterplotsalongthetransectsestablishedthrougheachrehabilitationarea.Plot
samplingwillbeconductedusingastratifiedrandomdesign.Transectswillbestratifiedbydividing
theminto10equal‐sizedsubtransects.One1‐square‐metersampleplotwillbeplacedatrandomin
eachsubtransect,foratotalof10plotspertransect.Withineachplot,absolutecoverwillbe
estimatedforeveryplantspecies.
Todeterminewhetherthenumberofplotsfromeachtransectissufficienttoallowstatistical
analysis,thedatawillbesubjectedtoatrendlineanalysis.Anaccurateestimateofthenecessary
numberofplotscanbedeterminedbygraphingdataforpercentcovervs.numberofplots.The
appropriatenumberofplotscorrespondstothepointatwhichthetrendlinebecomesflat(i.e.,
neitherascendingnordecreasing).
Attheendoftheeachtransect,thetotalcoverofwetlandspecieswillbecalculatedforeachplot.
Thenthecumulativemeanswillbegraphed(e.g.,Plot1,Plots1+2,Plots1+2+3).Ifthetrendline
formeancoveracrossthe10plotsisflat,thensamplingforthattransectwillbeconsidered
complete.Thetrendlinewillbeconsideredflatifthedifferencebetweenthemeansfor9plotsand
10plotsisequaltoorlessthan1%ofthemeanfor10plots.Ifthetrendlineisnotflat,fivemore
plotswillberandomlysampledinsubtransects1,3,5,7,and9.Thecumulativemeansforthe
additionalfiveplotswillbegraphed,andagainthetrendlineexamined.Ifthetrendlineformean
coverhasflattened,samplingforthattransectwillbeconsideredcomplete.Ifthetrendlinehasstill
notflattened,fivemoreplotswillberandomlysampledinsubtransects2,4,6,8,and10,and

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .