Attachment_B_Drawings.pdf
PDF 12 MB Posted
- Solicitation number
- 140P8323Q0048
About this file
This file attachment relates to a federal solicitation from the National Park Service Pacific West Region to rehabilitate RV dump stations at Olympic National Park. The solicitation number is 140P8323Q0048 and seeks to rehabilitate RV dump stations through repairs and replacement of infrastructure including plumbing and drainage systems, installation of new concrete pads and asphalt pavement, and ADA accessibility upgrades. Responses are due by the date listed on SAM.gov and the contract award date will also be posted to SAM.gov. Products and services must meet specification requirements and work must be completed within the performance period defined in the final contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_D_Forms_to_Return_with_Quote.docx | DOCX document | |
| Attachment_A_Specifications.pdf | ||
| Sol_140P8323Q0048.pdf | ||
| Attachment_C_DOL_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET SUB SHEET TITLE OF SHEET
1 G0 COVER SHEET
2 G1 GENERAL NOTES
3 G2 VICINITY MAP – FAIRHOLM CAMPGROUND
4 G3 EXISTING CONDITIONS – FAIRHOLM
5 G4 VICINITY MAP – SOL DUC CAMPGROUND
6 G5 EXISTING CONDITIONS – SOL DUC
7 G6 VICINITY MAP – MORA CAMPGROUND
8 G7 EXISTING CONDITIONS – MORA
9 G8 VICINITY MAP – KALALOCH CAMPGROUND
10 G9 EXISTING CONDITIONS – KALALOCH
11 D1 VICINITY MAP – HOH RAIN FOREST CAMPGROUND
12 D2 EXISTING CONDITIONS – HOH RAIN FOREST
13 C1 WATER DETAILS
14 C2 TRENCH DETAILS
15 C3 WASTEWATER DETAILS
16 C4 SIGNAGE DETAILS
17 C5 BOLLARD DETAILS
18 C6 SITE PLAN – FAIRHOLM CAMPGROUND
19 C7 SITE PLAN – SOL DUC CAMPGROUND
20 C8 SITE PLAN – MORA CAMPGROUND
21 C9 SITE PLAN – KALALOCH CAMPGROUND
UNITED STATES
DEPARTMENT OF THE INTERIOR
TITLE OF PROJECT
REHABILITATE RV DUMP STATIONS
DRAWING NO.
_149_
189,732
NATIONAL PARK SERVICE
OLYMPIC NATIONAL PARK
LOCATION WITHIN PARK
FAIRHOLM, SOL DUC, MORA, KALALOCH, HOH
PMIS/PKG NO.
237531
REGION COUNTY STATE
PACIFIC WEST CLALLAM/JEFFERSON WASHINGTON
SHEET
_1_ OF _21_
GENERAL NOTES
1. ALL CONSTRUCTION SHALL BE IN CONFORMANCE WITH NPS STANDARDS AND
THE REQUIREMENTS OF CHAPTER 246-290 WASHINGTON ADMINISTRATIVE
CODE (GROUP A PUBLIC WATER SUPPLIES), IN ADDITION TO OTHER STATE
AND LOCAL STANDARDS. MAINTAIN AT LEAST 10-FOOT HORIZONTAL
SEPARATION BETWEEN WATER AND SEWER LINES OR PROVIDE SLEEVE
PROTECTION FOR NEW WORK.
2. CONTRACTOR SHALL CONTACT DIG ALERT AND FIELD VERIFY ALL UTILITIES
PRIOR TO EXCAVATION. DIAL 811 BEFORE YOU DIG. CONDUCT PRIVATE
LOCATE AT ALL SITES.
3. DIMENSIONS SHOWN ON PLANS ARE TO BE USED BY CONTRACTOR TO
DETERMINE APPROXIMATE FIELD CONDITIONS. PRIOR TO CONSTRUCTION,
CONTRACTOR SHALL FIELD VERIFY EXISTING LOCATIONS, ELEVATIONS,
MATERIAL TYPES, DIAMETER OF PIPES, ETC. OF ALL UTILITIES AND FEATURES
WHERE PROPOSED IMPROVEMENTS CONNECT. NOTIFY CONTRACTING
OFFICER OF ANY DISCREPANCIES IN WRITING.
