Attachment B - Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- 36C77626B0020
About this file
Summary: Construction Design Documents for Life Safety/Critical Branch Electrical Distribution Upgrade
This document set comprises comprehensive construction design plans and specifications for an upgrade to the life safety and critical branch electrical distribution system at the VA New York Harbor Healthcare System's Brooklyn Campus (Project 630A4-16-430). The project involves 91 drawing sheets covering architectural, mechanical, fire protection, and electrical work across Building 1 and attached buildings at 800 Poly Place, Brooklyn, NY 11209. The design team includes D2X Associates (Service Disabled Veteran Owned Small Business) as project manager, Patriot Design & Consulting for architecture/structural/mechanical/fire protection, Ramboll Americas Engineering Solutions, Inc. for electrical systems, and Environmental Monitoring & Consulting Associates for asbestos abatement.
The work encompasses multiple task orders organized by floor level (basement through sixteenth floor) and includes detailed floor plans showing existing conditions and proposed installations, demolition plans identifying items for removal, life safety and infection control risk assessment (ICRA) requirements with dust control barriers and protection measures, and comprehensive mechanical systems including HVAC equipment schedules, exhaust fan installations, sprinkler system modifications, and pipe support details. Electrical work involves installation of new panels, circuits, transformers, and disconnects with extensive coordination requirements between trades. General contract requirements mandate contractor responsibility for site safety, OSHA compliance, utility coordination (requiring four weeks advance notice for shutdowns), minimal facility disruption, material disposal per VA/state/local regulations, and completion with one-year warranty on all work and equipment. All work must comply with NYC Building Code, NEC, ASHRAE, NFPA, ASTM, and UL standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment C - Drawings.pdf | ||
| Attachment F - Site Visit Instructions.pdf | ||
| Attachment E - Wages Rates - King County 5-26-26.pdf | ||
| 36C77626B0020 - 9-30-26.pdf | ||
| Attachment G - RFI TRACKING SHEET.xlsx | XLSX spreadsheet | |
| Attachment A - Specifications - 3-11-26.pdf | ||
| Attachment D - Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
,E •
.23 as • i O a:::"' I � ll.
'---'--r-, �
.-----'---' j 0 v rr-'-' 1-UJOO
".......,,!j!
i I f o�i
1 2 3 4 5
Project: 630A4-1 6-430
UPGRADE LIFE SAFETY/CRITICAL
BRANCH ELECTRICAL DISTRIBUTION,
NY HARBOR HEALTHCARE CENTER,
BROOKLYN VA
VA NEW YORK HARBOR HEALTHCARE SYSTEM
Brooklyn Campus, 800 Poly Place, Brooklyn, NY 11209
Project Directory
D2X Associates
Service Disabled Veteran Owned Small Business 259 St. Ives Dr., Talent, Oregon 97540
442 Chelsea Ave, W. Babylon, NY 11704 541-944-8768 email: bdxinfo@gmail.com
Architecture/Structural /Mechanical /Fire Protection .- .- .
Patriot Design & Consulting
3610 Lawson Road Jamestown, New York 14701 phone: (716) 484-1366 email: rtolman@tpatriot-dc.com
Electrical
Ramboll Americas Engineering Solutions, Inc.(OBG)
18 Link Drive, Binghamton, NY 13904 333 West Washington St., Syracuse, NY 13221
163 North Wellwood Ave phone:607-232-5316 email: Todd.Farr@ramboll.com
Asbestos Abatement
Environmental Monitoring & Consulting Assoc .
P.O. Box 872 Summerville, NJ 08876 Lindenhurst, New York 11757 email: emcaeng@aol.com
6 7 8
:>-T() ........._._ ""::::.,-,. -.J,�alveme Roc��I�
LOCATION
Valley stream Lynb
East Rockaway
MAP
er Bay
Syos:
Levitt<
'---'--r-,� �---------�-��----------------------��----��----------�---------����----------����-------����--��-----�
� CONSULTANTS: ARCHITECT/ENGINEERS: APPROVE
VJ
D
C
BY: DATE: DrawingTitle ProjectTitle ProjectNumber
�:::::::� - 1------------+---------<1-------------------------------<f-sT_AM_,,y;.
P ",.,,,_1;,o f N
E
""" 08/24122 UPGRADE LIFE SAFETY/CRITICAL BRANCH 630A4-16-430
.-----'---' re ,__,,. ,c , TITLE SHEET
ELECTRICAL DISTRIBUTION
" vS' NY HARBOR HEALTHCARE CENTER
Building Number
Office of Construction and Facilities 15 "
D X
VA BROOKLYN CAMPUS
l :rr-'-' i_·_ 1------------+---------i
RAMBOLLAMERICAS �
2 Associates Approved: Project Director Location 800 POL Y PLACE, BROOKLYNNY11209 Drawing Number Management
18-01-BK
~ • ENGINEERING SOLUTIONS, INC. "-.V/ 259 St. Ives Dr. Issue Date Checked
� } � REV.0ISSU EDFORCONSTRUCTION 08/24/22 18 LINK DRIVE T.lent, OR 97540 08/24122 TMF B
� il!
Revisions: Date BINGHAMTON, NY 13902 2022-08-17
VA FORM 08 - 6231
1 2 3 4 5 6 7 8
Gl-001 Dwg. 1 of 91
� □ r,p,11t111c 11t ot
� VctClclllS Aff.:ms ro
.5
0 ,2
II :
. 5
"IL
'i w
-� IL
��i~�8 r.--'�j � f6 m v �� 1-UJOO i I fo �
�� :i:
LL,� �
"' <ri
-��1il
GENERAL
Gl-001 Gl-002
Drawing
TITLE SHEET
DRAWING LIST, GENERAL NOTES, AND SYMBOLS
Index
TASK ORDER 1, 2, & 3 - BUILDING 1 AND ATTACHED BUILDINGS LIFE SAFETY BRANCH
ARCHITECTURAL
Gl-003 LIFE SAFETY AND ICRA PLANS - BASEMENT Gl-004 LIFE SAFETY AND ICRA PLANS - GROUND FLOOR Gl-005 LIFE SAFETY AND ICRA PLANS - FIRST FLOOR Gl-006 LIFE SAFETY AND ICRA PLANS - SECOND - SIXTEENTH FLOORS
AD-101 ARCHITECTURAL DEMOLITION FLOOR PLANS - BASEMENT
AD-102 ARCHITECTURAL DEMOLITION FLOOR PLANS - GROUND FLOOR
AD-103 ARCHITECTURAL DEMOLITION FLOOR PLANS - FIRST FLOOR
AD-104 ARCHITECTURAL DEMOLITION FLOOR PLANS - SECOND - SIXTEENTH FLOORS
AE-100 ARCHITECTURAL GENERAL NOTES, SOMBOLS & SCHEDULES
AE-101 ARCHITECTURAL FLOOR PLANS - BASEMENT
AE-102 ARCHITECTURAL FLOOR PLANS - GROUND FLOOR
AE-103 ARCHITECTURAL FLOOR PLANS - FIRST FLOOR
AE-104 ARCHITECTURAL FLOOR PLANS - SECOND - SIXTEENTH FLOORS
AE-501 CONSTRUCTION DETAILS
MECHANICAL & FIRE PROTECTION
M-001 MECHANICAL AND FIRE PROTECTION SCHEDULES, NOTES, AND LEGENDS
MD-101 BASEMENT HVAC DEMOLITION FLOOR PLANS
MD-102 FIRST TO FOURTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS
MD-103
MD-104
MD-105
M-101 M-102 M-103 M-104 M-105
FX-201
M-201
ELECTRICAL
EG-001
EP-101
EP-102
EP-103
EP-104
EP-105
EP-106
EP-107
EP-108
EP-109
EP-110
EP-111
EP-112
EP-113
EP-114
EP-115
EP-116
EP-117
EP-118
EP-119
EP-120
EP-121
EP-301
EP-601
EP-602
EP-603
EP-604
EP-605
EP-606
EP-607
FIFTH TO EIGHTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS
NINTH TO TWELFTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS
THIRTEENTH TO SIXTEENTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS
BASEMENT HVAC FLOOR PLANS
FIRST TO FOURTH FLOOR HVAC AND FIRE PROTECTION PLANS
FIFTH TO EIGHTH FLOOR HVAC AND FIRE PROTECTION PLANS
NINTH TO TWELFTH FLOOR HVAC AND FIRE PROTECTION PLANS
THIRTEENTH TO SIXTEENTH FLOOR HVAC AND FIRE PROTECTION PLANS
FIRE PROTECTION DETAILS
MECHANICAL DETAILS
ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
PARTIAL BASEMENT FLOOR PLAN - INSTALLATION
PARTIAL GROUND FLOOR PLAN - INSTALLATION
PARTIAL FIRST FLOOR PLAN - INSTALLATION
PARTIAL SECOND FLOOR PLAN - INSTALLATION
PARTIAL THIRD FLOOR PLAN - INSTALLATION
PARTIAL FOURTH FLOOR PLAN - INSTALLATION
PARTIAL FIFTH FLOOR PLAN - INSTALLATION
PARTIAL SIXTH FLOOR PLAN - INSTALLATION
PARTIAL SEVENTH FLOOR PLAN - INSTALLATION
PARTIAL EIGHTH FLOOR PLAN - INSTALLATION
PARTIAL NINTH FLOOR PLAN - INSTALLATION
PARTIAL TENTH FLOOR PLAN - INSTALLATION
PARTIAL ELEVENTH FLOOR PLAN - INSTALLATION
PARTIAL TWELFTH FLOOR PLAN - INSTALLATION
PARTIAL THIRTEENTH FLOOR PLAN - INSTALLATION
PARTIAL FOURTEENTH FLOOR PLAN - INSTALLATION
PARTIAL FIFTEENTH FLOOR PLAN - INSTALLATION
PARTIAL SIXTEENTH FLOOR PLAN - INSTALLATION
PARTIAL SEVENTEENTH FLOOR PLAN - INSTALLATION
PARTIAL EIGHTEENTH FLOOR PLAN - INSTALLATION
PARTIAL NINETEENTH FLOOR PLAN - INSTALLATION
ENLARGED PLANS - ROOM G-148
PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION
PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION
PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION
PANEL SCHEDULES
PANEL SCHEDULES
PANEL SCHEDULES
PANEL SCHEDULES
TASK ORDER 5 - EQUIPMENT SHORT CIRCUIT CURRENT RATING
ELECTRICAL
EP-155
EP-156
EP-157
EP-158
EP-159
EP-160
EP-161
EP-162
EP-163
EP-164
EP-165
EP-166
EP-167
EP-168
PANEL SB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
A-BOARD AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
B-BOARD AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL PP-B AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL DP-B AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL PP3R AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL LP2FA AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
HDP-1CA & LPE-OB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL LPE-1C AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL EPP-EL AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL PPE-GB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL PPE-GC AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL HDP-18 AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
PANEL LS-GB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE
TASK ORDER 6 THROUGH 26 - EQUIPMENT CODE COMPLIANCE UPGRADES
ELECTRICAL
EP-169
EP-170
EP-171
EP-172
EP-173
EP-174
EP-175
EP-176
EP-177
EP-178
EP-179
EP-180
EP-181
EP-182
EP-183
EP-184
EP-185
EP-186
BUILDING 1 PARTIAL BASEMENT PLAN PANEL LPBH AREA
BUILDING 1 PARTIAL BASEMENT PLAN PANEL LPB-1 AREA
BUILDING 1 PARTIAL BASEMENT PLAN PANEL LP-BB AREA
BUILDING 1 PARTIAL 2ND FLOOR PLAN PANEL PP-2Q AREA
BUILDING 1 PARTIAL 2ND FLOOR PLAN PANEL PP-2P AREA
BUILDING 1 PARTIAL 3RD FLOOR PLAN
BUILDING 1 PARTIAL FLOOR PLANS PANEL X-RAY AND LP-15A AREAS
BUILDING 1 PARTIAL 7TH FLOOR PLAN PANEL LP-7B-1 AREA
BUILDING 1 PARTIAL 8TH FL PANEL LP-8KA AREA
BUILDING 1 PARTIAL 14TH FLOOR PLAN PANEL LP-14C AREA
BUILDING 1 PARTIAL FIFTEENTH FLOOR PLAN PANEL LP15A
BUILDING 2 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM
PARTIAL BUILDING 4 PLAN AND ONE-LINE DIAGRAM
BUILDING 15 PARTIAL BASEMENT PLAN PANEL LPE-BA
BUILDING 15 GROUND FLOOR AND ONE-LINE DIAGRAM
BUILDING 14 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM
BUILDING 2 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM
BUILDING 1 PARTIAL GROUND FLOOR PLAN AND ONE-LINE DIAGRAM
CONSULTANTS:
2 3 4
STAMP ARCHITECT /ENGINEERS:
5 6
G ENERAL NOTES:
1. FIELD-VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS
BEFORE STARTING WORK.
2. EQUIPMENT DIMENSIONAL INFORMATION IS PRESENTED FOR
3.
4.
5.
6.
REFERENCE ONLY. DIMENSIONS MAY VARY ACCORDING TO THE
EQUIPMENT MANUFACTURER SELECTED AND FIELD VARIATIONS.
COORDINATE ANY DIMENSIONAL VARIATIONS BETWEEN THESE
CONSTRUCTION DOCUMENTS AND THE AS-DELIVERED EQUIPMENT.
CONFIRM AND COORDINATE JOBSITE DIMENSIONS THAT AFFECT
THE ERECTION OR OPERATION OF SYSTEMS, AS INTENDED BY
THESE CONTRACT DOCUMENTS. MAINTAIN ADEQUATE
CLEARANCES FOR OPERATIONAL ACCESS AND SERVICE OF ALL
INSTALLED EQUIPMENT, AND SHALL MAINTAIN ANY CLEARANCES
REQUIRED BY ALL APPLICABLE CODES .
INFORM THE OWNER/ENGINEER OF ANY DISCREPANCIES
BETWEEN THE CONSTRUCTION DOCUMENTS AND FIELD
CONDITIONS THAT AFFECT THE WORK DESCRIBED HEREIN. PRIOR
TO INSTALLATION.
IF, DURING THE COURSE OF CONSTRUCTION, A CONDITION
EXISTS WHICH DISAGREES OR CONFLICTS WITH THE DRAWINGS
OR SPECIFICATIONS, STOP WORK AND NOTIFY THE ENGINEER. IF
THE CONTRACTOR FAILS TO FOLLOW THIS PROCEDURE AND
CONTINUES WITH THE WORK, THEY SHALL ASSUME ALL
RESPONSIBILITY AND LIABILITY ARISING THEREOF.
7. THESE CONTRACT DOCUMENTS ARE INTENDED TO INDICATE THE
WORK NEEDED TO PROVIDE A COMPLETE AND READY-FOR
OPERATION INSTALLATION. THESE DOCUMENTS ARE INTENDED
TO GUIDE THE CONTRACTOR. THESE DOCUMENTS ARE NOT
INTENDED TO SHOW EVERY DETAIL OF THE EXISTING
CONDITIONS OR NEW INSTALLATIONS, NOR DO THEY DESCRIBE
EVERY FITTING REQUIRED FOR THE INSTALLATION OF THE WORK.
8. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL
INCLUDE ALL EQUIPMENT, DEVICES, HARDWARE, MOUNTS,
LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A
COMPLETE AND FUNCTIONAL JOB.
9. FURNISH AND INSTALL ALL EQUIPMENT, ACCESSORIES,
SUPPORTS, FITTINGS, AND ALL OTHER INCIDENTAL MATERIAL
NEEDED FOR THE COMPLETE AND OPERATING INSTALLATION.
MINOR ITEMS TO FINISH THE WORK SUCH AS PATCHING,
BLOCKING, TRIM, TOUCH-UP PAINT, ETC., SHALL BE PROVIDED
WHETHER OR NOT INDICATED IN THE CONTRACT DOCUMENTS.
