Attachment B - Drawings.pdf

PDF 12 MB Posted

Attached to
Brooklyn Upgrade Life Safety/Critical Branch Electrical Construction - 630A4-16-430
Solicitation number
36C77626B0020
Issued by

About this file

Summary: Construction Design Documents for Life Safety/Critical Branch Electrical Distribution Upgrade

This document set comprises comprehensive construction design plans and specifications for an upgrade to the life safety and critical branch electrical distribution system at the VA New York Harbor Healthcare System's Brooklyn Campus (Project 630A4-16-430). The project involves 91 drawing sheets covering architectural, mechanical, fire protection, and electrical work across Building 1 and attached buildings at 800 Poly Place, Brooklyn, NY 11209. The design team includes D2X Associates (Service Disabled Veteran Owned Small Business) as project manager, Patriot Design & Consulting for architecture/structural/mechanical/fire protection, Ramboll Americas Engineering Solutions, Inc. for electrical systems, and Environmental Monitoring & Consulting Associates for asbestos abatement.

The work encompasses multiple task orders organized by floor level (basement through sixteenth floor) and includes detailed floor plans showing existing conditions and proposed installations, demolition plans identifying items for removal, life safety and infection control risk assessment (ICRA) requirements with dust control barriers and protection measures, and comprehensive mechanical systems including HVAC equipment schedules, exhaust fan installations, sprinkler system modifications, and pipe support details. Electrical work involves installation of new panels, circuits, transformers, and disconnects with extensive coordination requirements between trades. General contract requirements mandate contractor responsibility for site safety, OSHA compliance, utility coordination (requiring four weeks advance notice for shutdowns), minimal facility disruption, material disposal per VA/state/local regulations, and completion with one-year warranty on all work and equipment. All work must comply with NYC Building Code, NEC, ASHRAE, NFPA, ASTM, and UL standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

,E •

.23 as • i O a:::"' I � ll.

'---'--r-, �

.-----'---' j 0 v rr-'-' 1-UJOO

".......,,!j!

i I f o�i

1 2 3 4 5

Project: 630A4-1 6-430

UPGRADE LIFE SAFETY/CRITICAL

BRANCH ELECTRICAL DISTRIBUTION,

NY HARBOR HEALTHCARE CENTER,

BROOKLYN VA

VA NEW YORK HARBOR HEALTHCARE SYSTEM

Brooklyn Campus, 800 Poly Place, Brooklyn, NY 11209

Project Directory

D2X Associates

Service Disabled Veteran Owned Small Business 259 St. Ives Dr., Talent, Oregon 97540

442 Chelsea Ave, W. Babylon, NY 11704 541-944-8768 email: bdxinfo@gmail.com

Architecture/Structural /Mechanical /Fire Protection .- .- .

Patriot Design & Consulting

3610 Lawson Road Jamestown, New York 14701 phone: (716) 484-1366 email: rtolman@tpatriot-dc.com

Electrical

Ramboll Americas Engineering Solutions, Inc.(OBG)

18 Link Drive, Binghamton, NY 13904 333 West Washington St., Syracuse, NY 13221

163 North Wellwood Ave phone:607-232-5316 email: Todd.Farr@ramboll.com

Asbestos Abatement

Environmental Monitoring & Consulting Assoc .

P.O. Box 872 Summerville, NJ 08876 Lindenhurst, New York 11757 email: emcaeng@aol.com

6 7 8

:>-T() ........._._ ""::::.,-,. -.J,�alveme Roc��I�

LOCATION

Valley stream Lynb

East Rockaway

MAP

er Bay

Syos:

Levitt<

'---'--r-,� �---------�-��----------------------��----��----------�---------����----------����-------����--��-----�

� CONSULTANTS: ARCHITECT/ENGINEERS: APPROVE

VJ

D

C

BY: DATE: DrawingTitle ProjectTitle ProjectNumber

�:::::::� - 1------------+---------<1-------------------------------<f-sT_AM_,,y;.

P ",.,,,_1;,o f N

E

""" 08/24122 UPGRADE LIFE SAFETY/CRITICAL BRANCH 630A4-16-430

.-----'---' re ,__,,. ,c , TITLE SHEET

ELECTRICAL DISTRIBUTION

" vS' NY HARBOR HEALTHCARE CENTER

Building Number

Office of Construction and Facilities 15 "

D X

VA BROOKLYN CAMPUS

l :rr-'-' i_·_ 1------------+---------i

RAMBOLLAMERICAS �

2 Associates Approved: Project Director Location 800 POL Y PLACE, BROOKLYNNY11209 Drawing Number Management

18-01-BK

~ • ENGINEERING SOLUTIONS, INC. "-.V/ 259 St. Ives Dr. Issue Date Checked

� } � REV.0ISSU EDFORCONSTRUCTION 08/24/22 18 LINK DRIVE T.lent, OR 97540 08/24122 TMF B

� il!

Revisions: Date BINGHAMTON, NY 13902 2022-08-17

VA FORM 08 - 6231

1 2 3 4 5 6 7 8

Gl-001 Dwg. 1 of 91

� □ r,p,11t111c 11t ot

� VctClclllS Aff.:ms ro

.5

0 ,2

II :

. 5

"IL

'i w

-� IL

��i~�8 r.--'�j � f6 m v �� 1-UJOO i I fo �

�� :i:

LL,� �

"' <ri

-��1il

GENERAL

Gl-001 Gl-002

Drawing

TITLE SHEET

DRAWING LIST, GENERAL NOTES, AND SYMBOLS

Index

TASK ORDER 1, 2, & 3 - BUILDING 1 AND ATTACHED BUILDINGS LIFE SAFETY BRANCH

ARCHITECTURAL

Gl-003 LIFE SAFETY AND ICRA PLANS - BASEMENT Gl-004 LIFE SAFETY AND ICRA PLANS - GROUND FLOOR Gl-005 LIFE SAFETY AND ICRA PLANS - FIRST FLOOR Gl-006 LIFE SAFETY AND ICRA PLANS - SECOND - SIXTEENTH FLOORS

AD-101 ARCHITECTURAL DEMOLITION FLOOR PLANS - BASEMENT

AD-102 ARCHITECTURAL DEMOLITION FLOOR PLANS - GROUND FLOOR

AD-103 ARCHITECTURAL DEMOLITION FLOOR PLANS - FIRST FLOOR

AD-104 ARCHITECTURAL DEMOLITION FLOOR PLANS - SECOND - SIXTEENTH FLOORS

AE-100 ARCHITECTURAL GENERAL NOTES, SOMBOLS & SCHEDULES

AE-101 ARCHITECTURAL FLOOR PLANS - BASEMENT

AE-102 ARCHITECTURAL FLOOR PLANS - GROUND FLOOR

AE-103 ARCHITECTURAL FLOOR PLANS - FIRST FLOOR

AE-104 ARCHITECTURAL FLOOR PLANS - SECOND - SIXTEENTH FLOORS

AE-501 CONSTRUCTION DETAILS

MECHANICAL & FIRE PROTECTION

M-001 MECHANICAL AND FIRE PROTECTION SCHEDULES, NOTES, AND LEGENDS

MD-101 BASEMENT HVAC DEMOLITION FLOOR PLANS

MD-102 FIRST TO FOURTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS

MD-103

MD-104

MD-105

M-101 M-102 M-103 M-104 M-105

FX-201

M-201

ELECTRICAL

EG-001

EP-101

EP-102

EP-103

EP-104

EP-105

EP-106

EP-107

EP-108

EP-109

EP-110

EP-111

EP-112

EP-113

EP-114

EP-115

EP-116

EP-117

EP-118

EP-119

EP-120

EP-121

EP-301

EP-601

EP-602

EP-603

EP-604

EP-605

EP-606

EP-607

FIFTH TO EIGHTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS

NINTH TO TWELFTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS

THIRTEENTH TO SIXTEENTH FLOOR HVAC AND FIRE PROTECTION DEMOLITION PLANS

BASEMENT HVAC FLOOR PLANS

FIRST TO FOURTH FLOOR HVAC AND FIRE PROTECTION PLANS

FIFTH TO EIGHTH FLOOR HVAC AND FIRE PROTECTION PLANS

NINTH TO TWELFTH FLOOR HVAC AND FIRE PROTECTION PLANS

THIRTEENTH TO SIXTEENTH FLOOR HVAC AND FIRE PROTECTION PLANS

FIRE PROTECTION DETAILS

MECHANICAL DETAILS

ELECTRICAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

PARTIAL BASEMENT FLOOR PLAN - INSTALLATION

PARTIAL GROUND FLOOR PLAN - INSTALLATION

PARTIAL FIRST FLOOR PLAN - INSTALLATION

PARTIAL SECOND FLOOR PLAN - INSTALLATION

PARTIAL THIRD FLOOR PLAN - INSTALLATION

PARTIAL FOURTH FLOOR PLAN - INSTALLATION

PARTIAL FIFTH FLOOR PLAN - INSTALLATION

PARTIAL SIXTH FLOOR PLAN - INSTALLATION

PARTIAL SEVENTH FLOOR PLAN - INSTALLATION

PARTIAL EIGHTH FLOOR PLAN - INSTALLATION

PARTIAL NINTH FLOOR PLAN - INSTALLATION

PARTIAL TENTH FLOOR PLAN - INSTALLATION

PARTIAL ELEVENTH FLOOR PLAN - INSTALLATION

PARTIAL TWELFTH FLOOR PLAN - INSTALLATION

PARTIAL THIRTEENTH FLOOR PLAN - INSTALLATION

PARTIAL FOURTEENTH FLOOR PLAN - INSTALLATION

PARTIAL FIFTEENTH FLOOR PLAN - INSTALLATION

PARTIAL SIXTEENTH FLOOR PLAN - INSTALLATION

PARTIAL SEVENTEENTH FLOOR PLAN - INSTALLATION

PARTIAL EIGHTEENTH FLOOR PLAN - INSTALLATION

PARTIAL NINETEENTH FLOOR PLAN - INSTALLATION

ENLARGED PLANS - ROOM G-148

PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION

PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION

PARTIAL CAMPUS ONE-LINE DIAGRAM LIFE SAFETY INSTALLATION

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

PANEL SCHEDULES

TASK ORDER 5 - EQUIPMENT SHORT CIRCUIT CURRENT RATING

ELECTRICAL

EP-155

EP-156

EP-157

EP-158

EP-159

EP-160

EP-161

EP-162

EP-163

EP-164

EP-165

EP-166

EP-167

EP-168

PANEL SB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

A-BOARD AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

B-BOARD AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL PP-B AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL DP-B AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL PP3R AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL LP2FA AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

HDP-1CA & LPE-OB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL LPE-1C AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL EPP-EL AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL PPE-GB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL PPE-GC AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL HDP-18 AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

PANEL LS-GB AREA PLAN ONE-LINE DIAGRAM AND SCHEDULE

TASK ORDER 6 THROUGH 26 - EQUIPMENT CODE COMPLIANCE UPGRADES

ELECTRICAL

EP-169

EP-170

EP-171

EP-172

EP-173

EP-174

EP-175

EP-176

EP-177

EP-178

EP-179

EP-180

EP-181

EP-182

EP-183

EP-184

EP-185

EP-186

BUILDING 1 PARTIAL BASEMENT PLAN PANEL LPBH AREA

BUILDING 1 PARTIAL BASEMENT PLAN PANEL LPB-1 AREA

BUILDING 1 PARTIAL BASEMENT PLAN PANEL LP-BB AREA

BUILDING 1 PARTIAL 2ND FLOOR PLAN PANEL PP-2Q AREA

BUILDING 1 PARTIAL 2ND FLOOR PLAN PANEL PP-2P AREA

BUILDING 1 PARTIAL 3RD FLOOR PLAN

BUILDING 1 PARTIAL FLOOR PLANS PANEL X-RAY AND LP-15A AREAS

BUILDING 1 PARTIAL 7TH FLOOR PLAN PANEL LP-7B-1 AREA

BUILDING 1 PARTIAL 8TH FL PANEL LP-8KA AREA

BUILDING 1 PARTIAL 14TH FLOOR PLAN PANEL LP-14C AREA

BUILDING 1 PARTIAL FIFTEENTH FLOOR PLAN PANEL LP15A

BUILDING 2 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM

PARTIAL BUILDING 4 PLAN AND ONE-LINE DIAGRAM

BUILDING 15 PARTIAL BASEMENT PLAN PANEL LPE-BA

BUILDING 15 GROUND FLOOR AND ONE-LINE DIAGRAM

BUILDING 14 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM

BUILDING 2 PARTIAL FIRST FLOOR PLAN AND ONE-LINE DIAGRAM

BUILDING 1 PARTIAL GROUND FLOOR PLAN AND ONE-LINE DIAGRAM

CONSULTANTS:

2 3 4

STAMP ARCHITECT /ENGINEERS:

5 6

G ENERAL NOTES:

1. FIELD-VERIFY ALL EXISTING DIMENSIONS AND CONDITIONS

BEFORE STARTING WORK.

2. EQUIPMENT DIMENSIONAL INFORMATION IS PRESENTED FOR

3.

4.

5.

6.

REFERENCE ONLY. DIMENSIONS MAY VARY ACCORDING TO THE

EQUIPMENT MANUFACTURER SELECTED AND FIELD VARIATIONS.

COORDINATE ANY DIMENSIONAL VARIATIONS BETWEEN THESE

CONSTRUCTION DOCUMENTS AND THE AS-DELIVERED EQUIPMENT.

CONFIRM AND COORDINATE JOBSITE DIMENSIONS THAT AFFECT

THE ERECTION OR OPERATION OF SYSTEMS, AS INTENDED BY

THESE CONTRACT DOCUMENTS. MAINTAIN ADEQUATE

CLEARANCES FOR OPERATIONAL ACCESS AND SERVICE OF ALL

INSTALLED EQUIPMENT, AND SHALL MAINTAIN ANY CLEARANCES

REQUIRED BY ALL APPLICABLE CODES .

INFORM THE OWNER/ENGINEER OF ANY DISCREPANCIES

BETWEEN THE CONSTRUCTION DOCUMENTS AND FIELD

CONDITIONS THAT AFFECT THE WORK DESCRIBED HEREIN. PRIOR

TO INSTALLATION.

IF, DURING THE COURSE OF CONSTRUCTION, A CONDITION

EXISTS WHICH DISAGREES OR CONFLICTS WITH THE DRAWINGS

OR SPECIFICATIONS, STOP WORK AND NOTIFY THE ENGINEER. IF

THE CONTRACTOR FAILS TO FOLLOW THIS PROCEDURE AND

CONTINUES WITH THE WORK, THEY SHALL ASSUME ALL

RESPONSIBILITY AND LIABILITY ARISING THEREOF.

7. THESE CONTRACT DOCUMENTS ARE INTENDED TO INDICATE THE

WORK NEEDED TO PROVIDE A COMPLETE AND READY-FOR

OPERATION INSTALLATION. THESE DOCUMENTS ARE INTENDED

TO GUIDE THE CONTRACTOR. THESE DOCUMENTS ARE NOT

INTENDED TO SHOW EVERY DETAIL OF THE EXISTING

CONDITIONS OR NEW INSTALLATIONS, NOR DO THEY DESCRIBE

EVERY FITTING REQUIRED FOR THE INSTALLATION OF THE WORK.

8. "PROVIDE" SHALL MEAN "FURNISH AND INSTALL" AND SHALL

INCLUDE ALL EQUIPMENT, DEVICES, HARDWARE, MOUNTS,

LABOR, RIGGING, SUBCONTRACTS, ETC., THAT RESULT IN A

COMPLETE AND FUNCTIONAL JOB.

9. FURNISH AND INSTALL ALL EQUIPMENT, ACCESSORIES,

SUPPORTS, FITTINGS, AND ALL OTHER INCIDENTAL MATERIAL

NEEDED FOR THE COMPLETE AND OPERATING INSTALLATION.

MINOR ITEMS TO FINISH THE WORK SUCH AS PATCHING,

BLOCKING, TRIM, TOUCH-UP PAINT, ETC., SHALL BE PROVIDED

WHETHER OR NOT INDICATED IN THE CONTRACT DOCUMENTS.

10. WITH THE SUBMISSION OF A PROPOSAUBID, THE CONTRACTOR

INDICATES THAT THEY ARE FULLY AWARE OF THE EXTENT,

CHARACTER AND INTENT OF THE WORK TO BE ACCOMPLISHED

BY THIS PROJECT. ALL CLARIFICATIONS SHALL BE RESOLVED

BEFORE SUBMITTING THE PROPOSAL. NO CONSIDERATION WILL

BE GRANTED FOR ANY MISUNDERSTANDING OF THE MATERIAL

OR EQUIPMENT TO BE FURNISHED OR WORK TO BE PERFORMED

AFTER THE CONTRACT IS EXECUTED.

11. INFORM THE OWNER/ENGINEER OF ANY DEVIATIONS OR

EXCEPTIONS THAT THEY INTEND TO TAKE TO THESE CONTRACT

DOCUMENTS PRIOR TO EXECUTING THE CONSTRUCTION

CONTRACT. NO VARIATIONS TO THESE DOCUMENTS AFTER

EXECUTION OF THE CONTRACT ARE PERMITTED.