4. EXISTING FACILITIES, INCLUDING BUT NOT LIMITED TO ROADS, SIDEWALKS,
STRUCTURES AND UTILITIES, DAMAGED BY CONTRACTOR’S OPERATIONS
SHALL BE RESTORED TO MATCH ORIGINAL PRE-CONSTRUCTION CONDITION
AND TO THE SATISFACTION OF THE CONTRACTING OFFICER WITHOUT
ADDITIONAL COST TO THE GOVERNMENT.
5. ALL DISTURBED ASPHALT, GRASS, DRAINAGE PATTERNS, ROADSIDE DITCHES,
TRAILS AND GRADE SHALL BE RESTORED TO ITS ORIGINAL CONDITION OR AS
CALLED FOR IN THE CONTRACT DOCUMENTS, WHICHEVER IS MORE
STRINGENT.
6. CONTRACTOR SHALL FURNISH AND INSTALL EVERYTHING REQUIRED TO
PROVIDE COMPLETE AND OPERABLE FACILITIES AS SHOWN HEREIN. IF THERE
IS AN OMISSION ON THE CONSTRUCTION DOCUMENTS, SUCH OMISSION
SHALL NOT BE CONSTRUED TO MEAN THAT THE CONTRACTOR IS NOT
REQUIRED TO FURNISH OR PROVIDE EVERYTHING THAT IS NECESSARY TO
PROVIDE COMPLETE AND OPERABLE FACILITIES.
7. ALL CONTRACTORS WORKING WITH THE PROJECT BOUNDARIES ARE
RESPONSIBLE FOR COMPLIANCE WITH ALL APPLICABLE SAFETY LAWS.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL EMPLOYEES AND/OR
SUBCONTRACTORS WITH PERSONAL PROTECTIVE EQUIPMENT AND
FOLLOWING ALL SAFETY PROTOCOLS.
8. CONTRACTOR SHALL PROVIDE TRACER WIRE AND LOCATOR TAPE FOR ALL
BURIED PIPE AND CONDUITS.
9. ALL COSTS INCURRED IN CORRECTION OF DEFICIENT WORK SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
10. CONSTRUCTION FENCING OR BARRIERS SHALL BE PROVIDED WHERE
NECESSARY, INCLUDING AROUND OPEN EXCAVATIONS WHEN WORK IS NOT
ACTIVELY IN PROGRESS, TO PREVENT THE PUBLIC FROM ENTERING WORK
AREAS.
11. UNLESS OTHERWISE INDICATED, DEMOLISHED MATERIALS BECOME THE
PROPERTY OF THE CONTRACTOR. COMPLY WITH EPA REGULATIONS AND
DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.
12. MINIMIZE CONSTRUCTION IMPACTS TO SOILS, WATER, PLANTS, AND
ANIMALS, AND OTHER NATURAL RESOURCES DURING CONSTRUCTION.
CONFINE CONSTRUCTION OPERATIONS TO MINIMUM PRACTICAL AREA. IN NO
CASE SHALL CONSTRUCTION OPERATIONS EXTEND BEYOND LIMITS OF
CONSTRUCTION INDICATED WITHOUT PRIOR APPROVAL BY THE
CONTRACTING OFFICER.
13. CONDUCT ALL OPERATIONS IN ACCORDANCE WITH APPROVED, CONTRACTOR-
PREPARED UNDER-AN-ACRE POLLUTION PREVENTION PLAN (UPPP).