10. WITH THE SUBMISSION OF A PROPOSAUBID, THE CONTRACTOR
INDICATES THAT THEY ARE FULLY AWARE OF THE EXTENT,
CHARACTER AND INTENT OF THE WORK TO BE ACCOMPLISHED
BY THIS PROJECT. ALL CLARIFICATIONS SHALL BE RESOLVED
BEFORE SUBMITTING THE PROPOSAL. NO CONSIDERATION WILL
BE GRANTED FOR ANY MISUNDERSTANDING OF THE MATERIAL
OR EQUIPMENT TO BE FURNISHED OR WORK TO BE PERFORMED
AFTER THE CONTRACT IS EXECUTED.
11. INFORM THE OWNER/ENGINEER OF ANY DEVIATIONS OR
EXCEPTIONS THAT THEY INTEND TO TAKE TO THESE CONTRACT
DOCUMENTS PRIOR TO EXECUTING THE CONSTRUCTION
CONTRACT. NO VARIATIONS TO THESE DOCUMENTS AFTER
EXECUTION OF THE CONTRACT ARE PERMITTED.
APPROVED BY: DATE:
08124/22 Drawing Title
VJC
12. THE BID SHALL BE BASED ON THE EQUIPMENT LISTED IN THESE
CONTRACT DOCUMENTS. SHOULD THE CONTRACTOR WISH TO
SUBSTITUTE ALTERNATE EQUIPMENT, THEY SHALL LIST SUCH
ALTERNATES DURING THE BIDDING PROCESS AND THEY SHALL LIST
THE AMOUNT OF MONEY TO BE ADDED OR DEDUCTED FROM THEIR
PRICE. FINAL APPROVAL FOR SUBSTITUTES SHALL BE OBTAINED
FROM THE OWNERS ENGINEER AND VA COR. PRIOR TO PROCURING
THE EQUIPMENT. IF THE CONTRACTOR NAMES NO SUBSTITUTES
WITH THEIR BID, THE EQUIPMENT INDICATED IN THESE DRAWINGS OR
SPECIFICATIONS SHALL BE USED.
13. COSTS ASSOCIATED WITH PROVIDING SUBSTITUTES SHALL BE
ASSUMED BY THE CONTRACTOR. "SUBSTITUTES" SHALL INCLUDE
ACCEPTABLE ALTERNATES, ALTERNATES TO THE SCOPE OF WORK,
OR ANY MODIFICATIONS THAT DEVIATE FROM THE BASE-BID DESIGN.
THE ASSOCIATED COSTS SHALL INCLUDE, BUT ARE NOT LIMITED TO
REDESIGN & ENGINEERING COSTS, CHANGES CAUSED TO
INTERRELATED SYSTEMS SUCH AS ELECTRICAL COMPONENTS,
WIRING, AND CONNECTIONS, CHANGES TO MOUNTING SYSTEMS OR
STRUCTURES, REROUTING OF INTERFERENCES, ETC.
14. USE APPROVED SHOP DRAWING SUBMITTALS FOR FINAL
COORDINATION OF THEIR WORK.
15. SUBMIT EQUIPMENT INFORMATION, SHOP DRAWINGS AND A
CONSTRUCTION SCHEDULE TO THE OWNERS ENGINEER AND VA
COR. FOR APPROVAL BEFORE STARTING ANY WORK OR
PURCHASING ANY EQUIPMENT.
16. ALL MATERIALS PROVIDED SHALL BE NEW AND FREE FROM ANY
DEFECT. SALVAGED OR REBUILT EQUIPMENT SHALL NOT BE
PERMITTED.
17. ALL MATERIALS, ETC., SHALL BE PROVIDED AND INSTALLED IN
ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AND ALL
LOCAL AND NATIONALLY RECOGNIZED STANDARDS, SUCH AS VA,
ASHRAE, NFPA, NEC, ASTM, UL, ETC., AS EXAMPLES.
18. PERFORM COORDINATION SO THAT ONCE THE PROJECT IS
STARTED, IT SHALL CONTINUE WITHOUT DELAY UNTIL
COMPLETION.
19. THE CONTRACTOR IS RESPONSIBLE FOR THE WORK OF ALL
THEIR SUBCONTRACTORS, AND THEIR CONFORMANCE TO THESE
CONTRACT DOCUMENTS.
20. PROVIDE NOTIFICATION AND OPPORTUNITY FOR INSPECTION TO
THE OWNER BEFORE CLOSING UP ANY WORK, EQUIPMENT, OR
PIPING SYSTEM.
21. MAINTAIN THE WORK AREA IN A STATE FREE FROM HAZARDS.
TAKE ALL NECESSARY PRECAUTIONS, FOLLOW SAFE WORKING
PRACTICES, AND MAINTAIN THE SITE AND ADJACENT AREAS
SAFE FOR WORKERS, INSPECTORS, PATIENTS, VISITORS, AND
FACILITY EMPLOYEES .
22. SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
23. THE OWNER'S REPRESENTATIVE DOES NOT PROFESS TO BE
FAMILIAR WITH CONSTRUCTION SITE SAFETY REQUIREMENTS.
MEETING SITE SAFETY AND OSHA REQUIREMENTS IS THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. THE OWNER'S
REPRESENTATIVE RESERVES THE RIGHT TO RETAIN A THIRD-PARTY
CONSULTANT IF THEY OBSERVE PRACTICES THAT APPEAR UNSAFE_
Project Title
8 9
24. IF THE OWNER'S REPRESENTATIVE DEEMS THAT ANY UNSAFE
CONDITION APPEARS TO EXIST. THE OWNER HAS THE RIGHT TO
STOP ALL WORK. ANY STOP-WORK ORDERS BY THE OWNER
BECAUSE OF POTENTIALLY UNSAFE CONDITIONS SHALL NOT BE
USED BY THE CONTRACTOR TO DELAY THE WORK SCHEDULE,
INCREASE THE CONTRACT VALUE, OR AVOID ANY
LIQUIDATED-DAMAGE PENAL TIES ASSOCIATED WITH THE WORK
OR TO MAKE A CLAIM AGAINST THE OWNER.
25. THE OWNER REQUIRES ACCESS TO AND AROUND AREAS OF THE
WORK. ALL WORK MUST BE CONDUCTED IN A MANNER TO
MINIMIZE DISRUPTION OF NORMAL FACILITY OPERATIONS.
26. ALL CONSTRUCTION MATERIALS AND TOOLS SHALL BE STORED
IN AREAS DESIGNATED BY THE OWNER. THE OWNER SHALL NOT
BE RESPONSIBLE FOR ANY SHIPPING, DELIVERY OR SECURITY
ISSUES RELATED TO MATERIALS, EQUIPMENT, OR TOOL
STORAGE.
27. LEAVE THE SITE IN A NEAT, ORDERLY AND SAFE CONDITION AT
THE END OF EACH WORK DAY. THE SITE AND BUILDING SHALL
BE MADE AS SECURE AS POSSIBLE SO AS TO PREVENT
UNAUTHORIZED ENTRY AND ACTIVITY.
28. ALL REMOVED/ DEMOLISHED MATERIALS, UNLESS OTHERWISE
NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR
AND SHALL BE REMOVED FROM THE SITE.
29. DISPOSAL OF ALL MATERIALS SHALL BE PROVIDED IN ACCORDANCE
WITH VA, STATE & LOCAL REQUIREMENTS, AND THE CONTRACT
SPECIFICATIONS.
30. THE OWNER SHALL HAVE THE RIGHT AT ALL TIMES TO EXAMINE
THE WORK AND DETERMINE THE CONFORMANCE WITH THE
REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS.
