This file is a 100% design drawing submission for the East Parking Garage structural concrete repair and preventative maintenance project at Howard Community College in Columbia, Maryland. The drawing package, dated October 9, 2026, represents the complete design documentation for Project 30-26107.01-2 and serves as the technical basis for the sealed, firm-fixed-price bidding process. The scope of work encompasses structural concrete repairs and preventative maintenance at the East Expansion Garage located at 5640 Faculty Drive. Qualified parking-structure restoration contractors are required to submit bids in strict accordance with the DESMAN Project Manual, Outline Specifications, and these 100% design drawings.
The technical drawings provide detailed specifications and design standards that establish the baseline requirements for all bid submissions and subsequent contract performance. Contractors must base their firm-fixed-price proposals on the complete design documentation contained within this 100% drawing set, ensuring that all repairs, materials, methodologies, and preventative maintenance measures comply with the engineered design standards. The design drawings serve as the contractual reference documents for scope definition, quality standards, and project deliverables throughout the execution of the parking structure restoration work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (IFB) 27P-001_EPG Repair_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
East Expansion Garage
DATEDESCRIPTIONNO.
DRAWING TITLE:
DRAWING NO.
SCALE:
DATE:
PROJECT NO :
DES. DRWN. CK'D.
I S S U E
Copyright © 2026 DESMAN, Inc. All rights reserved. No part of these documents may be reproduced in any form or by any means without permission from DESMAN.
of th e
R ep ai rs a nd
P re ve nt at iv e M ai nt en an ce
H C
C E
AS
T
G
AR
AG
E
EX
PA
N
SI
O N
C O
LU
M
BI
A, M D
AS NOTED
OCTOBER 9, 2026
30-26107.01-2
MO MO SB
1 90% SUBMISSION 9/18/2026
PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND, LICENSE NO. 21576, EXPIRATION DATE:
04/29/27.
2 100% SUBMISSION 10/9/2026
AutoCAD SHX Text
(SUMMARY ONLY)
AutoCAD SHX Text N
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
CONSTRUCTION NOTES
AutoCAD SHX Text THE FOLLOWING GENERAL NOTES SHALL APPLY UNLESS NOTED OTHERWISE ON PLANS. 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT LOCAL, STATE AND NATIONAL BUILDING CODES. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CURRENT LOCAL, STATE AND NATIONAL BUILDING CODES. 2. CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS SHOWN ON PLANS WITH EXISTING CONDITIONS PRIOR TO CONTRACTOR IS RESPONSIBLE TO VERIFY ALL DIMENSIONS SHOWN ON PLANS WITH EXISTING CONDITIONS PRIOR TO COMMENCING WORK. DO NOT SCALE DIMENSIONS FROM DRAWINGS. 3. ALL NOTES GIVEN ON THESE DRAWINGS ARE SUPPLEMENT TO THE PROJECT SPECIFICATIONS AND ARE INTENDED NOT TO ALL NOTES GIVEN ON THESE DRAWINGS ARE SUPPLEMENT TO THE PROJECT SPECIFICATIONS AND ARE INTENDED NOT TO REPLACE THEM. IN THE EVENT OF A CONFLICT BETWEEN THE NOTES AND PROJECT SPECIFICATIONS, CONTRACTOR TO OBTAIN CLARIFICATION IN WRITING. 4. CONTRACTOR SHALL REPORT IMMEDIATELY TO THE ARCHITECT/ENGINEER ANY DISCREPANCIES OR INCORRECT INFORMATION CONTRACTOR SHALL REPORT IMMEDIATELY TO THE ARCHITECT/ENGINEER ANY DISCREPANCIES OR INCORRECT INFORMATION SHOWN ON THE DRAWINGS BASED ON EXISTING CONDITIONS. AFTER REPORTING THE DISCREPANCIES VERBALLY, A WRITTEN REPORT SHOULD THEN FOLLOW. CONTRACTOR SHALL BE DIRECTED BY THE ARCHITECT/ENGINEER REGARDING THE ABOVE MATTER. 5. THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND HEALTH LAWS AND REGULATIONS INCLUDING, BUT NOT LIMITED THE CONTRACTOR SHALL COMPLY WITH ALL SAFETY AND HEALTH LAWS AND REGULATIONS INCLUDING, BUT NOT LIMITED TO: (I.) PROVISIONS, AND REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, AS AMENDED, (II.) THE CONSTRUCTION SAFETY ACT OF 1969, AS AMENDED AND WITH ALL MOST RECENT APPLICABLE LAWS, (III.) ORDINANCES, RULE, REGULATIONS, AND ORDER OF ANY PUBLIC AUTHORITY HAVING JURISDICTION OVER THE WORK AND (IV.) THE SAFETY OF PERSONS OR PROPERTY OR TO PROTECT THEM FROM DAMAGE, INJURY OR LOSS. CONTRACTOR SHALL ERECT AND MAINTAIN, AS REQUIRED BY EXISTING CONDITIONS AND PROGRESS OF THE WORK, ALL REASONABLE SAFEGUARDS FOR SAFETY AND PROTECTION, INCLUDING POSTING DANGER SIGNS AND OTHER WARNING AGAINST HAZARDS, PROMULGATING SAFETY REGULATIONS AND NOTIFYING THE OWNER AND USERS OF ADJACENT UTILITIES. CONTRACTOR SHALL ASSURE THAT ALL OF HIS SUBCONTRACTORS ALSO CONFORM TO ALL HEALTH AND SAFETY LAWS AND REGULATIONS. THE CONTRACTOR SHALL AT ALL TIMES HAVE AN OSHA CERTIFIED "COMPETENT PERSON" ON THE JOB AND AN INDIVIDUAL TRAINED AND CERTIFIED IN FIRST AID BY THE AMERICAN RED CROSS. 6. THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING AND SHEETING REQUIRED FOR SAFETY AND PROPER EXECUTION THE CONTRACTOR SHALL PROVIDE ALL SHORING, BRACING AND SHEETING REQUIRED FOR SAFETY AND PROPER EXECUTION OF THE WORK. 7. CONTRACTOR IS SOLELY RESPONSIBLE TO PREPARE SHOP DRAWINGS FOR THE BRACING AND SHORING MEMBERS DESIGNED CONTRACTOR IS SOLELY RESPONSIBLE TO PREPARE SHOP DRAWINGS FOR THE BRACING AND SHORING MEMBERS DESIGNED AND STAMPED BY A PROFESSIONAL ENGINEER (REGISTERED IN THE STATE OF MARYLAND) AND TO SUBMIT THEM INCLUDING SHORING CALCULATIONS TO THE ARCHITECT/ENGINEER FOR APPROVAL. 8. WHEN THE PLANS INCLUDE INFORMATION PERTAINING TO SURFACE OBSERVATION, MATERIAL TESTING AND OTHER WHEN THE PLANS INCLUDE INFORMATION PERTAINING TO SURFACE OBSERVATION, MATERIAL TESTING AND OTHER PRELIMINARY INVESTIGATION, SUCH INFORMATION REPRESENTS ONLY THE OPINION OF THE ARCHITECT/ENGINEER AS TO THE LOCATION, CHARACTER, OR QUANTITY OF THE MATERIALS ENCOUNTERED AND IS ONLY INCLUDED FOR THE CONVENIENCE OF THE BIDDER. THE OWNER/ENGINEER ASSUMES NO RESPONSIBILITY WHATEVER IN RESPECT TO THE SUFFICIENCY OR ACCURACY OF THE INFORMATION, AND THERE IS NO GUARANTEE, EITHER EXPRESSED OR IMPLIED, THAT THE CONDITIONS INDICATED ARE REPRESENTATIVE OF THOSE EXISTING THROUGHOUT THE WORK, OR THAT UNANTICIPATED DEVELOPMENTS MAY NOT OCCUR, SAID INFORMATION SHALL NOT BE CONSIDERED BY THE PARTIES AS A BASIS FOR THE CONTRACT AWARD AMOUNT. 9. THE PLANS MAY BE SUPPLEMENTED BY STANDARD AND WORKING DRAWINGS AS ARE NECESSARY TO ADEQUATELY THE PLANS MAY BE SUPPLEMENTED BY STANDARD AND WORKING DRAWINGS AS ARE NECESSARY TO ADEQUATELY DESCRIBE THE WORK. IN THE EVENT, IN THE SOLE JUDGMENT OF THE ARCHITECT/ENGINEER, A CHANGE BECOMES NECESSARY IN THE BEST INTERESTS OF THE PROJECT DUE TO CIRCUMSTANCES NOT KNOWN AT THE TIME THE CONDITION SURVEY WAS PERFORMED OR ARISING THEREAFTER, THE ARCHITECT/ENGINEER MAY ALTER THE PLANS AS MAYBE NECESSARY AND INCREASE OR DECREASE THE QUANTITIES OF WORK TO BE PERFORMED IN ACCORDANCE WITH SUCH CHANGES. THE OWNER SHALL BE INFORMED WITH A COPY OF ALL SUBMITTALS AND CORRESPONDENCE AS THE CHANGES MAY OCCUR. 10. THE CONTRACTOR SHALL REVIEW ALL EXISTING CONDITIONS TO DETERMINE ALL SERVICES (ELECTRICAL AND MECHANICAL) THE CONTRACTOR SHALL REVIEW ALL EXISTING CONDITIONS TO DETERMINE ALL SERVICES (ELECTRICAL AND MECHANICAL) AFFECTED BY THE REPAIR WORK. HE SHALL MAKE NECESSARY TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SERVICES TO ALL AREAS OF THE PARKING GARAGE OR OTHER AREAS (NOT IN CONTRACT) AFFECTED BY THE WORK. THE CONTRACTOR SHALL SUBMIT THE METHODS AND SCHEDULE OF CONNECTIONS FOR THE OWNER'S APPROVAL PRIOR TO COMMENCEMENT. 11. CONTRACTOR SHALL NOT ATTEMPT TO BRING ANY CONSTRUCTION EQUIPMENT INTO PARKING FACILITY PRIOR TO CONTRACTOR SHALL NOT ATTEMPT TO BRING ANY CONSTRUCTION EQUIPMENT INTO PARKING FACILITY PRIOR TO INSTALLATION OF PROPER SHORING MEMBERS APPROVED BY THE ENGINEER AND OF WHICH THE REQUIREMENTS ARE SHOWN ON PLANS. ANY VEHICLE AND/OR EQUIPMENT TO BE USED INSIDE THE PARKING FACILITY SHALL BE APPROVED BY THE ENGINEER. 12. PRIOR TO START OF CONSTRUCTION, EACH REPAIR AREA SHALL BE SURVEYED BY THE CONTRACTOR IN THE PRESENCE OF PRIOR TO START OF CONSTRUCTION, EACH REPAIR AREA SHALL BE SURVEYED BY THE CONTRACTOR IN THE PRESENCE OF THE ENGINEER. DURING THE SURVEY, THE CONTRACTOR'S REPRESENTATIVE SHALL MARK AND MEASURE THE AREAS TO BE REPAIRED AS DIRECTED BY THE ENGINEER. ADDITIONALLY, THE ENGINEER WILL PERFORM INSPECTION FROM TIME TO TIME TO THE REPAIR WORK IN PROGRESS. ANY DEFECTIVE WORK SHALL BE REMOVED AND REPLACED AT NO ADDITIONAL COST TO THE OWNER. 13. AS THE WORK PROGRESSES, THE CONTRACTOR SHALL PRODUCE "AS-BUILT" DRAWINGS IN THE INSTALLATION OF ALL AS THE WORK PROGRESSES, THE CONTRACTOR SHALL PRODUCE "AS-BUILT" DRAWINGS IN THE INSTALLATION OF ALL REPAIR ITEMS UNDER THE CONTRACT. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN THE "AS-BUILT" DRAWINGS UPDATED ACCORDING TO THE JOB PROGRESS. FOR EACH PAY REQUEST BY THE CONTRACTOR, THE OWNER AND ENGINEER SHALL RECEIVE A COPY OF THE UPDATED "AS-BUILT" DRAWINGS IN A TIMELY MANNER. FINAL PAYMENT MAY NOT BE ISSUED BY THE OWNER PRIOR TO RECEIPT OF "AS-BUILT" DRAWINGS. 14. THE ESTIMATED QUANTITIES OF WORK TO BE DONE AND MATERIALS TO BE FURNISHED UNDER THIS CONTRACT ARE GIVEN THE ESTIMATED QUANTITIES OF WORK TO BE DONE AND MATERIALS TO BE FURNISHED UNDER THIS CONTRACT ARE GIVEN IN THE PROPOSAL FORM. THE ACTUAL QUANTITIES MAY BE INCREASED OR DECREASED. PAYMENT TO THE CONTRACTOR WILL BE MADE FOR THE ACTUAL QUANTITY OF WORK PERFORMED AT THE CONTRACT UNIT PRICE. 15. ANY EXTRA WORK BEYOND THE SCHEDULED QUANTITIES, REQUIRING ADDITIONAL COST TO THE OWNER SHALL BE APPROVED ANY EXTRA WORK BEYOND THE SCHEDULED QUANTITIES, REQUIRING ADDITIONAL COST TO THE OWNER SHALL BE APPROVED BY THE OWNER PRIOR TO TAKING SUCH ACTION. CLAIMS FOR EXTRA WORK WHICH HAVE NOT BEEN AUTHORIZED IN WRITING BY THE OWNER AND APPROVED BY THE ENGINEER WILL BE REJECTED AND THE CONTRACTOR SHALL NOT BE ENTITLED TO PAYMENT. 16. PRIOR TO THE AWARD OF THE CONTRACT, THE CONSTRUCTION SCHEDULE PREPARED BY THE CONTRACTOR SHALL BE PRIOR TO THE AWARD OF THE CONTRACT, THE CONSTRUCTION SCHEDULE PREPARED BY THE CONTRACTOR SHALL BE SUBMITTED TO THE OWNER, AND COORDINATED WITH THE MANAGEMENT OFFICE. 17. CONTRACTOR SHALL PROVIDE ALL CAUTION/PEDESTRIAN WAY FINDING DIRECTION SIGNAGE AS REQUIRED. CONTRACTOR SHALL PROVIDE ALL CAUTION/PEDESTRIAN WAY FINDING DIRECTION SIGNAGE AS REQUIRED. 18. CONCRETE REPAIRS: ALL NEW AND EXISTING REINFORCING SHALL LAP SPLICED AS PER CURRENT ACI LAPPING CONCRETE REPAIRS: ALL NEW AND EXISTING REINFORCING SHALL LAP SPLICED AS PER CURRENT ACI LAPPING REQUIREMENTS. 19. ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO ALL DETAILS, SECTIONS AND NOTES SHOWN ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL APPLY TO SIMILAR SITUATIONS ELSEWHERE, UNLESS OTHERWISE SHOWN. SPECIFIC ITEMS DESIGNATED FOR REPAIR THAT ARE NOT INDICATED/DELINEATED ON THE DRAWINGS WILL BE ADDRESSED AS SELECTED BY THE ENGINEER IN THE FIELD.
AutoCAD SHX Text
HOWARD COMMUNITY COLLEGE - EAST EXPANSION GARAGE
AutoCAD SHX Text
2026 REPAIR AND PREVENTATIVE MAINTENANCE
AutoCAD SHX Text
OF THE
AutoCAD SHX Text
COLUMBIA, MD
AutoCAD SHX Text
1. THE GENERAL CONTRACTOR SHALL APPLY AT ALL TIMES SUFFICIENT LABOR AND MATERIALS FOR THE GENERAL CONTRACTOR SHALL APPLY AT ALL TIMES SUFFICIENT LABOR AND MATERIALS FOR PROSECUTING THE SEVERAL CLASSES OF WORK TO FULL COMPLETION IN THE MANNER REQUIRED BY THE SPECIFICATION AND THE REPAIR DETAILS SHOWN ON THE DRAWINGS. 2. THE GENERAL CONTRACTOR SHALL COMMENCE ON-SITE OPERATIONS WITHIN SEVEN CALENDAR DAYS THE GENERAL CONTRACTOR SHALL COMMENCE ON-SITE OPERATIONS WITHIN SEVEN CALENDAR DAYS AFTER THE DATE OF THE WRITTEN "NOTICE TO PROCEED" AND SHALL COMPLETE THE WORK WITHIN THE CONSTRUCTION TIME SPECIFIED IN THE BID PROPOSAL. 3. THE CONTRACTOR SHALL PROTECT EXISTING LIGHT FIXTURES OR HAVE FIXTURES DISCONNECTED AND THE CONTRACTOR SHALL PROTECT EXISTING LIGHT FIXTURES OR HAVE FIXTURES DISCONNECTED AND REMOVED BY A LICENSED ELECTRICIAN, WITHIN WORK AREAS, PRIOR TO DEMOLITION. HE SHALL ALSO PROTECT AND MAINTAIN CONTINUITY OF ALL OTHER EXISTING SYSTEMS AND ASSOCIATED WIRING. 4. THE CONTRACTOR SHALL COMPLETE IN ITS ENTIRETY, THE SCOPE OF WORK DELINEATED ON PLANS THE CONTRACTOR SHALL COMPLETE IN ITS ENTIRETY, THE SCOPE OF WORK DELINEATED ON PLANS AND IN THE BID FORM OF THE PROJECT SPECIFICATIONS. ALL LEVELS OF THE GARAGE ARE AVAILABLE AT ONE TIME. 5. THE CONTRACTOR SHALL PROVIDE ACCESS AT ALL TIMES FOR THE BUILDING MAINTENANCE THE CONTRACTOR SHALL PROVIDE ACCESS AT ALL TIMES FOR THE BUILDING MAINTENANCE PERSONNEL, TO ALL H.V.A.C. EQUIPMENT LOCATED IN THE PARKING GARAGE. THE CONTRACTOR SHALL ALSO INSTALL DUST PROOF PARTITIONS AROUND H.V.A.C. EQUIPMENT AREAS AND PROTECT THESE LOCATIONS FROM ANY DAMAGE DURING THE CONSTRUCTION PERIOD. 6. THE CONTRACTOR SHALL SUBMIT THE PROPOSED CONSTRUCTION SCHEDULE TO OBTAIN THE OWNER'S THE CONTRACTOR SHALL SUBMIT THE PROPOSED CONSTRUCTION SCHEDULE TO OBTAIN THE OWNER'S APPROVAL PRIOR TO THE START OF MOBILIZATION FOR THE PROJECT. THE CONTRACTOR SHALL STRICTLY FOLLOW THE CONSTRUCTION SCHEDULE SUBMITTED AND APPROVED UNLESS IT HAS BEEN REVISED, DURING THE CONSTRUCTION, IN COORDINATION WITH THE OWNER AND THE ENGINEER. 7. THE CONTRACTOR SHALL PROVIDE/INSTALL ALL TEMPORARY SIGNS AND DEVICES NECESSARY TO THE CONTRACTOR SHALL PROVIDE/INSTALL ALL TEMPORARY SIGNS AND DEVICES NECESSARY TO CONTROL TRAFFIC FLOW FOR THE ENTIRE REPAIR PERIOD. 8. PRIOR TO CONCRETE REMOVAL, THE CONTRACTOR SHALL ESTABLISH FLOOR ELEVATIONS AS PRIOR TO CONCRETE REMOVAL, THE CONTRACTOR SHALL ESTABLISH FLOOR ELEVATIONS AS NECESSARY FOR THE PLACEMENT OF NEW CONCRETE TO THE EXISTING ELEVATIONS. 9. THE CONTRACTOR SHALL PROVIDE PROPER MEANS SUBJECT TO ENGINEER'S APPROVAL FOR THE THE CONTRACTOR SHALL PROVIDE PROPER MEANS SUBJECT TO ENGINEER'S APPROVAL FOR THE DISPOSAL OF WATER AND DEBRIS GENERATED BY THE WORK. ALL DEBRIS SHALL BE REMOVED TOA WASTE CONTAINER LOCATED OUTSIDE THE PARKING FACILITY, AT A LOCATION TO BE COORDINATED WITH THE OWNER OR HIS/HER REPRESENTATIVE. 10. THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO PREVENT CUTTING OR OTHERWISE THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO PREVENT CUTTING OR OTHERWISE DAMAGING REINFORCING STEEL, INCLUDING ANY VERTICAL STIRRUPS. 11. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ANY NECESSARY SHORING FOR THE IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE ANY NECESSARY SHORING FOR THE DEMOLITION/REPAIR WORK. ANY SHORING WHERE REQUIRED SHALL BE DESIGNED TO SUSTAIN A LIVE LOAD OF 40 POUNDS PER SQUARE FOOT (P.S.F.) IN ADDITION TO THE EXISTING DEAD LOADS AND THE SHORING SYSTEM ITSELF AND THE OPERATION WEIGHT OF EQUIPMENT. 12. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR THE ERECTION AND MAINTENANCE OF THE THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR THE ERECTION AND MAINTENANCE OF THE SHORING DURING DEMOLITION/REPAIR WORK. 13. THE CONTRACTOR SHALL INSTALL THE NECESSARY FORM WORK; FORMS SHALL BE MORTAR TIGHT THE CONTRACTOR SHALL INSTALL THE NECESSARY FORM WORK; FORMS SHALL BE MORTAR TIGHT AND SUFFICIENTLY RIGID TO SUPPORT THE IMPOSED LOADS WITHOUT ANY SETTLEMENT DEFORMATIONS. 14. THE SHORING AND FORM WORK SHALL REMAIN IN PLACE UNTIL THE NEW CONCRETE HAS ACHIEVED THE SHORING AND FORM WORK SHALL REMAIN IN PLACE UNTIL THE NEW CONCRETE HAS ACHIEVED A MINIMUM COMPRESSIVE STRENGTH OF 3000 PSI.
AutoCAD SHX Text T-1 COVER SHEET COVER SHEET R-1 ROOF LEVEL FLOOR PLAN ROOF LEVEL FLOOR PLAN R-2 REPAIR DETAILS REPAIR DETAILS R-3 REPAIR DETAILS REPAIR DETAILS
AutoCAD SHX Text
SCOPE OF WORK
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text
SITE LOCATION MAP
AutoCAD SHX Text SPECIFIED REPAIR MATERIAL PROPERTIES: CONCRETE COMPRESSIVE STRENGTH (28-DAY) 5000-PSI 5000-PSI STRUCTURAL NORMAL WEIGHT 145 PCF 145 PCF W/C RATIO 0.38 MAX. 0.38 MAX. AIR CONTENT 6.0% +/- 1.0% 6.0% +/- 1.0% REINFORCING REINFORCING BARS ASTM A615, GRADE 60, DEFORMED ASTM A615, GRADE 60, DEFORMED WELDED WIRE FABRIC ASTM A82 AND ASTM A185 (EPOXY COATED) ASTM A82 AND ASTM A185 (EPOXY COATED)
AutoCAD SHX Text ADDRESS: EAST EXPANSION GARAGE EAST EXPANSION GARAGE 5640 FACULTY DR, COLUMBIA, MD 21044
AutoCAD SHX Text BASE BID CONCRETE FLANGE AND/OR TOPPING REPAIRS SHEAR CONNECTOR REPAIRS REPLACEMENT OF SEALANTS
AutoCAD SHX Text
COVER
AutoCAD SHX Text
SHEET
AutoCAD SHX Text T-1
ROOF LEVEL
FLOOR PLAN
R-1
DATEDESCRIPTIONNO.
DRAWING TITLE:
DRAWING NO.
SCALE:
DATE:
PROJECT NO :
DES. DRWN. CK'D.
I S S U E
Copyright © 2026 DESMAN, Inc. All rights reserved. No part of these documents may be reproduced in any form or by any means without permission from DESMAN.
of th e
R ep ai rs a nd
P re ve nt at iv e M ai nt en an ce
H C
C E
AS
T
G
AR
AG
E
EX
PA
N
SI
O N
C O
LU
M
BI
A, 30-26107.01-2
MO MO SB
1 90% SUBMISSION 9/18/2026
PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND, LICENSE NO. 21576, EXPIRATION DATE:
04/29/27.
2 100% SUBMISSION 10/9/2026
AutoCAD SHX Text D.D.
AutoCAD SHX Text + 466.17
AutoCAD SHX Text + 465.65
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
SLOPE UP
AutoCAD SHX Text
SLOPE UP
AutoCAD SHX Text
SLOPE DN
AutoCAD SHX Text
SLOPE DN
AutoCAD SHX Text
FSP
AutoCAD SHX Text D.D.
AutoCAD SHX Text D.D.
AutoCAD SHX Text
FSP
AutoCAD SHX Text
FOR REF. ONLY
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text 182'-8"
AutoCAD SHX Text 14'-7"
AutoCAD SHX Text
AutoCAD SHX Text 48'-0"
AutoCAD SHX Text
AutoCAD SHX Text 36'-0"
AutoCAD SHX Text
AutoCAD SHX Text 36'-0"
AutoCAD SHX Text
AutoCAD SHX Text 48'-0"
AutoCAD SHX Text
AutoCAD SHX Text 48'-0"
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text 59'-10"
AutoCAD SHX Text 60'-6"
AutoCAD SHX Text 25'-4"
AutoCAD SHX Text 22'-8"
AutoCAD SHX Text 25'-4"
AutoCAD SHX Text 6.7
AutoCAD SHX Text 13'-0"
AutoCAD SHX Text
AutoCAD SHX Text 1.6
AutoCAD SHX Text C.7
AutoCAD SHX Text 1.3
AutoCAD SHX Text 33'-5"
AutoCAD SHX Text 17'-5"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 36'-6"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 8'-10"
AutoCAD SHX Text 39'-0"
AutoCAD SHX Text 22'-0"
AutoCAD SHX Text 26'-4"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 36'-6"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 12'-0"
AutoCAD SHX Text 44'-10"
AutoCAD SHX Text REMOVE AND REPLACE DETERIORATED CONCRETE TOPPING FULL DEPTH PER DETAIL 2/R-2 (TYP.)
AutoCAD SHX Text
ROUT AND SEAL ALL FLOOR CRACKS PER DETAIL 1/R-3 (TYP.)
AutoCAD SHX Text
ROUT AND SEAL ALL FLOOR CONSTRUCTION JOINTS PER DETAIL 1/R-3 (TYP.)
AutoCAD SHX Text REMOVE AND REPLACE COVE JOINTS PER DETAIL 1/R-3 ALONG THE BASE OF ALL WALLS, CURBS, AND COLUMNS (TYP.).
AutoCAD SHX Text FULLY REMOVE AND REPLACE DOUBLE TEE JOINT SEALANT BETWEEN ADJACENT DOUBLE TEE FLANGES PER DETAIL 1/R-3(TYP.)
AutoCAD SHX Text REMOVE AND REPLACE DETERIORATED CONCRETE FLANGE FULL DEPTH PER DETAIL 1/R-2 (TYP.)
AutoCAD SHX Text GENERAL NOTES 1. LOCATION, EXTENT, AND SIZE OF DELAMINATIONS, SPALLS AND PATCH AREAS SHOWN ON PLANS ARE APPROXIMATE. ALL AREAS SHALL BE LOCATION, EXTENT, AND SIZE OF DELAMINATIONS, SPALLS AND PATCH AREAS SHOWN ON PLANS ARE APPROXIMATE. ALL AREAS SHALL BE EXACTLY LOCATED BY THE CONTRACTOR IN THE FIELD IN ACCORDANCE WITH NOTE #2 BELOW. ADDITIONALLY, AREAS OF CONCRETE REMOVAL/REPLACEMENT MAY BE INCREASED/DECREASED AS DIRECTED BY THE ENGINEER. 2. PRIOR TO THE START OF CONSTRUCTION, THE ENTIRE FLOOR SLAB AREA DESIGNATED FOR REPAIR SHALL BE SOUNDED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION, THE ENTIRE FLOOR SLAB AREA DESIGNATED FOR REPAIR SHALL BE SOUNDED BY THE CONTRACTOR FOR ENGINEER REVIEW. ALL DELAMINATED/SPALLED AREAS SHALL BE PAINT MARKED BY THE CONTRACTOR AS DIRECTED BY THE ENGINEER IN THE FIELD. 3. CRACKS ARE PARTIALLY SHOWN ONLY. CONTRACT QUANTITY ACCOUNTS FOR ALL ANTICIPATED CRACK REPAIRS. CRACKS ARE PARTIALLY SHOWN ONLY. CONTRACT QUANTITY ACCOUNTS FOR ALL ANTICIPATED CRACK REPAIRS. 4. ALL EXISTING FLOOR DRAINS THROUGHOUT THE ROOF LEVEL ARE TO BE CLEANED AND CLEARED. ALL EXISTING FLOOR DRAINS THROUGHOUT THE ROOF LEVEL ARE TO BE CLEANED AND CLEARED. 5. SUBSEQUENT TO THE REPLACEMENT OF SEALANT MATERIAL FROM JOINTS, ALL EXPOSED CONNECTORS SHALL BE CLEANED AND INSPECTED SUBSEQUENT TO THE REPLACEMENT OF SEALANT MATERIAL FROM JOINTS, ALL EXPOSED CONNECTORS SHALL BE CLEANED AND INSPECTED BY THE ENGINEER. FAILED CONNECTORS SHALL BE REPAIRED AS DIRECTED. 6. ANY SOFFIT REPAIRS SHALL BE REPAIRED FULL DEPTH PER DETAIL 1/R-2 AND ARE SHOWN REPRESENTATIVE ON THE FLOOR PLAN AND ANY SOFFIT REPAIRS SHALL BE REPAIRED FULL DEPTH PER DETAIL 1/R-2 AND ARE SHOWN REPRESENTATIVE ON THE FLOOR PLAN AND ARE NOT SHOWN ON THE SOFFIT. ANY FULL DEPTH REPAIRS SHALL BE TRANSFERRED TO THE FLOOR PLAN.
AutoCAD SHX Text
LEGEND:
AutoCAD SHX Text : FULL DEPTH CONCRETE TOPPING REPAIR (DETAIL 2/R-2) : FULL DEPTH DOUBLE TEE FLANGE REPAIR (DETAIL 1/R-2) : ROUT AND SEAL CRACKS (DETAIL 1/R-3) : ROUT AND SEAL CONSTRUCTION JOINTS (DETAIL 1/R-3)
AutoCAD SHX Text
AutoCAD SHX Text R-1
AutoCAD SHX Text
ROOF LEVEL FLOOR PLAN
SCALE: 1/16"=1'-0"
REPAIR
DETAILS
R-2
DATEDESCRIPTIONNO.
DRAWING TITLE:
DRAWING NO.
SCALE:
DATE:
PROJECT NO :
DES. DRWN. CK'D.
I S S U E
Copyright © 2026 DESMAN, Inc. All rights reserved. No part of these documents may be reproduced in any form or by any means without permission from DESMAN.
of th e
R ep ai rs a nd
P re ve nt at iv e M ai nt en an ce
H C
C E
AS
T
G
AR
AG
E
EX
PA
N
SI
O N
C O
LU
M
BI
A, 30-26107.01-2
MO MO SB
1 90% SUBMISSION 9/18/2026
PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND, LICENSE NO. 21576, EXPIRATION DATE:
04/29/27.
2 100% SUBMISSION 10/9/2026
AutoCAD SHX Text REPAIR PROCEDURE: 1. CLEAN THE REPAIR AREA OF ALL DUST AND DIRT USING COMPRESSED AIR CLEAN THE REPAIR AREA OF ALL DUST AND DIRT USING COMPRESSED AIR OR BY OTHER APPROVED MEANS. 2. SAND BLAST CLEAN EXISTING EXPOSED REINFORCEMENT AND PROVIDE NEW SAND BLAST CLEAN EXISTING EXPOSED REINFORCEMENT AND PROVIDE NEW WWF (TO MATCH EXISTING). LAP NEW REINFORCING STEEL AS PER A.C.I. REQUIREMENTS. 3. PROVIDE NEW #4 DOWELS EMBEDDED 4" MIN IN EPOXY ALONG PATCH PROVIDE NEW #4 DOWELS EMBEDDED 4" MIN IN EPOXY ALONG PATCH PERIMETER AND AT EACH STEM AS SHOWN. 4. ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER. CLEAN ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER. CLEAN AND EPOXY PAINT ANY EXPOSED STEEL PRECAST CONNECTIONS LOCATED WITHIN REPAIR AREA. 5. PREWET SURFACE 2 HOURS PRIOR TO PLACEMENT OF CONCRETE. SURFACE PREWET SURFACE 2 HOURS PRIOR TO PLACEMENT OF CONCRETE. SURFACE MUST BE WET TO SATURATED SURFACE DRY (SSD) WITH NO FREE STANDING WATER. 6. PLACE HIGH STRENGTH CONCRETE. FINISH TO MATCH THE EXISTING SLAB PLACE HIGH STRENGTH CONCRETE. FINISH TO MATCH THE EXISTING SLAB SURFACE. CURE AND PROTECT FINISHED REPAIR. 7. PROVIDE A TOOLED JOINT AROUND PERIMETER OF REPAIR, SEAL WITH TWO PROVIDE A TOOLED JOINT AROUND PERIMETER OF REPAIR, SEAL WITH TWO PART POLYURETHANE SEALANT AS PER DETAIL 1/R-3. NOTES: 1. AT FULL DEPTH PRECAST REPAIR, ANY CONCRETE TOPPING SHALL BE AT FULL DEPTH PRECAST REPAIR, ANY CONCRETE TOPPING SHALL BE REMOVED AND REPLACED MONOLITHICALLY.
AutoCAD SHX Text
EXISTING PRECAST DT
AutoCAD SHX Text EXISTING CORRODED WWF TO BE REMOVED. CONTRACTOR TO LEAVE MIN. OF 2 GRIDS WWF AROUND PERIMETER OF REPAIR (TYP.)
AutoCAD SHX Text
DETERIORATED/UNSOUND FLOOR AND/OR SOFFIT CONCRETE TO BE REMOVED (TYP.)
AutoCAD SHX Text SAWCUT 1/2" DEEP ALONG PERIMETER OF REMOVAL AREA PRIOR TO DEMOLITION OF CONCRETE (TYP.)
AutoCAD SHX Text
SOUND CONCRETE
AutoCAD SHX Text EXISTING EMBEDDED SHEAR CONNECTOR ASSEMBLY TO BE REVIEWED BY THE ENGINEER IN THE FIELD AND REPAIRED (WHERE APPLICABLE)
AutoCAD SHX Text
%%UREPAIRED CONDITION
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
#4 DOWELS @12" O.C. EMBED 4" MIN. AT EACH STEM AND ALONG REPAIR PERIMETER
AutoCAD SHX Text
PROVIDE TOOLED JOINT (TYP.)
AutoCAD SHX Text
NEW HIGH STRENGTH CONCRETE
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text 4"
AutoCAD SHX Text 9"
AutoCAD SHX Text 9"
AutoCAD SHX Text
SEAL DOUBLE TEE JOINT
AutoCAD SHX Text %%uEXISTING CONDITION - DEMOLITION
AutoCAD SHX Text
AutoCAD SHX Text R-2
AutoCAD SHX Text
FULL DEPTH PRECAST CONCRETE FLANGE REPAIR
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text CLEAN EXPOSED REINFORCEMENT FREE FROM ALL RUST AND PROVIDE NEW WWF TO MATCH EXISTING
AutoCAD SHX Text
REPAIRED SHEAR CONNECTOR ASSEMBLY (WHERE APPLICABLE)
AutoCAD SHX Text REPAIR PROCEDURE: 1. ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER. ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER. 2. CLEAN THE REPAIR AREA FREE OF ALL DUST AND DIRT USING COMPRESSED AIR OR OTHER APPROVED MEANS. CLEAN THE REPAIR AREA FREE OF ALL DUST AND DIRT USING COMPRESSED AIR OR OTHER APPROVED MEANS. 3. SAND BLAST CLEAN EXISTING EXPOSED REINFORCING AND SUPPLEMENT THE WWF THAT HAVE LOST 20% OR MORE OF SAND BLAST CLEAN EXISTING EXPOSED REINFORCING AND SUPPLEMENT THE WWF THAT HAVE LOST 20% OR MORE OF ITS CROSS-SECTION AS DIRECTED BY THE ENGINEER. LAP NEW WWF PER A.C.I LAPPING REQUIREMENTS. 4. ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER AND REPAIRED IF REQUIRED. CLEAN AND EPOXY ANY EXPOSED CONNECTORS SHALL BE INSPECTED BY THE ENGINEER AND REPAIRED IF REQUIRED. CLEAN AND EPOXY PAINT ANY EXPOSED STEEL PRECAST CONNECTIONS LOCATED WITHIN REPAIR AREA. 5. PREWET EXISTING CONCRETE SURFACE 2 HOURS PRIOR TO PLACEMENT OF NEW CONCRETE. SURFACE MUST BE WET PREWET EXISTING CONCRETE SURFACE 2 HOURS PRIOR TO PLACEMENT OF NEW CONCRETE. SURFACE MUST BE WET TO SATURATED SURFACE DRY (SSD) WITH NO FREE STANDING WATER. 6. PLACE HIGH STRENGTH FAST SETTING CONCRETE, FINISH TO MATCH THE EXISTING SURFACE AND CURE. PLACE HIGH STRENGTH FAST SETTING CONCRETE, FINISH TO MATCH THE EXISTING SURFACE AND CURE. 7. PROVIDE A TOOLED JOINT AROUND PERIMETER OF REPAIR; AFTER 7 DAYS OF CURING ROUT AND SEAL AS IN DETAIL PROVIDE A TOOLED JOINT AROUND PERIMETER OF REPAIR; AFTER 7 DAYS OF CURING ROUT AND SEAL AS IN DETAIL 1/R-3. NOTES: 1. AT FULL DEPTH PRECAST REPAIR, ANY CONCRETE TOPPING SHALL BE REMOVED AND REPLACED MONOLITHICALLY. AT FULL DEPTH PRECAST REPAIR, ANY CONCRETE TOPPING SHALL BE REMOVED AND REPLACED MONOLITHICALLY. 2. TOPPING THICKNESS VARIES. MAXIMUM THICKNESS IS APPROXIMATELY 3".TOPPING THICKNESS VARIES. MAXIMUM THICKNESS IS APPROXIMATELY 3".
AutoCAD SHX Text
AutoCAD SHX Text R-2
AutoCAD SHX Text
CAST IN PLACE TOPPING REPAIR
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text DETERIORATED/UNSOUND TOPPING CONCRETE TO BE REMOVED FULL DEPTH. EXISTING CORRODED REINFORCEMENT TO BE CLEANED AND EPOXY COATED.
AutoCAD SHX Text SAWCUT 1/2" DEEP ALONG PERIMETER OF REMOVAL AREA PRIOR TO DEMOLITION OF CONCRETE (TYP.)
AutoCAD SHX Text EXISTING EMBEDDED CLIP CONNECTION TO BE REVIEWED BY THE ENGINEER IN THE FIELD IF EXPOSED
AutoCAD SHX Text
PRECAST DOUBLE TEE
AutoCAD SHX Text
PRECAST IT GIRDER
AutoCAD SHX Text
NEW HIGH STRENGTH CONCRETE TOPPING
AutoCAD SHX Text
PROVIDE TOOLED CONSTRUCTION JOINT AND SEAL (TYP.)