APPROVED BY: DATE:

08124/22 Drawing Title

VJC

12. THE BID SHALL BE BASED ON THE EQUIPMENT LISTED IN THESE

CONTRACT DOCUMENTS. SHOULD THE CONTRACTOR WISH TO

SUBSTITUTE ALTERNATE EQUIPMENT, THEY SHALL LIST SUCH

ALTERNATES DURING THE BIDDING PROCESS AND THEY SHALL LIST

THE AMOUNT OF MONEY TO BE ADDED OR DEDUCTED FROM THEIR

PRICE. FINAL APPROVAL FOR SUBSTITUTES SHALL BE OBTAINED

FROM THE OWNERS ENGINEER AND VA COR. PRIOR TO PROCURING

THE EQUIPMENT. IF THE CONTRACTOR NAMES NO SUBSTITUTES

WITH THEIR BID, THE EQUIPMENT INDICATED IN THESE DRAWINGS OR

SPECIFICATIONS SHALL BE USED.

13. COSTS ASSOCIATED WITH PROVIDING SUBSTITUTES SHALL BE

ASSUMED BY THE CONTRACTOR. "SUBSTITUTES" SHALL INCLUDE

ACCEPTABLE ALTERNATES, ALTERNATES TO THE SCOPE OF WORK,

OR ANY MODIFICATIONS THAT DEVIATE FROM THE BASE-BID DESIGN.

THE ASSOCIATED COSTS SHALL INCLUDE, BUT ARE NOT LIMITED TO

REDESIGN & ENGINEERING COSTS, CHANGES CAUSED TO

INTERRELATED SYSTEMS SUCH AS ELECTRICAL COMPONENTS,

WIRING, AND CONNECTIONS, CHANGES TO MOUNTING SYSTEMS OR

STRUCTURES, REROUTING OF INTERFERENCES, ETC.

14. USE APPROVED SHOP DRAWING SUBMITTALS FOR FINAL

COORDINATION OF THEIR WORK.

15. SUBMIT EQUIPMENT INFORMATION, SHOP DRAWINGS AND A

CONSTRUCTION SCHEDULE TO THE OWNERS ENGINEER AND VA

COR. FOR APPROVAL BEFORE STARTING ANY WORK OR

PURCHASING ANY EQUIPMENT.

16. ALL MATERIALS PROVIDED SHALL BE NEW AND FREE FROM ANY

DEFECT. SALVAGED OR REBUILT EQUIPMENT SHALL NOT BE

PERMITTED.

17. ALL MATERIALS, ETC., SHALL BE PROVIDED AND INSTALLED IN

ACCORDANCE WITH THE CONSTRUCTION DOCUMENTS, AND ALL

LOCAL AND NATIONALLY RECOGNIZED STANDARDS, SUCH AS VA,

ASHRAE, NFPA, NEC, ASTM, UL, ETC., AS EXAMPLES.

18. PERFORM COORDINATION SO THAT ONCE THE PROJECT IS

STARTED, IT SHALL CONTINUE WITHOUT DELAY UNTIL

COMPLETION.

19. THE CONTRACTOR IS RESPONSIBLE FOR THE WORK OF ALL

THEIR SUBCONTRACTORS, AND THEIR CONFORMANCE TO THESE

CONTRACT DOCUMENTS.

20. PROVIDE NOTIFICATION AND OPPORTUNITY FOR INSPECTION TO

THE OWNER BEFORE CLOSING UP ANY WORK, EQUIPMENT, OR

PIPING SYSTEM.

21. MAINTAIN THE WORK AREA IN A STATE FREE FROM HAZARDS.

TAKE ALL NECESSARY PRECAUTIONS, FOLLOW SAFE WORKING

PRACTICES, AND MAINTAIN THE SITE AND ADJACENT AREAS

SAFE FOR WORKERS, INSPECTORS, PATIENTS, VISITORS, AND

FACILITY EMPLOYEES .

22. SITE SAFETY SHALL BE THE SOLE RESPONSIBILITY OF THE

CONTRACTOR.

23. THE OWNER'S REPRESENTATIVE DOES NOT PROFESS TO BE

FAMILIAR WITH CONSTRUCTION SITE SAFETY REQUIREMENTS.

MEETING SITE SAFETY AND OSHA REQUIREMENTS IS THE SOLE

RESPONSIBILITY OF THE CONTRACTOR. THE OWNER'S

REPRESENTATIVE RESERVES THE RIGHT TO RETAIN A THIRD-PARTY

CONSULTANT IF THEY OBSERVE PRACTICES THAT APPEAR UNSAFE_

Project Title

8 9

24. IF THE OWNER'S REPRESENTATIVE DEEMS THAT ANY UNSAFE

CONDITION APPEARS TO EXIST. THE OWNER HAS THE RIGHT TO

STOP ALL WORK. ANY STOP-WORK ORDERS BY THE OWNER

BECAUSE OF POTENTIALLY UNSAFE CONDITIONS SHALL NOT BE

USED BY THE CONTRACTOR TO DELAY THE WORK SCHEDULE,

INCREASE THE CONTRACT VALUE, OR AVOID ANY

LIQUIDATED-DAMAGE PENAL TIES ASSOCIATED WITH THE WORK

OR TO MAKE A CLAIM AGAINST THE OWNER.

25. THE OWNER REQUIRES ACCESS TO AND AROUND AREAS OF THE

WORK. ALL WORK MUST BE CONDUCTED IN A MANNER TO

MINIMIZE DISRUPTION OF NORMAL FACILITY OPERATIONS.

26. ALL CONSTRUCTION MATERIALS AND TOOLS SHALL BE STORED

IN AREAS DESIGNATED BY THE OWNER. THE OWNER SHALL NOT

BE RESPONSIBLE FOR ANY SHIPPING, DELIVERY OR SECURITY

ISSUES RELATED TO MATERIALS, EQUIPMENT, OR TOOL

STORAGE.

27. LEAVE THE SITE IN A NEAT, ORDERLY AND SAFE CONDITION AT

THE END OF EACH WORK DAY. THE SITE AND BUILDING SHALL

BE MADE AS SECURE AS POSSIBLE SO AS TO PREVENT

UNAUTHORIZED ENTRY AND ACTIVITY.

28. ALL REMOVED/ DEMOLISHED MATERIALS, UNLESS OTHERWISE

NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR

AND SHALL BE REMOVED FROM THE SITE.

29. DISPOSAL OF ALL MATERIALS SHALL BE PROVIDED IN ACCORDANCE

WITH VA, STATE & LOCAL REQUIREMENTS, AND THE CONTRACT

SPECIFICATIONS.

30. THE OWNER SHALL HAVE THE RIGHT AT ALL TIMES TO EXAMINE

THE WORK AND DETERMINE THE CONFORMANCE WITH THE

REQUIREMENTS AND INTENT OF THE CONTRACT DOCUMENTS.

31. COMPLETE ALL WORK WITH MINIMAL DISRUPTION OF THE

FACILITY'S UTILITIES AND OPERATIONS. ANY WORK REQUIRING

A SHUTDOWN OF ELECTRIC, STEAM, HOT WATER, CONDENSATE

AND ELEVATOR/WALKWAYS SHALL BE REQUESTED 4 WEEKS IN

ADVANCE AND APPROVAL RECEIVED FROM THE COR BEFORE

SCHEDULING WORK. ALL OUTAGES SHALL BE COORDINATED

WITH THE FACILITY AND SHALL BE DONE AFTER HOURS OR

WEEKENDS. ACCOUNT FOR UTILITY/ ELEVATOR SHUTDOWN

WORK BEING DONE OUTSIDE NORMAL BUSINESS HOURS.

32. MAINTAIN AWARENESS OF THE FACILITY'S SHUTDOWN

RESTRICTIONS AND LIMITATIONS. ANY WORK- SCHEDULING

PROBLEMS CAUSED BY SHUTDOWN RESTRICTIONS BY THE

FACILITY SHALL NOT BE CAUSE FOR CLAIM OR DELAY.

33. PROVIDE THE NECESSARY LABOR INCLUDING ANY

PREMIUM-TIME AND OVERTIME LABOR REQUIRED TO MAINTAIN

THE CONSTRUCTION SCHEDULE.

34. ALL STRUCTURAL STEEL, PIPING, REINFORCING STEEL, OR

OTHER MAJOR STEEL ITEMS TO BE INCORPORATED IN THE WORK

SHALL BE PRODUCED OR MADE IN WHOLE OR SUBSTANTIAL PART

IN THE UNITED STATES, ITS TERRITORIES OR POSSESSIONS.

35. ALL WORK AND EQUIPMENT SHALL BE FULLY GUARANTEED FOR

ONE (1) YEAR FROM DATE OF FINAL PAYMENT AND ACCEPTANCE

UNLESS OTHERWISE STATED IN THE SPECIFICATIONS.

Project Number

630A4-16-430

DRAWING LIST AND GENERAL NOTES

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRICAL DISTRIBUTION

NY HARBOR HEALTHCARE CENTER

Building Number

15 �� I

� 2 It! D2X Associates Approved: Project Director Location 800POLYPLACE,BROOKLYNNY11209 i :�� ;�·- RAMBOLLAMERICAS o9089s lssueDate

VA BROOKLYN CAMPUS

Drawing Number

Office of Construction and Facilities Management

} � REV. O ISSUED FOR CONSTRUCTION 08124/22 18 LINK DRIVE Talent, OR 97540 08/24/22 TMF B

18-01-BK

Gl-002 Dwg. 2 of 91

� Dcp,11t111r_11t ot

� Vctc1:ins Aff:ms

~ • ENGINEERING SOLUTIONS, INC. o,-Ess,o � 259 St. Ives Dr. Checked

� 0 _,, Revisions: Date BINGHAMTON, NY 13902 2022_08_17 0 ii: l.,:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:;;;;;;;;;;;;;;;;;;;;;;;;;�;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,;;;;;;;;;;;;;;;;;;;;;;;;;;:,,:;;;;;;;;;;;;;;;;;;;;;;;;;:.:;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:,============.J

VA FORM 08 - 6231

1 2 3 4 5 6 7 8 9

3 91

LIFE SAFETY AND ICRA PLANS -

BASEMENT

PLAN

NORTH

BASEMENT LIFE SAFETY AND ICRA PLAN

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

STAMP

Approved: Project Director

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

259 St. Ives Dr.

Talent, OR 97540

APPROVED BY: DATE:

630A4-16-430

LLJ EHA

3610 LAWSON ROAD JAMESTOWN, NY 14701

(716) 484 - 1366 (716) 484 - 1519 FAX

P TRIOT

DESIGN & CONSULTING

STILL SERVING

UPGRADE LIFE SAFETY/CRITICAL BRANCH

ELECTRIC DISTRIBUTION,

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

800 POLY PLACE, BROOKLYN NY 11209

LINEN

CHUTE

TOILET

LOCATION KEY - BUILDING 1

18-01-BK

REV. 0 ISSUED FOR CONSTRUCTION 08/24/22

GENERAL LIFE SAFETY NOTES:

1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO

EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED

AT ALL TIMES.

2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE

TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO

MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.

3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND

BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL

HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.

4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS

FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS

REQUIRED FOR INFECTION CONTROL.

5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS

SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.

6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO

BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.

7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY

INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND

UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING

OPERATIONS.

8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND

ICRA MATRIX, THIS SHEET, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY

AND ICRA MEASURES.

9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.

COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH

COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY

REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO

ANY SYSTEM COMPONENTS.

10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.

11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH

DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH

CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD

ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.

KEYED LIFE SAFETY AND ICRA NOTES:

CLASS II WORK ABOVE CEILING

CLASS II WORK

CLASS III WORK

CLASS IV WORK

INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RELOCATION

TYPE CONSTRUCTION PROJECT ACTIVITY

TYPE A INSPECTION AND NON-INVASIVE ACTIVITIES.

INCLUDE, BUT ARE NOT LIMITED TO:

REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1

TILE PER 50 SQUARE FEET.

PAINTING (BUT NOT SANDING).

WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND

ACTIVITIES THAT DO NOT GENERATE DUST OR REQUIRE CUTTING OF

WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL

INSPECTION.

TYPE B SMALL SCALE, SHORT DURATION ACTIVITIES THAT CREATE MINIMAL

DUST.

INCLUDE, BUT ARE NOT LIMITED TO:

INSTALLATION OF TELEPHONE AND COMPUTER CABLING.

ACCESS TO CHASE SPACES.

CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE

CONTROLLED.

TYPE C WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR

REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING

COMPONENTS OR ASSEMBLIES.

INCLUDES, BUT IS NOT LIMITED TO:

SANDING OF WALLS FOR PAINTING OR WALL COVERING.

REMOVAL OF FLOOR COVERINGS, CEILING TILES, AND CASEWORK.

NEW WALL CONSTRUCTION.

MINOR DUCT WORK OR ELECTRICAL WORK ABOVE CEILINGS.

MAJOR CABLING ACTIVITIES.

ANY ACTIVITY THAT CANNOT BE COMPLETED WITHIN A SINGLE

WORK SHIFT.

TYPE D MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.

INCLUDES, BUT IS NOT LIMITED TO:

ACTIVITIES THAT REQUIRE CONSECUTIVE WORK SHIFTS.

REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE

CABLING SYSTEM.

NEW CONSTRUCTION.

PATIENT RISK GROUPS

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

ICRA MATRIX CLASS OF PRECAUTIONS

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP I II II III/IV

MEDIUM RISK GROUP I II III IV

HIGH RISK GROUP I II III or IV IV HIGHEST RISK GROUP II III or IV III or IV IV

NOTE: INFECTION CONTROL APPROVAL IS REQUIRED FOR ALL DEMOLITION, CONSTRUCTION OR RENOVATION ACTIVITIES. IT IS THE CONTRACTORS RESPONSIBILITY TO OBTAIN AN INFECTION CONTROL PERMIT FROM HOSPITAL SAFETY OFFICER OR FACILITIES MANAGEMENT, MAINTENANCE AND ENGINEERING DEPARTMENT BEFORE DEMOLITION OR CONSTRUCTION BEGINS AND PROVIDE ALL REQUIRED INFECTION

CONTROL PRECAUTIONS.

DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS - SEE "KEYED NOTE" THIS SHEET, FOR PROJECT SPECIFICS

CLASS DURING CONSTRUCTION/DEMOLITION PHASE UPON COMPLETION OF THE PROJECT/PHASE

CLASS I

CLASS II

CLASS III

CLASS IV

· OFFICE AREAS

· BOILER ROOM

· EQUIPMENT

ROOMS

(NON-CLINICAL)

· CARDIOLOGY

· ECHOCARDIOGRAPHY

· ENDOSCOPY

· NUCLEAR MEDICINE

· PHYSICAL THERAPY

· RADIOLOGY/MRI

· RESPIRATORY

THERAPY

· OUTPATIENT CLINICS

· EMERGENCY ROOM

· LABOR & DELIVERY

· CLINICAL

LABORATORIES

· PEDIATRICS

· PHARMACY

· POST ANESTHESIA

CARE UNIT

· SURGICAL UNITS

· ANY AREA CARING FOR

IMMUNOCOMPROMISED

PATIENTS

· BURN UNIT

· CARDIAC CATH LAB

· SUPPLY, PROCESSING, AND

DISTRIBUTION

· ALL INPATIENT MEDICAL OR

SURGICAL UNITS

· MEDICAL UNIT

· NEGATIVE PRESSURE ISOLATION

ROOMS

· OUTPATIENT CHEMOTHERAPY

AREAS

· OPERATING ROOMS

1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.

2. EXECUTE WORK BY METHODS TO MINIMIZE RAISING DUST FROM

CONSTRUCTION OPERATIONS.

1. NOTIFY THE COR OR GOVERNMENT DESIGNATED AUTHORITY.

2. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST FROM DISPERSING

INTO ATMOSPHERE SUCH AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS WHERE POSSIBLE. WHERE DUST CONTROL IS SHOWN ON

ICRA PLAN, PROVIDE SHEET PLASTIC BARRIERS AS SPECIFIED IN SECTION

01 35 26, INFECTION CONTROL, PRODUCTS AND MATERIALS, DURING

DEMOLITION ACTIVITIES. REMOVE BARRIERS UPON COMPLETION OF

DEMOLITION WORK AND APPROVAL OF COR.

3. WATER MIST WORK SURFACES TO CONTROL DUST WHILE CUTTING.

4. SEAL UNUSED DOORS WITH DUCT TAPE.

5. BLOCK OFF AND SEAL AIR VENTS.

6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE WORK IS BEING

PERFORMED.

AS ABOVE AND:

1. OBTAIN PERMIT FROM THE COR OR GOVERNMENT DESIGNATED AUTHORITY.

2. COMPLETE ALL CRITICAL BARRIERS (SHEETROCK, PLYWOOD, PLASTIC), TO

SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE

METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO

WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY, COORDINATE TIMING OF INSTALLATION WITH VA

STAFF.

3. MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF WATER GAUGE, WITHIN

WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITOR WITH A DIGITAL DISPLAY, RECORDING AND ALARM

INSTRUMENT, WHICH MUST BE CALIBRATED ON INSTALLATION AND

MAINTAINED WITH PERIODIC CALIBRATION AND MONITORED BY THE

CONTRACTOR. USE HEPA 360 AIR SCRUBBER MACHINE OR EQUAL MACHINE

FROM OTHER MANUFACTURER.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY

COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS

SOLID LID.

AS ABOVE AND:

1. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

2. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH

THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER

COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

3. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

1. CLEAN WORK AREA UPON COMPLETION OF TASK.

2. NOTIFY THE COR OR GOVERNMENT DESIGNATED

AUTHORITY.

1. WET MOP/WIPE WORK SURFACES WITH

CLEANER/DISINFECTANT.

2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN

TIGHTLY COVERED CONTAINERS.

3. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM

BEFORE LEAVING WORK AREA.

4. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK

WAS PERFORMED.

5. NOTIFY THE COR OR GOVERNMENT DESIGNATED

AUTHORITY.

AS ABOVE AND:

1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL

COMPLETED PHASE HAS BEEN INSPECTED BY THE COR OR

GOVERNMENT DESIGNATED AUTHORITY AND THOROUGHLY

CLEANED BY THE VA ENVIRONMENTAL SERVICES

DEPARTMENT.

2. REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH CONSTRUCTION;

COORDINATE TIMING OF REMOVAL WITH VA STAFF.

3. RETURN PERMIT TO THE COR.

AS ABOVE

LEGEND:

WALK-OFF (TACKY) MAT

1-HOUR RATED DUST CONTROL BARRIER,

REFER TO DETAIL 1/GI-006. PROVIDE

SELF-CLOSING 1-HOUR FIRE RATED SOLID

CORE WOOD DOOR IN STEEL FRAME WITH

CLASSROOM LOCK FUNCTION.

PROVIDE ZIP WALL OR OTHER VA APPROVED

PLASTIC DUST CONTROL BARRIER SYSTEM,

COMPLETE WITH ALL REQUIRED MOUNTING

POLES, FOAM SEALS, ZIPPER ENTRANCE

DOORS, ETC.. SEAL ENTIRE PERIMETER AT

WALLS, CEILING AND FLOOR.

EXISTING 2 HOUR FIRE BARRIER

EGRESS PATH

DC-1

DC-2 DC-2

DC-2

DC-2

D C

-2

D C

-2

DC-2

D C

-2

D C

-2

D C

-2

DC-2

6'-0"

DC-2

AutoCAD SHX Text

LINEN

AutoCAD SHX Text

CHUTE

AutoCAD SHX Text B-301

AutoCAD SHX Text

SOILED LINEN

AutoCAD SHX Text 179.27

AutoCAD SHX Text B-105

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text B-107

AutoCAD SHX Text

ETO RM

AutoCAD SHX Text B-116A

AutoCAD SHX Text

DUMBWAITER

AutoCAD SHX Text B-116D

AutoCAD SHX Text

ENG. ROOM

AutoCAD SHX Text B-108A

AutoCAD SHX Text

SPD GAS STERILIZER

AutoCAD SHX Text B-126

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 42.15

AutoCAD SHX Text

PIT

AutoCAD SHX Text

(5'-6" DEEP)

AutoCAD SHX Text 136.48

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 18.07

AutoCAD SHX Text B-116

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 59.28

AutoCAD SHX Text

CORRIDOR SC

AutoCAD SHX Text 1611.11

AutoCAD SHX Text B-125

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 40.40

AutoCAD SHX Text B-123

AutoCAD SHX Text

ELEC. FEEDER "C"

AutoCAD SHX Text 104.39

AutoCAD SHX Text B-122

AutoCAD SHX Text

BLDG. MANAGEMENT SUPPLY RM.

AutoCAD SHX Text 1435.82

AutoCAD SHX Text

STERILIZER

AutoCAD SHX Text 32.72

AutoCAD SHX Text B-114

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 56.33

AutoCAD SHX Text B-115

AutoCAD SHX Text

CLEAN AREA

AutoCAD SHX Text 283.14

AutoCAD SHX Text B-115D

AutoCAD SHX Text

DIRTY AREA

AutoCAD SHX Text 308.23

AutoCAD SHX Text B-112

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 77.52

AutoCAD SHX Text B-113

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 61.55

AutoCAD SHX Text B-111

AutoCAD SHX Text

STERILE STORAGE AREA

AutoCAD SHX Text 325.61

AutoCAD SHX Text B-119

AutoCAD SHX Text

TRAINING RM.

AutoCAD SHX Text 274.09

AutoCAD SHX Text B-116C

AutoCAD SHX Text

CHIEF OFFICE

AutoCAD SHX Text 108.31

AutoCAD SHX Text B-116B

AutoCAD SHX Text

ASST. CHIEF OFFICE

AutoCAD SHX Text 101.29

AutoCAD SHX Text B-109

AutoCAD SHX Text

CLEAN STERILE AREA

AutoCAD SHX Text 974.15

AutoCAD SHX Text B-110

AutoCAD SHX Text

SUPPLY RM. NON-STERILE AREA

AutoCAD SHX Text 1078.96

AutoCAD SHX Text

SERVICE ELEV. CORRIDOR W/C

AutoCAD SHX Text 1246.36

AutoCAD SHX Text

ELEVATOR PIT

AutoCAD SHX Text 350.75

AutoCAD SHX Text B-117A

AutoCAD SHX Text

MEDICAL SUPPLIES

AutoCAD SHX Text 265.83

AutoCAD SHX Text B-117

AutoCAD SHX Text

ELECTRICAL ROOM

AutoCAD SHX Text 157.69

AutoCAD SHX Text B-124

AutoCAD SHX Text

SPD STORAGE RM.

AutoCAD SHX Text B-108

AutoCAD SHX Text

CLEAN PREP ROOM

AutoCAD SHX Text B-104B

AutoCAD SHX Text

DRYING ROOM

AutoCAD SHX Text 79.17

AutoCAD SHX Text B-104D

AutoCAD SHX Text

DARK ROOM

AutoCAD SHX Text 88.13

AutoCAD SHX Text B-104C

AutoCAD SHX Text

DARK ROOM

AutoCAD SHX Text 106.89

AutoCAD SHX Text B-200

AutoCAD SHX Text

EXCHANGE CART STORAGE

AutoCAD SHX Text 2617.33

AutoCAD SHX Text B-128

AutoCAD SHX Text

ANATOMY ROOM

AutoCAD SHX Text 340.18

AutoCAD SHX Text B-102

AutoCAD SHX Text

AIR CONDITIONING RM.

AutoCAD SHX Text 387.87

AutoCAD SHX Text B-33

AutoCAD SHX Text

PREPARATION RM.

AutoCAD SHX Text 521.08

AutoCAD SHX Text

REFIRG.

AutoCAD SHX Text 111.36

AutoCAD SHX Text B-400

AutoCAD SHX Text

MECHANICAL EQUIPMENT ROOM

AutoCAD SHX Text 6132.10

AutoCAD SHX Text

PIT

AutoCAD SHX Text

(7'-0" DEEP)

AutoCAD SHX Text 199.07

AutoCAD SHX Text

CORRIDOR SW

AutoCAD SHX Text 2068.98

AutoCAD SHX Text B-501

AutoCAD SHX Text

SUPPLY RM.

AutoCAD SHX Text 87.63

AutoCAD SHX Text B-503

AutoCAD SHX Text

RADIOACTIVE WASTE

AutoCAD SHX Text 95.17

AutoCAD SHX Text

FOOD STORAGE RM.

AutoCAD SHX Text B-106

AutoCAD SHX Text

MECICAL MEDIA

AutoCAD SHX Text 103.39

AutoCAD SHX Text B-524

AutoCAD SHX Text

STORAGE RM.

AutoCAD SHX Text 369.51

AutoCAD SHX Text B-302

AutoCAD SHX Text

STORAGE&TRAINING

AutoCAD SHX Text 179.27

AutoCAD SHX Text B-116

AutoCAD SHX Text

S.P.D. CLERICAL

AutoCAD SHX Text B-303

AutoCAD SHX Text

LOCKER SHWR.

AutoCAD SHX Text 152.32

AutoCAD SHX Text B-304

AutoCAD SHX Text

LOCKER SHWR.