31. COMPLETE ALL WORK WITH MINIMAL DISRUPTION OF THE
FACILITY'S UTILITIES AND OPERATIONS. ANY WORK REQUIRING
A SHUTDOWN OF ELECTRIC, STEAM, HOT WATER, CONDENSATE
AND ELEVATOR/WALKWAYS SHALL BE REQUESTED 4 WEEKS IN
ADVANCE AND APPROVAL RECEIVED FROM THE COR BEFORE
SCHEDULING WORK. ALL OUTAGES SHALL BE COORDINATED
WITH THE FACILITY AND SHALL BE DONE AFTER HOURS OR
WEEKENDS. ACCOUNT FOR UTILITY/ ELEVATOR SHUTDOWN
WORK BEING DONE OUTSIDE NORMAL BUSINESS HOURS.
32. MAINTAIN AWARENESS OF THE FACILITY'S SHUTDOWN
RESTRICTIONS AND LIMITATIONS. ANY WORK- SCHEDULING
PROBLEMS CAUSED BY SHUTDOWN RESTRICTIONS BY THE
FACILITY SHALL NOT BE CAUSE FOR CLAIM OR DELAY.
33. PROVIDE THE NECESSARY LABOR INCLUDING ANY
PREMIUM-TIME AND OVERTIME LABOR REQUIRED TO MAINTAIN
THE CONSTRUCTION SCHEDULE.
34. ALL STRUCTURAL STEEL, PIPING, REINFORCING STEEL, OR
OTHER MAJOR STEEL ITEMS TO BE INCORPORATED IN THE WORK
SHALL BE PRODUCED OR MADE IN WHOLE OR SUBSTANTIAL PART
IN THE UNITED STATES, ITS TERRITORIES OR POSSESSIONS.
35. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR
ONE (1) YEAR FROM DATE OF FINAL PAYMENT AND ACCEPTANCE
UNLESS OTHERWISE STATED IN THE SPECIFICATIONS.
Project Number
630A4-16-430
DRAWING LIST AND GENERAL NOTES
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRICAL DISTRIBUTION
NY HARBOR HEALTHCARE CENTER
Building Number
15 �� I
� 2 It! D2X Associates Approved: Project Director Location 800POLYPLACE,BROOKLYNNY11209 i :�� ;�·- RAMBOLLAMERICAS o9089s lssueDate
VA BROOKLYN CAMPUS
Drawing Number
Office of Construction and Facilities Management
} � REV. O ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR 97540 08/24/22 TMF B
18-01-BK
Gl-002 Dwg. 2 of 91
� Dcp,11t111r_11t ot
� Vctc1:ins Aff:ms
~ • ENGINEERING SOLUTIONS, INC. o,-Ess,o � 259 St. Ives Dr. Checked
� 0 _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17 0 ii: l.,:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:;;;;;;;;;;;;;;;;;;;;;;;;;�;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,;;;;;;;;;;;;;;;;;;;;;;;;;;:,,:;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,============.J
VA FORM 08 - 6231
1 2 3 4 5 6 7 8 9
3 91
LIFE SAFETY AND ICRA PLANS -
BASEMENT
PLAN
NORTH
BASEMENT LIFE SAFETY AND ICRA PLAN
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
STAMP
Approved: Project Director
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
259 St. Ives Dr.
Talent, OR 97540
APPROVED BY: DATE:
630A4-16-430
LLJ EHA
3610 LAWSON ROAD JAMESTOWN, NY 14701
(716) 484 - 1366 (716) 484 - 1519 FAX
P TRIOT
DESIGN & CONSULTING
STILL SERVING
UPGRADE LIFE SAFETY/CRITICAL BRANCH
ELECTRIC DISTRIBUTION,
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
800 POLY PLACE, BROOKLYN NY 11209
LINEN
CHUTE
TOILET
LOCATION KEY - BUILDING 1
18-01-BK
REV. 0 ISSUED FOR CONSTRUCTION 08/24/22
GENERAL LIFE SAFETY NOTES:
1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO
EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED
AT ALL TIMES.
2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE
TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO
MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.
3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND
BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL
HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.
4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS
FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS
REQUIRED FOR INFECTION CONTROL.
5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS
SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.
6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO
BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.
7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY
INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND
UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING
OPERATIONS.
8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND
ICRA MATRIX, THIS SHEET, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY
AND ICRA MEASURES.
9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.
COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH
COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY
REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO
ANY SYSTEM COMPONENTS.
10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.
11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH
DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH
CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD
ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.
KEYED LIFE SAFETY AND ICRA NOTES:
CLASS II WORK ABOVE CEILING
CLASS II WORK
CLASS III WORK
CLASS IV WORK
INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RELOCATION
TYPE CONSTRUCTION PROJECT ACTIVITY
TYPE A INSPECTION AND NON-INVASIVE ACTIVITIES.
INCLUDE, BUT ARE NOT LIMITED TO:
REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1
TILE PER 50 SQUARE FEET.
PAINTING (BUT NOT SANDING).
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES THAT DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL
INSPECTION.
TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL
DUST.
INCLUDE, BUT ARE NOT LIMITED TO:
INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
ACCESS TO CHASE SPACES.
CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE
CONTROLLED.
TYPE C WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
SANDING OF WALLS FOR PAINTING OR WALL COVERING.
REMOVAL OF FLOOR COVERINGS, CEILING TILES, AND CASEWORK.
NEW WALL CONSTRUCTION.
MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.
MAJOR CABLING ACTIVITIES.
ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE
WORK SHIFT.
TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.
INCLUDES, BUT IS NOT LIMITED TO:
ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.
REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CABLING SYSTEM.
NEW CONSTRUCTION.
PATIENT RISK GROUPS
LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK
ICRA MATRIX CLASS OF PRECAUTIONS
PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP I II II III/IV
MEDIUM RISK GROUP I II III IV
HIGH RISK GROUP I II III or IV IV HIGHEST RISK GROUP II III or IV III or IV IV
NOTE: INFECTION CONTROL APPROVAL IS REQUIRED FOR ALL DEMOLITION, CONSTRUCTION OR RENOVATION ACTIVITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN AN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR FACILITIES MANAGEMENT, MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE DEMOLITION OR CONSTRUCTION BEGINS AND PROVIDE ALL REQUIRED INFECTION
CONTROL PRECAUTIONS.
DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS - SEE "KEYED NOTE" THIS SHEET, FOR PROJECT SPECIFICS
CLASS DURING CONSTRUCTION/DEMOLITION PHASE UPON COMPLETION OF THE PROJECT/PHASE
CLASS I
CLASS II
CLASS III
CLASS IV
· OFFICE AREAS
· BOILER ROOM
· EQUIPMENT
ROOMS
(NON-CLINICAL)
· CARDIOLOGY
· ECHOCARDIOGRAPHY
· ENDOSCOPY
· NUCLEAR MEDICINE
· PHYSICAL THERAPY
· RADIOLOGY/MRI
· RESPIRATORY
THERAPY
· OUTPATIENT CLINICS
· EMERGENCY ROOM
· LABOR & DELIVERY
· CLINICAL
LABORATORIES
· PEDIATRICS
· PHARMACY
· POST ANESTHESIA
CARE UNIT
· SURGICAL UNITS
· ANY AREA CARING FOR
IMMUNOCOMPROMISED
PATIENTS
· BURN UNIT
· CARDIAC CATH LAB
· SUPPLY, PROCESSING, AND
DISTRIBUTION
· ALL INPATIENT MEDICAL OR
SURGICAL UNITS
· MEDICAL UNIT
· NEGATIVE PRESSURE ISOLATION
ROOMS
· OUTPATIENT CHEMOTHERAPY
AREAS
· OPERATING ROOMS
1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.
2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM
CONSTRUCTION OPERATIONS.
1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.
2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING
INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST
COLLECTORS WHERE POSSIBLE. WHERE DUST CONTROL IS SHOWN ON
ICRA PLAN, PROVIDE SHEET PLASTIC BARRIERS AS SPECIFIED IN SECTION
01 35 26, INFECTION CONTROL, PRODUCTS AND MATERIALS, DURING
DEMOLITION ACTIVITIES. REMOVE BARRIERS UPON COMPLETION OF
DEMOLITION WORK AND APPROVAL OF COR.
3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.