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
GENERAL NOTES
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G1 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH, HOH
OLYMPIC NATIONAL PARK
_2_ OF _21_
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G2
FAIRHOLM CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
LAKE CRESCENT, WA
OLYMPIC NATIONAL PARK
SHEET
_3_ OF _21_
Water service valve
Septic tank
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G3
FAIRHOLM CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
LAKE CRESCENT, WA
OLYMPIC NATIONAL PARK
_4_ OF _21_
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G4
SOL DUC HOT SPRINGS CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
SOL DUC, WA
OLYMPIC NATIONAL PARK
SHEET
_5_ OF _21_
Water service valve Septic tank
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G5
SOL DUC HOT SPRINGS CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
SOL DUC, WA
OLYMPIC NATIONAL PARK
_6_ OF _21_
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G6
MORA CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
MORA, WA
OLYMPIC NATIONAL PARK
SHEET
_7_ OF _21_
Water service valve
Septic tank
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G7
MORA CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
MORA, WA
OLYMPIC NATIONAL PARK
_8_ OF _21_
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G8
KALALOCH CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
KALALOCH, WA
OLYMPIC NATIONAL PARK
SHEET
_9_ OF _21_
Water service valve Gravity sewer manhole
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK G9
KALALOCH CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
KALALOCH, WA
OLYMPIC NATIONAL PARK
_10_ OF _21_
SUB SHEET NO. TITLE OF SHEET
VICINITY MAP
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK D1
HOH RAIN FOREST CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
SHEET
_11_ OF _21_
Water service valve
Electrical service panel
Septic tank
DEMOLITION NOTES:
1. REMOVE ALL ABOVE-GROUND APPURTENANCES INCLUDING RV RINSE AND POTABLE
WATER TOWERS, PEDESTALS, SIGNAGE, CONCRETE CURBING, AND ELECTRICAL
CONTROL PANEL WITH VENTING FOR SEPTIC TANK AERATION
2. PUMP SEPTAGE FROM SEPTIC TANK, REMOVE RISERS/LIDS, AND CRUSH/BACKFILL
5000-GALLON FIBERGLASS TANK WITH NATIVE MATERIAL
3. CUT/CAP ABANDONED WATER AND SEWER LINES, DISCONNECT ELECTRICAL POWER
4. RE-GRADE DISTURBED AREA AND RESTORE WITH GRAVEL FOR ADDITIONAL
OVERFLOW PARKING
SUB SHEET NO. TITLE OF SHEET
EXISTING CONDITIONS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK D2
HOH RAIN FOREST CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
HOH RAIN FOREST, WA
OLYMPIC NATIONAL PARK
_12_ OF _21_
FIBERGLASS FLIP TOP ENCLOSURE
(N.T.S.)
DESIGNED:
K. COOK
SUB SHEET NO. TITLE OF SHEET
WATER DETAILS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C1 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH
OLYMPIC NATIONAL PARK
SHEET
_13_ OF _21_
RPBA INSTALLATION
(N.T.S.)
FREEZEPROOF WATER TOWER
(N.T.S.)
GENERAL WATER NOTES
1. POTABLE WATER TOWER SHALL BE BLUE; NON-POTABLE RINSE DOWN TOWER SHALL
BE RED OR GREEN.
2. ALL PIPING AND FITTINGS TO RPBA SHALL BE COPPER OR BRASS UNLESS OTHERWISE
NOTED.
3. ALL FITTINGS AND ADAPTERS SHALL BE DIELECTRIC IF SERVICE PIPE IS NOT PLASTIC.
4. ALL PIPE PENETRATIONS THROUGH CONCRETE SHALL BE SLEEVED.
5. ATTACH DRINKING WATER SIGN TO BLUE POTABLE WATER TOWER.
FIBERGLASS ASSE 1060
CLASS II ENCLOSURE,
HUBBELL HOT BOX OR
APPROVED EQUAL
LEAD FREE BRONZE “Y”
STRAINER, SUPPLIED BY
MANUFACTURER
REDUCED PRESSURE
BACKFLOW ASSEMBLY,
1” ZURN 975XL2 OR
APPROVED EQUAL
4” MIN CONCRETE SLAB
(9” LARGER THAN
ENCLOSURE EXTERIOR
DIMENSION) ON
4” MIN GRAVEL BASE
18”
ANCHOR
BOLTS
¾“ MALE PIPE THREAD
SUPPLY LINE TO WATER
TOWER PIPING
ASSEMBLY
2 3
SUB SHEET NO. TITLE OF SHEET
TRENCH DETAILS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C2 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH
OLYMPIC NATIONAL PARK
SHEET
_14_ OF _21_
NOTES
1. PIPE ZONE BEDDING PER PROJECT
SPECIFICATIONS.
2. USE OF NATIVE MATERIAL FOR
BACKFILL MAY BE APPROVED BY THE
CONTRACTING OFFICER. WHERE
NATIVE MATERIAL IS NOT APPROVED,
BACKFILL MATERIAL SHALL CONFORM
WITH PROJECT SPECIFICATIONS.
3. SAWCUT BOTH SIDES BACK TO
UNDISTURBED PAVEMENT. SQUARE
ALL EDGES AND TACK PRIOR TO
PAVING. SEAL ALL JOINTS WITH
LIQUID ASPHALT AFTER PAVING.
COVER IMMEDIATELY WITH SAND.
4. HDPE PIPE SHALL REQUIRE INSULATED
METALLIC LOCATING TRACER WIRE
(14 GAUGE COPPER) CAPABLE OF
DETECTION BY A CABLE LOCATOR.
NOTES
1. PIPE ZONE BEDDING PER
PROJECT SPECIFICATIONS.
2. USE OF NATIVE MATERIAL FOR
BACKFILL MAY BE APPROVED
BY THE CONTRACTING
OFFICER. WHERE NATIVE
MATERIAL IS NOT APPROVED,
BACKFILL MATERIAL SHALL
CONFORM WITH PROJECT
SPECIFICATIONS.
3. HDPE PIPE SHALL REQUIRE
INSULATED METALLIC
LOCATING TRACER WIRE (14
GAUGE COPPER) CAPABLE OF
DETECTION BY A CABLE
LOCATOR.
2’ MIN
MAX TRENCH
OPENING
SHALL NOT
EXCEED 30”
MAX TRENCH
OPENING
SHALL NOT
EXCEED 30”
SUB SHEET NO. TITLE OF SHEET
WASTEWATER DETAILS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C3 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH
OLYMPIC NATIONAL PARK
SHEET
_15_ OF _21_
10.0’
0.5’
SLOPE 2% MIN – 5% MAX
R2.5’
R1.0’
9.5’
4.5’
WATER TOWER
MOUNTING BASE
1.0’ X 1.0’
CONCRETE CLASS 4000,
SLOPED APRON 6” THICK
#4 REBAR @ 18” MAX OC
2” MIN CLR ON EDGES
3” MIN CLR ON BOTTOM
RV DUMP STATION PLAN
(N.T.S.)
DUMP STATION
SIGNAGE SLEEVE
RV DUMP DRAIN SECTION
(N.T.S.)
4” SANITARY HATCH
(N.T.S.)
GENERAL NOTES
1. 4” SANITARY HATCH SHALL BE LOCKABLE, OPW 269 OR APPROVED EQUAL.
2. ALL PIPE AND CONDUIT PENETRATIONS THROUGH CONCRETE TO BE SLEEVED.
3. INSTALL 6” CRUSHED SURFACING BASE COURSE BENEATH ALL NEW SITE CONCRETE.
R1.0” 0.5’
R1.0”
0.5’
#4 REBAR ALONG TOP
PERIMETER OF ISLAND
2” CLR (TYP)
RV DUMP SIGNAGE
(N.T.S.)
_1_ C4
DUMP STATION
SIGNAGE
_2_ C4
SUB SHEET NO. TITLE OF SHEET
SIGNAGE DETAILS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C4 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH
OLYMPIC NATIONAL PARK
SHEET
_16_ OF _21_
GENERAL SIGN NOTES
1. ALL SIGNS SHALL COMPLY WITH U.S. DEPARTMENT OF TRANSPORTATION, FEDERAL HIGHWAY ADMINISTRATION’S “MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES”, WASHINGTON STATE DEPARTMENT
OF TRANSPORTATION’S SIGN FABRICATION MANUAL, LOCAL CODES, AND AS SPECIFIED.
2. REFER TO WSDOT STANDARD DETAIL G-24.40-07 FOR SINGLE POST SIGN MOUNTING AND POST INSTALLATION.
3. INSTALL TAMPER RESISTANT FASTENERS AND MOUNTING SYSTEMS ON ALL SIGNS.
SUB SHEET NO. TITLE OF SHEET
BOLLARD DETAILS
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C5 REHABILITATE RV DUMP STATIONS
PMIS/PKG NO.
237531
DATE:
2/2023
FAIRHOLM, SOL DUC, MORA, KALALOCH
OLYMPIC NATIONAL PARK
SHEET
_17_ OF _21_
4” SCH40
CONCRETE-FILLED
STEEL PIPE
42.5”
SLIDE-THROUGH
LAG ANCHOR
52.5”
SUB SHEET NO. TITLE OF SHEET
SITE PLAN
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C6
FAIRHOLM CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
LAKE CRESCENT, WA
OLYMPIC NATIONAL PARK
SHEET
_18_ OF _21_
KEYNOTES:
1. REPLACE RV DUMP RINSE TOWER
2. REPLACE POTABLE WATER TOWER
3. INSTALL BACKFLOW ASSEMBLIES WITH INSULATED FIBERGLASS
ENCLOSURES
4. INSTALL PROTECTIVE BOLLARDS (7 EA)
5. REPLACE WATER VALVE
6. REPLACE WATER LINE TO TOWERS
7. REPLACE CONCRETE DUMP PAD WITH CURBING AND SANITARY
DRAIN HATCH
8. INSTALL SIGNAGE
9. PATCH/REPAIR ASPHALT SURFACING
EXISTING
VALVE
VAULT
EXTEND ~3’ AND
CONNECT NEW
SANITARY HATCH TO
GRAVITY SEWER
EXISTING
GRAVITY
SEWER LINE
TO SEPTIC
40’ SEPARATION
BETWEEN SANITARY
HATCH AND POTABLE
WATER TOWER
EXISTING
ACCESS
ROAD
SUB SHEET NO. TITLE OF SHEET
SITE PLAN
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C7
SOL DUC HOT SPRINGS CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
SOL DUC, WA
OLYMPIC NATIONAL PARK
SHEET
_19_ OF _21_
KEYNOTES:
1. REPLACE RV DUMP RINSE TOWER
2. REPLACE POTABLE WATER TOWER
3. INSTALL BACKFLOW ASSEMBLIES WITH INSULATED FIBERGLASS
ENCLOSURES
4. INSTALL PROTECTIVE BOLLARDS (3 EA)
5. CONNECT TO EXISTING WATER LINE (NO VALVE REPLACEMENT)
6. REPLACE WATER LINE TO TOWERS
7. REPLACE CONCRETE DUMP PAD WITH CURBING AND SANITARY
DRAIN HATCH
8. INSTALL SIGNAGE
9. PATCH/REPAIR ASPHALT SURFACING
EXISTING
WATER
LINE
CONNECT NEW
SANITARY HATCH TO
GRAVITY SEWER
EXISTING
GRAVITY
SEWER LINE &
SEPTIC TANK
40’ SEPARATION
BETWEEN SANITARY
HATCH AND POTABLE
WATER TOWER
3 6
EXISTING
ACCESS
SUB SHEET NO. TITLE OF SHEET
SITE PLAN
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C8
MORA CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
MORA, WA
OLYMPIC NATIONAL PARK
SHEET
_20_ OF _21_
KEYNOTES:
1. REPLACE RV DUMP RINSE TOWER
2. REPLACE POTABLE WATER TOWER
3. INSTALL BACKFLOW ASSEMBLIES WITH INSULATED FIBERGLASS
ENCLOSURES
4. INSTALL PROTECTIVE BOLLARDS (7 EA)
5. REPLACE WATER VALVE
6. REPLACE WATER LINE TO TOWERS
7. REPLACE CONCRETE DUMP PAD WITH CURBING AND SANITARY
DRAIN HATCH
8. INSTALL SIGNAGE
9. PATCH/REPAIR ASPHALT SURFACING
EXISTING
VALVE
VAULT
EXTEND ~3’ AND
CONNECT NEW
SANITARY HATCH TO
GRAVITY SEWER
EXISTING
GRAVITY
SEWER LINE
TO SEPTIC
40’ SEPARATION
BETWEEN SANITARY
HATCH AND POTABLE
WATER TOWER
EXISTING
ACCESS
SUB SHEET NO. TITLE OF SHEET
SITE PLAN
DRAWING NO.
_149_
189,732
TECH REVIEW:
L. TURECEK C9
KALALOCH CAMPGROUND
RV DUMP STATION
PMIS/PKG NO.
237531
DATE:
2/2023
KALALOCH, WA
OLYMPIC NATIONAL PARK
SHEET
_21_ OF _21_
KEYNOTES:
1. REPLACE RV DUMP RINSE TOWER
2. REPLACE POTABLE WATER TOWER
3. INSTALL BACKFLOW ASSEMBLIES WITH INSULATED FIBERGLASS
ENCLOSURES
4. INSTALL PROTECTIVE BOLLARDS (3 EA)
5. REPLACE WATER VALVE
6. REPLACE WATER LINE TO TOWERS
7. REPLACE CONCRETE DUMP PAD WITH CURBING AND SANITARY
DRAIN HATCH
8. INSTALL SIGNAGE
9. PATCH/REPAIR ASPHALT SURFACING
EXISTING
VALVE
VAULT
REMOVE ~3’ AND
CONNECT NEW
SANITARY HATCH TO
GRAVITY SEWER
EXISTING
GRAVITY
SEWER LINE
TO MANHOLE
1 2
40’ SEPARATION
BETWEEN SANITARY
HATCH AND POTABLE
WATER TOWER
3 6
EXISTING
ACCESS
ROAD
10’ 10’ 20’
EXISTING
WATER MAIN
& VALVE
| Slide Number 1 |
| GENERAL NOTES |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| Slide Number 15 |
| Slide Number 16 |
| Slide Number 17 |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
File details come from the government source that posted it. Updated .