AutoCAD SHX Text 148.10

AutoCAD SHX Text B-305

AutoCAD SHX Text

SUPERVISOR OFFICE

AutoCAD SHX Text 342.72

AutoCAD SHX Text B-306

AutoCAD SHX Text

MECHANICAL EQUIPMENT

AutoCAD SHX Text 3059.20

AutoCAD SHX Text B-300

AutoCAD SHX Text

ELEC ROOM

AutoCAD SHX Text 502.86

AutoCAD SHX Text B-200A

AutoCAD SHX Text

ELEC. FEEDER "A"

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text

VJC

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text A

AutoCAD SHX Text

GI-003

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SB

SB

SB

SB

4 91

LIFE SAFETY AND ICRA PLANS -

GROUND FLOOR

PLAN

NORTH

GROUND FLOOR LIFE SAFETY AND ICRA PLAN

SCALE: 1/8" = 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

STAMP

Approved: Project Director

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

259 St. Ives Dr.

Talent, OR 97540

APPROVED BY: DATE:

630A4-16-430

LLJ EHA

3610 LAWSON ROAD JAMESTOWN, NY 14701

(716) 484 - 1366 (716) 484 - 1519 FAX

P TRIOT

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

800 POLY PLACE, BROOKLYN NY 11209

LINEN

CHUTE

TOILET

LOCATION KEY - BUILDING 1

18-01-BK

REV. 0 ISSUED FOR CONSTRUCTION 08/24/22

GENERAL LIFE SAFETY NOTES:

1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO

EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED

AT ALL TIMES.

2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE

TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO

MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.

3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND

BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL

HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.

4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS

FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS

REQUIRED FOR INFECTION CONTROL.

5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS

SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.

6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO

BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.

7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY

INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND

UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING

OPERATIONS.

8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND

ICRA MATRIX, SHEET GI-003, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY

AND ICRA MEASURES.

9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.

COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH

COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY

REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO

ANY SYSTEM COMPONENTS.

10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.

11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH

DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH

CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD

ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.

KEYED LIFE SAFETY AND ICRA NOTES:

CLASS II WORK ABOVE ACT SUSPENDED CEILING

CLASS II WORK

CLASS III WORK

CLASS IV WORK

D C

-1

DC-2

4'-0"

LEGEND:

WALK-OFF (TACKY) MAT

1-HOUR RATED DUST CONTROL BARRIER,

REFER TO DETAIL 1/GI-006. PROVIDE

SELF-CLOSING 1-HOUR FIRE RATED SOLID

CORE WOOD DOOR IN STEEL FRAME WITH

CLASSROOM LOCK FUNCTION.

PROVIDE ZIP WALL OR OTHER VA APPROVED

PLASTIC DUST CONTROL BARRIER SYSTEM,

COMPLETE WITH ALL REQUIRED MOUNTING

POLES, FOAM SEALS, ZIPPER ENTRANCE

DOORS, ETC.. SEAL ENTIRE PERIMETER AT

WALLS, CEILING AND FLOOR.

EXISTING 2 HOUR FIRE BARRIER

EGRESS PATH

EXISTING COMBINED 1-HOUR FIRE RATED

PARTITION AND SMOKE BARRIER PARTITION

DC-1

DC-2

SB

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

CORRIDOR SE

AutoCAD SHX Text G-104

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text 90.22

AutoCAD SHX Text G-103B

AutoCAD SHX Text

DK RM

AutoCAD SHX Text 40.71

AutoCAD SHX Text G-202

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text G-103A

AutoCAD SHX Text

CONTROL

AutoCAD SHX Text 51.85

AutoCAD SHX Text G-103

AutoCAD SHX Text

SIMULATOR UNIT

AutoCAD SHX Text 255.10

AutoCAD SHX Text G-137

AutoCAD SHX Text

BATH ROOM

AutoCAD SHX Text 42.00

AutoCAD SHX Text G-138

AutoCAD SHX Text

PHYSICIAN

AutoCAD SHX Text 77.58

AutoCAD SHX Text G-136

AutoCAD SHX Text

WAITING RECEPTIONIST

AutoCAD SHX Text 482.77

AutoCAD SHX Text G-201

AutoCAD SHX Text

TEL

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text G-103

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

CORRIDOR SE1

AutoCAD SHX Text G-136A

AutoCAD SHX Text

DRESSING

AutoCAD SHX Text 27.54

AutoCAD SHX Text G-214

AutoCAD SHX Text

MECHANICAL RM

AutoCAD SHX Text G-102

AutoCAD SHX Text

CONTD. SUBSTANCE

AutoCAD SHX Text 399.68

AutoCAD SHX Text G-100A

AutoCAD SHX Text

SUPERVISOR

AutoCAD SHX Text

VISITOR'S

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text

STAIR #3A

AutoCAD SHX Text

PLUMB

AutoCAD SHX Text

SHAFT

AutoCAD SHX Text

STAIR #3

AutoCAD SHX Text 141.41

AutoCAD SHX Text

DUCT

AutoCAD SHX Text G-141

AutoCAD SHX Text J.C.

AutoCAD SHX Text 36.04

AutoCAD SHX Text

DUCT

AutoCAD SHX Text

DUCT

AutoCAD SHX Text G-143

AutoCAD SHX Text J.C.

AutoCAD SHX Text 24.24

AutoCAD SHX Text G-142

AutoCAD SHX Text

STOR

AutoCAD SHX Text 33.96

AutoCAD SHX Text

ELEVATOR LOBBY

AutoCAD SHX Text

SC 1A

AutoCAD SHX Text 464.14

AutoCAD SHX Text G-140

AutoCAD SHX Text

RECEPTION RM.

AutoCAD SHX Text 182.70

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text G-140A

AutoCAD SHX Text

STORAGE ROOM

AutoCAD SHX Text 406.58

AutoCAD SHX Text

BUILDING

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

SC

AutoCAD SHX Text 311.99

AutoCAD SHX Text G-145

AutoCAD SHX Text

MACHINERY AND SPRINKLER

AutoCAD SHX Text 377.77

AutoCAD SHX Text G-301

AutoCAD SHX Text

VEST

AutoCAD SHX Text 97.50

AutoCAD SHX Text G-146

AutoCAD SHX Text

LINEN

AutoCAD SHX Text 125.36

AutoCAD SHX Text G-139A

AutoCAD SHX Text

VENDING MACHINES

AutoCAD SHX Text 324.311

AutoCAD SHX Text

BULIDING

AutoCAD SHX Text G-307

AutoCAD SHX Text

DRY FOODS

AutoCAD SHX Text 327.77

AutoCAD SHX Text G-302

AutoCAD SHX Text

NON-FOOD SUPPLIES

AutoCAD SHX Text 325.05

AutoCAD SHX Text G-303

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 218.28

AutoCAD SHX Text G-303A

AutoCAD SHX Text

REFRIGERATOR

AutoCAD SHX Text 99.51

AutoCAD SHX Text G-306

AutoCAD SHX Text

TELEPHONE SWITCH GEAR ROOM

AutoCAD SHX Text 1161.79

AutoCAD SHX Text G-144

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 24.58

AutoCAD SHX Text G-148

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text P-1

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text G-147

AutoCAD SHX Text

COMPACTOR RM

AutoCAD SHX Text 230.74

AutoCAD SHX Text P-2

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text S-1

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text S-2

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

SERVICE

AutoCAD SHX Text

LOBBY

AutoCAD SHX Text P-4

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text S-3

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text P-3

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text G-146

AutoCAD SHX Text

MAIL ROOM

AutoCAD SHX Text 661.11

AutoCAD SHX Text G-147A

AutoCAD SHX Text

RECEIVING AREA

AutoCAD SHX Text

CORRIDOR SW 1A

AutoCAD SHX Text G-100

AutoCAD SHX Text

ELIGIBILITY

AutoCAD SHX Text G-501E

AutoCAD SHX Text

TRIAGE

AutoCAD SHX Text G-100B

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text G-521

AutoCAD SHX Text

STABILIZATION ROOM

AutoCAD SHX Text G-501

AutoCAD SHX Text

WAITING ROOM

AutoCAD SHX Text G-501D

AutoCAD SHX Text

TRIAGE

AutoCAD SHX Text P-5

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text S-4

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text G-151

AutoCAD SHX Text

FIRE ALARM CONTROL RM

AutoCAD SHX Text G-149

AutoCAD SHX Text

OXYGEN STOR

AutoCAD SHX Text

STAIR #6

AutoCAD SHX Text 206.93

AutoCAD SHX Text G-150

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

RECEIVING

AutoCAD SHX Text G-152

AutoCAD SHX Text

OXYGEN STOR

AutoCAD SHX Text

CORRIDOR N/C

AutoCAD SHX Text 527.98

AutoCAD SHX Text S-6

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text P-6

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text

DUCT

AutoCAD SHX Text S-5

AutoCAD SHX Text

ELEV.