4. SEAL UNUSED DOORS WITH DUCT TAPE.
5. BLOCK OFF AND SEAL AIR VENTS.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING
PERFORMED.
AS ABOVE AND:
1. OBTAIN PERMIT FROM THE COR OR GOVERNMENT DESIGNATED AUTHORITY.
2. COMPLETE ALL CRITICAL BARRIERS (SHEETROCK, PLYWOOD, PLASTIC), TO
SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE
METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO
WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE
CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY, COORDINATE TIMING OF INSTALLATION WITH VA
STAFF.
3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN
WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND
CONTINUOUSLY MONITOR WITH A DIGITAL DISPLAY, RECORDING AND ALARM
INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION AND
MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE
CONTRACTOR. USE HEPA 360 AIR SCRUBBER MACHINE OR EQUAL MACHINE
FROM OTHER MANUFACTURER.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY
COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
AS ABOVE AND:
1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
1. CLEAN WORK AREA UPON COMPLETION OF TASK.
2. NOTIFY THE COR OR GOVERNMENT DESIGNATED
AUTHORITY.
1. WET MOP/WIPE WORK SURFACES WITH
CLEANER/DISINFECTANT.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN
TIGHTLY COVERED CONTAINERS.
3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM
BEFORE LEAVING WORK AREA.
4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK
WAS PERFORMED.
5. NOTIFY THE COR OR GOVERNMENT DESIGNATED
AUTHORITY.
AS ABOVE AND:
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
COMPLETED PHASE HAS BEEN INSPECTED BY THE COR OR
GOVERNMENT DESIGNATED AUTHORITY AND THOROUGHLY
CLEANED BY THE VA ENVIRONMENTAL SERVICES
DEPARTMENT.
2. REMOVE CONSTRUCTION BARRIERS AND CEILING
PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION;
COORDINATE TIMING OF REMOVAL WITH VA STAFF.
3. RETURN PERMIT TO THE COR.
AS ABOVE
LEGEND:
WALK-OFF (TACKY) MAT
1-HOUR RATED DUST CONTROL BARRIER,
REFER TO DETAIL 1/GI-006. PROVIDE
SELF-CLOSING 1-HOUR FIRE RATED SOLID
CORE WOOD DOOR IN STEEL FRAME WITH
CLASSROOM LOCK FUNCTION.
PROVIDE ZIP WALL OR OTHER VA APPROVED
PLASTIC DUST CONTROL BARRIER SYSTEM,
COMPLETE WITH ALL REQUIRED MOUNTING
POLES, FOAM SEALS, ZIPPER ENTRANCE
DOORS, ETC.. SEAL ENTIRE PERIMETER AT
WALLS, CEILING AND FLOOR.
EXISTING 2 HOUR FIRE BARRIER
EGRESS PATH
DC-1
DC-2 DC-2
DC-2
DC-2
D C
-2
D C
-2
DC-2
D C
-2
D C
-2
D C
-2
DC-2
6'-0"
DC-2
AutoCAD SHX Text
LINEN
AutoCAD SHX Text
CHUTE
AutoCAD SHX Text B-301
AutoCAD SHX Text
SOILED LINEN
AutoCAD SHX Text 179.27
AutoCAD SHX Text B-105
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text B-107
AutoCAD SHX Text
ETO RM
AutoCAD SHX Text B-116A
AutoCAD SHX Text
DUMBWAITER
AutoCAD SHX Text B-116D
AutoCAD SHX Text
ENG. ROOM
AutoCAD SHX Text B-108A
AutoCAD SHX Text
SPD GAS STERILIZER
AutoCAD SHX Text B-126
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 42.15
AutoCAD SHX Text
PIT
AutoCAD SHX Text
(5'-6" DEEP)
AutoCAD SHX Text 136.48
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 18.07
AutoCAD SHX Text B-116
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 59.28
AutoCAD SHX Text
CORRIDOR SC
AutoCAD SHX Text 1611.11
AutoCAD SHX Text B-125
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 40.40
AutoCAD SHX Text B-123
AutoCAD SHX Text
ELEC. FEEDER "C"
AutoCAD SHX Text 104.39
AutoCAD SHX Text B-122
AutoCAD SHX Text
BLDG. MANAGEMENT SUPPLY RM.
AutoCAD SHX Text 1435.82
AutoCAD SHX Text
STERILIZER
AutoCAD SHX Text 32.72
AutoCAD SHX Text B-114
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 56.33
AutoCAD SHX Text B-115
AutoCAD SHX Text
CLEAN AREA
AutoCAD SHX Text 283.14
AutoCAD SHX Text B-115D
AutoCAD SHX Text
DIRTY AREA
AutoCAD SHX Text 308.23
AutoCAD SHX Text B-112
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 77.52
AutoCAD SHX Text B-113
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 61.55
AutoCAD SHX Text B-111
AutoCAD SHX Text
STERILE STORAGE AREA
AutoCAD SHX Text 325.61
AutoCAD SHX Text B-119
AutoCAD SHX Text
TRAINING RM.
AutoCAD SHX Text 274.09
AutoCAD SHX Text B-116C
AutoCAD SHX Text
CHIEF OFFICE
AutoCAD SHX Text 108.31
AutoCAD SHX Text B-116B
AutoCAD SHX Text
ASST. CHIEF OFFICE
AutoCAD SHX Text 101.29
AutoCAD SHX Text B-109
AutoCAD SHX Text
CLEAN STERILE AREA
AutoCAD SHX Text 974.15
AutoCAD SHX Text B-110
AutoCAD SHX Text
SUPPLY RM. NON-STERILE AREA
AutoCAD SHX Text 1078.96
AutoCAD SHX Text
SERVICE ELEV. CORRIDOR W/C
AutoCAD SHX Text 1246.36
AutoCAD SHX Text
ELEVATOR PIT
AutoCAD SHX Text 350.75
AutoCAD SHX Text B-117A
AutoCAD SHX Text
MEDICAL SUPPLIES
AutoCAD SHX Text 265.83
AutoCAD SHX Text B-117
AutoCAD SHX Text
ELECTRICAL ROOM
AutoCAD SHX Text 157.69
AutoCAD SHX Text B-124
AutoCAD SHX Text
SPD STORAGE RM.
AutoCAD SHX Text B-108
AutoCAD SHX Text
CLEAN PREP ROOM
AutoCAD SHX Text B-104B
AutoCAD SHX Text
DRYING ROOM
AutoCAD SHX Text 79.17
AutoCAD SHX Text B-104D
AutoCAD SHX Text
DARK ROOM
AutoCAD SHX Text 88.13
AutoCAD SHX Text B-104C
AutoCAD SHX Text
DARK ROOM
AutoCAD SHX Text 106.89
AutoCAD SHX Text B-200
AutoCAD SHX Text
EXCHANGE CART STORAGE
AutoCAD SHX Text 2617.33
AutoCAD SHX Text B-128
AutoCAD SHX Text
ANATOMY ROOM
AutoCAD SHX Text 340.18
AutoCAD SHX Text B-102
AutoCAD SHX Text
AIR CONDITIONING RM.
AutoCAD SHX Text 387.87
AutoCAD SHX Text B-33
AutoCAD SHX Text
PREPARATION RM.
AutoCAD SHX Text 521.08
AutoCAD SHX Text
REFIRG.
AutoCAD SHX Text 111.36
AutoCAD SHX Text B-400
AutoCAD SHX Text
MECHANICAL EQUIPMENT ROOM
AutoCAD SHX Text 6132.10
AutoCAD SHX Text
PIT
AutoCAD SHX Text
(7'-0" DEEP)
AutoCAD SHX Text 199.07
AutoCAD SHX Text
CORRIDOR SW
AutoCAD SHX Text 2068.98
AutoCAD SHX Text B-501
AutoCAD SHX Text
SUPPLY RM.
AutoCAD SHX Text 87.63
AutoCAD SHX Text B-503
AutoCAD SHX Text
RADIOACTIVE WASTE
AutoCAD SHX Text 95.17
AutoCAD SHX Text
FOOD STORAGE RM.