AutoCAD SHX Text
CONTROL JOINT OVER GAP BETWEEN DOUBLE TEE AND INVERTED TEE GIRDER (TYP.)
AutoCAD SHX Text
PRECAST DOUBLE TEE
AutoCAD SHX Text
PRECAST WALL/SPANDREL
AutoCAD SHX Text
NEW COVE JOINT
AutoCAD SHX Text DEMOLITION PROCEDURE: 1. CONTRACTOR TO VERIFY THE DELAMINATED AREA BY SOUNDING AND MARK THE AREA FOR REPAIR. CONTRACTOR TO VERIFY THE DELAMINATED AREA BY SOUNDING AND MARK THE AREA FOR REPAIR. 2. ERECT NECESSARY SHORING AT THE UNDERSIDE OF DEMOLITION AREA. ERECT NECESSARY SHORING AT THE UNDERSIDE OF DEMOLITION AREA. 3. SAW CUT PERIMETER OF AREA TO BE REPAIRED TO A MINIMUM OF 1/2" DEEP SAW CUT PERIMETER OF AREA TO BE REPAIRED TO A MINIMUM OF 1/2" DEEP 4. REMOVE DELAMINATED/SPALLED CONCRETE FULL DEPTH USING SAWS AND CHIPPING HAMMERS. REMOVE DELAMINATED/SPALLED CONCRETE FULL DEPTH USING SAWS AND CHIPPING HAMMERS. . NOTE: 1. ALL GARAGE FLOOR AREAS WITH TOPPING DESIGNATED FOR REPAIR MUST BE SOUNDED BY THE CONTRACTOR IN THE ALL GARAGE FLOOR AREAS WITH TOPPING DESIGNATED FOR REPAIR MUST BE SOUNDED BY THE CONTRACTOR IN THE PRESENCE OF THE ENGINEER USING A CHAIN AND ALL DELAMINATIONS MARKED BY THE CONTRACTOR AS DIRECTED PRIOR TO START OF DEMOLITION.
AutoCAD SHX Text
%%UREPAIRED CONDITION
%%UEXISTING CONDITION
REPAIR
DETAILS
R-3
DATEDESCRIPTIONNO.
DRAWING TITLE:
DRAWING NO.
SCALE:
DATE:
PROJECT NO :
DES. DRWN. CK'D.
I S S U E
Copyright © 2026 DESMAN, Inc. All rights reserved. No part of these documents may be reproduced in any form or by any means without permission from DESMAN.
of th e
R ep ai rs a nd
P re ve nt at iv e M ai nt en an ce
H C
C E
AS
T
G
AR
AG
E
EX
PA
N
SI
O N
C O
LU
M
BI
A, 30-26107.01-2
MO MO SB
1 90% SUBMISSION 9/18/2026
PROFESSIONAL CERTIFICATION. I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND THAT I AM
A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND, LICENSE NO. 21576, EXPIRATION DATE:
04/29/27.
2 100% SUBMISSION 10/9/2026
AutoCAD SHX Text
FINISHED FLOOR SURFACE
AutoCAD SHX Text
SEALANT MATERIAL 1/4" MIN. THROAT
AutoCAD SHX Text
BUILDING WALL, CURB, SIDEWALK
AutoCAD SHX Text
EXISTING WALL, CURB, SIDEWALK
AutoCAD SHX Text
COVE JOINT SEALANT
AutoCAD SHX Text
CONCRETE SLAB
AutoCAD SHX Text
INSTALL BACKER ROD AS REQUIRED (25% LARGER THAN JOINT WIDTH)
AutoCAD SHX Text
E- PERIMETER COVE JOINT
AutoCAD SHX Text
WITH BACKER ROD
AutoCAD SHX Text
E- PERIMETER COVE JOINT
AutoCAD SHX Text
NO BACKER ROD
AutoCAD SHX Text
BOND BREAKER
AutoCAD SHX Text
NEW CONCRETE
AutoCAD SHX Text
TOOLED EDGE
AutoCAD SHX Text 3/4"
AutoCAD SHX Text NOTES: 1. DO NOT OVERFILL JOINTS WITH SEALANT. 2. DOUBLE TEE JOINT REPLACEMENT INCLUDES POCKET SEALANT FOR SHEAR CONNECTORS.
AutoCAD SHX Text ROUT CONTROL JOINTS AND FILL W/ FLEXIBLE SEALANT. INSTALL SEALANT EVENLY WITH SURFACE
AutoCAD SHX Text
EXISTING FLOOR SLAB
AutoCAD SHX Text
EXISTING JOINT. CENTER ROUTED GROOVE ON JOINT
AutoCAD SHX Text
AutoCAD SHX Text R-3
AutoCAD SHX Text
CRACK AND JOINT SEALANT DETAILS
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
A - CONTROL/TOOLED JOINT SEAL DETAIL
AutoCAD SHX Text
D - TOOLED EDGE DETAIL
AutoCAD SHX Text
EXISTING JOINT. CENTER ROUTED GROOVE ON JOINT
AutoCAD SHX Text
EXISTING FLOOR SLAB
AutoCAD SHX Text
ROUT CRACK & FILL W/ FLEXIBLE SEALANT. INSTALL SEALANT EVENLY WITH SURFACE
AutoCAD SHX Text
C - CRACK SEAL DETAIL
AutoCAD SHX Text
EXISTING CONCRETE
AutoCAD SHX Text
BACKER ROD (25% LARGER THAN JOINT WIDTH)
AutoCAD SHX Text
SEALANT
AutoCAD SHX Text W
AutoCAD SHX Text D
AutoCAD SHX Text
NOTES: W = 3/8" MIN. D = W/2 (1/4" MIN./ 1/2" MAX.)
AutoCAD SHX Text
B- TYPICAL SEALANT JOINT DETAIL
AutoCAD SHX Text NOTES: 1. APPLICATION IS FOR UP TO 2 1/2" WIDTH IF LARGER NOTIFY ENGINEER FOR FURTHER ACTION. 2. ALL EXPOSED CONNECTIONS SHALL BE REVIEWED BY THE ENGINEER AND CLEANED AND PAINTED.
AutoCAD SHX Text REPAIR PROCEDURE: 1. REMOVE EXISTING JOINT MATERIAL. ROUT AND CLEAN CRACKS/JOINTS USING COMPRESSED AIR OR REMOVE EXISTING JOINT MATERIAL. ROUT AND CLEAN CRACKS/JOINTS USING COMPRESSED AIR OR OTHER APPROVED MEANS TO REMOVE DUST OR OTHER FOREIGN MATERIALS. 2. CLEAN ALL EXPOSED CONNECTORS. ENGINEER SHALL INSPECT ALL CONNECTORS. CONTRACTOR SHALL REPAIR ANY FAILED CONNECTORS AS DIRECTED. 4. INSTALL BACKER ROD/BOND BREAKER, PRIME ENTIRE SURFACE OF JOINT AND GROOVE, ALLOW FOR PRIMER TO CURE PROPERLY PRIOR TO INSTALLING SEALANT, IF SEALING CONTROL/CONSTRUCTION JOINTS, APPLY A BOND BREAKER TO BOTTOM OF JOINT BEFORE PRIMING. 5. AFTER PRIMER HAS CURED INSTALL TWO PART POLYURETHANE JOINT SEALANT. DO NOT OVERFILL JOINT. 6. PROHIBIT VEHICULAR/PEDESTRIAN TRAFFIC ON SEALED JOINTS UNTIL SEALANT MATERIAL HAS CURED ACCORDING TO MFR'S RECOMMENDATIONS.
AutoCAD SHX Text
SLUG (STAINLESS STEEL)
AutoCAD SHX Text REPAIR PROCEDURE: 1. EXPOSE SHEAR CONNECTOR AND REMOVE EXISTING STEEL BAR (SLUG). EXPOSE SHEAR CONNECTOR AND REMOVE EXISTING STEEL BAR (SLUG). 2. SANDBLAST CLEAN EXISTING EXPOSED CONNECTOR BARS, PLATES, AND WELDMENTS AS REQUIRED. SANDBLAST CLEAN EXISTING EXPOSED CONNECTOR BARS, PLATES, AND WELDMENTS AS REQUIRED. 3. PROVIDE NEW SLUG AND WELDED CONNECTION AS SHOWN. NEW SLUG MATERIAL SHALL MATCH EXISTING PROVIDE NEW SLUG AND WELDED CONNECTION AS SHOWN. NEW SLUG MATERIAL SHALL MATCH EXISTING EMBEDDED PLATES. WELDING SIZE/LENGTH TO MATCH EXISTING OR MINIMUM AS SHOWN
AutoCAD SHX Text
AutoCAD SHX Text R-3
AutoCAD SHX Text
SHEAR CONNECTOR REPAIR
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text 2 12
AutoCAD SHX Text
PLATE (STAINLESS STEEL)
AutoCAD SHX Text 1/4
AutoCAD SHX Text 2 12
AutoCAD SHX Text
AutoCAD SHX Text R-3
AutoCAD SHX Text
SHEAR CONNECTOR REPLACEMENT
AutoCAD SHX Text
CARBON FIBER BISCUIT
AutoCAD SHX Text
SCALE: N.T.S.
AutoCAD SHX Text
%%USECTION VIEW
AutoCAD SHX Text L
AutoCAD SHX Text
C STEM
AutoCAD SHX Text
C STEM
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text
C TEE-TO-TEE JOINT
AutoCAD SHX Text REPAIR PROCEDURE 1. PROVIDE SHORING AS REQUIRED TO ALLOW VEHICLE TRAFFIC DURING CURING. PROVIDE SHORING AS REQUIRED TO ALLOW VEHICLE TRAFFIC DURING CURING. 2. CARBON FIBER BISCUIT TO BE INSTALLED BETWEEN EXISTING SHEAR CONNECTORS. EXISTING CONNECTORS TO CARBON FIBER BISCUIT TO BE INSTALLED BETWEEN EXISTING SHEAR CONNECTORS. EXISTING CONNECTORS TO REMAIN. 3. MAKE A 19" LONG X 3 " DEEP SAW CUT MAXIMUM " FROM BOTTOM OF FLANGE. MAKE A 19" LONG X 3 " DEEP SAW CUT MAXIMUM " FROM BOTTOM OF FLANGE. 12" DEEP SAW CUT MAXIMUM " FROM BOTTOM OF FLANGE. 12" FROM BOTTOM OF FLANGE. 4. PLACE A DUCT TAPE AROUND SLOT, LEAVING ABOUT " SURFACE EXPOSED. PLACE A DUCT TAPE AROUND SLOT, LEAVING ABOUT " SURFACE EXPOSED. 14" SURFACE EXPOSED. 5. WIPE BISCUITS WITH METHYL ETHYL KETONE TO REMOVE DIRT AND OILS. SET ASIDE IN CLEAN, DRY LOCATION. WIPE BISCUITS WITH METHYL ETHYL KETONE TO REMOVE DIRT AND OILS. SET ASIDE IN CLEAN, DRY LOCATION. 6. BLOW OUT CUT SLOT WITH CLEAN COMPRESSED AIR. BLOW OUT CUT SLOT WITH CLEAN COMPRESSED AIR. 7. COMPLETELY FILL CUT SLOT WITH BISCUIT BOND EPOXY PASTE. COMPLETELY FILL CUT SLOT WITH BISCUIT BOND EPOXY PASTE. 8. APPLY BISCUIT BOND EPOXY PASTE TO BOTH SIDE OF BISCUIT. APPLY BISCUIT BOND EPOXY PASTE TO BOTH SIDE OF BISCUIT. 9. PLACE BISCUIT INTO EPOXY FILLED SLOT ASSURING THE ENTIRE BISCUIT IS BELOW THE CONCRETE DECK PLACE BISCUIT INTO EPOXY FILLED SLOT ASSURING THE ENTIRE BISCUIT IS BELOW THE CONCRETE DECK SURFACE. USING A PUTTY KNIFE, WORK THE BISCUIT SIDE TO SIDE IN THE SLOT TO SEAT IT AND REMOVE ANY TRAPPED AIR. 10. REMOVE ANY EXCESS EPOXY USING ACETONE OR EPOXY THINNER (CURED CAN ONLY BE REMOVED BY REMOVE ANY EXCESS EPOXY USING ACETONE OR EPOXY THINNER (CURED CAN ONLY BE REMOVED BY MECHANICAL MEANS). 11. THE REPAIR NEEDS EIGHT (8) HOURS TO REACH FULL CURE. THE REPAIR NEEDS EIGHT (8) HOURS TO REACH FULL CURE.
AutoCAD SHX Text CFRP TEE JOINT BISCUIT BY V2 COMPOSITE OR APPROVED EQUAL. INSTALL PER MFR RECOMMENDATIONS
AutoCAD SHX Text
PRE-CAST DOUBLE TEE
AutoCAD SHX Text CFRP TEE JOINT BISCUIT BY V2 COMPOSITE OR APPROVED EQUAL. INSTALL PER MFR RECOMMENDATIONS
AutoCAD SHX Text
TOP VIEW
AutoCAD SHX Text
BISCUIT LOCATION
CONCRETE TEE FLANGE
| Sheets and Views |
| Layout1 |
| R-1 |
| R-2 |
| R-3 |
File details come from the government source that posted it. Updated .