AutoCAD SHX Text G-153

AutoCAD SHX Text

SECURITY

AutoCAD SHX Text G-409

AutoCAD SHX Text

TOILET

AutoCAD SHX Text 25.59

AutoCAD SHX Text G-160

AutoCAD SHX Text

MORGUE PLATFORM

AutoCAD SHX Text G-405

AutoCAD SHX Text

TREATMENT RM

AutoCAD SHX Text 100.62

AutoCAD SHX Text G-408

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text 108.15

AutoCAD SHX Text G-404

AutoCAD SHX Text

STOR

AutoCAD SHX Text G-159

AutoCAD SHX Text

MORGUE VEST

AutoCAD SHX Text G-403

AutoCAD SHX Text

TREATMENT RM

AutoCAD SHX Text G-155

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G-154

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G-410

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text G-413

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text N.C.C.

AutoCAD SHX Text G-412

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G-414

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text G-415

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text G-417

AutoCAD SHX Text

STAFF LOUNGE

AutoCAD SHX Text

STAIR #5

AutoCAD SHX Text 198.65

AutoCAD SHX Text G-417A

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G-429

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text G-428

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text

CORRIDOR N/W

AutoCAD SHX Text 145.94

AutoCAD SHX Text G-81

AutoCAD SHX Text

SCHEDULING

AutoCAD SHX Text

DEPOSITION

AutoCAD SHX Text

CORRIDOR N/W 1A

AutoCAD SHX Text 926.22

AutoCAD SHX Text G-425

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text G-424

AutoCAD SHX Text

UTILITY

AutoCAD SHX Text G-423A

AutoCAD SHX Text

ISOLATION

AutoCAD SHX Text G-423

AutoCAD SHX Text

STABILIZATION AREA

AutoCAD SHX Text G-157

AutoCAD SHX Text

TOILET

AutoCAD SHX Text G-411

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text G-416

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text G-407

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 102.01

AutoCAD SHX Text G-406

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text 107.39

AutoCAD SHX Text G-402

AutoCAD SHX Text

EXAM RM

AutoCAD SHX Text G-401

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

CLINICAL PHARMACIST

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

EC

AutoCAD SHX Text 1149.73

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text

WC

AutoCAD SHX Text 748.97

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text

VJC

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text A

AutoCAD SHX Text

GI-004

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5 91

FIRST FLOOR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

STAMP

Approved: Project Director

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

259 St. Ives Dr.

Talent, OR 97540

APPROVED BY: DATE:

630A4-16-430

LLJ EHA

3610 LAWSON ROAD JAMESTOWN, NY 14701

(716) 484 - 1366 (716) 484 - 1519 FAX

P TRIOT

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

800 POLY PLACE, BROOKLYN NY 11209

LINEN

CHUTE

TOILET

LOCATION KEY - BUILDING 1

18-01-BK

REV. 0 ISSUED FOR CONSTRUCTION 08/24/22

PLAN

NORTH

FIRST FLOOR LIFE SAFETY AND ICRA PLAN

SCALE: 1/8" = 1'-0"

ENLARGED ICRA PLAN

SCALE: 1/4" = 1'-0"

GENERAL LIFE SAFETY NOTES:

1. NEVER COMPLETELY OBSTRUCT DOORS, CORRIDORS OR PATHWAYS TO

EXITS. PERFORM WORK SO THAT SAFE AND CLEAR PASSAGE IS MAINTAINED

AT ALL TIMES.

2. EXISTING EXITS TO BE MAINTAINED DURING CONSTRUCTION. PROVIDE

TEMPORARY PROTECTION AND TEMPORARY SIGNAGE AS REQUIRED TO

MAINTAIN EGRESS AND SAFE PASSAGE FROM THE BUILDING.

3. PROVIDE TEMPORARY PROTECTION FOR SPACES AND AREAS ABOVE AND

BELOW AREAS OF DEMOLITION TO PROTECT PERSONS FROM PHYSICAL

HAZARD AND BUILDING COMPONENTS, EQUIPMENT, ETC. FROM DAMAGE.

4. PROVIDE TEMPORARY BARRIERS OR PARTITIONS TO PROTECT OCCUPANTS

FROM PHYSICAL HAZARD, NOISE OF ALL DEMOLITION WORK, AND AS

REQUIRED FOR INFECTION CONTROL.

5. PROVIDE DUST CONTROL BARRIERS WHERE SHOWN. ALL WORK LOCATIONS

SHALL BE PROVIDED WITH HEPA AIR SCRUBBER UNITS AND WALK-OFF MATS.

6. THE LOCATION OF CONSTRUCTION DOORS IN CONSTRUCTION BARRIERS TO

BE VERIFIED BY THE CONTRACTOR, WITH PRIOR APPROVAL FROM THE COR.

7. COORDINATE DEMOLITION OF AREAS WITH PHASING PLANS TO CAREFULLY

INTEGRATE WITH EXISTING CONSTRUCTION TO REMAIN FOR EACH PHASE AND

UPON COMPLETION OF FINAL PHASE WITH MINIMAL DISRUPTION OF BUILDING

OPERATIONS.

8. REFER TO SPECIFICATION SECTION 01 35 26, SAFETY REQUIREMENTS AND

ICRA MATRIX, SHEET GI-003, FOR DETAILED INSTRUCTIONS ON LIFE SAFETY

AND ICRA MEASURES.

9. DO NOT IMPAIR EXISTING FIRE PROTECTION SYSTEMS AND COMPONENTS.

COORDINATE ANY TEMPORARY IMPAIRMENTS NECESSARY FOR WORK WITH

COR. PROVIDE FIRE WATCH ACCORDING TO SECTION 01 35 26, SAFETY

REQUIREMENTS, 1.14 FIRE SAFETY FOR ALL NECESSARY IMPAIRMENTS TO

ANY SYSTEM COMPONENTS.

10. REFER TO SHEET GI-002 FOR GENERAL PROJECT NOTES.

11. CONTRACTOR SHALL TEMPORARILY COVER ANY EXISTING EXIT SIGNS WHICH

DIRECT OCCUPANTS TOWARD TEMPORARY DUST CONTROL BARRIERS WHICH

CUT OFF ACCESS TO EXITS. PROVIDE TEMPORARY EXIT SIGNAGE TOWARD

ALTERNATE PATH. COORDINATE ALTERNATE PATH WITH VA COR.

KEYED LIFE SAFETY AND ICRA NOTES:

CLASS II WORK ABOVE ACT SUSPENDED CEILING

CLASS II WORK

CLASS III WORK

CLASS IV WORK

D C

-1

DC-1 DC-1 DC-1 DC-1 DC-1 DC-1 DC-1

3' H

O

LD

DC-1

LEGEND:

WALK-OFF (TACKY) MAT

1-HOUR RATED DUST CONTROL BARRIER,

REFER TO DETAIL 1/GI-006. PROVIDE

SELF-CLOSING 1-HOUR FIRE RATED SOLID

CORE WOOD DOOR IN STEEL FRAME WITH

CLASSROOM LOCK FUNCTION.

PROVIDE ZIP WALL OR OTHER VA APPROVED

PLASTIC DUST CONTROL BARRIER SYSTEM,

COMPLETE WITH ALL REQUIRED MOUNTING

POLES, FOAM SEALS, ZIPPER ENTRANCE

DOORS, ETC.. SEAL ENTIRE PERIMETER AT

WALLS, CEILING AND FLOOR.

EXISTING 2 HOUR FIRE BARRIER

EGRESS PATH

DC-1

DC-2

AutoCAD SHX Text

DENTAL LOBBY

AutoCAD SHX Text 1-521

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text 154.04

AutoCAD SHX Text 1-522

AutoCAD SHX Text

F.TOILET

AutoCAD SHX Text 162.40

AutoCAD SHX Text 1-523

AutoCAD SHX Text

OFFICE DAV

AutoCAD SHX Text 175.80

AutoCAD SHX Text 1-502

AutoCAD SHX Text

DATA. CL.

AutoCAD SHX Text 63.01

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

SEC/CLERICAL

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text

CHIEFS

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

ATM

AutoCAD SHX Text

PNEUMATIC

AutoCAD SHX Text

TUBE

AutoCAD SHX Text 1-406

AutoCAD SHX Text

OR.SURGERY

AutoCAD SHX Text 184.59

AutoCAD SHX Text 1-409A

AutoCAD SHX Text

STAIRWAY 5

AutoCAD SHX Text 175.43

AutoCAD SHX Text 1-406A

AutoCAD SHX Text

STER. RM

AutoCAD SHX Text 99.25

AutoCAD SHX Text 1-402

AutoCAD SHX Text

CHIEF.OFF.