AutoCAD SHX Text B-106
AutoCAD SHX Text
MECICAL MEDIA
AutoCAD SHX Text 103.39
AutoCAD SHX Text B-524
AutoCAD SHX Text
STORAGE RM.
AutoCAD SHX Text 369.51
AutoCAD SHX Text B-302
AutoCAD SHX Text
STORAGE&TRAINING
AutoCAD SHX Text 179.27
AutoCAD SHX Text B-116
AutoCAD SHX Text
S.P.D. CLERICAL
AutoCAD SHX Text B-303
AutoCAD SHX Text
LOCKER SHWR.
AutoCAD SHX Text 152.32
AutoCAD SHX Text B-304
AutoCAD SHX Text
LOCKER SHWR.
AutoCAD SHX Text 148.10
AutoCAD SHX Text B-305
AutoCAD SHX Text
SUPERVISOR OFFICE
AutoCAD SHX Text 342.72
AutoCAD SHX Text B-306
AutoCAD SHX Text
MECHANICAL EQUIPMENT
AutoCAD SHX Text 3059.20
AutoCAD SHX Text B-300
AutoCAD SHX Text
ELEC ROOM
AutoCAD SHX Text 502.86
AutoCAD SHX Text B-200A
AutoCAD SHX Text
ELEC. FEEDER "A"
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text
VJC
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text A
AutoCAD SHX Text
GI-003
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SB
SB
SB
SB
4 91
LIFE SAFETY AND ICRA PLANS -
GROUND FLOOR
PLAN
NORTH
GROUND FLOOR LIFE SAFETY AND ICRA PLAN
SCALE: 1/8" = 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
STAMP
Approved: Project Director
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
259 St. Ives Dr.
Talent, OR 97540
APPROVED BY: DATE:
630A4-16-430
LLJ EHA
3610 LAWSON ROAD JAMESTOWN, NY 14701
(716) 484 - 1366 (716) 484 - 1519 FAX
P TRIOT
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
800 POLY PLACE, BROOKLYN NY 11209
LINEN
CHUTE
TOILET
LOCATION KEY - BUILDING 1
18-01-BK
REV. 0 ISSUED FOR CONSTRUCTION 08/24/22
GENERAL LIFE SAFETY NOTES:
1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO
EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED
AT ALL TIMES.
2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE
TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO
MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.
3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND
BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL
HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.
4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS
FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS
REQUIRED FOR INFECTION CONTROL.
5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS
SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.
6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO
BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.
7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY
INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND
UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING
OPERATIONS.
8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND
ICRA MATRIX, SHEET GI-003, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY
AND ICRA MEASURES.
9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.
COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH
COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY
REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO
ANY SYSTEM COMPONENTS.
10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.
11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH
DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH
CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD
ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.
KEYED LIFE SAFETY AND ICRA NOTES:
CLASS II WORK ABOVE ACT SUSPENDED CEILING
CLASS II WORK
CLASS III WORK
CLASS IV WORK
D C
-1
DC-2
4'-0"
LEGEND:
WALK-OFF (TACKY) MAT
1-HOUR RATED DUST CONTROL BARRIER,
REFER TO DETAIL 1/GI-006. PROVIDE
SELF-CLOSING 1-HOUR FIRE RATED SOLID
CORE WOOD DOOR IN STEEL FRAME WITH
CLASSROOM LOCK FUNCTION.
PROVIDE ZIP WALL OR OTHER VA APPROVED
PLASTIC DUST CONTROL BARRIER SYSTEM,
COMPLETE WITH ALL REQUIRED MOUNTING
POLES, FOAM SEALS, ZIPPER ENTRANCE
DOORS, ETC.. SEAL ENTIRE PERIMETER AT
WALLS, CEILING AND FLOOR.
EXISTING 2 HOUR FIRE BARRIER
EGRESS PATH
EXISTING COMBINED 1-HOUR FIRE RATED
PARTITION AND SMOKE BARRIER PARTITION
DC-1
DC-2
SB
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
CORRIDOR SE
AutoCAD SHX Text G-104
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 90.22
AutoCAD SHX Text G-103B
AutoCAD SHX Text
DK RM
AutoCAD SHX Text 40.71
AutoCAD SHX Text G-202
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G-103A
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text 51.85
AutoCAD SHX Text G-103
AutoCAD SHX Text
SIMULATOR UNIT
AutoCAD SHX Text 255.10
AutoCAD SHX Text G-137
AutoCAD SHX Text
BATH ROOM
AutoCAD SHX Text 42.00
AutoCAD SHX Text G-138
AutoCAD SHX Text
PHYSICIAN
AutoCAD SHX Text 77.58
AutoCAD SHX Text G-136
AutoCAD SHX Text
WAITING RECEPTIONIST
AutoCAD SHX Text 482.77
AutoCAD SHX Text G-201
AutoCAD SHX Text
TEL
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text G-103
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text
CORRIDOR SE1
AutoCAD SHX Text G-136A
AutoCAD SHX Text
DRESSING
AutoCAD SHX Text 27.54
AutoCAD SHX Text G-214
AutoCAD SHX Text
MECHANICAL RM
AutoCAD SHX Text G-102
AutoCAD SHX Text
CONTD. SUBSTANCE
AutoCAD SHX Text 399.68
AutoCAD SHX Text G-100A
AutoCAD SHX Text
SUPERVISOR
AutoCAD SHX Text
VISITOR'S
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text
STAIR #3A
AutoCAD SHX Text
PLUMB
AutoCAD SHX Text
SHAFT
AutoCAD SHX Text
STAIR #3
AutoCAD SHX Text 141.41
AutoCAD SHX Text
DUCT
AutoCAD SHX Text G-141
AutoCAD SHX Text J.C.
AutoCAD SHX Text 36.04
AutoCAD SHX Text
DUCT
AutoCAD SHX Text
DUCT
AutoCAD SHX Text G-143
AutoCAD SHX Text J.C.
AutoCAD SHX Text 24.24
AutoCAD SHX Text G-142
AutoCAD SHX Text
STOR
AutoCAD SHX Text 33.96
AutoCAD SHX Text
ELEVATOR LOBBY
AutoCAD SHX Text
SC 1A
AutoCAD SHX Text 464.14
AutoCAD SHX Text G-140
AutoCAD SHX Text
RECEPTION RM.
AutoCAD SHX Text 182.70
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text G-140A
AutoCAD SHX Text
STORAGE ROOM
AutoCAD SHX Text 406.58
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
SC
AutoCAD SHX Text 311.99
AutoCAD SHX Text G-145
AutoCAD SHX Text
MACHINERY AND SPRINKLER
AutoCAD SHX Text 377.77
AutoCAD SHX Text G-301
AutoCAD SHX Text
VEST
AutoCAD SHX Text 97.50
AutoCAD SHX Text G-146
AutoCAD SHX Text
LINEN
AutoCAD SHX Text 125.36
AutoCAD SHX Text G-139A
AutoCAD SHX Text
VENDING MACHINES
AutoCAD SHX Text 324.311
AutoCAD SHX Text
BULIDING
AutoCAD SHX Text G-307
AutoCAD SHX Text
DRY FOODS
AutoCAD SHX Text 327.77
AutoCAD SHX Text G-302
AutoCAD SHX Text
NON-FOOD SUPPLIES
AutoCAD SHX Text 325.05
AutoCAD SHX Text G-303
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 218.28
AutoCAD SHX Text G-303A
AutoCAD SHX Text
REFRIGERATOR
AutoCAD SHX Text 99.51
AutoCAD SHX Text G-306
AutoCAD SHX Text
TELEPHONE SWITCH GEAR ROOM
AutoCAD SHX Text 1161.79
AutoCAD SHX Text G-144
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 24.58
AutoCAD SHX Text G-148
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text P-1
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text G-147
AutoCAD SHX Text
COMPACTOR RM
AutoCAD SHX Text 230.74
AutoCAD SHX Text P-2
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text S-1
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text S-2
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
SERVICE
AutoCAD SHX Text
LOBBY
AutoCAD SHX Text P-4
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text S-3
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text P-3
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text G-146
AutoCAD SHX Text
MAIL ROOM
AutoCAD SHX Text 661.11
AutoCAD SHX Text G-147A
AutoCAD SHX Text
RECEIVING AREA
AutoCAD SHX Text
CORRIDOR SW 1A
AutoCAD SHX Text G-100
AutoCAD SHX Text
ELIGIBILITY
AutoCAD SHX Text G-501E
AutoCAD SHX Text
TRIAGE
AutoCAD SHX Text G-100B
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text G-521
AutoCAD SHX Text
STABILIZATION ROOM
AutoCAD SHX Text G-501
AutoCAD SHX Text
WAITING ROOM
AutoCAD SHX Text G-501D
AutoCAD SHX Text
TRIAGE
AutoCAD SHX Text P-5
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text S-4
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text G-151
AutoCAD SHX Text
FIRE ALARM CONTROL RM
AutoCAD SHX Text G-149
AutoCAD SHX Text
OXYGEN STOR
AutoCAD SHX Text
STAIR #6
AutoCAD SHX Text 206.93
AutoCAD SHX Text G-150
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
RECEIVING
AutoCAD SHX Text G-152
AutoCAD SHX Text
OXYGEN STOR
AutoCAD SHX Text
CORRIDOR N/C
AutoCAD SHX Text 527.98
AutoCAD SHX Text S-6
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text P-6
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text
DUCT
AutoCAD SHX Text S-5
AutoCAD SHX Text
ELEV.
AutoCAD SHX Text G-153
AutoCAD SHX Text
SECURITY
AutoCAD SHX Text G-409
AutoCAD SHX Text
TOILET
AutoCAD SHX Text 25.59
AutoCAD SHX Text G-160
AutoCAD SHX Text
MORGUE PLATFORM
AutoCAD SHX Text G-405
AutoCAD SHX Text
TREATMENT RM
AutoCAD SHX Text 100.62
AutoCAD SHX Text G-408
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 108.15
AutoCAD SHX Text G-404
AutoCAD SHX Text
STOR
AutoCAD SHX Text G-159
AutoCAD SHX Text
MORGUE VEST
AutoCAD SHX Text G-403
AutoCAD SHX Text
TREATMENT RM
AutoCAD SHX Text G-155
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G-154
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G-410
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text G-413
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text N.C.C.
AutoCAD SHX Text G-412
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G-414
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text G-415
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text G-417
AutoCAD SHX Text
STAFF LOUNGE
AutoCAD SHX Text
STAIR #5
AutoCAD SHX Text 198.65
AutoCAD SHX Text G-417A
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G-429
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text G-428
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text
CORRIDOR N/W
AutoCAD SHX Text 145.94
AutoCAD SHX Text G-81
AutoCAD SHX Text
SCHEDULING
AutoCAD SHX Text
DEPOSITION
AutoCAD SHX Text
CORRIDOR N/W 1A
AutoCAD SHX Text 926.22
AutoCAD SHX Text G-425
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text G-424
AutoCAD SHX Text
UTILITY
AutoCAD SHX Text G-423A
AutoCAD SHX Text
ISOLATION
AutoCAD SHX Text G-423
AutoCAD SHX Text
STABILIZATION AREA
AutoCAD SHX Text G-157
AutoCAD SHX Text
TOILET
AutoCAD SHX Text G-411
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text G-416
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text G-407
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 102.01
AutoCAD SHX Text G-406
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text 107.39
AutoCAD SHX Text G-402
AutoCAD SHX Text
EXAM RM
AutoCAD SHX Text G-401
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
CLINICAL PHARMACIST
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
EC
AutoCAD SHX Text 1149.73
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
WC
AutoCAD SHX Text 748.97
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text
VJC
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text A
AutoCAD SHX Text
GI-004
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
5 91
FIRST FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
STAMP
Approved: Project Director
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
259 St. Ives Dr.
Talent, OR 97540
APPROVED BY: DATE:
630A4-16-430
LLJ EHA
3610 LAWSON ROAD JAMESTOWN, NY 14701
(716) 484 - 1366 (716) 484 - 1519 FAX
P TRIOT
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
800 POLY PLACE, BROOKLYN NY 11209
LINEN
CHUTE
TOILET
LOCATION KEY - BUILDING 1
18-01-BK
REV. 0 ISSUED FOR CONSTRUCTION 08/24/22
PLAN
NORTH
FIRST FLOOR LIFE SAFETY AND ICRA PLAN
SCALE: 1/8" = 1'-0"
ENLARGED ICRA PLAN
SCALE: 1/4" = 1'-0"
GENERAL LIFE SAFETY NOTES:
1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO
EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED
AT ALL TIMES.
2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE
TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO
MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.
3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND
BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL
HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.
4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS
FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS
REQUIRED FOR INFECTION CONTROL.
5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS
SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.
6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO
BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.
7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY
INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND
UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING
OPERATIONS.
8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND
ICRA MATRIX, SHEET GI-003, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY
AND ICRA MEASURES.
9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.
COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH
COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY
REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO
ANY SYSTEM COMPONENTS.
10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.
11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH
DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH
CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD
ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.
KEYED LIFE SAFETY AND ICRA NOTES:
CLASS II WORK ABOVE ACT SUSPENDED CEILING
CLASS II WORK
CLASS III WORK
CLASS IV WORK
D C
-1
DC-1 DC-1 DC-1 DC-1 DC-1 DC-1 DC-1
3' H
O
LD
DC-1
LEGEND:
WALK-OFF (TACKY) MAT
1-HOUR RATED DUST CONTROL BARRIER,
REFER TO DETAIL 1/GI-006. PROVIDE
SELF-CLOSING 1-HOUR FIRE RATED SOLID
CORE WOOD DOOR IN STEEL FRAME WITH
CLASSROOM LOCK FUNCTION.
PROVIDE ZIP WALL OR OTHER VA APPROVED
PLASTIC DUST CONTROL BARRIER SYSTEM,
COMPLETE WITH ALL REQUIRED MOUNTING
POLES, FOAM SEALS, ZIPPER ENTRANCE
DOORS, ETC.. SEAL ENTIRE PERIMETER AT
WALLS, CEILING AND FLOOR.
EXISTING 2 HOUR FIRE BARRIER
EGRESS PATH
DC-1
DC-2
AutoCAD SHX Text
DENTAL LOBBY
AutoCAD SHX Text 1-521
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text 154.04
AutoCAD SHX Text 1-522
AutoCAD SHX Text
F.TOILET
AutoCAD SHX Text 162.40
AutoCAD SHX Text 1-523
AutoCAD SHX Text
OFFICE DAV
AutoCAD SHX Text 175.80
AutoCAD SHX Text 1-502
AutoCAD SHX Text
DATA. CL.
AutoCAD SHX Text 63.01
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text
SEC/CLERICAL
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text
CHIEFS
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
ATM
AutoCAD SHX Text
PNEUMATIC
AutoCAD SHX Text
TUBE
AutoCAD SHX Text 1-406
AutoCAD SHX Text
OR.SURGERY
AutoCAD SHX Text 184.59
AutoCAD SHX Text 1-409A
AutoCAD SHX Text
STAIRWAY 5
AutoCAD SHX Text 175.43
AutoCAD SHX Text 1-406A
AutoCAD SHX Text
STER. RM
AutoCAD SHX Text 99.25
AutoCAD SHX Text 1-402
AutoCAD SHX Text
CHIEF.OFF.
AutoCAD SHX Text 139.10
AutoCAD SHX Text 1-409
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 167.15
AutoCAD SHX Text 1-403
AutoCAD SHX Text
X-RAY
AutoCAD SHX Text 198.07
AutoCAD SHX Text 1-401A
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 9.88
AutoCAD SHX Text 1-402A
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 26.92
AutoCAD SHX Text 1-401
AutoCAD SHX Text
SEC. OFF.
AutoCAD SHX Text 199.31
AutoCAD SHX Text 1-113
AutoCAD SHX Text
VESTIBULE
AutoCAD SHX Text 42.16
AutoCAD SHX Text 113A
AutoCAD SHX Text
CL CANTEEN
AutoCAD SHX Text 102.90
AutoCAD SHX Text 1-403A
AutoCAD SHX Text
DARK RM.
AutoCAD SHX Text 90.57
AutoCAD SHX Text 1-405
AutoCAD SHX Text H.A.C.
AutoCAD SHX Text 24.42
AutoCAD SHX Text 1-404
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 20.47
AutoCAD SHX Text 1-400A
AutoCAD SHX Text
DENWAITING
AutoCAD SHX Text 1,223.98
AutoCAD SHX Text 1-407
AutoCAD SHX Text
OR.SURGERY
AutoCAD SHX Text 50.07
AutoCAD SHX Text 1-408
AutoCAD SHX Text
OR.SURGERY
AutoCAD SHX Text 197.76
AutoCAD SHX Text 1-109
AutoCAD SHX Text
SALES/DIN.
AutoCAD SHX Text 430.23
AutoCAD SHX Text 1-301
AutoCAD SHX Text
ALOVE
AutoCAD SHX Text 27.51
AutoCAD SHX Text 1-301A
AutoCAD SHX Text
MEN TOILET
AutoCAD SHX Text 120.85
AutoCAD SHX Text 1-302
AutoCAD SHX Text
JAN CLOSET
AutoCAD SHX Text 24.52
AutoCAD SHX Text 1-303
AutoCAD SHX Text
ALOVE
AutoCAD SHX Text 40.60
AutoCAD SHX Text 1-303A
AutoCAD SHX Text
F.TOILET
AutoCAD SHX Text 140.64
AutoCAD SHX Text 1-303B
AutoCAD SHX Text
DININGAREA
AutoCAD SHX Text 1,864.71
AutoCAD SHX Text 1-308
AutoCAD SHX Text
DININGAREA
AutoCAD SHX Text 1,477.33
AutoCAD SHX Text 1-310
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text 99.23
AutoCAD SHX Text 1-309
AutoCAD SHX Text
PIZZA PL.
AutoCAD SHX Text 286.83
AutoCAD SHX Text
SC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 486.80
AutoCAD SHX Text 1-102
AutoCAD SHX Text
CANTEEN
AutoCAD SHX Text 217.54
AutoCAD SHX Text 1-102A
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 30.52
AutoCAD SHX Text
SW 1
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 783.46
AutoCAD SHX Text 1-310A
AutoCAD SHX Text
ELEV.LOBBY
AutoCAD SHX Text 415.61
AutoCAD SHX Text 1-103A
AutoCAD SHX Text
PLUMBSHAFT
AutoCAD SHX Text 46.07
AutoCAD SHX Text 1-103B
AutoCAD SHX Text
STAIRWAY 3
AutoCAD SHX Text 132.33
AutoCAD SHX Text 1-103
AutoCAD SHX Text
F.TOILET
AutoCAD SHX Text 28.36
AutoCAD SHX Text 1-104
AutoCAD SHX Text
MEN TOILET
AutoCAD SHX Text 26.84
AutoCAD SHX Text
EC
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 932.04
AutoCAD SHX Text 1-105
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text 1-106
AutoCAD SHX Text
RET. ST CL
AutoCAD SHX Text 167.97
AutoCAD SHX Text 1-106A
AutoCAD SHX Text
STAIRWAY 6
AutoCAD SHX Text 191.58
AutoCAD SHX Text 1-108
AutoCAD SHX Text
MEN TOILET
AutoCAD SHX Text 81.52
AutoCAD SHX Text 1-107
AutoCAD SHX Text
F.TOILET
AutoCAD SHX Text 38.85
AutoCAD SHX Text N/G
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 157.94
AutoCAD SHX Text S/C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 116.02
AutoCAD SHX Text 1-110A
AutoCAD SHX Text 259.83
AutoCAD SHX Text 1-110B
AutoCAD SHX Text
CR. UNION
AutoCAD SHX Text 169.04
AutoCAD SHX Text 1-110
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 248.41
AutoCAD SHX Text 1-110C
AutoCAD SHX Text
CR. UNION
AutoCAD SHX Text 232.06
AutoCAD SHX Text 147.65
AutoCAD SHX Text 248.85
AutoCAD SHX Text 1-112
AutoCAD SHX Text
RETAIL ST.
AutoCAD SHX Text 1,428.72
AutoCAD SHX Text 1-112A
AutoCAD SHX Text
RET. ST CL
AutoCAD SHX Text 34.09
AutoCAD SHX Text E/C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 1,462.70
AutoCAD SHX Text 1-101A
AutoCAD SHX Text
MED. REC.
AutoCAD SHX Text 715.42
AutoCAD SHX Text 1-225
AutoCAD SHX Text
MED. REC.
AutoCAD SHX Text 142.87
AutoCAD SHX Text 1-202
AutoCAD SHX Text
SOCIAL WK
AutoCAD SHX Text 193.81
AutoCAD SHX Text 1-201
AutoCAD SHX Text S.W.S.
AutoCAD SHX Text 80.55
AutoCAD SHX Text 1-203
AutoCAD SHX Text
SOCIAL WK
AutoCAD SHX Text 402.32
AutoCAD SHX Text
WAITING RM
AutoCAD SHX Text 1-501
AutoCAD SHX Text
COMPENSATION
AutoCAD SHX Text 175.80
AutoCAD SHX Text
OFFICE DAV
AutoCAD SHX Text 1-523
AutoCAD SHX Text
POLICE
AutoCAD SHX Text
RECEPTION
AutoCAD SHX Text
INVESTIGATIONS
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
POLICE
AutoCAD SHX Text
CHIEF OFFICE
AutoCAD SHX Text
LOCKER RM
AutoCAD SHX Text
LOCKER RM
AutoCAD SHX Text
COURT
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
CONFERENCE RM
AutoCAD SHX Text
OFFICER
AutoCAD SHX Text
FIREARMS
AutoCAD SHX Text
TRAINING
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
LIEUTENANT
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
POLICE
AutoCAD SHX Text
TRAINING ROOM
AutoCAD SHX Text
CHIEF, ER
AutoCAD SHX Text 1-101
AutoCAD SHX Text S-1
AutoCAD SHX Text
ELEV
AutoCAD SHX Text P-5
AutoCAD SHX Text
ELEV
AutoCAD SHX Text P-4
AutoCAD SHX Text
ELEV
AutoCAD SHX Text S-2
AutoCAD SHX Text
ELEV
AutoCAD SHX Text S-3
AutoCAD SHX Text
ELEV
AutoCAD SHX Text P-3
AutoCAD SHX Text
ELEV
AutoCAD SHX Text P-2
AutoCAD SHX Text
ELEV
AutoCAD SHX Text S-4
AutoCAD SHX Text
ELEV
AutoCAD SHX Text P-1
AutoCAD SHX Text
ELEV
AutoCAD SHX Text 1-115
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 1-105
AutoCAD SHX Text
ELECTRICAL
AutoCAD SHX Text S/C
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text 116.02
AutoCAD SHX Text P-1
AutoCAD SHX Text
ELEV
AutoCAD SHX Text
CLOSET
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text
VJC
AutoCAD SHX Text 08/24/2022
AutoCAD SHX Text A
AutoCAD SHX Text
GI-005
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
6 91
SECOND - SIXTEENTH FLOORS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
VA FORM 08 - 6231
STAMP
Approved: Project Director
Dwg. ofRevisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot 6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Office of Construction and Facilities Management
259 St. Ives Dr.
Talent, OR 97540
APPROVED BY: DATE:
630A4-16-430
LLJ EHA
3610 LAWSON ROAD JAMESTOWN, NY 14701
(716) 484 - 1366 (716) 484 - 1519 FAX
P TRIOT
NY HARBOR HEALTHCARE CENTER
VA BROOKLYN CAMPUS
800 POLY PLACE, BROOKLYN…
This is the start of the file's text. The full file is on GovTribe.