AutoCAD SHX Text 139.10

AutoCAD SHX Text 1-409

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 167.15

AutoCAD SHX Text 1-403

AutoCAD SHX Text

X-RAY

AutoCAD SHX Text 198.07

AutoCAD SHX Text 1-401A

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 9.88

AutoCAD SHX Text 1-402A

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 26.92

AutoCAD SHX Text 1-401

AutoCAD SHX Text

SEC. OFF.

AutoCAD SHX Text 199.31

AutoCAD SHX Text 1-113

AutoCAD SHX Text

VESTIBULE

AutoCAD SHX Text 42.16

AutoCAD SHX Text 113A

AutoCAD SHX Text

CL CANTEEN

AutoCAD SHX Text 102.90

AutoCAD SHX Text 1-403A

AutoCAD SHX Text

DARK RM.

AutoCAD SHX Text 90.57

AutoCAD SHX Text 1-405

AutoCAD SHX Text H.A.C.

AutoCAD SHX Text 24.42

AutoCAD SHX Text 1-404

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 20.47

AutoCAD SHX Text 1-400A

AutoCAD SHX Text

DENWAITING

AutoCAD SHX Text 1,223.98

AutoCAD SHX Text 1-407

AutoCAD SHX Text

OR.SURGERY

AutoCAD SHX Text 50.07

AutoCAD SHX Text 1-408

AutoCAD SHX Text

OR.SURGERY

AutoCAD SHX Text 197.76

AutoCAD SHX Text 1-109

AutoCAD SHX Text

SALES/DIN.

AutoCAD SHX Text 430.23

AutoCAD SHX Text 1-301

AutoCAD SHX Text

ALOVE

AutoCAD SHX Text 27.51

AutoCAD SHX Text 1-301A

AutoCAD SHX Text

MEN TOILET

AutoCAD SHX Text 120.85

AutoCAD SHX Text 1-302

AutoCAD SHX Text

JAN CLOSET

AutoCAD SHX Text 24.52

AutoCAD SHX Text 1-303

AutoCAD SHX Text

ALOVE

AutoCAD SHX Text 40.60

AutoCAD SHX Text 1-303A

AutoCAD SHX Text

F.TOILET

AutoCAD SHX Text 140.64

AutoCAD SHX Text 1-303B

AutoCAD SHX Text

DININGAREA

AutoCAD SHX Text 1,864.71

AutoCAD SHX Text 1-308

AutoCAD SHX Text

DININGAREA

AutoCAD SHX Text 1,477.33

AutoCAD SHX Text 1-310

AutoCAD SHX Text

STORAGE

AutoCAD SHX Text 99.23

AutoCAD SHX Text 1-309

AutoCAD SHX Text

PIZZA PL.

AutoCAD SHX Text 286.83

AutoCAD SHX Text

SC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 486.80

AutoCAD SHX Text 1-102

AutoCAD SHX Text

CANTEEN

AutoCAD SHX Text 217.54

AutoCAD SHX Text 1-102A

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 30.52

AutoCAD SHX Text

SW 1

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 783.46

AutoCAD SHX Text 1-310A

AutoCAD SHX Text

ELEV.LOBBY

AutoCAD SHX Text 415.61

AutoCAD SHX Text 1-103A

AutoCAD SHX Text

PLUMBSHAFT

AutoCAD SHX Text 46.07

AutoCAD SHX Text 1-103B

AutoCAD SHX Text

STAIRWAY 3

AutoCAD SHX Text 132.33

AutoCAD SHX Text 1-103

AutoCAD SHX Text

F.TOILET

AutoCAD SHX Text 28.36

AutoCAD SHX Text 1-104

AutoCAD SHX Text

MEN TOILET

AutoCAD SHX Text 26.84

AutoCAD SHX Text

EC

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 932.04

AutoCAD SHX Text 1-105

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text 1-106

AutoCAD SHX Text

RET. ST CL

AutoCAD SHX Text 167.97

AutoCAD SHX Text 1-106A

AutoCAD SHX Text

STAIRWAY 6

AutoCAD SHX Text 191.58

AutoCAD SHX Text 1-108

AutoCAD SHX Text

MEN TOILET

AutoCAD SHX Text 81.52

AutoCAD SHX Text 1-107

AutoCAD SHX Text

F.TOILET

AutoCAD SHX Text 38.85

AutoCAD SHX Text N/G

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 157.94

AutoCAD SHX Text S/C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 116.02

AutoCAD SHX Text 1-110A

AutoCAD SHX Text 259.83

AutoCAD SHX Text 1-110B

AutoCAD SHX Text

CR. UNION

AutoCAD SHX Text 169.04

AutoCAD SHX Text 1-110

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 248.41

AutoCAD SHX Text 1-110C

AutoCAD SHX Text

CR. UNION

AutoCAD SHX Text 232.06

AutoCAD SHX Text 147.65

AutoCAD SHX Text 248.85

AutoCAD SHX Text 1-112

AutoCAD SHX Text

RETAIL ST.

AutoCAD SHX Text 1,428.72

AutoCAD SHX Text 1-112A

AutoCAD SHX Text

RET. ST CL

AutoCAD SHX Text 34.09

AutoCAD SHX Text E/C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 1,462.70

AutoCAD SHX Text 1-101A

AutoCAD SHX Text

MED. REC.

AutoCAD SHX Text 715.42

AutoCAD SHX Text 1-225

AutoCAD SHX Text

MED. REC.

AutoCAD SHX Text 142.87

AutoCAD SHX Text 1-202

AutoCAD SHX Text

SOCIAL WK

AutoCAD SHX Text 193.81

AutoCAD SHX Text 1-201

AutoCAD SHX Text S.W.S.

AutoCAD SHX Text 80.55

AutoCAD SHX Text 1-203

AutoCAD SHX Text

SOCIAL WK

AutoCAD SHX Text 402.32

AutoCAD SHX Text

WAITING RM

AutoCAD SHX Text 1-501

AutoCAD SHX Text

COMPENSATION

AutoCAD SHX Text 175.80

AutoCAD SHX Text

OFFICE DAV

AutoCAD SHX Text 1-523

AutoCAD SHX Text

POLICE

AutoCAD SHX Text

RECEPTION

AutoCAD SHX Text

INVESTIGATIONS

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

POLICE

AutoCAD SHX Text

CHIEF OFFICE

AutoCAD SHX Text

LOCKER RM

AutoCAD SHX Text

LOCKER RM

AutoCAD SHX Text

COURT

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

CONFERENCE RM

AutoCAD SHX Text

OFFICER

AutoCAD SHX Text

FIREARMS

AutoCAD SHX Text

TRAINING

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

LIEUTENANT

AutoCAD SHX Text

OFFICE

AutoCAD SHX Text

POLICE

AutoCAD SHX Text

TRAINING ROOM

AutoCAD SHX Text

CHIEF, ER

AutoCAD SHX Text 1-101

AutoCAD SHX Text S-1

AutoCAD SHX Text

ELEV

AutoCAD SHX Text P-5

AutoCAD SHX Text

ELEV

AutoCAD SHX Text P-4

AutoCAD SHX Text

ELEV

AutoCAD SHX Text S-2

AutoCAD SHX Text

ELEV

AutoCAD SHX Text S-3

AutoCAD SHX Text

ELEV

AutoCAD SHX Text P-3

AutoCAD SHX Text

ELEV

AutoCAD SHX Text P-2

AutoCAD SHX Text

ELEV

AutoCAD SHX Text S-4

AutoCAD SHX Text

ELEV

AutoCAD SHX Text P-1

AutoCAD SHX Text

ELEV

AutoCAD SHX Text 1-115

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 1-105

AutoCAD SHX Text

ELECTRICAL

AutoCAD SHX Text S/C

AutoCAD SHX Text

CORRIDOR

AutoCAD SHX Text 116.02

AutoCAD SHX Text P-1

AutoCAD SHX Text

ELEV

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text

VJC

AutoCAD SHX Text 08/24/2022

AutoCAD SHX Text A

AutoCAD SHX Text

GI-005

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

6 91

SECOND - SIXTEENTH FLOORS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

VA FORM 08 - 6231

STAMP

Approved: Project Director

Dwg. ofRevisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

on e ei gh th in ch o ne fo ot

B

A

C

D

E

F th re e in ch es o ne fo ot 6"

6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot

6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r i nc h on e fo ot

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Office of Construction and Facilities Management

259 St. Ives Dr.

Talent, OR 97540

APPROVED BY: DATE:

630A4-16-430

LLJ EHA

3610 LAWSON ROAD JAMESTOWN, NY 14701

(716) 484 - 1366 (716) 484 - 1519 FAX

P TRIOT

NY HARBOR HEALTHCARE CENTER

VA BROOKLYN CAMPUS

800 POLY PLACE, BROOKLYN…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .